36C25719Q0712-0001000.docx

DOCX document 19 KB Posted

Attached to
NEW-Kitchen Turnkey for Temple/Waco (VA-19-00049694)
Solicitation number
36C25719Q0712
Issued by

About this file

36C25719Q0712 0001 36C25719Q0712 0001_1.docx

View the file

Other files

File Type Posted
36C25719Q0712-0001007.pdf PDF
36C25719Q0712-0001006.docx DOCX document
36C25719Q0712-0001001.pdf PDF
36C25719Q0712-001.docx DOCX document
36C25719Q0712-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05-23-2019 36C257-19-Q-0712 674-19-3-3485-0017 Department of Veterans Affairs VISN17 Network Contracting Activity 7400 Merton Minter Blvd. (10N17/90C) San Antonio

TX

78229 Department of Veterans Affairs VISN17 Network Contracting Activity 7400 Merton Minter Blvd. (10N17/90C) San Antonio

TX

78229 To all Offerors/Bidders

36C25719Q0712 05-23-2019

X

See CONTINUATION Page The purpose of this modification is to add additional information from the site visit.

All interested parties shall only contact Dr. Ervin via email no later than 07 Jun 2019 by 4 P.M. C.S.T.

Dr. Vinicky Ann Ervin Ph.D.

vinicky.ervin@va.gov

See attached document: BUILDING 202 0017.

CONTINUATION PAGE

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
EA
__________________
__________________

WACO BLDG 202 DISH MACHINE W/SCRAPPING STATION ROLLER REPLACEMENT Turnkey job that will require removal and demolition of existing equipment and all installation and hook-ups of new equipment, including any repairs needed to floor or walls as a result of the demolition/installation. It is turnkey but not limited to connection of all utility lines, breaker, and piping associated with the new machine and scrapping station. LOW-ENERGY FLIGHT TYPE DISH MACHINE WITH STEAM AND BLOWER DYER a. 1-year parts and labor warranty b. Water usage 58 gallons per hour c. digital controls with machine diagnostics d. low temperature alert e. start and stop switch at both ends f. doors open indicator g. drain open indicator h. 3 1/2 H. P. prewash, power wash, and power rinse pump motors i. Capless auto clean wash arms j. removable stainless-steel scrap pans and baskets k. 30" wide conveyor belt l. dual rinse m. auto clean n. auto delime o. front and rear panels p. variable speed conveyor q. steam booster heater r. steam blower dryer s. right to left operation with right side being nearest existing pulper. t. automatic soil removal system u. 480/60/3 phase

LOCAL STOCK NUMBER: FT1000E=ENERGY

1.00
EA
__________________
__________________

SITE VISTS (2) a. Initial site visit prior to bid to verify all existing conditions, devices, equipment, dimensions, location, power cable, steam, hot water, cold water, drain route, measurements and areas provided in scope of work b. Second site visit for dish machine removal, demolition, and installation and is to be completed within ten calendar days of start date. This site visit also involves install of new rollers for existing scrapping station.

1.00
EA
__________________
__________________

SCRAPPING STATION ROLLERS Scrapping station rollers to consist of solid, steel, lightweight gravity stub rollers that are easily cleanable for entire length of soiled scrapping station with 1/2"- 3/4" clearance between rollers. a. Gravity rollers to extend to the load end of the dish machine b. Gravity rollers to be 21 ?" long

1.00
EA
__________________
__________________

ADDITIONAL ITEMS a. Repair any damage to floors, walls, and ceilings that occurs during demolition or installation. b. Must have a commercial kitchen equipment business that has operated continuously for the past five (5) years and have accomplished similar work in the removal and installation of dish machine and scrapping station units for a minimum of three (3) years.

GRAND TOTAL
__________________

A.2 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE

1.00

1.00

1.00

1.00

File details come from the government source that posted it.