36C25719Q0712-000.docx
DOCX document 138 KB Posted
- Solicitation number
- 36C25719Q0712
About this file
36C25719Q0712 36C25719Q0712.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25719Q0712-0001007.pdf | ||
| 36C25719Q0712-0001006.docx | DOCX document | |
| 36C25719Q0712-0001001.pdf | ||
| 36C25719Q0712-0001000.docx | DOCX document | |
| 36C25719Q0712-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Combined Synopsis/Solicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Combined Synopsis/Solicitation Notice Rev. March 2010 NEW-Kitchen Turnkey for Temple/Waco (VA-19-00049694) Site Visit Monday May 13, 2019 at 1PM - 3PM CST 78229 36C25719Q0712 05-24-2019 N 333318 Department of Veterans Affairs VISN17 Network Contracting Activity 7400 Merton Minter Blvd. (10N17/90C) San Antonio TX 78229 Contract Specialist: Dr. Vinicky Ann Ervin Ph.D.
All interested parties shall only contact Dr.Ervin via email no later than May 24, 2019 by 4 P.M. C.S.T.
Central Texas Veterans Healthcare System Nutrition and Food Services 4800 Memorial Drive Bldg 202 Waco, Texas 76711
USA
vinicky.ervin@va.gov Business Site Visit Date: Monday May 13, 2019 @ 1 P.M. to 3 P.M. CST POC Brittany.Zaring@va.gov at (254)743-0634
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| EA |
| $00.00 |
| $00.00 |
WACO BLDG 202 DISH MACHINE W/SCRAPPING STATION ROLLER REPLACEMENT Turnkey job that will require removal and demolition of existing equipment and all installation and hook-ups of new equipment, including any repairs needed to floor or walls as a result of the demolition/installation. It is turnkey but not limited to connection of all utility lines, breaker, and piping associated with the new machine and scrapping station. LOW-ENERGY FLIGHT TYPE DISH MACHINE WITH STEAM AND BLOWER DYER a. 1-year parts and labor warranty b. Water usage 58 gallons per hour c. digital controls with machine diagnostics d. low temperature alert e. start and stop switch at both ends f. doors open indicator g. drain open indicator h. 3 1/2 H. P. prewash, power wash, and power rinse pump motors i. Capless auto clean wash arms j. removable stainless-steel scrap pans and baskets k. 30" wide conveyor belt l. dual rinse m. auto clean n. auto delime o. front and rear panels p. variable speed conveyor q. steam booster heater r. steam blower dryer s. right to left operation with right side being nearest existing pulper. t. automatic soil removal system u. 480/60/3 phase
LOCAL STOCK NUMBER: FT1000E=ENERGY
| 1.00 |
| EA |
| $00.00 |
| $00.00 |
SITE VISTS (2) a. Initial site visit prior to bid to verify all existing conditions, devices, equipment, dimensions, location, power cable, steam, hot water, cold water, drain route, measurements and areas provided in scope of work b. Second site visit for dish machine removal, demolition, and installation and is to be completed within ten calendar days of start date. This site visit also involves install of new rollers for existing scrapping station.
| 1.00 |
| EA |
| $00.0000 |
| $00.00 |
SCRAPPING STATION ROLLERS Scrapping station rollers to consist of solid, steel, lightweight gravity stub rollers that are easily cleanable for entire length of soiled scrapping station with 1/2"- 3/4" clearance between rollers. a. Gravity rollers to extend to the load end of the dish machine b. Gravity rollers to be 21 ?" long
| 1.00 |
| EA |
| N/C |
| $0.00 |
ADDITIONAL ITEMS a. Repair any damage to floors, walls, and ceilings that occurs during demolition or installation. b. Must have a commercial kitchen equipment business that has operated continuously for the past five (5) years and have accomplished similar work in the removal and installation of dish machine and scrapping station units for a minimum of three (3) years.
| GRAND TOTAL |
| $0.00 |
image1.emf
File details come from the government source that posted it.