Mold abatement removal services Federal contract opportunity
Solicitation number
36C25626Q1108
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document is Amendment 0003 to RFQ 36C25626Q1108, issued by the Department of Veterans Affairs' Gulf Coast Veterans Health Care System Network Contracting Office 16 in Biloxi, Mississippi, with an effective date of July 23, 2026.

The amendment responds to 41 questions received during a site visit held on August 12, 2026, regarding mold abatement services in Building 58 at the VA facility. Key clarifications include: (1) no prior mold testing reports are available; (2) final acceptance will be based on visual inspection by the Government Contracting Officer Representative using a before-and-after visual inspection log, with no post-remediation air sampling or third-party clearance testing required; (3) all painted walls will be treated as positive for lead-based paint per the attached Building 58 Asbestos Inventory Checklist; (4) mold remediation scope is limited to identified areas based on visual inspection with no reconstruction required; (5) the contractor is responsible for developing phasing plans and temporary egress provisions, with the Southeast stairwell available only for authorized VA employees during work; (6) no ductwork remediation is included; and (7) no modifications to pricing will be accepted after bid award for additional discovered mold. The original closing date of August 14, 2026, has been extended to August 21, 2026, at 12:00 p.m. Central Time. No further questions are being accepted. Offerors must acknowledge receipt of the amendment by returning copies to the issuing office or by acknowledging receipt on each offer submitted prior to the closing date.

View the file

Other files for this federal contract opportunity

Other files attached to Mold abatement removal services, newest first.
File Type Posted
36C25626P1080_1.pdf PDF
S02-Bldg 58 Asbestos Inventory Checklist.pdf PDF
36C25626Q1108 0002.pdf PDF
36C25626Q1108.pdf PDF
ATTACHMENT D Photo Log of Builidng number 58 July 2026.pdf PDF
36C25626Q1108_1.pdf PDF
ATTACHMENT B LIST OF PAST PERF REF.docx DOCX document
Attachment C Past Performance Questionaire fillable.pdf PDF
ATTACHMENT A Pulaski County AR WD 2015-5117 R30 dtd 05-13-2026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

0003 08-13-2026

Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531

Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531

To all Offerors/Bidders

36C25626Q1108

07-23-2026

X

X X

See CONTINUATION Page

X 1

The purpose of this amendment is to respond to questions received from site visit held Aug. 12, 2026. No further questions are being accepted. The closing date remains the same 08/21/2026; 12:00 PM CT.

NOTE: Please see attached Bldg. 58 Asbestos Inventory Checklist as it relates to some questions received.

Danette Rene' Impey Contracting Officer

V1614L2-64902

Questions to RFQ 36C25626Q1108 from Site Visit 08-12-2026

1. Was any prior mold testing, assessment, sampling, or industrial hygiene evaluation completed for Building 58? If so, would the Government be able to provide the applicable report(s) or findings?

No.

2. What final cleaning and post-remediation clearance protocol will be required upon completion of the work?

Visual inspection by the Government/COR. The visual inspection will consist of a before and after visual inspection log.

3. Will final acceptance be based on visual inspection by the Government/COR, or will post-remediation air sampling, third-party clearance testing, or another verification method be required?

Visual inspection by the Government/COR.

4. If post-remediation testing or third-party clearance is required, are there specific acceptance criteria, sampling requirements, or thresholds that should be incorporated into the contractor’s scope and pricing?

None.

5. Given the technical questions identified during the August 12 site visit and the limited time remaining before the current August 14 quotation deadline, would the Government consider extending the quotation due date to August 19, 2026?

Yes, the government intends to extend the closing date from Aug. 14, 2026 to Aug. 21, 2026; 12:00 p.m. CT.

6. Hazardous Material Surveys: Will the Government make the complete asbestos and lead-based paint survey reports available to bidders before the quote deadline?

Please see attached Bldg. 58 Asbestos Inventory Checklist. Painted walls will be treated as positive for lead base paint.

7. Bidding Assumptions: If these surveys cannot be provided, should bidders price strictly for standard mold remediation? Please confirm that if asbestos or lead abatement is subsequently required, it will be handled post-award via a change order.

There will be no post-award via change order. Please see attached Bldg. 58 Asbestos Inventory Checklist. Painted walls will be treated as positive for lead base paint.

8. Due Date Extension: Because the walkthrough occurred today (August 12) and quotes are due in 48 hours (August 14), we respectfully request a one-week extension to Friday, August 21, 2026, at 12:00 PM CT to ensure we can incorporate these clarifications and subcontractor pricing.

The government intends to extend the closing date from Aug. 14, 2026 to Aug. 21, 2026;

12:00 p.m. CT.

Questions to RFQ 36C25626Q1108 from Site Visit 08-11-2026 (Cont’d)

9. SOW Section 1.2(b) Flooring Description SOW Section 1.2(b) references "modular 24" x 24" carpet tile throughout."

However, our field inspection identified standard glue-down commercial carpet in the affected areas. Please confirm whether the 24" x 24" reference pertains to ceiling/plenum tiles, or if the glue-down carpet is the intended mold remediation target.

Mold abatement for identified areas by visual inspection.

10. Flooring Scope (Removal vs. Remediation)

Amendment 0001, Question 15, states that the carpet scope is for "removal and disposal only." Please confirm whether the second-floor glue-down carpet is to be fully removed and disposed of, including adhesive scraping as required, or if clean-in-place remediation methods (HEPA vacuuming, antimicrobial treatment, etc.) are acceptable.

Mold abatement for identified areas by visual inspection.

11. Supplied air with Spot coolers to fit OSHA requirements

Not provided by VA.

12. What is the Power distribution plan, tap into existing breaker panels with pig tails and spider boxes, or an alternative?

Will have to consult with VA electrician onsite. Information not avaible at this time.

13. Does the bid reflect only demolition, or does it need to include construction/ putback?

None, no demolition. No putback.

14. Is there an asbestos survey of the building?

Please see attached Bldg. 58 Asbestos Inventory Checklist.

15. Will floor plans be provided?

No.

16. Floor/ceiling removal

Mold abatement for identified areas by visual inspection of COR.

17. Air quality pre/post test required?

Not applicable.

18. Hospital equipment removal by contractor? Or done prior by VA?

If necessary, by VA but prefer by Contractor.

19. Crawl space included in the scope of work?

Yes, of the main stairwell ground floor during the site visit, but not literal the crawl space on the other side of the small door.

20. OSHA sign off on confined space entry along with health and safety if the VA campus?

21. Elevator pit included in scope?

22. Removal of all porous materials?

Mold abatement for identified areas by visual inspection of COR.

23. Built in vault on the ground floor, necessary keep item, or deemed non salvageable?

24. Has there been testing for lead paint?

Yes, all painted walls will be treated as positive for lead base paint.

25. Required air monitoring during mold remediation/ abatement?

26. Will there be ICRA’s associated, if so, will there be an on-site epidemiologist?

27. Moisture Source / Corrective Action Has the source or sources of moisture contributing to the mold condition been identified and corrected? If not, please identify the source, the party responsible for corrective work, and whether that work will be completed before, during, or after mold remediation.

Not Applicable. This is a mold abatement service as per the Scope of Work.

28. Above-Ceiling / Plenum Remediation Limits Please define the exact remediation scope within the second-floor plenum and above-ceiling areas. Specifically, confirm whether mold-affected ductwork, piping, pipe insulation, conduit, ceiling/roof deck, structural members, cabling, or other building systems are included. The solicitation requires inspection and treatment of mold-impacted plenum areas but does not define the individual components included.

Mold abatement for identified areas by visual inspection of COR. No duct work.

29. Hazardous Materials / Pipe Insulation and Wraps

During the site visit, numerous pipes and/or insulated piping components were observed covered with plastic and duct tape. Please provide all available asbestos, lead, and other hazardous-material survey or testing information applicable to these materials and other components that may be disturbed during remediation. Please also confirm whether the coverings, insulation, and/or piping are included in the mold-remediation scope and what treatment is required.

Please see attached Bldg. 58 Asbestos Inventory Checklist.

30. Exact Remediation Limits / Quantities Please provide or confirm the remediation limits for walls, ceilings, stairwell surfaces, plenum areas, and other affected components. The solicitation provides floor-area quantities for the second-floor offices, restrooms, utility areas, and hallways, but does not establish corresponding wall, ceiling, stairwell, or plenum surface quantities.

31. Additional or Concealed Mold

If additional concealed mold or mold outside the identified limits is discovered during performance, what is the required procedure for documenting, obtaining authorization for, and pricing the additional work?

No modification to pricing after successful bid.

32. Post-Remediation Clearance / Acceptance Criteria

Please identify the required standard for successful completion and acceptance of the mold remediation. Specifically, clarify whether acceptance requires visual inspection, moisture readings, air sampling, surface sampling, third-party post-remediation verification, or other testing, and identify which party is responsible for performing and paying for such testing.

Please see attached Bldg. 58 Asbestos Inventory Checklist. Yes, all painted walls will be treated as positive for lead base paint.

33. Removal Versus Reconstruction / Replacement Please confirm that the base scope is limited to mold remediation, removal, and cleaning, and the contractor is not responsible for replacement or reconstruction of materials removed during remediation, including drywall, insulation, ceiling materials, base, coatings, flooring, or other finishes.

No reconstruction.

34. Containment / Negative-Air Requirements

The solicitation requires a containment chamber with negative air. Please clarify whether the VA has specific requirements for negative-pressure differential, air changes per hour, continuous pressure monitoring, decontamination chambers, HEPA exhaust locations, critical barriers, or other containment-performance criteria.

None.

35. Building Occupancy / Phasing Will the affected second-floor areas remain occupied during remediation? Please identify required phasing, occupied-space protections, work-area access requirements, and whether access through the two main hallways must be maintained during performance.

The floors will not be occupied during mold abatement.

36. Southeast Stairwell Closure / Egress

May the southeast stairwell be completely closed during remediation? If not, please identify required phasing, temporary egress provisions, or other life-safety requirements that must be maintained while work is performed.

The Southeast stairwell will not be completely closed during the mold abatement except for authorized VA employees when needed. The successful bidder will develop their own phasing plan, temporary egress, or life-safety requirements to tackle the mold abatement Scope of Work.

37. HVAC / Plenum System Requirements Please confirm whether HVAC systems serving the affected areas must be shut down, isolated, sealed, protected, or cleaned during remediation. If shutdown or other HVAC work is required, please identify which party is responsible for performing and coordinating that work.

38. Carpet Tile Disposition

The solicitation identifies mold-contaminated 24-inch by 24-inch modular carpet tile within the stairwell. Please confirm whether the contractor is required to clean and retain, remove and dispose, or remove and replace the carpet tile. If replacement is required, please provide the applicable material and installation requirements.

No replacement.

39. Structural Drying / Dehumidification

Is structural drying, dehumidification, or use of air-moving equipment required as part of the base scope? If additional drying becomes necessary due to existing moisture conditions, please confirm whether that work will be considered part of the base contract or separately authorized additional work.

Mold abatement for identified areas.

40. Media Blasting Requirements

The solicitation states that media cleanup is required “if media blasting technique [is] used,” which appears to make media blasting an optional contractor means and method rather than a mandatory procedure. If media blasting is used, please clarify any restrictions on the blasting media and identify the required final surface condition or acceptance standard.

None at this time.

41. Extension of Due Date

As the answers to the questions above will impact the technical approach and pricing proposals, we respectfully request an extension of at least 3 business days following the posting of Q&A to allow for revisions to our response.

The government intends to extend the closing date from Aug. 14, 2026 to Aug. 21, 2026;

12:00 p.m. CT.

See attached document: S02-Bldg 58 Asbestos Inventory Checklist.