36C25626Q0626.pdf

PDF 671 KB Posted

Attached to
J045--Sewer and Grease Trap Cleaning Service
Solicitation number
36C25626Q0626
Issued by

About this file

This is a Solicitation/Contract/Order (SF 1449) for commercial products and services issued by the Department of Veterans Affairs (VA) Network Contracting Office 16 for sewer jetting and grease trap cleaning services at the G.V. "Sonny" Montgomery VA Medical Center in Jackson, Mississippi.

The solicitation requires quarterly sewer jetting of sanitary sewer lines and quarterly grease trap cleaning, along with semi-annual closed-circuit television (CCTV) inspection and video recording of designated sewer sections. The contractor must provide all necessary labor, materials, equipment, tools, trucks, and supervision to complete these services during normal business hours (8:00 a.m. to 4:30 p.m., Monday through Friday, excluding federal holidays). Services must comply with Joint Commission Standards, OSHA regulations, EPA/State Environmental Compliance for waste disposal, and demonstrated competency in high-pressure jetting equipment and CCTV inspection systems. The contractor must possess a minimum of three to five years of experience in sewer jetting and grease trap cleaning. The contract includes a base year (May 1, 2026 to April 30, 2027) plus four option years. The total contract award amount is $16.5 million. This is an unrestricted acquisition with offers due by April 15, 2026 at 10:00 a.m. Central Standard Time via email. Evaluation will be based on technical capability (acceptable/unacceptable), past performance (acceptable/unacceptable), and price (reasonableness). The contract will be firm-fixed-price. Payment will be made electronically upon receipt and acceptance of services, with invoices submitted per VAAR Clause 852.232-72. The contractor must provide quarterly documentation including inspection reports, volume of grease removed, and copies of GCD Maintenance Forms, along with semi-annual CCTV video recordings in MPEG-2 or Windows Media format.

View the file

Other files

File Type Posted
36C25626Q0626 0001.docx DOCX document
Sewer Site Plan.pdf PDF
WD 2015-5153 Rev 29.pdf PDF
36C25626Q0626_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

36C25626Q0626

Michelle Atwell 04-15-2026 10am CDT

Department of Veterans Affairs Network Contracting Office 16 5075 Westheimer Road, Suite 750

Houston TX 77056-5643

X

562998

$16.5 Million

N/A

Department of Veterans Affairs G.V. (Sonny) Montgomery

1500 E. Woodrow Wilson Dr.

Jackson MS 39216

Department of Veterans Affairs Network Contracting Office 16

FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically

See CONTINUATION Page

See Price/Cost Schedule and Statement of Work

See Addendum to Instructions to Offerors for quotation submission instructions.

See CONTINUATION Page x 1

Tammie Chaney Contracting Officer

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

B.3 DELIVERY SCHEDULE

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (NOV 2023)

C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) ... 24

C.4 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)

(DEVIATION)

C.5 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

C.6 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ... 35

C.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.8 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (OCT 2025) (DEVIATION FEB 2025)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (SEP 2023)

E.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

E.3 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS

AND CERTIFICATIONS (NOV 2025) (DEVIATION)

E.4 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

E.5 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021)

E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION

FEB 2025)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C256

Department of Veterans Affairs

Network Contracting Office 16

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[X] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [x] Upon Receipt and Acceptance

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

It is your firm’s responsibility to submit a completed and signed Final Invoice Memo (template is located in section D) in accordance with the terms and conditions of this contract. The Final Invoice Memo must be signed and attached to your firm’s submission of the final invoice for final payment or within seven (7) calendar days after the period of performance or contract expiration.

If the Contracting Officer or designated representative does not receive a signed copy of the

Final Invoice Memo with your firm’s final invoice for final payment and/or if the Government does not hear from your firm via e-mail after seven (7) calendar days, after the period of performance or contract expiration, the Government will accept that there is adequate evidence that all supplies and services have been delivered and accepted, all invoices have been paid, and that there are no outstanding invoices or issues concerning this contract; thus, the Government will continue with a unilateral de-obligation of any remaining funds and issue the signed modification to all parties. Further, failure to submit a signed Final Invoice Memo could result in a negative CPARS entry as a lack of business-like concern for the interest of the customer—which in this case is the VAMC. Notwithstanding the claim period Stated in FAR 52.233-1, Disputes, and pursuant to FAR 33.206, Initiation of a Claim, the contractor agrees to submit any claim related to this contract within 12 months after accrual.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

Scope of Work

SEWER JETTING AND GREASE TRAP CLEANING

G.V. “Sonny” Montgomery VA Medical Center (GVSMVAMC) 1500 E Woodrow Wilson Drive

Jackson, MS 39216

1. OBJECTIVE: The G.V. “Sonny” Montgomery VA Medical Center located in Jackson, MS requires the following services for the facility: SEWER JETTING AND GREASE TRAP CLEANING as required by (and in accordance with) Joint Commission Standards, Occupational Safety and Health Administration (OSHA) Standards, and other regulations/policies that are applicable.

2. GENERAL: This is a non-personnel services requirement. The contractor shall provide all management, supervision, labor, transportation, tools, materials, parts, and other items necessary to perform work, execute services, and to successfully complete all deliverables as contained within this Scope of Work. The Government shall not exercise any supervision and/or control over contractor personnel (which includes contractor service providers, contractor representatives, and subcontractors employed with and/or being utilized by the prime contractor) during all active performance periods of the contract. All contractor personnel shall be accountable solely to the Contractor, who in turn is responsible to the Government.

3. BACKGROUND: The Department of Veterans Affairs, G.V. “Sonny” Montgomery VA

Medical Center, has a requirement for providing sewer jetting and grease trap cleaning for the facility. The sewer jetting services are vital for ensuring that the facility plumbing is free from obstruction that can cause backups into the facility affecting patient health. The grease trap cleaning is required in accordance with the City of Jacksons (FOG) Control Program.

4. SCOPE OF SERVICES: Contractor shall provide all necessary supervision, labor, materials, equipment, tools, and trucks to pump out and/or vacuum grease trap and jetting sewers to complete the quarterly cleaning and semi-annual inspection with report and video recording of a section of sewer line at the G.V. “Sonny” Montgomery VA Medical Center in accordance with the specifications of the Statement of Work. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning and inspection equipment.

1. The cleaning operation is intended to remove any debris, grease, clogs, roots, or any other items inside the pipes within the project area described. Contractor shall remove all debris generated by service performed under this contract and dispose of off VA premises. Areas where Contractor performs this service shall be left in a sanitary condition prior to Contractor leaving VA facility when service has been performed.

Contractor shall report any deficiencies or breaks in lines to COR or Plumbing Shop Supervisor prior to leaving VA facility when service has been performed.

A. Quarterly Sewer Jetting – As scheduled with COR and in approximate months of

October, January, April, and July of each contract year, Contractor shall clean sewer lines around building (see attached site plan):

a. The specified section of sewer line shall be cleaned using hydraulically propelled, high-velocity jet or mechanically powered equipment. The equipment shall be capable of removing dirt, grease, rocks, sand and other materials and clogs/obstructions from the sewer lines and manholes.

b. Contractor shall clean by jetting from service manholes located at back loading dock as mapped on site plan. Piping is eight-inch diameter and 100 linear feet +/-.

c. Contractor shall clean by jetting from service manholes located at back Canteen dock as mapped on site map. Piping is eight-inch diameter and 100 linear feet +/-.

B. Quarterly Grease Trap Cleaning-

a. The following grease traps will be serviced as scheduled with COR and in approximate months of October (Q1), January (Q2), April (Q3), and July (Q4) of each contract year, Contractor shall clean grease traps (see attached site plan):

a) Canteen/Main Kitchen Trap- Located at Canteen dock. 500 Gallon capacity.

b) Future Main Kitchen Trap- Trap will be located at back dock to main kitchen. This trap will not be serviced until Option Year 2. This will NOT be a part of the first two years of service. 600 Gallon Capacity.

b. Contractor shall remove all grease, sludge, and caked detergent from grease traps. Contractor shall ensure in-lets are free of grease. Contractor shall scrape sides of grease traps to remove any clinging substance and leave area above and around grease traps in a sanitary condition.

C. General Requirements

a. Place safety cones around grease interceptor to prevent pedestrian or vehicular encroachment.

b. Remove manhole covers.

c. Place vacuum tube all the way into the interceptor to suck solids from the bottom.

d. Vacuum water from the interceptor including all the floating grease layer and clean the sides. Vacuum up any remaining water and solids and make sure the tank is clean.

e. Check that baffle wall is in place and secure. Inspect tank for any sign of cracks or defects.

f. Check that sanitary “T” s on the inlet and outlet compartments are not clogged, loose, or damaged.

g. If the interceptor has a separate sample box, open it and clean the box.

h. Replace manhole covers and clean up any grease spills using grease/oil absorbent pads.

i. After completion of the final inspection fill out a GCD Maintenance Form.

j. IMPORTANT: Decanting is not permitted. DECANTING is the practice of returning wastewater from the truck back into the interceptor tank after it is vacuumed out. Grease content in this water is very high.

k. Documentation of Waste Disposal (manifests showing disposal at approved facility)

l. Use of Approved Haulers for grease waste

2. EMERGENCY SERVICES

a. Emergency Service may be required. Contractor shall provide quote per occurrence and will submit a detailed estimate to COR for approval. No work may begin until the Government issues a written contract modification. All estimates exceeding $2500.00 will be issued through a modification of contract. All estimates below $2500.00 will be paid via Government Purchase Card.

3. DOCUMENTATION/REPORTS

a. Contractor will provide a written report, digital in nature, to the COR within 7 days of completed service.

b. Information contractor should include in report for Grease Trap Service:

a) Facility Name and Address

b) Grease Trap #

c) What took place: cleaning, repair or pumping.

d) Volume of grease removed.

e) Signature of Person conducting removal

f) Signature of COR or Plumbing Shop Supervisor verifying cleaning of trap.

c. Information contractor should include in report for Sewer Jetting Service:

a) Facility Name and Address

b) Any blockages or other notifications.

c) Signature of Person conducting jetting.

d) Signature of COR or Plumbing Shop Supervisor verifying cleaning.

d. Contractor will conduct and provide a single copy of CCTV inspection of one section of sanitary sewer line (100 feet) semi-annually, October and April, after its jetting has been completed. Contractor will provide a report on what designated section was videoed.

e. The CCTV inspection of the defined section of sewer line, as mapped on site plan, shall be performed by qualified personnel and recorded. The recorded data shall include all pertinent information related to the inspection including the date, time, and section of sewer being inspected. Each semi-annual inspection shall be recorded and logged into a database and submitted electronically via digital format through e-mail to COR. The video shall be direct from a live video source into a video file, MPEG -2 or Windows Media File format (640 x 480 resolution, minimum) or equivalent and, of good quality for viewing. The inspection report and CCTV video recording shall be submitted to the Owner within 7 days following the inspection.

f. The Contractor shall utilize a camera with height adjustment so that the camera lens is always centered at one-half the inside diameter, or higher in the pipe being televised. The camera shall have color pan, tilt, and zoom features to facilitate the inspection of all service laterals, sewer line, manholes and any other features. The adjustment of focus and iris shall provide a minimum focal range of 3 inches in front of the camera’s lens. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe.

g. If any of the Contractor’s equipment becomes stuck in the sewer line or manhole the Contractor shall be responsible for all costs associated with extracting the equipment. The repair of any excavation associated with the extraction including the replacement of sod, hard surface such as driveway, parking lot and any other feature shall be required by the Contractor at no additional cost to the Owner.

5. PLACE AND PERIOD OF PERFORMANCE: Work will be performed, services will be executed, and deliverables will be completed at G.V. “Sonny” Montgomery VA Medical Center, 1500 E Woodrow Wilson Drive, Jackson, MS 39216. This project, as encompassed by the final contract when executed, will consist of a base year plus 4 option years of service for the facility. Contract performance will end when the contract is successfully completed.

Base Year: 05/01/2026 – 04/30/2027 Option Year 1 – 05/01/2027 – 04/30/2028 Option Year 2 – 05/01/2028 – 04/30/2029 Option Year 3 – 05/01/2029 – 04/30/2030 Option Year 4 – 05/01/2030 – 04/30/2031

6. WORK HOURS AND SCHEDULE: All work, execution of services, and completion of deliverables must be accomplished during normal business hours, 8:00 a.m. through 4:30 p.m.

Monday through Friday, Federal Holidays excluded. Prior to work being performed proper coordination shall be initiated between the contractor and the government to ensure that services/work can be executed when scheduled. Any work, services, and/or other tasks performed during other than normal business hours must be approved in advance by the Contracting Officer Representative (COR), Contracting Officer, and/or other authorized facility designee/representative before such work begins. The Federal Holidays that are currently being observed by the facility are listed in the table below.

New Year’s Day January 1 Martin Luther King‘s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth Independence Day June 19th Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

Other Federal Holidays (that could occur)

Any other day specifically declared to be a national holiday (per Federal Statute, Executive Order, or by the President’s Proclamation).

An alternative schedule (different from the schedule described above) may be utilized if there is mutual agreement between the government and the contractor regarding this alternative schedule if implemented.

7. PERSONNEL PERFORMING WORK/SERVICES – REQUIRED COMPETENCIES,

LICENSURE, PERMITS AND EXPERIENCE:

Personnel performing work, executing services, and completing deliverables during the active performance periods of the contract shall possess the knowledge, skills, and abilities required to successfully accomplish the following: SEWER JETTING AND GREASE TRAP CLEANING. No unqualified individual shall be allowed to perform work, execute services, and to complete deliverables at any time under the contract while active. Contractor must have the following:

• EPA/State Environmental Compliance for transporting and disposing of grease waste

• OSHA Safety Compliance (for confined space entry if applicable)

• Recommended Minimum: 3 years’ experience in sewer jetting and grease trap cleaning.

Personnel must have demonstrated competency in operating high-pressure jetting equipment and CCTV inspection systems

8. OTHER REQUIREMENTS:

A. CHECK IN AND CHECK OUT PROCEDURES:

Before beginning any work at any time during the active performance periods of the contract personnel performing services must physically check in with the appropriate facility representative to obtain approval and confirmation of the expected work to be performed and services to be executed. Check out procedures will be the same once work has been completed and services have been executed. Check in and check out procedures shall include the following: 1). Written documentation of the contractor’s arrival and departure while on site and 2). Written documentation showing the expected work to be performed, approval of such work before such work begins, and confirmation/completion status of the planned work that was scheduled to be performed. Contractor must check in with COR or Plumbing Shop Supervisor when on site. Failure to do so will constitute that no work had been completed.

B. Identification and Badges: Any individual performing work under this contract shall wear a badge or other identification while on site that is clearly always displayed. While on site, any person performing work directly or indirectly must be able to specify their authorized purpose for their presence at the facility if such information is requested by VA facility personnel.

C. Parking: It is the responsibility of the contractor to park in the appropriate designated parking areas, to avoid ticketing or towing. Information on parking is available from the facility if requested by the contractor.

D. Contract Administration: The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitments or issue changes that will affect price, quantity, or quality of performance of this contract. In the event the Contractor makes any such change at the direction of any person other than the Contracting Officer, this change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof. All changes to the contract will be issued via an amendment and/or modifications in writing from the Contracting Officer to the Contractor.

E. Invoicing and Payment: Contractor is authorized prompt payment IAW applicable regulation following the successful performance of work, execution of services, and completion of required deliverables. Contractor invoices shall be submitted IAW VAAR Clause 852.232-72 Electronic Submission of Payment Requests. Invoices submitted for payment must be detailed to the extent necessary to reflect the work done and the services performed during the time periods when completed so an accurate assessment can be made by the facility for certification of these invoices for payment. Advance payments are not authorized, and contractor is not authorized payment for future work not performed and/or for work that has not been successfully completed.

F. VA authorized personnel who may contact contractor for repair service (Note:

names will be provided but are subject to change)

Contracting Officer Representative Plumbing Shop Supervisor Contracting Specialist

G. KEY PERSONNEL

During the active performance periods of the contract a Key Personnel Person shall be designated by the contractor (to be contacted by the government when needed) regarding performance of work, execution of services, and completion of Deliverables as contained within this Scope of Work and covered by the final contract.

H. REPORTS

All reports required will be digital in nature and must be submitted to the COR within 7 days of completion of services. At minimum, reports will have equipment that services were performed on, date and time, services performed, and any deficiencies.

I. WARRANTY:

a. Contractor shall provide a one (1) year warranty on all equipment/services, completed by the contractor, for all performance periods.

b. Warranty letter due at the completion of the project

J. CONFORMANCE STANDARDS:

a. Services shall be performed, and equipment shall function in conformance with all VA safety standards, manufacturer’s/industry standards, the latest published edition of NFPA-99, FDA, OSHA, JC, and other applicable national standards.

K. SMOKING POLICY:

a. Smoking is not permitted within or around the VA except in designated areas.

9. RECORDS MANAGEMENT

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a).

These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created while performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. G.V. Sonny Montgomery VAMC (GVSMVAMC) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency]. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity.

Contractor personnel shall sign VA Form 10-0708 “Employee Clearance from Indebtedness” before resigning or termination from Contractor working for GVSMVAMC and Facility Records Officer must sign form. A copy of completed signed VA Form 10-0708 (Contractor personnel and Facility Records Officer signatures) shall be place in each competency folder. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with GVSMVAMC policy.

8. The Contractor shall not create or maintain any records containing any non-public GVSMVAMC information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The GVSMVAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which GVSMVAC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. TMS (Talent Management System) course VA 4192704: “Records Management for Everyone” [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]

12. Flow-down of requirements to subcontractors:

a. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

b. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVI

CES

QUANTI

TY

UNI

T UNIT PRICE AMOUNT

4.00 ea _______________

Quarterly Jet Cleaning - Base Year Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment

Quarterly Grease Trap Cleaning - Base Year Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair,

2.00 ea _______________

Video Inspection/Report - Semi Annual Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Jet Cleaning - Option Year 1 Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Grease Trap Cleaning - Option Year 1 Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Video Inspection/Report - Semi Annual Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Jet Cleaning - Option Year 2 Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Grease Trap Cleaning - Option Year 2 Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Video Inspection/Report - Semi Annual Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Jet Cleaning - Option Year 3 Contract Period: Option 3 POP Begin: 05-01-2029 POP End: 04-30-2030 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Grease Trap Cleaning - Option Year 3 Contract Period: Option 3 POP Begin: 05-01-2029 POP End: 04-30-2030 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Video Inspection/Report - Semi Annual Contract Period: Option 3 POP Begin: 05-01-2029 POP End: 04-30-2030 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Jet Cleaning - Option Year 4 Contract Period: Option 4 POP Begin: 05-01-2030 POP End: 04-30-2031 PRINCIPAL NAICS CODE: 562998 - All Other

Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Quarterly Grease Trap Cleaning - Option Year 4 Contract Period: Option 4 POP Begin: 05-01-2030 POP End: 04-30-2031 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, Video Inspection/Report - Semi Annual Contract Period: Option 4 POP Begin: 05-01-2030 POP End: 04-30-2031 PRINCIPAL NAICS CODE: 562998 - All Other Miscellaneous Waste Management Services PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, GRAND TOTAL _______________

B.3 DELIVERY SCHEDULE

ITEM

NUMBER SHIPPING INFORMATION QUANTITY

DELIVERY

DATE

4.00

2.00

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered;

and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212- 5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause)

ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES

Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

The following clauses are incorporated into 52.212-4 as an addendum to this contract:

C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

(End of Clause)

C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR

2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .