This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Request for Quote (RFQ) issued by the Department of Veterans Affairs Network Contracting Office 16 in Ridgeland, Mississippi. The amendment includes a Questions and Answers (Q&A) attachment for RFQ 36C25626Q0243, which appears to involve maintenance work on a water tank constructed in 1994. Key details include the requirement for a Service-Disabled Veteran-Owned Small Business (SDVOSB) prime contractor to perform at least 50% of the contract's cost with its own employees, and specific clarifications about the scope of work, such as interior tank maintenance in Option Year 3, antenna status, and coating information. The solicitation emphasizes that subcontractor experience is not acceptable, and the prime contractor must demonstrate its own qualifications and experience.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626Q0243 0001_1.docx | DOCX document | |
| 36C25626Q0243_1.docx | DOCX document | |
| 36C25626Q0243.pdf | ||
| P11_WAGE DETERMINATION_15-4673.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 01-07-2026
36C256
Department of Veterans Affairs Network Contracting Office 16
715 South Pear Orchard Road Ridgeland MS 39157
10N16
Department of Veterans Affairs Network Contracting Office 16
715 South Pear Orchard Road Ridgeland MS 39157
To all Offerors/Bidders 36C25626Q0243
12-29-2025 X
X X
X 1(One)
The purpose of this amendment is as follows:
1. To post Questions and Answers (Q&A)
2. Q&A is attached to this amendment as Attachment A.
Note: Contractor must acknowledge this amendment by signing in box 15b and submit with quote before the solicitation due date. If amendment is not acknowledged, contractor may be ineligible for award at the discretion of the Contracting Officer.
Diyonne Williams Contracting Officer
Attachment A – Question and Answers
The Network Contracting Office (NCO) 16 received questions in response to Request for Quote (RFQ) 36C25626Q0243. Please see below for the Contractor’s questions and NCO 16’s respective answers accordingly.
Question
Number
Question Answer
1 When was the tank constructed 1994
2 Are there lead coatings on the tank The government is not aware of any lead coatings on the tank.
3 Please provide a copy of the most recent inspection report.
An inspection report is not available currently.
However, the tasks identified in the SOW are relatively standard and cited by the Arkansas Department of Health as typical.
4 Will worker background checks be required
Background checks were not cited as a requirement in the SOW but will be required as specified in the relevant clauses of the Federal Acquisition Regulation (FAR) and any agency-specific supplements included in the RFQ.
5 This contract contains various elements of construction-related activities. Would the VA amend the Limitations of Subcontracting to 25% specialty trade?
The government determined that this contract aligns more with services rather than construction activities, and it has been issued as a service RFQ. Therefore, the Limitations on Subcontracting for this service contract require that the Service-Disabled Veteran-Owned Small Business (SDVOSB) prime contractor perform at least 50% of the contract's cost (excluding the cost of materials and supplies) with its own employees.
6 The solicitation states experience of a subcontractor is not acceptable in the proposal. Would the VA amend the proposal requirements to accommodate subcontractor input?
This will help the VA see the full team.
The current solicitation specifies that the experience of a subcontractor is not acceptable and that the proposal must reflect the prime contractor's own experience and qualifications.
This requirement is in place to ensure that the prime contractor, in this case the Service- Disabled Veteran-Owned Small Business (SDVOSB), possesses the necessary experience and capability to successfully execute the contract. At this time, it is the VA’s position to evaluate the experience and qualifications of the prime contractor directly.
7 Has the interior and exterior coating been tested for lead and is there any concern about lead in the existing
The VA is not aware of past lead testing on the existing tank coatings. Nor is the VA aware if the coatings contain lead.
coatings
8 Is there any documentation /information on what the existing coatings are? e.g. from the last coating application
The VA is not aware of the existing coatings.
However, 2-3 mils of Sherwin Williams Kembond and Industrial Enamel were used as touchup paint in 2019 during windage rod repair.
9 When the tank is offline for maintenance, will the contractor be responsible for maintaining system pressure? If yes, will that be through a pressure relief valve or a portable pressure tank?
No
10 Are there any specific requirements for maintaining pressure the contractor should be aware of/consider?
No
11 In relation to Option Year 3 maintenance with the sandblasting and coatings, is that interior tank work only?
Yes. Reference SOW.
12 Please provide the contract number and value for the current or most recent awarded contract for maintaining this tower.
Not available
13 There are a number of antennas on the tower, will the owners of the antennas be powering them off when the contractor is working?
All antennas are deenergized
14 Would it be possible for the antenna owners to remove and reinstall their antennas are (after) the work is completed?
All antennas are deenergized
(End of Questions and Answers)