This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a medical gas master alarm panel installation project at the G.V. (Sonny) Montgomery VAMC. The amendment extends the solicitation submission date to August 14, 2025, at 10 AM CT, schedules a mandatory site visit for August 7, 2025, at 9 AM CT in the foyer of Building 1, and provides responses to contractor questions. The project involves installing a new medical gas panel in Building 37 and connecting it to the existing master alarm panel in Building 1, with specific requirements for wiring, conduit, and inspection. The VA emphasizes that contractors must develop a technical approach compliant with applicable codes, regulations, VA Design Guides, and manufacturer requirements, and clarifies that this is considered a commercial service procurement under FAR Part 2.

The amendment addresses several technical clarifications, including conduit path and size, wiring methods, and inspection protocols. Specifically, the VA indicates that no drawings are available for the conduit path, and contractors must use professional skills to develop their approach. The inspection and testing can be performed by either an ASSE 6020 Medical Gas Systems Inspector or an ASSE 6030 Medical Gas Systems Verifier, with the requirement that inspections be conducted by a party other than the installing contractor. The period of performance remains 60 days, and the project is classified as a commercial service rather than a specialty trade construction project.

View the file

Other files

File Type Posted
36C25625Q1218_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0001 07-30-2025

00586

Department of Veterans Affairs G.V. (Sonny) Montgomery VAMC

1500 E. Woodrow Wilson Dr.

Jackson MS 39216

10N16

Department of Veterans Affairs G.V. (Sonny) Montgomery VAMC A&MM Service (90C) 715 South Pear Orchard Road Ridgeland MS 39157

To all Offerors/Bidders

36C25625Q1218

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-14-2025 10AM CDT

See CONTINUATION Page

The purpose of this amendment is to "extend" the solicitation date for submission of quotes, add a site visit, and provide response to questions that were received.

A. The updated hour and date for all receipt of offers is extended to 8/14/25 at 10AM CT.

B. A site visit is scheduled for 8/7/25 at 9AM CT - Meet in the Foyer of Bldg 1.

C. All submitted questions answers are provided on pages 2-3.

D. The last day to provide questions is on 8/11/25 at 9AM CT.

CONTINUATION PAGE

1. General Requirements (D) 14/84 POP is 60 days. Recommend extending to 90 days to allow for adequate lead times of equipment, materials, and mobilization.

PoP will remain 60 days.

2. SOW (D) page 19/84 references conduit connecting building 1 to building 37 but does not specify size or path. There is no way for bidders to trace this during the bidding phase, can the VA confirm path and size?

VHSO does not possess any drawings or other documentation to indicate conduit path or even if it is usable. Potential offerors are encouraged attend a site visit and use their professional skills and experience to develop the technical approach.

3. SOW (D) page 19/84 references “Install all required data and communication cables and accessories to connect the new panel in building 37 to the existing master panel located in building 1, room M1-3 Mechanical Room.” Confirming the intent is to use the existing master alarm panel as a j-box and extend the wires from the existing panel to the new panel? We will not be running from the new panel in bldg 37 to the pressure switches, control panels, and manifold?

The contractor is responsible to provide the technical approach that is compliant with all applicable codes, regulations, VA Design Guides, and manufacturers requirements. All of these documents are available to the public.

4. SOW (D)(1) page 19/84 references all wiring in EMT cable. NFPA 99 allows medical gas signal wire to be free air other than mechanical spaces. Please confirm if VA is requiring low voltage wire in conduit.

Low voltage wire is to be in conduit and may use existing data trays if they are available. All installations must meet all applicable codes, regulations, VA Design Guides, and manufacturers’ requirements. These documents are available to the general public.

5. SOW (F) page 20/84 references inspection by 6020, this should be changed to verified by 6030. New panels require verification.

The inspection, testing and certification may be performed by an ASSE 6020 Medical Gas Systems inspector or an ASSE 6030 Medical Gas Systems Verifier.

NFPA 99-5.1.12.3.1.4 Inspections shall be performed by a party other than the installing contractor.

6. Page 14/84 states: “Contractors are required to attend a site visit to assess the availability of raceways, paths, and dimensions necessary for the installation of the medical gas panel and associated conductors”. When is the scheduled site visit?

Site visit is scheduled for 7 August 2025 at 0900. Offerors are to arrive at the foyer of building 1 of the VHSO station located at 1100 North College Ave, Fayetteville, Arkansas 72703.

7. VAAR 852.219-75 40/84 references this as a “specialty trade construction” project.

These upgrades typically fall under “general construction”. Please verify if this needs to change.

This is a commercial service as defined in FAR Part 2.

Commercial service means—

(1) Installation services, maintenance services, repair services, training services, and other services if–

(i) Such services are procured for support of a commercial product as defined in this section, regardless of whether such services are provided by the same source or at the same time as the commercial product; and

(ii) The source of such services provides similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government;

End of Document