This is a Statement of Work for testing, verification, calibration and adjustment of HVAC critical systems at Overton Brooks VA Medical Center in Shreveport, LA. The contractor must test, verify, calibrate and adjust Operating Rooms, Isolation Rooms, and Sterile Processing Service areas once per year, including temperature, pressure, humidity sensors, and air control devices within each zone, space, and equipment. Testing requirements include documenting and calibrating all sensors, adjusting airflow from diffusers, performing filter leak tests on HEPA filters, and replacing 10% of sensors/devices and HEPA filters annually if calibration fails.
The contract is structured as a firm fixed price with one base year and four one-year options. Work must be performed during non-operational hours (typically outside Monday-Friday 5am-8pm and weekends/holidays). The contractor must provide direct employees including Control System Engineers, Testing and Balance Agents, and Commissioning Agents. Key deliverables include service schedules, calibration certificates, test/balance reports, and checklists documenting calibrated/non-calibrated sensors. The facility uses a Johnson Controls Metasys building automation system to provide automated environmental control across the campus. The provided files include HVAC drawings showing system layouts, schedules, and specifications for the critical areas covered under this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Operating Rooms HVAC Dwg.pdf.pdf | ||
| Isolation Rooms Dwg and TAB sched.pdf | ||
| TAB E - VA HVAC Design Manual VA T.pdf | ||
| Air Change Test Result SPS - June 2.xlsx | XLSX spreadsheet | |
| HEPA Filter Locatins.pdf.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Testing, verification, calibration and adjustment of Critical System Overton Brooks VA Medical Center 510 E. Stoner Avenue Shreveport, LA 71101
GENERAL
Scope of Work Overton Brook VA Medical Center requires a service contract to test, verify, calibrate, and adjust Heating, ventilation and air conditioning (HVAC) critical systems throughout the hospital. This service will ensure each critical system is in compliance with VHA standards as outlined throughout this scope of work. Critical systems serve the following areas: Operating Rooms, Isolation Rooms, and Sterile Processing Service. Test, verify, calibrate, and adjust Operating Rooms, Isolation Rooms, and Sterile Processing Service once a year.
All temperature, pressures, humidity sensors, and air control devices must be tested and calibrated within each zone, space, and at the equipment. All sensors that cannot be calibrated must documented and reported if sensors cannot be calibrated within manufacturer acceptable limit. All registers, grills and airflow station must be test and adjusted for correct airflow. The test must verify and adjust flow from each diffuser to confirm compliance with designed conditions along with overall air change and pressure verification. All procedures must be documented and provided. Contractor must contractually account on replacing 10% sensor and devices once a year for bidding purposes and in the event the sensor and/or device are unable to be calibrated.
Once a year, perform filter leak test on all HEPA filters using recommended practice, IEST-RP-CC034.5. All HEPA filters that fail must be replaced and retested as defined in the recommended practice. At minimum, replace all filters every five years. Contractor must contractually account on replacing and retesting 10% of every filter once a year for bidding purposes and in the event the filters fail.
The current system is Metasys which is manufactured by Johnson Controls, Inc. The Building and Energy Management Control System at the Overton Brooks VA Medical Center in Shreveport, La is a Metasys system manufactured by Johnson Controls, Inc. It provides automated environmental control on the entire campus. The Contractor shall provide technicians employed directly by the contractor (i.e. Control System Engineer, Testing and Balance Agent, Commissioning Agent) as needed to perform the work within this contract.
Deliverables Company resume of experience Service schedule Manufacturer’s Literature and Data for all replacement parts Description of each product Installation Instruction Calibration certificate Test and Balance Report Preliminary Report Final Report Checklist to report calibrated/noncalibrated sensors and devices.
HOURS OF WORK
Contractor must perform this work while the critical areas are not operating. These areas typically do not operate Monday to Friday 5am-8pm or on Saturday and Sunday including federal holidays. The VA may approve normal business hour work, but contractor’s cost must include after hour work only within the cost proposal. All work shall be performed and completed on a schedule that will be approved in advance. Dates and times must be coordinated between the contractor and Government to eliminate impact to operations.
Price/cost schedule This is a firm fixed priced contract. Contractor must provide breakdown of cost that is separated by test and balance and by test and calibrate. Separate each area, zone, device, and sensor in the breakdown cost.
Contractor must contractually account on replacing 10% sensor and devices once a year for bidding purposes and in the event the sensor and/or device are unable to be calibrated.
Contractor must include a cost allowance to replace and retest 10% of all HEPA filters annually in case the filter fails testing. This cost must be separated and identified by quantity, and material and labor cost.
Period of performance This is annual contract with 1 base year and four additional 1 year options to extend.
Feature of work Operating Rooms Description Areas is served by two air handling units and six constant volume exhaust fans. All rooms within the surgical suites are to be included which consisted of surgical rooms, sub sterile rooms, clean rooms, corridors, operating rooms, and nurses stations.
Reference previous TAB design report.
Test and balance all rooms listed Reference HVAC Drawings.
Sensor and Device Information Each VAV box has a dedicated temperature and humidity device
ISOLATION ROOMS
Description Area is served by a single constant volume exhaust fan and fan coil units serving each isolation room.
Reference HVAC drawings and TAB schedule
In addition to “Isolation Rooms Dwg and TAB sched”, include testing, balancing and reporting on the exhaust fan serving this area.
Each room has a dedicated temperature and humidity sensor served by FCU.
Sterile Processing Service Description Most area is served by a different HVAC system which consist of FCU served by fresh air unit or AHU serving reheat variable air boxes.
Reference TAB Report “Air Change Test Result (SPS) - June 2024”
Test and balance all rooms listed. Rooms with fan coil units must also be tested and balanced.
Each room should have a temperature and humidity sensor per room. Annotate spaces with limited temperature and humidity control capabilities.
hepa filters (95% efficiency at minimum) Location and Size 2N Roof (12x24x12). One filter. 600 CFM Room 3N20 (24x24x12). One filter 1200 CFM Room 6N18 (24x24x12). One filter 1200 CFM Room 6W8 (24x24x12). 2 Filters 1200 CFM Reference HVAC drawings and TAB schedule
Operating Rooms HVAC Dwg.pdf
AI
GROE
G
KNO
W
L E S
J
R
M Y
NO. 034176
PROFESSIONAL
TIS RE
DEER
NG I NEE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
HVAC SCHEDULES UPGRADE AND REPLACE SURGERY
HVAC SYSTEM AND ROOFING
SHREVEPORT, LA
M601
667-18-121
JMK JSW/RCPFEB. 03, 2022
NOTES:
1. COUNTER FLOW INDUCED.
2. PROVIDE STAINLESS STEEL BASIN WITH SWEEPER SYSTEM.
3. PROVIDE EXTENDED LUBE LINES FOR SHAFT BEARINGS.
CT-1
G.P.M.
WATER
TEMP.
°F
ENT./LVG.
DESIGN
AMBIENT
W.B.T.
V
P
O
MARK
LE
MODEL
NO.
MNFR MAX.
TOTAL
FAN
H.P.
MAX.
P.D.
FT. W.G.
OPER.
WT. LBS.
NOTES
* AT 19-3L14 80.0 95/85 900 6.5 25 11000 1:2:3:
COOLING TOWER SCHEDULE
MODEL SERIES
MNFRTYPE
U
T
LT
I Z
N
IN
Z
C.F.M.
MIN.
O.A.
SUPPLY FAN
RPMTYPE
MBH HTG
E.A.T.
MBH
CLG
FACE
AREA
SQ.FT.
d.b.
R.P.M.H.P.
LA
S.P.
MOTOR
w.b.
d.b.
w.b.
W.P.D.
FT.
-H
-H
L.A.T.
COOLING COIL
FACE
AREA SF.
E.A.T.
L.A.T.
STEAM PRE-HEATING COIL
K
IK
IG
LB
/H
IC
IO
. W
.G . A
IR
.W
.T
X
1. MERV 8 PRE-FILTERS, MERV 11 INTERMEDIATE FILTERS, AND MERV 17 (HEPA) FINAL FILTERS.
2. PROVIDE UNIT WITH FOUR DIRECT DRIVE PLENUM FANS IN SUPPLY FAN SECTION. (2 PER ROW)
3. PROVIDE UNIT WITH TWO VARIABLE FREQUENCY DRIVES. ONE STAND-BY DRIVE AND ONE DRIVE SHALL CONTROL ALL FANS.
4. 208 / 3∅ POWER.
5. PROVIDE UV LIGHT DOWNSTREAM OF COOLING COIL.
6. MAXIMUM 10 ROW.
7. MAXIMUM 9 FPI.
8. FACE AND BY-PASS.
HEAT
SOURCE
ACCESSORIES
HUMIDIFIER
MAXIMUM SOUND POWER DATA RE 10 WATTS
OCTAVE BAND CENTER FREQUENCY HZ
SUPPLY AND RETURN
OPER.
WEIGHT
(LBS)
50025012563 NOTES800040002000
TYPE
LO
IT
H
IM
ID
IS
IS
1-AHU-1 * * OAH045 16000 12000 16000 PLN 3300 3.0 III 10 3500 1650 42 96.1 285 0.7 13.0
1-AHU-2 * * CAH043 3200 3.0 III 10 3500 0.615000 11000 15000 PLN 41 96.1 27079.4 49.0 48.5
79.4 49.0 48.5 800 19.0 65.0 15 ** 750 19.0 65.0 15 **
88/88** 13500
**785
* 7.4
7.4
* 28
0.1
SUP
RET
81/79
77/70
83/78
81/72
79/66
74/56
64/51
OF
FANS
1:2:3:4:5:
1:2:3:4:5:
20.0 28
0.1
12000 89/89 81/79 77/70 83/78 81/72 79/66 74/55 64/51
E.W.T. L.W.T.
43 55
43 55
15 15 250
15 240
1 6 7 8
AIR HANDLING UNIT SCHEDULE
1. HORIZONTAL SLIT-CASE PUMP.
2. PROVIDE NON-OVERLOADING PUMP SELECTION.
3. PROVIDE SUCTION DIFFUSER.
4. PROVIDE WITH VARIABLE FREQUENCY DRIVE MOTOR CONTROLLER.
P-5
HEAD
FT. W.G.
CAPACITY
G.P.M.
LL
G MODEL
SERIES
MNFR
MAX
MOTOR
SERVICE
FLUID
P-6
* HSC 4x6x10A 900 80 1:2:3:4:25 WATER
* HSC 4x6x10A 900 80 1:2:3:4:25 WATER
PUMP SCHEDULE
OR-SSS-1
1. FLANGED CONNECTION.
2. MANUFACTURER TO PROVIDE 200-GAL POLYMER SURGE TANK (ST-1) FOR EXHAUST EFFLUENT CONTROL WITH AUTOMATIC LEVEL.
LAYOUT BASIS
AMIAD EBS-10K
FLOW RATE
900 GPM
MIN
PRESSURE
80 FT HD
MIN FILTER
AREA (IN )
INLET/OUTLET
DIAMETER
8"
MAX OPERATING
WEIGHT (lb)
EXHAUST
VALVE
3"
FILTER
DEGREE
50 MICRON
1:2:
IN-LINE WATER FILTRATION SYSTEM SCHEDULE
STEAM TRAP SCHEDULE
MARK LOCATION SERVICE TYPE SIZE (IN)
(LBS/HR)
OPERATING
PRESSURE (PSI)
DIFFERENTIAL
PRESSURE (PSI) Remarks
DST-1 ROOF DRIP STATION IB 3/4" 378 15 12.00
DST-2 ROOF DRIP STATION IB 3/4" 378 15 12.00
DST-3 ROOF DRIP STATION IB 3/4" 378 15 12.00
EST-1 ROOF AHU-1 PREHEAT COIL F&T 1 1/4" 2000 15 0.25
EST-2 ROOF AHU-2 PREHEAT COIL F&T 1 1/4" 1875 15 0.25
4. IT IS THE DESIGN INTENT TO REUSE EXISTING PLATFORM. MAX WIDTH OF COOLING TOWER IS WIDTH OF
PLATFORM. FIELD VERIFY BEFORE PURCHASING.
3 4
(E)12"x12"
(E )3
2" x1
)1
6"
0" (E)26"x12"
(E)16"x12"
(E)16"x12"
"x
(E)16"Ø
(E)20"x16"
(E)12"x16" TOP
(E)20"x16" UNDER
(E)20"x12"
(E)24"Ø (E )2
0" x2
(E)14"x8"
(E)12"x10"
(E)20"x16"
(E)12"Ø
(E)16"x20"
(E)12"Ø
(E)8"Ø
(E)26"x20"
(E)10"Ø
(E)16"Ø
(E)8"Ø
4"
(E)22"x12" O/A
(E)24"Ø
(E)28"x16"
(E)18"x10"
)4
(E)12"x16"
(E)AHU (E)EF-7
(E)EF-4
(E)EF-3
(E)EF-2
(E)EF-1
(4)
(E)VAV
)V
)V
(E)VAV
)E
(E)18"x10"
(E)20"x18"
(E)40"x10"
"x
(E)VFD
(EF-2)
(EF-1)
)L
(E)TCP
(E)14"x12"
DOWN TO 3RD FLOOR
MECHANICAL
ROOM 4W34
PENTHOUSE
ROOM 400
SURGERY
ROOF
EXT
INT
(E)AHU-3
(EF-3)
(E)EF-6
(E)CH-1
/A
(E)30"x18"
(E)36"x18"
1-AHU-2
(E)14"x14" E/A
78"x36" S-O/A
(E)10"Ø
MH101
SD SD
1-AHU-1
MP101
1-CT-1
EXT INT
SD
CT-WTS
TAHU-1
CDE
36"x78" S-O/A
CONCRETE PAD EXTEND
AS REQUIRED
4" STM-LP
18"x36" S/A
18"x30" S/A
24"x70" S-O/A
4" CWS
1/
-L
2" LPSR
(E) 4" CWS
FLOOR
FLEX CONNECTION
L0
(E)26"x48"
(E) 6" CWS
(BEYOND)
(E) 6" CWR
26"x48" S/A
6" CWR
6" CWS
2 1/2" STM-LP
OA
NEW ROOF CURB FULL
SIZE OF UNIT. NO CURB
ADAPTOR ALLOWED.
FLEX CONNECTION
WORK AREA
KEY PLAN - NOT TO SCALE
PLAN
NORTH
TRUE
PENTHOUSE AND ROOF HVAC PLAN UPGRADE AND REPLACE SURGERY
8' 16'4'0
1/8" = 1'-0"MH101
1 PENTHOUSE AND ROOF HVAC PLAN
MH101 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 NEW 1-AHU-1, CONTRACTOR SHALL INSTALL UNIT ON NEW ROOF
CURB; CONNECT SA DUCT TO EXISTING AND REINSULATE
2 CONTRACTOR SHALL PROVIDE NEW PUMPS ON INERTIA BASE. SEE
DETAIL 4 ON SHEET M501.
3 30"X18" SA DUCT INTO UNIT. PROVIDE BELLMOUTH AT UNIT
CONNECTION.
4 CONNECT INTO EXISTING OA INTAKE LOUVER WITH 78"X36"
INSULATED OA DUCT. PROVIDE INSULATED SHEET METAL PLENUM
FULL SIZE.
5 NEW 1-AHU-2, CONTRACTOR SHALL EXTEND CONCRETE PAD TO 6"
BEYOND UNIT; CONNECT SUPPLY AIR AND OA DUCT TO EXISTING
AND REINSULATE.
6 CONTRACTOR SHALL PROVIDE DUCT SMOKE DETECTOR 7'0" AFF.
PROVIDE DUCT ACCESS DOOR.
7 36"X18" SA DUCT INTO UNIT. PROVIDE BELLMOUTH AT UNIT
CONNECTION.
8 CONTRACTOR TO PROVIDE DUCT MOUNTED SMOKE DETECTOR.
PROVIDE DUCT ACCESS DOOR.
9 CONTRACTOR SHALL INSTALL NEW COOLING TOWER WATER
TREATMENT SYSTEM. REFER TO 5/M502 FOR DETAILS. PROVIDE ¾”
PAINTED PLYWOOD BACKBOARD FOR MOUNTING ALL EQUIPMENT
AND APPURTENANCES.
1/4" = 1'-0"MH101
2 MECHANICAL PENTHOUSE ROOM 400 - NEW 1-AHU-2 ELEVATION
1/4" = 1'-0"MH101
3 SURGERY ROOF NEW 1-AHU-1
0 4' 8'2' 0 4' 8'2'
TEMPORARY CHILLED WATER
CONNECTION VALVES
T (E)P-3
(E)AHU
(E)P-2
(E)P-1
(E) 3/4" STM-LP
(E) 3/4" CDR-LPC
(E) 2 1/2" HWR
(E) 2 1/2" HWS
(E)AHU-3
(E) 1 1/2" CWS
(E) 1 1/2" CWS
(E) 3/4"
(E) 3/4"
(E) 1" HWS
(E) 1" HWR
(E) 3" STM-MP 40S
(E) 2 1/2" STM-LP
40S
(E) 2 1/2" HWR
(E)ET-1
(E)AS-1
(EF-2)
(EF-1)
(E)TCP
3 4
ROOM 400
ROOM 4W34
(E) 6" CHILLED WATER
SUPPLY AND RETURN FROM
SURGERY CHILLER (400)
(E) 8" CONDENSING WATER
RETURN AND SUPPLY
(E) CWS/R FROM
SUB-BASEMENT
(E)3" 40S DOWN
(E)EF-6
EXT
INT
(E) HTX
(E)AS-2
(E)PRV
(E)UH-1
(E)P-4
(E) HTX
(E)BT-CHW
(E)AS-1
(E)UH-2
(E) 4" CWR
8" CS
8" CR
CT-WTS
(E)UH-3
(E)1-CT-2
(E)1-CT-3
EXT INT
DST-1
EST-1
ST-1
DST-2
1 1/4" CD
TAHU-1
EST-2
1"
4" CWR
8" CS TOP
8" CS BOTTOM
3" CR
(E) 3/4" HWS
(E) 3/4" HWR
(E) 2" STM-LP (E) 2" HWS
(E) 2" HWR
8" CS BOTTOM
(E) 8" CR ABOVE
8" CS BELOW
(E) 8" CR BELOW
(E) 8" CS ABOVE
(E)8" 3-WAY
CNTRL
(E) 2" HWS
)P
-4
)P
-3
(E) 4" CWR
IN-LINE FILTER SYSTEM
SLAB
CONCRETE COOLING COIL
HUMDIFIER
PREHEAT COIL
DST-3
DST-2
EST-2
3/
I
(E) 3/4" STM-LP
PRE HEAT COIL
COOLING COIL
PIPE CHASE
PIPE CHASE
CONNECT TO
EXISTING STEAM
LINE
DST-1
EST-1
SEAL PIPE
PENETRATION (TYP)
(E) 8" CS ABOVE
(E) 8" CR BELOW
STRUCTURAL FRAMING
(E) 6" CWS (E) 4" CWS
(E)8" 3-WAY
CNTRL
(E) 2" STM-LP
(E) 1" STM-LP
(E) 3" STM(E) 2" HWR
P-6P-5
(E) 8" CR
(E) 8" CS
(E) 3" STM
TEMPORARY CHILLED
WATER CONNECTION
VALVES
(E)P-4
FLOOR
WORK AREA
KEY PLAN - NOT TO SCALE
PLAN
TRUE
PENTHOUSE AND ROOF MECHANICAL
PIPING PLAN
UPGRADE AND REPLACE SURGERY
1/8" = 1'-0"MP101
1 PENTHOUSE AND ROOF MECHANICAL PIPING PLAN
8' 16'4'0
MP101 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO
PREHEAT COIL.
2 CONTRACTOR SHALL PROVIDE NEW CHILLED WATER CONNECTION
TO CHILLED WATER COIL.
3 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO
HUMIDIFIER.
4 EXISTING FAN TO BE ACTIVE DURING CONSTRUCTION.
CONTRACTOR TO PROTECT EQUIPMENT DURING ALL PHASES OF
CONSTRUCTION.
5 CONTRACTOR TO PROVIDE NEW COOLING TOWER, 1-CT-1. UTILIZE
EXISTING STEEL SUPPORTS AND MODIFY TO SUPPORT NEW
EQUIPMENT.
6 EXISTING AHU TO BE ACTIVE DURING CONSTRUCTION.
CONTRACTOR TO PROTECT EQUIPMENT DURING ALL PHASES OF
CONSTRUCTION.
7 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO
PREHEAT COIL.
8 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO
HUMIDIFIER.
9 CONTRACTOR TO PROVIDE NEW AIR HANDLER, 1-AHU-2.
CONTRACTOR SHALL EXPAND EXISTING CONCRETE
HOUSEKEEPING PAD TO 6" BEYOND NEW UNIT. DOWEL
HORIZONTAL 3/4" REBAR WHERE PAD IS EXPANDED. EXISTING PAD
IS APPROXIMATELY 8'x22'-6".
10 CONTRACTOR SHALL PROVIDE NEW CHILLED WATER CONNECTION
TO CHILLED WATER COIL.
12 ROUTE STEAM CONDENSATE RETURN ALONG UNIT.
13 CONNECT NEW 4” DIA CWS TO EXISTING AT THIS APPROXIMATE
LOCATION ROUTING OVER TO NEW AHU-2. COORDINATE WITH
DEMOLITION PLANS.
14 NEW SIDE STREAM FILTER SYSTEM. BASIS OF DESIGN, AMIAD
WATER SYSTEM. PART NUMBER 8” EBS 10000 OL.
15 AFTER REMOVING EXISTING PUMP INSTALL NEW PUMP IN ITS
APPROXIMATE LOCATION. COORDINATE WITH PUMP CONNECTION
WITH EXISTING PIPING FOR EASY RE-CONNECTION.
16 AFTER DEMOLITION OF EXISTING PIPE, RECONNECT NEW 8”
CONDENSING WATER PIPING AT APPROXIMATE LOCATION OF
ISOLATION VALVE. COORDINATE WITH DEMOLITION FOR EASY
CONNECTION OF NEW PUMPS.
17 AFTER DEMOLITION OF EXISTING PIPE, RECONNECT NEW 8”
CONDENSING WATER PIPING AT APPROXIMATE LOCATION.
18 AFTER DEMOLITION OF EXISTING PIPE, RECONNECT NEW 8”
CONDENSING WATER PIPING AT APPROXIMATE LOCATION. THIS IS
LOCATED UNDER EXISTING 8” CR.
19 CONTRACTOR SHALL INSTALL NEW COOLING TOWER WATER
TREATMENT SYSTEM. REFER TO 5/M502 FOR DETAILS. PROVIDE ¾”
PAINTED PLYWOOD BACKBOARD FOR MOUNTING ALL EQUIPMENT
AND APPURTENANCES.
20 ROUTE DRAIN LINES TO DRAIN.
21 PROVIDE HEAT TRACE ON ALL CHILLED WATER, CONDENSING
WATER, AND STEAM CONDENSATE RETURN PIPES EXPOSED TO
WEATHER. LOCATE THERMOSTAT ON NORTH EXPOSURE.
1/4" = 1'-0"MP101
6 PUMPS P-5 AND P-6 - ENLARGED PLAN
1/2" = 1'-0"MP101
3 1-AHU-2 - ENLARGED PLAN
1/2" = 1'-0"MP101
4 1-AHU-1 - ENLARGED PLAN
5 SURGERY ROOF NEW COOLING TOWER SECTION
2 P-5 AND P-6 REPLACEMENT SECTION
0 4' 8'2'
0 4' 8'2'
0 2' 4'1'
0 2' 4'1' 0 2' 4'1'
TEMPORARY CHILLED WATER
CONNECTION AT VALVES.
TEMPORARY CHILLED
WATER CONNECTION
VALVES
VHASHRMoralJ
Typewritten Text
AutoCAD SHX Text
PURTLE
CONSULTING ENGINEERS
purtle@purtle.net
701 TEXAS STREET
fax 318 222 6564
SHREVEPORT, LA 71101
ASSOCIATES
PA-1072
318 425 4500
OVERTON BROOKS
MEDICAL CENTER
SURGERY ADDITION
SHREVEPORT, LOUISIANA
P l a n n i n g A r c h i t e c t u r e I n t e r i o r s s
The t o p
The Estopinal Group, Inc.
820 Jordan Street, Suite 507
Shreveport, Louisiana 71101
318.424.3700
318.424.3764 fax
Group n i a l
VASH.010
Revisions
Date
VA FORM 08-6231 FEB. 1983
Drawing Title
Approved: Division Chief
Approved: Service Director
Project Title
Location
Checked
Project No.
DRAWING NO.
Dwg.
Of
U.S. GOVERMENT PRINTING OFFICE 1984 455-088
one-eighth inch = one foot one-quarter inch = one foot three-eighths inch = one foot one-half inch = one foot three-quarters inch = one foot one inch = one foot one and one half inches = one foot three inches = one foot
HP
TP
26 APRIL 2002
MECHANICAL SCHEDULES
H1
DISCHARGE PLENUM
LAT (%%DF) DB/WB
EAT DB/WB (%%DF)
AIR P.D. ("WG)
WATER P.D. (FT)
EWT/LWT (%%DF)
TOTAL CAPACITY (MBH)
WATER FLOWRATE (GPM)
HEATING
CHILLED
AIRFLOW (CFM)
EXT. S.P. ("WG)
FAN TYPE
VOLTAGE/PHASE
FACE VEL. (FPM)
TOTAL S.P. ("WG)
FAN SPEED (RPM)
VENTILATION AIRFLOW (CFM)
TOTAL CAP. (MBH)
MOTOR SIZE (HP)
EAT (%%DF) DB/WB
EWT/LWT
WATER P.D. (FT)
PRESSURE (PSI)
EAT/LAT (%%DF)
SENS. CAP. (MBH)
WATERFLOW RATE (GPM)
TOTAL CAPACITY (MBH)
STEAM (LBS/HR)
PREFILTER EFF.
ACCESS SECTIONS
SERVES
MOUNT
* PROVIDE A 277/24V TRANSFORMER FOR EACH BOX
HX-1,2
DESIGN.
0-500
AIRFLOW
(CFM)
RANGE
FLOW
STEAM
(MBH)
160/180
(LBS/HR)
PSI
(GPM)
1.0
(FT)
(%%DF)
P3,P4
180/160
(%%dF)
E.W.T./L.W.T.
VARIABLE AIR VOLUME BOX SCHEDULE (SUPPLY)
SHELL SIDE
TUBE SIDE
6"%%C
SIZE
INLET
0.75"
INLET S.P.
(IN. W.G.)
HOT WATER COIL
12.0
FLOWRATE
1.2
P1,P2
P.D. FT
DESIG.
SIDEWALL EXHAUST
GRILLE
CEILING EXHAUST
CEILING EXHAUST
CURTAIN
LINEAR AIR
LINEAR FLOW
DIFFUSER
SQUARE CEILING
DIFFUSER
SQUARE CEILING
DESCRIPTION
G3
G2
G1
D4
D2
D3
CEILING DIFFUSER
D1
OPERATING ROOM AIR DISTRIBUTION SYSTEM,
SURFACE
WALL
CEILING
LAY-IN
ALUMINUM
ENAMEL
BAKED WHITE
35%%D BLADE DEFLECTION; 1/2" SPACING;
HORIZONTAL BLADES PARALLEL TO SHORT DIM;
ACCESSORIES
PREHEAT
DATA
12/12 PANEL; 1/2"x1/2"x1/2" EGG CRATE
24/24 PANEL; 1/2"x1/2"x1/2" EGG CRATE
CORE
CORE
SIZE AS INDICATED ON DRAWINGS
COOLING COIL #2
AIR DISTRIBUTION DEVICE SCHEDULE
MOUNTING
LAY-IN
FINISH
MATERIAL
48/24 PERFORATED FACE WITH VOLUME
12/12 FULLY LOUVERED FACE; NECK SIZE AS
24/24 FULLY LOUVERED FACE; NECK SIZE AS
ACCESSORIES/REMARKS
DAMPER, NECK SIZE AS INDICATED
INDICATED; 4-WAY THROW
INDICATED; 4-WAY THROW
FAN
LOCATION
SERVES
AHU NO.
208/3
GPM
TDH
RPM
CASE
HORIZONTAL SPLIT
PUMP SCHEDULE
75%
MIN
EFF
480/3
VOLTS
PHASE
CFM
IN. W.G.
E.S.P.
RPM
FAN SCHEDULE
SIZES (INCHES)
DIS
SUC
10.8"
IMP
SONES
BELT
DRIVE
REMARKS
LOW PRESSURE CONDENSATE
DUCT TRANSITION - CONCENTRIC, ECCENTRIC
SUPPLY AIR DIFFUSER OR DUCT
RETURN AIR GRILLE, REGISTER OR DUCT
EXHAUST AIR GRILLE, REGISTER OR DUCT
ADJUSTABLE SPLITTER TEE W/TURNING
ELBOW W/DOUBLE THICKNESS VANES
MECHANICAL LEGEND
FIRE DAMPER - VERTICAL AIR FLOW
FIRE DAMPER - HORIZONTAL AIR FLOW
HEAT EXCHANGER
STEAM (15 LBS.)
STEAM (80 LBS.)
HEATING WATER SUPPLY
HEATING WATER RETURN
CHILLED WATER RETURN
15S
HX
LPC
HWR
80S
HWS
CWR
BUTTERFLY VALVE
OPPOSED BLADE DAMPER
CHILLED WATER SUPPLY
EXHAUST FAN
UNIT HEATER
ABOVE FINISHED FLOOR
CONNECT TO EXISTING
CWS
OBD
AFF
EF
UH
THERMOSTAT
MANUAL VOLUME DAMPER
DRAIN LINE
SHUT-OFF VALVE
AIR HANDLING UNIT
FD
AHU
EXIST SURGERY
AIR HANDLING UNIT SCHEDULE
NEW SURGERY
SYMBOL
UNDERGROUND
FLEXIBLE DUCT
LINED DUCTWORK
VANES (S/A ONLY)
U/G
DESCRIPTION
HEATING WATER EXPANSION TANK, 20 GAL, 6 GAL ACCEPTANCE, ASME RATED 125 PSI
CHILLED WATER AIR SEPARATOR, 600 GPM MIN., ASME RATED 125 PSI, MAX PRESS DROP 3FT.
HEATING WATER AIR SEPARATOR, 60 GPM MIN., ASME RATED125 PSI, MAX PRESS DROP 1.5FT.
MISCELLANEOUS EQUIPMENT SCHEDULE
CHILLED WATER EXPANSION TANK, 44 GAL, 22 GAL ACCEPTANCE, ASME RATED 125 PSI VERTICAL
ET-1
ET-2
AS-2
AS-1
DESCRIPTION / ACCESSORIES / REMARKS
NOTE: PROVIDE T-STAT AND MOUNTING BRACKET
UH-1, 2, 3
1/8
39.8
MOTOR HP
HEAT
CAP.
115V/1%%C
4.0
STAIN STL
W/OBD; SIZE AS INDICATED
AIR FLOW (CFM)
EAT (F%%D) DB/WB
LAT (F%%D) DB/WB
STEAM (LBS/HR)
STEAM PRESSURE (PSI)
30%
COOLING COIL #1
30%
90%
90%
FINAL FILTER EFF.
CONDENSER
P5,P6
DOP
EFF
PRESS. DROP
INITIAL
FINAL
QUANTITY
8K
4K
2K
1K
DYNAMIC INSERTION LOSS
BANK SIZE
QUANTITY
IN. W.G.
S.P.
SOUND ATTENUATOR SCHEDULE
NO. OF
CELLS
TONS
%%DF
EWT
%%DF
LWT
NO. - HP
WB
OAT
FAN MTR
SUPPLY
NO. - KW
SUMP HTRS.
POWER
COOLING TOWER SCHEDULE
CT-1
480V/3%%C
P.D
CHILLER SCHEDULE
EVAPORATOR
EFFICIENCY
KW/TON
(TONS)
P.D
CONDENSER
REFRIGERANT
VOLTAGE
CH-1
.59
.63
FULL
IPLV
85/95
CENTRIFUGAL
FH-1
VAV-7
OR3
HEPA
AIR FILTER SCHEDULE
EF-1
EF-2
6" DIA; 2-PASS HEAD
HEAT EXCHANGER SCHEDULE
MOTORIZED BUTTERFLY VALVE
HYDRONIC UNIT HEATER SCHEDULE
SA-1
SA-2
AHU-1
SUPPLY DUCT
SUPPLY DUCT
AHU-1
IN-LINE
CASE
HORIZONTAL SPLIT
0-2000
0-1400
0-4000
0-900
0-3000
STEAM HUMIDIFIER SCHEDULE
LBS/HR
STEAM
PSI
MANIFOLD(S)
DISTRIBUTION
H-1, 2, 3, 4
ORs
FT
P.D.
0.35
(1)24x18x84
(1)12x18x84
(1)18x18x84
(1)12x18x84
0.35
12"%%C
10"%%C
16"%%C
8"%%C
14"%%C
30.0
21.0
114.0
10.0
95.0
3.0
2.1
8.2
180/157
58%
7"
99.97%
.65
1.2
(4)24x24x12
1-30
1-9
FILTER HOUSING
STAIN STL GASKETED
W/SIDE ACCESS
CROSS FLOW, MECHANICAL
DRAFT
52/40
15.0
3-STAGE
EF-3
EF-4
EF-5
UP BLAST
DOWN BLAST
1.25
1.50
1.50
0.50
2.0
0.75
15.0
11.0
11.0
13.0
8.0
* PERFORMANCE DATA LISTED DOES NOT INCLUDE LOSSES DUE TO SOUND ATTENUATOR
PROVIDE DISCONNECT SWITCH;
BIRDSCREEN;BACKDRAFT DAMPER
FACTORY CURB W/SOUND CURB
FACTORY CURB
15500
2.5
7.25
18/62
0.17
YES
DESIG.
RANGE
(IN. W.G.)
INLET S.P.
LEVEL
N.C.
INLET
VARIABLE AIR VOLUME BOX SCHEDULE (EXHAUST)
0.5"
18x12
PROVIDE AVERAGING VELOCITY SENSOR
0-2000
24x14
18x12
20x18
14x10
20x16
14x10
FSD
FIRE & SMOKE DAMPER
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
CS
CR
BALL VALVE
MOTORIZED BALL VALVE
TCP
TEMPERATURE CONTROL PANEL
OCCUPANCY SWITCH
0.25
2ND FLR
EF-6
115/1
6.0
* MOTORS SHALL BE NON-OVERLOADING
75%
8.3"
NPSHR=5FT
4 MINIMUM
DISPERSON DISTANCE: 24 IN MAX
TANK
HORIZONTAL TANK
BALANCING VALVE
15000
62/45
62/54.5
0.06
AF
2.5
7.2
B1
FACE VELOCITY (FPM)
SENS. CAPACITY (MBH)
LAT DB/WB (%%DF)
89.0/80.0
89.5/80.0
63.0/62.6
64.0/63.3
42/56.4
42/50.4
0.60
0.51
63.0/62.6
64.0/63.3
50.0/49.9
50.0/49.9
42/50.4
42/56.4
1.4
0.91
18/62
0.2
POWER
(KW)
R-134a
R-123
* UNIT PERFORMANCE SCHEDULED AT WET BULB CONDITION.
PROVIDE SUBMITTAL DATA AT 99/77 EAT ALSO.
DN
PROJECT
LIMITS
3W-41
STERILE
DRESSING
ROOM
PROJECT
LIMITS
3W-39
ANESTHESIA
3W-38
ANESTHESIA
EQUIPMENT
3W-48
SCRUB
3W-42
SCRUB
3W-43
UP
3W-44
CLEAN UP
3W-74
CORRIDOR
3W-78
GALLERY
3W-46
PURTLE
CONSULTING ENGINEERS
purtle@purtle.net
701 TEXAS STREET
fax 318 222 6564
ASSOCIATES
PA-1072
318 425 4500
OVERTON BROOKS
MEDICAL CENTER
SURGERY ADDITION
SHREVEPORT, LOUISIANA
P l a n n i n g A r c h i t e c t u r e I n t e r i o r s s
The t o p
The Estopinal Group, Inc.
820 Jordan Street, Suite 507
Shreveport, Louisiana 71101
318.424.3700
318.424.3764 fax
Group n i a l
VASH.010
Revisions
VA FORM 08-6231 FEB. 1983
Drawing Title
Approved: Division Chief
Approved: Service Director
Project Title
Location
Checked
Project No.
DRAWING NO.
Dwg.
Of
U.S. GOVERMENT PRINTING OFFICE 1984 455-088
one-eighth inch = one foot one-quarter inch = one foot three-eighths inch = one foot one-half inch = one foot three-quarters inch = one foot one inch = one foot one and one half inches = one foot three inches = one foot
TP
26 APRIL 2002
PARTIAL 3RD FLOOR PLAN -
HVAC
H2
FSD
250 CFM
D1, 10"%%C
D1, 8"%%C
125 CFM
200 CFM
300 CFM
100 CFM
D2, 8"%%C
(TYP 2)
300 CFM
600 CFM
D1, 12"%%C
H-4
FH-1
H-3
H-2
600 CFM
D1, 12"%%C
H-1
1250 CFM
G3, 18/36
EF-3
1350 CFM
EF-2
306A
24/16
18/14
12/12
12/6
12/5
14/12
30/18 UP
10"%%C
30/14
1275 CFM
1075 CFM
G3, 18/30
D4, 12'x10'
1675 CFM
(TYP 3)
D3, 12"%%C
275 CFM
36/18 UP
8"%%c
28/18
36/18
28/18
14/14
OFFSET INTO JOIST WEB
10/12
10/8
20/14
16/12
14"%%C
32/14
12/10
11/5
11/6
9/5
(TYP 4)
D4, 14'x12'
2000 CFM
700 CFM
1875 CFM
20/12
18/18
20/16
20/20
14/10
12/6 THRU JOIST
24/14
18/14 THRU JOIST
OFFSET BELOW BEAM
18/14 B/W JOIST
700 CFM
1450 CFM
20/18
24/18
14/10
20/12 (TYP)
24/18
18/12 B/W JOIST
12/8
12/8
150 CFM
150 CFM
125 CFM
EF-1
20/12 B/W JOIST
18/12
18/10
800 CFM
D2, 8"%%C
100 CFM
14/12 E/A FROM
BELOW
OFFSET UNDER BEAM
12/12 E/A FROM
BELOW
12/12 UP
OFFSET ABV
CLG
OFFSET B/W
JOIST
EXTG RTU
18/12 DN
MTD 7"AFF
(TYP)
OFFSET BELOW BEAM
EF-6
%%UHVAC NOTES:
H1
ALL FLEXIBLE DUCT SHALL BE FULLY EXTENDED FREE OF KINKS
AND NO LONGER THAN 5'-0" SAME SIZE AS DIFFUSER NECK.
H2
ALL DUCTWORK SIZES SHOWN ARE INSIDE FREE AREA DIMENSIONS.
H3
ALL DIFFUSERS AND/OR GRILLES LESS THAN FULL CEILING T-BAR
SPACINGS SHALL BE INDEPENDENTLY SUPPORTED FROM STRUCTURE
H4
H5
ALL DUCT WORK FROM EXHAUST FANS & AIR HANDLER TO VAV'S SHALL
BE MEDIUM PRESSURE CONSTRUCTED PER SMACNA STANDARDS FOR
6"WG. ALL LOW PRESSURE DUCTWORK SHALL BE CONSTRUCTED PER
PROVIDE FLEX DUCT CONNECTIONS AT THE DISCHARGE OF ALL VAV'S.
MEDIUM PRESSURE FLEXIBLE DUCT TO VAV'S TO BE SAME SIZE
H6
AS UNIT INLET.
ABOVE WITH CEILING TIE WIRES.
SMACNA STANDARDS FOR 2"WG.
H6
H7
PER MANUFACTURER'S INSTRUCTIONS.
4"%%C EXHAUST DUCT TO VACUUM PUMP MOTOR ABV CLG. CONNECT
6"%%c
PLAN - HVAC
PARTIAL THIRD FLOOR
1/4"=1'-0"
END
CAP(TYP)
OR HVAC new dwg
Operating Rooms Dwg
36_H1
37_H2
H1
Sheets and Views
Layout1
H2
Sheets and Views
Layout1 image3.emf
Isolation Rooms Dwg and TAB schedule.pdf
Rectangle image4.emf
Air Change Test Result (SPS) - June 2024.xlsx Sheet1
SPS Satellite Rooms - AIR CHANGE TEST RESULTS (Rev: 07/2022)
Test Date: June 2024 Tested By: Barnett & Williams
Bld. Rm. Room Rm. Vol. Press. Supply Air CFM Exhaust Air CFM Min Air Total Air Pass
No. No. Function CF Diff. Grill 1 Grill 2 Total Grill 1 Grill 2 Total Changes Changes or Fail
1 BW35 SPEECH LAB 1670 Positive X X 585 -151 -359 -510 4 21.02 PASS
1 BD19 SOILED UTILITY 612 Negative X X 67 X X -129 10 12.65 PASS
1 BD22 CLEAN SUPPLY 335 Positive X X 65 Can't Reach With Hood 4 11.64 PASS
1 BE30A CLEAN SUPPLY 525 Positive FAN COIL UNIT ONLY 4 N/A N/A
1 BS21 IMPLANT COORDINATOR OFFICE 68 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A
1 1N16 CLEAN SUPPLY 730 Positive X X 211 X X -57 4 17.34 PASS
1 1N23 SOILED UTILITY 480 Negative X X X X X -91 10 11.38 PASS
1 3E 11 SOILED UTILITY 771 Negative X X 61 X X -133 10 10.35 PASS
1 3N9 SOILED UTILITY 539 Negative X X X X X -389 10 43.3 PASS
1 3N10 CLEAN SUPPLY 1337 Positive X X 484 X X X 4 21.72 PASS
1 3W40C MAIN INSTRUMENT & SUPPLY 1590 Positive X X 126 X X -35 4 4.75 PASS
1 3W40H ORTHO SUPPLY 1230 Positive X X 221 X X -109 4 10.78 PASS
1 3W40L STERILE SUPPLY 1526 Positive X X 253 X X -169 4 9.95 PASS
1 3W48A CLEAN SUPPLY 1860 Positive X X 145 X X -111 4 4.68 PASS
1 3W53 ANESTHESIA SUPPLY 1500 Positive 60 108 168 X X N/A 4 6.72 PASS
1 4W41 CLEAN SUPPLY 1452 Positive X X 135 X X N/A 4 5.58 PASS
1 4E 15 UNIT SUPPLY 1150 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A
1 4E 16 SOILED UTILITY 1550 Negative NOT CURRENTLY USED BY SPS 10 N/A N/A
1 5E 22 ULTRA-SOUND 1400 Positive X X 522 X X -304 4 22.37 PASS
1 5E 23 UROLOGY SERVICE CYSTO SUITE 2150 Positive X X 805 X X -430 4 22.47 PASS
1 5E 24 CLEAN SUPPLY 780 Positive X X 250 X X -19 4 19.23 PASS
1 5E 28 BRONCHOCSCOPE TEST ROOM 2935 Negative FAN COIL UNIT X X -326 4 6.66 PASS
1 5E 29 G. U. CLEAN SUPPLY 1430 Positive FAN COIL UNIT ONLY 4 N/A N/A
1 5W31 CLINIC SUPPLIES 1056 Positive FAN COIL UNIT ONLY 4 N/A N/A
1 5W35 SOILED UTILITY 1116 Negative X X N/A X X -272 10 14.62 PASS
1 6E 15 CLEAN SUPPLY 1230 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A
1 6E 16 SOILED UTILITY 1552 Negative X X N/A X X * 10 * *
1 6E 21A SUPPLY ROOM 1162 Positive FAN COIL UNIT ONLY 4 N/A N/A
1 6N30 INFECTIOUS WASTE 422 Negative X X 41 X X -124 10 17.63 PASS
1 6N34 CLEAN SUPPLY 2527 Positive 188 195 383 X X N/A 4 9.09 PASS
1 7E 11 SOILED UTILITY 1116 Negative X X N/A X X -203 10 10.91 PASS
1 7E 16 ENDOSCOPY PROCEDURE - ROOM 2 2085 Positive FAN COIL UNITS X X -165 4 4.75 PASS
1 7E20B1 G. I. CLEAN ROOM 789 Positive FAN COIL UNIT ONLY 4 N/A N/A
* CONSTRUCTION
SPS Satellite Rooms - AIR CHANGE TEST RESULTS (Rev: 07/2022)
Test Date: June 2024 Tested By: Barnett & Williams
Bld. Rm. Room Rm. Vol. Press. Supply Air CFM Exhaust Air CFM Min Air Total Air Pass
No. No. Function CF Diff. Grill 1 Grill 2 Total Grill 1 Grill 2 Total Changes Changes or Fail
1 9W28 CLEAN SUPPLY 550 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A
1 10E 20 CLEAN STORAGE 1624 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A
55 105 DIRTY ROOM / BIOHAZARD 660 Negative X X 82 X X -177 10 16.09 PASS
55 115 CLEAN ROOM 588 Positive X X 85 X X N/A 4 8.67 PASS
55 213 SOILDED ROOM / BIOHAZARD 564 Negative X X N/A X X -105 10 11.17 PASS
55 214 CLEAN ROOM 576 Positive X X 59 X X N/A 4 6.15 PASS
55 312 NO I.D. / BIOHAZARD 514 Negative X X N/A X X -110 10 12.84 PASS
55 317 NO I.D. (CLEAN SUPPLIES) 963 Positive X X 98 X X -71 4 6.11 PASS
55 318 NO I.D. (CLEAN AREA) 518 Positive X X 53 X X N/A 4 6.14 PASS
57 122 BIOHAZARD 470 Negative X X 43 X X -92 10 11.74 PASS
57 124 STERILE SUPPLIES 491 Positive X X 149 -119 -159 -278 4 18.21 PASS
57 222 BIOHAZARD 470 Negative X X 64 X X -93 10 11.87 PASS
57 224 STERILE SUPPLIES 486 Positive 110 182 3292 X X -90 4 36.05 PASS
Sterile Processing Area
BE27-1 Clean Storage (Positive) BE27B-1 Sterile Prep. (Positive) BE28-1 Decon (Negative) Medivator Rm. (Positive)
Grill #1 CFM: 95
Grill #2 CFM: 539
Grill #3 CFM: BLOCKED Grill #12 CFM: -403
Grill #4 CFM: 150 Grill #7 CFM: 1179 Grill #13 CFM: -390
Grill #5 CFM: BLOCKED Grill #8 CFM: 627 Grill #14 CFM: REMOVED Supply Grill CFM: 227
Grill #6 CFM: 181 Grill #9 CFM: 983976 Grill #15 CFM: -298 Exhaust Grill CFM: 0
Total CFM: 965 Total CFM: 2782 Total CFM: -1091 Total CFM: N/A
Room Volume: 8960 CF Room Volume: 8100 CF Room Volume: 7400 CF Room Volume: 723 CF
Min Total Air Changes: 4 Min Total Air Changes: 4 Min Total Air Changes: 6 Min Air Changes: 6
Total Air Changes: 6.46 Total Air Changes: 20.61 Total Air Changes: 8.85 Total Air Changes: 18.84
Pass or Fail: PASS Pass or Fail: PASS Pass or Fail: PASS Pass or Fail: PASS image5.emf
HEPA Filter Locations.pdf
FIRST FLOOR (HEALTH CARE)
OVERTON BROOKS VAMC
510 E. STONER AVE.
1S66
1S37
1S10
1S4
1S1
1S6
1S15 1S63
1S53
1S511S21
1S19
1S55
1S49A
1S49
1S43 1S35
1S33
1S32 1S38
1S60
1S17
STAIRS #11
STAIRS #10
1S12
1S14
1S16
1S18
1S20
1S22
1S24
1S26
1S28
1S30
OFFICE
BREAK.
GROUP ROOM
WAITING
OFFICE OFFICE
1-S-23
GROUP ROOM
1S25
EN
. S
TO
1S47
TELE
MH
1S58
1S40
1S42
1S44
1S46
1S48
1S50
1S52
1S54
1S56WAITING
LIET
GEN. STOR.
KITCHEN
TOLIET
INFO DESK
1S2
GEN. STOR.
OIT STOR.
EQUIP.
STOR.
1S94
COORIDOR
1S96
1S6A
VESTIBULECOORIDOR
1N2
1N1
1N24H
1W10
1W12
1W2A
1W21W1
1W4
1W11
1W1A
1-W-8
1W13
1W14
1W17
1W33 1W34 1W35
1W18 1W19 1W20
1W31A
1W36 1W37 1W38 1W40
1W21 1W23 1W24 1W24A
1W451W44
1W50
1W25
1W26
1W57
1W58
SWITCHBOARD
1E82 1E81
1E79 1E801E78
1E87 1E87A
1E83 1E8485A1E861E92
A 1E91A 1E90
1E89
1E88
1E75 1E74
1E73A 1E73
1E39
1E38
1E37 1E40
1E41
1E42
1E43
1E441E45
1E46
1E47
1E48
1E491E50
1E51
1E52
1E53
1E54 1E45A
1E31 1E32 1E33 1E34 1E35
ELEV
ELEV
1E65
1E65A
1E63 1E62
1E
1E58
1E85
- 1E500 -
1E400
1W6
1W15
ELEV.
#-7
UP
ELEV. ELEV. ELEV.
#8 #9 #10
ELEV. ELEV. ELEV.
ELEV. ELEV.
#5 #6
#1#2#3 OFFICE
1E100
POLICE
ELECT.
1W25C
1W25B
1E93
EMER.GEN.ROOM
1E97
1E95
1W27D
17A
1E67
1E68
109 10199
PHARMACY
MAIL ROOM
VENDING ROOM
SWITCH GEAR
ROOM.
TELEPHONE
SWITCH
PIPE
CHASE
ALARM
PANELS
1E70 1E70A
1E70B
100B
58A
1E96
1E95A 1E95B
1E95C
1E95D
1E95E
1E95F
1E95G
1E25
21A
1W22
1W37A
1W26A1W26B
1W26C
1E66
1W25A
EXECUTIVE OFFICES
CANTEEN
ENG.
VOL.SVC.
IRM
FISCAL
ELEC. EMS
EMS
EM
ER
EM
ER
MAS
H.R.M.
H.R.M.H.R.M.H.R.M.
H.R.M. H.R.M.
MASRESTROOM
HBHC
HBHCHBHC
HBHC
BLUE TEAM
OFFICEOFFICE
OFFICEOFFICEOFFICEOFFICE
#2
#3
DW
DW
TE
AO/ASSO DIR
OFFICE OFFICE OFFICE
LIFE SUPPORT
1E98
DIR.
ASSOC DIR
COS
SEC SEC
SEC
1E98A
1W9
1W16A
AO/DIR
SEC
COPY RM.
P.A.
1E55
CONFERENCE RM
1E60
1E
1W50A 1W51
1W50B 1-W-52
CLASSROOM
1W49A 1W49B
1S3
GENERAL
STAIRS #11
STAIRS
STAIRS
OFFICE OFFICEOFFICE
STORAGE
EXAM
1E91
#20
#20
1W46
VLER
COMM.
MY HEALTH
eVET
OFF
OFF
ICE
BREAKROOM
TREATMENT
EXAM EXAM
OFFICE EXAM EXAM EXAM OFFICE
STAIRS #1
STAIRS #6
STAIRS #7
STAIRS #5
STAIRS #9
STAIRWELL
STAIRS #4
RESTROOM RESTROOM
BREAK
GEN.
STOR.
RESTROOM
ES
TI
1W27C
1W27B
1W27A
1W27B
1W28
VESTIBULE
PRESCRIPTION
TURN-IN
1E95
OFFICE HAC
RESTROOMWHEELCHAIR
CLEAN
PHARM
VAULT
CONFERENCE RM
1E95J
IV PREP
ROOM
1E95H
1E95L
1E95N
CLEAN SUPPLY
1E95M
HAC
1E111
ELEVATOR LOBBY
1W500
1W59
1E400B
1W31
1E100C
1E70C
1E500D
E4
1E500C
EXIT
1E39A
EXIT
1E400F
1N11
1N12
1N13
1N14
1N15
CLEAN SUPPLY
1N16 LIFE SUPPORT
1N17
1N18
SOILED UTILITY
1N23NURSE STATION
1N19
CRASH CART
1N9
1N08
1N10
TOILET
1N11A VESTIBULE
200A
DECON
200B
1N7A
EQUIPMENT
1N20
TRIAGE
1N21
1N22
CHECK-IN
1N7
100C
200E
200C
200FCOORIDOR
200D COORIDOR
100B
1N6
LINEN
100F
ELEC.
1N24A
1N24
FAST TRACK
1N24E
1N24F
1N24G
1N3 TOILET
1N4
100A
1N5
STRETCHER STORAGE
1N7B
PRESS TREAT.
1E11 EXAM
1E10
1E8
1E6A EXAM
1E6
1E4
1E2 HSKP
1E300C
EQUIP STOR
1E300B
ENTRY
1E300A
1E300D
1E300E
1E1
1E26
1E27
SOCIAL WK
1E28
DIETETICS
1E29
MH OFFICE
1E19
ELEC
1E20
SOIL UTIL
1E22
1E21
1E23 TLT
1E24
1E25
1E3
TLT
1E5EXAM
1E7
1E9
CLEAN UTIL
1E12
1E13
1E14
1E15
1E16
1E17
1E18
1E300F
1E400A
1E400B
1E400C
1E300G
Stamp
Line
6-W-48
6-W-49
6-W-52
-W
-5
6-W-53
6-W-55
-E
6-N-1
3A 3
6-N-33
6-N-34
6-N-31
6-N-29
6-N-28
6-N-7
6-N-8
6-N-10
6-N-12 6-N-27
6-N-17
35A 6-N-22
6-N-23
6-N-24
6-N-25
6-N-26
6-N-35
5 6
8 9 10
TA
3 2 153A
6-E-500
-N
-N-6
23 30
36 43
37 42 49
55 56
64 67
66 73
6848 58
6W31
20A 6W21
6W22
6W20 21A
6W23 6W24 23A
6W18
19A
18A
6W166W17 6W15
15A
29A
6W29 6W30
10B
6W10A
6W9A
9 9B
6W14
14A
13A
6W13 6W12
6W32
32B 6W35
12A
11A
6W11
6W36
35A
6W37
6W8
17A 16A
28A
6W28
6W27
6W26 6W2524A
CORRIDOR 6W39
6-W-4
6-W-5
6-W-6
6-W-738
ENG
BED
BEDN.S.
N.S.
22A
CATH LAB
22B
# 4
STAIR
6-E-500
500B
6-E-500A
A13
CATH LAB
HANDICAP SHOWER
HANDICAP SHOWER
SHELF
SHELF
6-E-1
2A
6-E-2 6-E-3
3A
6-E-5 6-E-7
6-E-31 6-E-30 6-E-29 6-E-28 6-E-27 6-E-26
-1
6-E-25 6-E-24 6-E-23B 6-E-23
6-E-22
6-E-20
20A
6- E-
21A 21D
21B
21C
AAAAA
A/C
MICU
N.S.
BED BED BED BED BED BED BED BED BED
BEDBED
BED BED BED BED BED BED BED BED
CATH
SIXTH FLOOR (HEALTH CARE)
OMNI
CELL
2276 SF
136 135 134 133
STAIR #5
143 144 145 146
150 149 148 147
162 159
175 174 173 172
9N-8
9N-5B
FEV
9N-7
9N-5
9N-6
9N-5A
9N-9
9N-10
9N-11
9N-12
9N-13
9N-1A
FE
9N-4
9N-3
9N-2
9N-1
DF
9W-3
9W-2
9W-1
9E-1
9E-30
62 69 7086
64 67
68 7179
80 81
85 84
93 94 95 96 97
101102103
108107106
119 116 115
120 121
130 131
9W-4
9W-169W-15
9W-59W-69W-6A 9W-7
9W-8
9W-9
MECH.
9W-12
STAIR #2
9W-22
9W-14 9W-17
9W-13
9W-13B
9W-13A
9W-31
9W-31A
STAIR #3 9E-29
9E-28C
129 132
123 122
112189
111188
98187
114 113
EIGHTH FLOOR
5959'
57'
FE
9W-18
9W-19
9W-20
9W-219W-20A
9W-239W-249W-259W-269W-279W-289W-29
9W-30
9N-14
9N-1B 9N-1C
9W-11
9E-31
9E-3 9E-5 9E-6 9E-8
9E-17
TEL.
9E-2A9E-2
9E-18
STAIR #49E-6A9E-3A
9E-19
9E-31A
9E-21 9E-20
9E-21A
9E-239E-25
9E-269E-27
9E-28B
9E-28A 9E-28 9E-20A
9E-15 9E-16A
9E-16 9E-15A
9E-4 9E-7
FEDF
9E-9 9E-10
9E-10A
9E-11 9E-12 9E-13
9E-14
9E-22 9E-24
9E-25A
9N-8
NURSING STATION
EA
MENTAL HEALTH
MENTAL HEALTH
OFFICEOFFICEOFFICEOFFICEOFFICE
BED BED
BED BEDCONF.ROOM
Exh.
112189
111188110
9E-1A
SALLY PORT
NINTH FLOOR (HEALTH CARE)
Sheets and Views
Building 1-MASTER 4-2019-S-B
Building 1-MASTER 4-2019-B
Building 1-MASTER 4-2019-1
Building 1-MASTER 4-2019-2
Building 1-MASTER 4-2019-3
Building 1-MASTER 4-2019-4
Building 1-MASTER 4-2019-5
Building 1-MASTER 4-2019-6
Building 1-MASTER 4-2019-7
Building 1-MASTER 4-2019-8
Building 1-MASTER 4-2019-9
Building 1-MASTER 4-2019-10
Building 1-MASTER 4-2019-11
Building 1-MASTER 4-2019-12 image1.emf
TAB E - VA HVAC Design Manual VA Table 2-1.pdf
VAMC SHREVEPORT LA - REPAIR OR HVAC AND ROOF
VA Medical Center November 6, 2019
Trace Load Calculation Results and Air Flow Calculations Shreveport LA
Global Variables
Cooling DT 17 F
Heating DT 20 F
AHU
AHU Number Trace Room Name and Number ASHRAE 62 Room Type
Area
(SF)
Height
(ft)
People
Count
System
Type VAV or CV
Sensible
Cooling
(BTUH)
Latent
VAV
Heating
Perimeter
Heat
Total Heat
Heating
Supply
(AC/hr)
(AC/hr)
Exhaust
OA CFM
per
Person
OA CFM
per SF
Max.
Min.
Exhaust
Min. OA
Fraction
Room Status VAV or
CV
Min.
Reheat T Original CFM
AHU-1 (OLD OR) Room - 005 OR 5 Pharmacy (prep. area) 378 8.83 8 VAV 18,643 2,000 -3,052 0 -3,052 1,015 147 20 4 0.00% 5 0.18 1,113 1,113 0 223 20.00% VAV POS 0.00% 77 1,113
AHU-1 (OLD OR) Room - 006 OR 6 Pharmacy (prep. area) 663 9 8 VAV 25,693 2,000 -10,429 0 -10,429 1,399 501 20 4 0.00% 5 0.18 1,989 1,989 0 398 20.00% VAV POS 0.00% 79 1,989
AHU-1 (OLD OR) Room - 007 OR 7 Pharmacy (prep. area) 513 9 8 VAV 24,763 2,000 -7,901 0 -7,901 1,349 380 20 4 0.00% 5 0.18 1,539 1,539 0 308 20.00% VAV POS 0.00% 79 1,539
AHU-1 (OLD OR) Room - 018 Equipment Room Pharmacy (prep. area) 185 9 0 VAV 13,430 0 -2,299 0 -2,299 732 111 6 2 0.00% 5 0.18 732 167 0 56 7.59% VAV POS 0.00% 87 167
AHU-1 (OLD OR) Room - 019 Scrub for OR 6 Pharmacy (prep. area) 96 9 2 VAV 2,554 500 -1,320 0 -1,320 139 63 6 2 0.00% 5 0.18 139 86 0 29 20.71% VAV POS 0.00% 88 86
AHU-1 (OLD OR) Room - 020 Substerile for OR 6 and 7 Pharmacy (prep. area) 144 9 1 VAV 15,122 500 -2,440 0 -2,440 824 117 6 2 0.00% 5 0.18 824 130 0 43 5.25% VAV POS 0.00% 92 130
AHU-1 (OLD OR) Room - 021 SUb sterile for OR 5 Pharmacy (prep. area) 80 9 1 VAV 14,437 500 -2,335 0 -2,335 786 112 6 2 0.00% 5 0.18 786 112 0 24 3.05% VAV POS 0.00% 94 112
AHU-1 (OLD OR) Room - 022 Scrub for OR 5 Pharmacy (prep. area) 100 9 2 VAV 2,583 500 -1,333 0 -1,333 141 64 6 2 0.00% 5 0.18 141 90 0 30 21.33% VAV POS 0.00% 88 90
AHU-1 (OLD OR) Room - 025 Old OR Corridor Pharmacy (prep. area) 631 9 1 VAV 4,421 0 -2,113 0 -2,113 241 102 8 2 0.00% 5 0.18 757 757 0 189 25.00% VAV POS 0.00% 77 568
AHU-1 (OLD OR) REST OF SPACES ON THIS SYSTEM Office space 6,440 6,440
14,459 12,422 0 1,299
Plus 5% Leakage 15,182
Plus 5% Safety 15,941 3,985 Based on critical space
AHU-2 (NEW OR) Room - 001 OR 1 Pharmacy (prep. area) 490 9 8 VAV 15,639 2,000 -2,804 0 -2,804 852 135 20 4 0.00% 5 0.18 1,469 1,469 0 294 20.00% VAV POS 0.00% 76 1,469
AHU-2 (NEW OR) Room - 002 OR2 Pharmacy (prep. area) 694 9 8 VAV 17,947 2,000 -3,022 0 -3,022 978 145 20 4 0.00% 5 0.18 2,081 2,081 0 416 20.00% VAV POS 0.00% 75 2,081
AHU-2 (NEW OR) Room - 003 OR3 Pharmacy (prep. area) 783 9.6 8 VAV 19,935 2,000 -3,366 0 -3,366 1,086 162 20 4 0.00% 5 0.18 2,506 2,506 0 501 20.00% VAV POS 0.00% 75 2,506
AHU-2 (NEW OR) Room - 004 OR 4 Pharmacy (prep. area) 759 9.6 8 VAV 21,559 2,000 -3,520 0 -3,520 1,174 169 20 4 0.00% 5 0.18 2,428 2,428 0 486 20.00% VAV POS 0.00% 75 2,428
AHU-2 (NEW OR) Room - 008 Sub Sterile for OR 1 and 2 Pharmacy (prep. area) 155 9 1 VAV 15,222 500 -2,459 0 -2,459 829 118 6 2 0.00% 5 0.18 829 140 0 47 5.61% VAV POS 0.00% 91 140
AHU-2 (NEW OR) Room - 009 Scrub OR 1 and 2 Pharmacy (prep. area) 88 9 2 VAV 2,530 500 -1,239 0 -1,239 138 60 6 2 0.00% 5 0.18 138 79 0 26 19.16% VAV POS 0.00% 89 79
AHU-2 (NEW OR) Room - 010 Sterile Supply Pharmacy (prep. area) 160 9 0 VAV 2,829 250 -1,435 0 -1,435 154 69 6 2 0.00% 5 0.18 154 144 0 48 31.06% VAV POS 0.00% 83 144
AHU-2 (NEW OR) Room - 011 Substerile for OR 3 and 4 Pharmacy (prep. area) 160 9 1 VAV 15,079 500 -2,441 0 -2,441 821 117 6 2 0.00% 5 0.18 821 144 0 48 5.83% VAV POS 0.00% 90 144
AHU-2 (NEW OR) Room - 012 Scrub for OR 3 and 4 Pharmacy (prep. area) 120 9 2 VAV 2,776 500 -1,327 0 -1,327 151 64 6 2 0.00% 5 0.18 151 108 0 36 23.81% VAV POS 0.00% 86 108
AHU-2 (NEW OR) Room - 013 Sterile Supply Pharmacy (prep. area) 189 9 0 VAV 3,058 250 -1,515 0 -1,515 167 73 6 2 0.00% 5 0.18 170 170 0 57 33.33% VAV POS 0.00% 82 170
AHU-2 (NEW OR) Room - 014 Bathroom Pharmacy (prep. area) 96 9 0 VAV 829 0 -428 0 -428 45 21 6 2 0.00% 5 0.18 86 86 0 29 33.33% VAV POS 0.00% 79 86
AHU-2 (NEW OR) Room - 015 Storage Pharmacy (prep. area) 210 9 0 VAV 1,842 0 -936 0 -936 100 45 6 2 0.00% 5 0.18 189 189 0 63 33.33% VAV POS 0.00% 79 189
AHU-2 (NEW OR) Room - 016 Storage Pharmacy (prep. area) 306 9 0 VAV 2,684 0 -1,364 0 -1,364 146 66 6 2 0.00% 5 0.18 275 275 0 92 33.33% VAV POS 0.00% 79 275
AHU-2 (NEW OR) Room - 017 Storage Pharmacy (prep. area) 144 9 0 VAV 1,263 0 -642 0 -642 69 31 6 2 0.00% 5 0.18 130 130 0 43 33.33% VAV POS 0.00% 79 130
AHU-2 (NEW OR) Room - 023 New OR Corridor Pharmacy (prep. area) 1238 9 0 VAV 10,243 0 -4,271 0 -4,271 558 205 8 2 0.00% 5 0.18 1,486 1,486 0 372 25.00% VAV POS 0.00% 77 1,115
AHU-2 (NEW OR) Room - 024 Nurse Station Pharmacy (prep. area) 273 9 3 VAV 12,430 750 -2,128 0 -2,128 677 102 6 2 0.00% 5 0.18 677 246 0 82 12.10% VAV POS 0.00% 82 246
13,590 11,679 0 2,638
Plus 5% Leakage 14,269
Plus 5% Safety 14,983 4,944 Based on critical space
Room Air
Balance
Air Flows Due to
LoadsRoom Data Minimum Air Flow Requirements Final Room ConditionsRoom Peak Loads image2.emf
File details come from the government source that posted it. Updated .