This is a Statement of Work for testing, verification, calibration and adjustment of HVAC critical systems at Overton Brooks VA Medical Center in Shreveport, LA. The contractor must test, verify, calibrate and adjust Operating Rooms, Isolation Rooms, and Sterile Processing Service areas once per year, including temperature, pressure, humidity sensors, and air control devices within each zone, space, and equipment. Testing requirements include documenting and calibrating all sensors, adjusting airflow from diffusers, performing filter leak tests on HEPA filters, and replacing 10% of sensors/devices and HEPA filters annually if calibration fails.

The contract is structured as a firm fixed price with one base year and four one-year options. Work must be performed during non-operational hours (typically outside Monday-Friday 5am-8pm and weekends/holidays). The contractor must provide direct employees including Control System Engineers, Testing and Balance Agents, and Commissioning Agents. Key deliverables include service schedules, calibration certificates, test/balance reports, and checklists documenting calibrated/non-calibrated sensors. The facility uses a Johnson Controls Metasys building automation system to provide automated environmental control across the campus. The provided files include HVAC drawings showing system layouts, schedules, and specifications for the critical areas covered under this contract.

View the file

Other files

File Type Posted
Operating Rooms HVAC Dwg.pdf.pdf PDF
Isolation Rooms Dwg and TAB sched.pdf PDF
TAB E - VA HVAC Design Manual VA T.pdf PDF
Air Change Test Result SPS - June 2.xlsx XLSX spreadsheet
HEPA Filter Locatins.pdf.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Testing, verification, calibration and adjustment of Critical System Overton Brooks VA Medical Center 510 E. Stoner Avenue Shreveport, LA 71101

GENERAL

Scope of Work Overton Brook VA Medical Center requires a service contract to test, verify, calibrate, and adjust Heating, ventilation and air conditioning (HVAC) critical systems throughout the hospital. This service will ensure each critical system is in compliance with VHA standards as outlined throughout this scope of work. Critical systems serve the following areas: Operating Rooms, Isolation Rooms, and Sterile Processing Service. Test, verify, calibrate, and adjust Operating Rooms, Isolation Rooms, and Sterile Processing Service once a year.

All temperature, pressures, humidity sensors, and air control devices must be tested and calibrated within each zone, space, and at the equipment. All sensors that cannot be calibrated must documented and reported if sensors cannot be calibrated within manufacturer acceptable limit. All registers, grills and airflow station must be test and adjusted for correct airflow. The test must verify and adjust flow from each diffuser to confirm compliance with designed conditions along with overall air change and pressure verification. All procedures must be documented and provided. Contractor must contractually account on replacing 10% sensor and devices once a year for bidding purposes and in the event the sensor and/or device are unable to be calibrated.

Once a year, perform filter leak test on all HEPA filters using recommended practice, IEST-RP-CC034.5. All HEPA filters that fail must be replaced and retested as defined in the recommended practice. At minimum, replace all filters every five years. Contractor must contractually account on replacing and retesting 10% of every filter once a year for bidding purposes and in the event the filters fail.

The current system is Metasys which is manufactured by Johnson Controls, Inc. The Building and Energy Management Control System at the Overton Brooks VA Medical Center in Shreveport, La is a Metasys system manufactured by Johnson Controls, Inc. It provides automated environmental control on the entire campus. The Contractor shall provide technicians employed directly by the contractor (i.e. Control System Engineer, Testing and Balance Agent, Commissioning Agent) as needed to perform the work within this contract.

Deliverables Company resume of experience Service schedule Manufacturer’s Literature and Data for all replacement parts Description of each product Installation Instruction Calibration certificate Test and Balance Report Preliminary Report Final Report Checklist to report calibrated/noncalibrated sensors and devices.

HOURS OF WORK

Contractor must perform this work while the critical areas are not operating. These areas typically do not operate Monday to Friday 5am-8pm or on Saturday and Sunday including federal holidays. The VA may approve normal business hour work, but contractor’s cost must include after hour work only within the cost proposal. All work shall be performed and completed on a schedule that will be approved in advance. Dates and times must be coordinated between the contractor and Government to eliminate impact to operations.

Price/cost schedule This is a firm fixed priced contract. Contractor must provide breakdown of cost that is separated by test and balance and by test and calibrate. Separate each area, zone, device, and sensor in the breakdown cost.

Contractor must contractually account on replacing 10% sensor and devices once a year for bidding purposes and in the event the sensor and/or device are unable to be calibrated.

Contractor must include a cost allowance to replace and retest 10% of all HEPA filters annually in case the filter fails testing. This cost must be separated and identified by quantity, and material and labor cost.

Period of performance This is annual contract with 1 base year and four additional 1 year options to extend.

Feature of work Operating Rooms Description Areas is served by two air handling units and six constant volume exhaust fans. All rooms within the surgical suites are to be included which consisted of surgical rooms, sub sterile rooms, clean rooms, corridors, operating rooms, and nurses stations.

Reference previous TAB design report.

Test and balance all rooms listed Reference HVAC Drawings.

Sensor and Device Information Each VAV box has a dedicated temperature and humidity device

ISOLATION ROOMS

Description Area is served by a single constant volume exhaust fan and fan coil units serving each isolation room.

Reference HVAC drawings and TAB schedule

In addition to “Isolation Rooms Dwg and TAB sched”, include testing, balancing and reporting on the exhaust fan serving this area.

Each room has a dedicated temperature and humidity sensor served by FCU.

Sterile Processing Service Description Most area is served by a different HVAC system which consist of FCU served by fresh air unit or AHU serving reheat variable air boxes.

Reference TAB Report “Air Change Test Result (SPS) - June 2024”

Test and balance all rooms listed. Rooms with fan coil units must also be tested and balanced.

Each room should have a temperature and humidity sensor per room. Annotate spaces with limited temperature and humidity control capabilities.

hepa filters (95% efficiency at minimum) Location and Size 2N Roof (12x24x12). One filter. 600 CFM Room 3N20 (24x24x12). One filter 1200 CFM Room 6N18 (24x24x12). One filter 1200 CFM Room 6W8 (24x24x12). 2 Filters 1200 CFM Reference HVAC drawings and TAB schedule

Operating Rooms HVAC Dwg.pdf

AI

GROE

G

KNO

W

L E S

J

R

M Y

NO. 034176

PROFESSIONAL

TIS RE

DEER

NG I NEE

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

FINAL SUBMITTAL

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

HVAC SCHEDULES UPGRADE AND REPLACE SURGERY

HVAC SYSTEM AND ROOFING

SHREVEPORT, LA

M601

667-18-121

JMK JSW/RCPFEB. 03, 2022

NOTES:

1. COUNTER FLOW INDUCED.

2. PROVIDE STAINLESS STEEL BASIN WITH SWEEPER SYSTEM.

3. PROVIDE EXTENDED LUBE LINES FOR SHAFT BEARINGS.

CT-1

G.P.M.

WATER

TEMP.

°F

ENT./LVG.

DESIGN

AMBIENT

W.B.T.

V

P

O

MARK

LE

MODEL

NO.

MNFR MAX.

TOTAL

FAN

H.P.

MAX.

P.D.

FT. W.G.

OPER.

WT. LBS.

NOTES

* AT 19-3L14 80.0 95/85 900 6.5 25 11000 1:2:3:

COOLING TOWER SCHEDULE

MODEL SERIES

MNFRTYPE

U

T

LT

I Z

N

IN

Z

C.F.M.

MIN.

O.A.

SUPPLY FAN

RPMTYPE

MBH HTG

E.A.T.

MBH

CLG

FACE

AREA

SQ.FT.

d.b.

R.P.M.H.P.

LA

S.P.

MOTOR

w.b.

d.b.

w.b.

W.P.D.

FT.

-H

-H

L.A.T.

COOLING COIL

FACE

AREA SF.

E.A.T.

L.A.T.

STEAM PRE-HEATING COIL

K

IK

IG

LB

/H

IC

IO

. W

.G . A

IR

.W

.T

X

1. MERV 8 PRE-FILTERS, MERV 11 INTERMEDIATE FILTERS, AND MERV 17 (HEPA) FINAL FILTERS.

2. PROVIDE UNIT WITH FOUR DIRECT DRIVE PLENUM FANS IN SUPPLY FAN SECTION. (2 PER ROW)

3. PROVIDE UNIT WITH TWO VARIABLE FREQUENCY DRIVES. ONE STAND-BY DRIVE AND ONE DRIVE SHALL CONTROL ALL FANS.

4. 208 / 3∅ POWER.

5. PROVIDE UV LIGHT DOWNSTREAM OF COOLING COIL.

6. MAXIMUM 10 ROW.

7. MAXIMUM 9 FPI.

8. FACE AND BY-PASS.

HEAT

SOURCE

ACCESSORIES

HUMIDIFIER

MAXIMUM SOUND POWER DATA RE 10 WATTS

OCTAVE BAND CENTER FREQUENCY HZ

SUPPLY AND RETURN

OPER.

WEIGHT

(LBS)

50025012563 NOTES800040002000

TYPE

LO

IT

H

IM

ID

IS

IS

1-AHU-1 * * OAH045 16000 12000 16000 PLN 3300 3.0 III 10 3500 1650 42 96.1 285 0.7 13.0

1-AHU-2 * * CAH043 3200 3.0 III 10 3500 0.615000 11000 15000 PLN 41 96.1 27079.4 49.0 48.5

79.4 49.0 48.5 800 19.0 65.0 15 ** 750 19.0 65.0 15 **

88/88** 13500

**785

* 7.4

7.4

* 28

0.1

SUP

RET

81/79

77/70

83/78

81/72

79/66

74/56

64/51

OF

FANS

1:2:3:4:5:

1:2:3:4:5:

20.0 28

0.1

12000 89/89 81/79 77/70 83/78 81/72 79/66 74/55 64/51

E.W.T. L.W.T.

43 55

43 55

15 15 250

15 240

1 6 7 8

AIR HANDLING UNIT SCHEDULE

1. HORIZONTAL SLIT-CASE PUMP.

2. PROVIDE NON-OVERLOADING PUMP SELECTION.

3. PROVIDE SUCTION DIFFUSER.

4. PROVIDE WITH VARIABLE FREQUENCY DRIVE MOTOR CONTROLLER.

P-5

HEAD

FT. W.G.

CAPACITY

G.P.M.

LL

G MODEL

SERIES

MNFR

MAX

MOTOR

SERVICE

FLUID

P-6

* HSC 4x6x10A 900 80 1:2:3:4:25 WATER

* HSC 4x6x10A 900 80 1:2:3:4:25 WATER

PUMP SCHEDULE

OR-SSS-1

1. FLANGED CONNECTION.

2. MANUFACTURER TO PROVIDE 200-GAL POLYMER SURGE TANK (ST-1) FOR EXHAUST EFFLUENT CONTROL WITH AUTOMATIC LEVEL.

LAYOUT BASIS

AMIAD EBS-10K

FLOW RATE

900 GPM

MIN

PRESSURE

80 FT HD

MIN FILTER

AREA (IN )

INLET/OUTLET

DIAMETER

8"

MAX OPERATING

WEIGHT (lb)

EXHAUST

VALVE

3"

FILTER

DEGREE

50 MICRON

1:2:

IN-LINE WATER FILTRATION SYSTEM SCHEDULE

STEAM TRAP SCHEDULE

MARK LOCATION SERVICE TYPE SIZE (IN)

(LBS/HR)

OPERATING

PRESSURE (PSI)

DIFFERENTIAL

PRESSURE (PSI) Remarks

DST-1 ROOF DRIP STATION IB 3/4" 378 15 12.00

DST-2 ROOF DRIP STATION IB 3/4" 378 15 12.00

DST-3 ROOF DRIP STATION IB 3/4" 378 15 12.00

EST-1 ROOF AHU-1 PREHEAT COIL F&T 1 1/4" 2000 15 0.25

EST-2 ROOF AHU-2 PREHEAT COIL F&T 1 1/4" 1875 15 0.25

4. IT IS THE DESIGN INTENT TO REUSE EXISTING PLATFORM. MAX WIDTH OF COOLING TOWER IS WIDTH OF

PLATFORM. FIELD VERIFY BEFORE PURCHASING.

3 4

(E)12"x12"

(E )3

2" x1

)1

6"

0" (E)26"x12"

(E)16"x12"

(E)16"x12"

"x

(E)16"Ø

(E)20"x16"

(E)12"x16" TOP

(E)20"x16" UNDER

(E)20"x12"

(E)24"Ø (E )2

0" x2

(E)14"x8"

(E)12"x10"

(E)20"x16"

(E)12"Ø

(E)16"x20"

(E)12"Ø

(E)8"Ø

(E)26"x20"

(E)10"Ø

(E)16"Ø

(E)8"Ø

4"

(E)22"x12" O/A

(E)24"Ø

(E)28"x16"

(E)18"x10"

)4

(E)12"x16"

(E)AHU (E)EF-7

(E)EF-4

(E)EF-3

(E)EF-2

(E)EF-1

(4)

(E)VAV

)V

)V

(E)VAV

)E

(E)18"x10"

(E)20"x18"

(E)40"x10"

"x

(E)VFD

(EF-2)

(EF-1)

)L

(E)TCP

(E)14"x12"

DOWN TO 3RD FLOOR

MECHANICAL

ROOM 4W34

PENTHOUSE

ROOM 400

SURGERY

ROOF

EXT

INT

(E)AHU-3

(EF-3)

(E)EF-6

(E)CH-1

/A

(E)30"x18"

(E)36"x18"

1-AHU-2

(E)14"x14" E/A

78"x36" S-O/A

(E)10"Ø

MH101

SD SD

1-AHU-1

MP101

1-CT-1

EXT INT

SD

CT-WTS

TAHU-1

CDE

36"x78" S-O/A

CONCRETE PAD EXTEND

AS REQUIRED

4" STM-LP

18"x36" S/A

18"x30" S/A

24"x70" S-O/A

4" CWS

1/

-L

2" LPSR

(E) 4" CWS

FLOOR

FLEX CONNECTION

L0

(E)26"x48"

(E) 6" CWS

(BEYOND)

(E) 6" CWR

26"x48" S/A

6" CWR

6" CWS

2 1/2" STM-LP

OA

NEW ROOF CURB FULL

SIZE OF UNIT. NO CURB

ADAPTOR ALLOWED.

FLEX CONNECTION

WORK AREA

KEY PLAN - NOT TO SCALE

PLAN

NORTH

TRUE

PENTHOUSE AND ROOF HVAC PLAN UPGRADE AND REPLACE SURGERY

8' 16'4'0

1/8" = 1'-0"MH101

1 PENTHOUSE AND ROOF HVAC PLAN

MH101 NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 NEW 1-AHU-1, CONTRACTOR SHALL INSTALL UNIT ON NEW ROOF

CURB; CONNECT SA DUCT TO EXISTING AND REINSULATE

2 CONTRACTOR SHALL PROVIDE NEW PUMPS ON INERTIA BASE. SEE

DETAIL 4 ON SHEET M501.

3 30"X18" SA DUCT INTO UNIT. PROVIDE BELLMOUTH AT UNIT

CONNECTION.

4 CONNECT INTO EXISTING OA INTAKE LOUVER WITH 78"X36"

INSULATED OA DUCT. PROVIDE INSULATED SHEET METAL PLENUM

FULL SIZE.

5 NEW 1-AHU-2, CONTRACTOR SHALL EXTEND CONCRETE PAD TO 6"

BEYOND UNIT; CONNECT SUPPLY AIR AND OA DUCT TO EXISTING

AND REINSULATE.

6 CONTRACTOR SHALL PROVIDE DUCT SMOKE DETECTOR 7'0" AFF.

PROVIDE DUCT ACCESS DOOR.

7 36"X18" SA DUCT INTO UNIT. PROVIDE BELLMOUTH AT UNIT

CONNECTION.

8 CONTRACTOR TO PROVIDE DUCT MOUNTED SMOKE DETECTOR.

PROVIDE DUCT ACCESS DOOR.

9 CONTRACTOR SHALL INSTALL NEW COOLING TOWER WATER

TREATMENT SYSTEM. REFER TO 5/M502 FOR DETAILS. PROVIDE ¾”

PAINTED PLYWOOD BACKBOARD FOR MOUNTING ALL EQUIPMENT

AND APPURTENANCES.

1/4" = 1'-0"MH101

2 MECHANICAL PENTHOUSE ROOM 400 - NEW 1-AHU-2 ELEVATION

1/4" = 1'-0"MH101

3 SURGERY ROOF NEW 1-AHU-1

0 4' 8'2' 0 4' 8'2'

TEMPORARY CHILLED WATER

CONNECTION VALVES

T (E)P-3

(E)AHU

(E)P-2

(E)P-1

(E) 3/4" STM-LP

(E) 3/4" CDR-LPC

(E) 2 1/2" HWR

(E) 2 1/2" HWS

(E)AHU-3

(E) 1 1/2" CWS

(E) 1 1/2" CWS

(E) 3/4"

(E) 3/4"

(E) 1" HWS

(E) 1" HWR

(E) 3" STM-MP 40S

(E) 2 1/2" STM-LP

40S

(E) 2 1/2" HWR

(E)ET-1

(E)AS-1

(EF-2)

(EF-1)

(E)TCP

3 4

ROOM 400

ROOM 4W34

(E) 6" CHILLED WATER

SUPPLY AND RETURN FROM

SURGERY CHILLER (400)

(E) 8" CONDENSING WATER

RETURN AND SUPPLY

(E) CWS/R FROM

SUB-BASEMENT

(E)3" 40S DOWN

(E)EF-6

EXT

INT

(E) HTX

(E)AS-2

(E)PRV

(E)UH-1

(E)P-4

(E) HTX

(E)BT-CHW

(E)AS-1

(E)UH-2

(E) 4" CWR

8" CS

8" CR

CT-WTS

(E)UH-3

(E)1-CT-2

(E)1-CT-3

EXT INT

DST-1

EST-1

ST-1

DST-2

1 1/4" CD

TAHU-1

EST-2

1"

4" CWR

8" CS TOP

8" CS BOTTOM

3" CR

(E) 3/4" HWS

(E) 3/4" HWR

(E) 2" STM-LP (E) 2" HWS

(E) 2" HWR

8" CS BOTTOM

(E) 8" CR ABOVE

8" CS BELOW

(E) 8" CR BELOW

(E) 8" CS ABOVE

(E)8" 3-WAY

CNTRL

(E) 2" HWS

)P

-4

)P

-3

(E) 4" CWR

IN-LINE FILTER SYSTEM

SLAB

CONCRETE COOLING COIL

HUMDIFIER

PREHEAT COIL

DST-3

DST-2

EST-2

3/

I

(E) 3/4" STM-LP

PRE HEAT COIL

COOLING COIL

PIPE CHASE

PIPE CHASE

CONNECT TO

EXISTING STEAM

LINE

DST-1

EST-1

SEAL PIPE

PENETRATION (TYP)

(E) 8" CS ABOVE

(E) 8" CR BELOW

STRUCTURAL FRAMING

(E) 6" CWS (E) 4" CWS

(E)8" 3-WAY

CNTRL

(E) 2" STM-LP

(E) 1" STM-LP

(E) 3" STM(E) 2" HWR

P-6P-5

(E) 8" CR

(E) 8" CS

(E) 3" STM

TEMPORARY CHILLED

WATER CONNECTION

VALVES

(E)P-4

FLOOR

WORK AREA

KEY PLAN - NOT TO SCALE

PLAN

TRUE

PENTHOUSE AND ROOF MECHANICAL

PIPING PLAN

UPGRADE AND REPLACE SURGERY

1/8" = 1'-0"MP101

1 PENTHOUSE AND ROOF MECHANICAL PIPING PLAN

8' 16'4'0

MP101 NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO

PREHEAT COIL.

2 CONTRACTOR SHALL PROVIDE NEW CHILLED WATER CONNECTION

TO CHILLED WATER COIL.

3 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO

HUMIDIFIER.

4 EXISTING FAN TO BE ACTIVE DURING CONSTRUCTION.

CONTRACTOR TO PROTECT EQUIPMENT DURING ALL PHASES OF

CONSTRUCTION.

5 CONTRACTOR TO PROVIDE NEW COOLING TOWER, 1-CT-1. UTILIZE

EXISTING STEEL SUPPORTS AND MODIFY TO SUPPORT NEW

EQUIPMENT.

6 EXISTING AHU TO BE ACTIVE DURING CONSTRUCTION.

CONTRACTOR TO PROTECT EQUIPMENT DURING ALL PHASES OF

CONSTRUCTION.

7 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO

PREHEAT COIL.

8 CONTRACTOR SHALL PROVIDE NEW STEAM CONNECTION TO

HUMIDIFIER.

9 CONTRACTOR TO PROVIDE NEW AIR HANDLER, 1-AHU-2.

CONTRACTOR SHALL EXPAND EXISTING CONCRETE

HOUSEKEEPING PAD TO 6" BEYOND NEW UNIT. DOWEL

HORIZONTAL 3/4" REBAR WHERE PAD IS EXPANDED. EXISTING PAD

IS APPROXIMATELY 8'x22'-6".

10 CONTRACTOR SHALL PROVIDE NEW CHILLED WATER CONNECTION

TO CHILLED WATER COIL.

12 ROUTE STEAM CONDENSATE RETURN ALONG UNIT.

13 CONNECT NEW 4” DIA CWS TO EXISTING AT THIS APPROXIMATE

LOCATION ROUTING OVER TO NEW AHU-2. COORDINATE WITH

DEMOLITION PLANS.

14 NEW SIDE STREAM FILTER SYSTEM. BASIS OF DESIGN, AMIAD

WATER SYSTEM. PART NUMBER 8” EBS 10000 OL.

15 AFTER REMOVING EXISTING PUMP INSTALL NEW PUMP IN ITS

APPROXIMATE LOCATION. COORDINATE WITH PUMP CONNECTION

WITH EXISTING PIPING FOR EASY RE-CONNECTION.

16 AFTER DEMOLITION OF EXISTING PIPE, RECONNECT NEW 8”

CONDENSING WATER PIPING AT APPROXIMATE LOCATION OF

ISOLATION VALVE. COORDINATE WITH DEMOLITION FOR EASY

CONNECTION OF NEW PUMPS.

17 AFTER DEMOLITION OF EXISTING PIPE, RECONNECT NEW 8”

CONDENSING WATER PIPING AT APPROXIMATE LOCATION.

18 AFTER DEMOLITION OF EXISTING PIPE, RECONNECT NEW 8”

CONDENSING WATER PIPING AT APPROXIMATE LOCATION. THIS IS

LOCATED UNDER EXISTING 8” CR.

19 CONTRACTOR SHALL INSTALL NEW COOLING TOWER WATER

TREATMENT SYSTEM. REFER TO 5/M502 FOR DETAILS. PROVIDE ¾”

PAINTED PLYWOOD BACKBOARD FOR MOUNTING ALL EQUIPMENT

AND APPURTENANCES.

20 ROUTE DRAIN LINES TO DRAIN.

21 PROVIDE HEAT TRACE ON ALL CHILLED WATER, CONDENSING

WATER, AND STEAM CONDENSATE RETURN PIPES EXPOSED TO

WEATHER. LOCATE THERMOSTAT ON NORTH EXPOSURE.

1/4" = 1'-0"MP101

6 PUMPS P-5 AND P-6 - ENLARGED PLAN

1/2" = 1'-0"MP101

3 1-AHU-2 - ENLARGED PLAN

1/2" = 1'-0"MP101

4 1-AHU-1 - ENLARGED PLAN

5 SURGERY ROOF NEW COOLING TOWER SECTION

2 P-5 AND P-6 REPLACEMENT SECTION

0 4' 8'2'

0 4' 8'2'

0 2' 4'1'

0 2' 4'1' 0 2' 4'1'

TEMPORARY CHILLED WATER

CONNECTION AT VALVES.

TEMPORARY CHILLED

WATER CONNECTION

VALVES

VHASHRMoralJ

Typewritten Text

AutoCAD SHX Text

PURTLE

CONSULTING ENGINEERS

purtle@purtle.net

701 TEXAS STREET

fax 318 222 6564

SHREVEPORT, LA 71101

ASSOCIATES

PA-1072

318 425 4500

OVERTON BROOKS

MEDICAL CENTER

SURGERY ADDITION

SHREVEPORT, LOUISIANA

P l a n n i n g A r c h i t e c t u r e I n t e r i o r s s

The t o p

The Estopinal Group, Inc.

820 Jordan Street, Suite 507

Shreveport, Louisiana 71101

318.424.3700

318.424.3764 fax

Group n i a l

VASH.010

Revisions

Date

VA FORM 08-6231 FEB. 1983

Drawing Title

Approved: Division Chief

Approved: Service Director

Project Title

Location

Checked

Project No.

DRAWING NO.

Dwg.

Of

U.S. GOVERMENT PRINTING OFFICE 1984 455-088

one-eighth inch = one foot one-quarter inch = one foot three-eighths inch = one foot one-half inch = one foot three-quarters inch = one foot one inch = one foot one and one half inches = one foot three inches = one foot

HP

TP

26 APRIL 2002

MECHANICAL SCHEDULES

H1

DISCHARGE PLENUM

LAT (%%DF) DB/WB

EAT DB/WB (%%DF)

AIR P.D. ("WG)

WATER P.D. (FT)

EWT/LWT (%%DF)

TOTAL CAPACITY (MBH)

WATER FLOWRATE (GPM)

HEATING

CHILLED

AIRFLOW (CFM)

EXT. S.P. ("WG)

FAN TYPE

VOLTAGE/PHASE

FACE VEL. (FPM)

TOTAL S.P. ("WG)

FAN SPEED (RPM)

VENTILATION AIRFLOW (CFM)

TOTAL CAP. (MBH)

MOTOR SIZE (HP)

EAT (%%DF) DB/WB

EWT/LWT

WATER P.D. (FT)

PRESSURE (PSI)

EAT/LAT (%%DF)

SENS. CAP. (MBH)

WATERFLOW RATE (GPM)

TOTAL CAPACITY (MBH)

STEAM (LBS/HR)

PREFILTER EFF.

ACCESS SECTIONS

SERVES

MOUNT

* PROVIDE A 277/24V TRANSFORMER FOR EACH BOX

HX-1,2

DESIGN.

0-500

AIRFLOW

(CFM)

RANGE

FLOW

STEAM

(MBH)

160/180

(LBS/HR)

PSI

(GPM)

1.0

(FT)

(%%DF)

P3,P4

180/160

(%%dF)

E.W.T./L.W.T.

VARIABLE AIR VOLUME BOX SCHEDULE (SUPPLY)

SHELL SIDE

TUBE SIDE

6"%%C

SIZE

INLET

0.75"

INLET S.P.

(IN. W.G.)

HOT WATER COIL

12.0

FLOWRATE

1.2

P1,P2

P.D. FT

DESIG.

SIDEWALL EXHAUST

GRILLE

CEILING EXHAUST

CEILING EXHAUST

CURTAIN

LINEAR AIR

LINEAR FLOW

DIFFUSER

SQUARE CEILING

DIFFUSER

SQUARE CEILING

DESCRIPTION

G3

G2

G1

D4

D2

D3

CEILING DIFFUSER

D1

OPERATING ROOM AIR DISTRIBUTION SYSTEM,

SURFACE

WALL

CEILING

LAY-IN

ALUMINUM

ENAMEL

BAKED WHITE

35%%D BLADE DEFLECTION; 1/2" SPACING;

HORIZONTAL BLADES PARALLEL TO SHORT DIM;

ACCESSORIES

PREHEAT

DATA

12/12 PANEL; 1/2"x1/2"x1/2" EGG CRATE

24/24 PANEL; 1/2"x1/2"x1/2" EGG CRATE

CORE

CORE

SIZE AS INDICATED ON DRAWINGS

COOLING COIL #2

AIR DISTRIBUTION DEVICE SCHEDULE

MOUNTING

LAY-IN

FINISH

MATERIAL

48/24 PERFORATED FACE WITH VOLUME

12/12 FULLY LOUVERED FACE; NECK SIZE AS

24/24 FULLY LOUVERED FACE; NECK SIZE AS

ACCESSORIES/REMARKS

DAMPER, NECK SIZE AS INDICATED

INDICATED; 4-WAY THROW

INDICATED; 4-WAY THROW

FAN

LOCATION

SERVES

AHU NO.

208/3

GPM

TDH

RPM

CASE

HORIZONTAL SPLIT

PUMP SCHEDULE

75%

MIN

EFF

480/3

VOLTS

PHASE

CFM

IN. W.G.

E.S.P.

RPM

FAN SCHEDULE

SIZES (INCHES)

DIS

SUC

10.8"

IMP

SONES

BELT

DRIVE

REMARKS

LOW PRESSURE CONDENSATE

DUCT TRANSITION - CONCENTRIC, ECCENTRIC

SUPPLY AIR DIFFUSER OR DUCT

RETURN AIR GRILLE, REGISTER OR DUCT

EXHAUST AIR GRILLE, REGISTER OR DUCT

ADJUSTABLE SPLITTER TEE W/TURNING

ELBOW W/DOUBLE THICKNESS VANES

MECHANICAL LEGEND

FIRE DAMPER - VERTICAL AIR FLOW

FIRE DAMPER - HORIZONTAL AIR FLOW

HEAT EXCHANGER

STEAM (15 LBS.)

STEAM (80 LBS.)

HEATING WATER SUPPLY

HEATING WATER RETURN

CHILLED WATER RETURN

15S

HX

LPC

HWR

80S

HWS

CWR

BUTTERFLY VALVE

OPPOSED BLADE DAMPER

CHILLED WATER SUPPLY

EXHAUST FAN

UNIT HEATER

ABOVE FINISHED FLOOR

CONNECT TO EXISTING

CWS

OBD

AFF

EF

UH

THERMOSTAT

MANUAL VOLUME DAMPER

DRAIN LINE

SHUT-OFF VALVE

AIR HANDLING UNIT

FD

AHU

EXIST SURGERY

AIR HANDLING UNIT SCHEDULE

NEW SURGERY

SYMBOL

UNDERGROUND

FLEXIBLE DUCT

LINED DUCTWORK

VANES (S/A ONLY)

U/G

DESCRIPTION

HEATING WATER EXPANSION TANK, 20 GAL, 6 GAL ACCEPTANCE, ASME RATED 125 PSI

CHILLED WATER AIR SEPARATOR, 600 GPM MIN., ASME RATED 125 PSI, MAX PRESS DROP 3FT.

HEATING WATER AIR SEPARATOR, 60 GPM MIN., ASME RATED125 PSI, MAX PRESS DROP 1.5FT.

MISCELLANEOUS EQUIPMENT SCHEDULE

CHILLED WATER EXPANSION TANK, 44 GAL, 22 GAL ACCEPTANCE, ASME RATED 125 PSI VERTICAL

ET-1

ET-2

AS-2

AS-1

DESCRIPTION / ACCESSORIES / REMARKS

NOTE: PROVIDE T-STAT AND MOUNTING BRACKET

UH-1, 2, 3

1/8

39.8

MOTOR HP

HEAT

CAP.

115V/1%%C

4.0

STAIN STL

W/OBD; SIZE AS INDICATED

AIR FLOW (CFM)

EAT (F%%D) DB/WB

LAT (F%%D) DB/WB

STEAM (LBS/HR)

STEAM PRESSURE (PSI)

30%

COOLING COIL #1

30%

90%

90%

FINAL FILTER EFF.

CONDENSER

P5,P6

DOP

EFF

PRESS. DROP

INITIAL

FINAL

QUANTITY

8K

4K

2K

1K

DYNAMIC INSERTION LOSS

BANK SIZE

QUANTITY

IN. W.G.

S.P.

SOUND ATTENUATOR SCHEDULE

NO. OF

CELLS

TONS

%%DF

EWT

%%DF

LWT

NO. - HP

WB

OAT

FAN MTR

SUPPLY

NO. - KW

SUMP HTRS.

POWER

COOLING TOWER SCHEDULE

CT-1

480V/3%%C

P.D

CHILLER SCHEDULE

EVAPORATOR

EFFICIENCY

KW/TON

(TONS)

P.D

CONDENSER

REFRIGERANT

VOLTAGE

CH-1

.59

.63

FULL

IPLV

85/95

CENTRIFUGAL

FH-1

VAV-7

OR3

HEPA

AIR FILTER SCHEDULE

EF-1

EF-2

6" DIA; 2-PASS HEAD

HEAT EXCHANGER SCHEDULE

MOTORIZED BUTTERFLY VALVE

HYDRONIC UNIT HEATER SCHEDULE

SA-1

SA-2

AHU-1

SUPPLY DUCT

SUPPLY DUCT

AHU-1

IN-LINE

CASE

HORIZONTAL SPLIT

0-2000

0-1400

0-4000

0-900

0-3000

STEAM HUMIDIFIER SCHEDULE

LBS/HR

STEAM

PSI

MANIFOLD(S)

DISTRIBUTION

H-1, 2, 3, 4

ORs

FT

P.D.

0.35

(1)24x18x84

(1)12x18x84

(1)18x18x84

(1)12x18x84

0.35

12"%%C

10"%%C

16"%%C

8"%%C

14"%%C

30.0

21.0

114.0

10.0

95.0

3.0

2.1

8.2

180/157

58%

7"

99.97%

.65

1.2

(4)24x24x12

1-30

1-9

FILTER HOUSING

STAIN STL GASKETED

W/SIDE ACCESS

CROSS FLOW, MECHANICAL

DRAFT

52/40

15.0

3-STAGE

EF-3

EF-4

EF-5

UP BLAST

DOWN BLAST

1.25

1.50

1.50

0.50

2.0

0.75

15.0

11.0

11.0

13.0

8.0

* PERFORMANCE DATA LISTED DOES NOT INCLUDE LOSSES DUE TO SOUND ATTENUATOR

PROVIDE DISCONNECT SWITCH;

BIRDSCREEN;BACKDRAFT DAMPER

FACTORY CURB W/SOUND CURB

FACTORY CURB

15500

2.5

7.25

18/62

0.17

YES

DESIG.

RANGE

(IN. W.G.)

INLET S.P.

LEVEL

N.C.

INLET

VARIABLE AIR VOLUME BOX SCHEDULE (EXHAUST)

0.5"

18x12

PROVIDE AVERAGING VELOCITY SENSOR

0-2000

24x14

18x12

20x18

14x10

20x16

14x10

FSD

FIRE & SMOKE DAMPER

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

CS

CR

BALL VALVE

MOTORIZED BALL VALVE

TCP

TEMPERATURE CONTROL PANEL

OCCUPANCY SWITCH

0.25

2ND FLR

EF-6

115/1

6.0

* MOTORS SHALL BE NON-OVERLOADING

75%

8.3"

NPSHR=5FT

4 MINIMUM

DISPERSON DISTANCE: 24 IN MAX

TANK

HORIZONTAL TANK

BALANCING VALVE

15000

62/45

62/54.5

0.06

AF

2.5

7.2

B1

FACE VELOCITY (FPM)

SENS. CAPACITY (MBH)

LAT DB/WB (%%DF)

89.0/80.0

89.5/80.0

63.0/62.6

64.0/63.3

42/56.4

42/50.4

0.60

0.51

63.0/62.6

64.0/63.3

50.0/49.9

50.0/49.9

42/50.4

42/56.4

1.4

0.91

18/62

0.2

POWER

(KW)

R-134a

R-123

* UNIT PERFORMANCE SCHEDULED AT WET BULB CONDITION.

PROVIDE SUBMITTAL DATA AT 99/77 EAT ALSO.

DN

PROJECT

LIMITS

3W-41

STERILE

DRESSING

ROOM

PROJECT

LIMITS

3W-39

ANESTHESIA

3W-38

ANESTHESIA

EQUIPMENT

3W-48

SCRUB

3W-42

SCRUB

3W-43

UP

3W-44

CLEAN UP

3W-74

CORRIDOR

3W-78

GALLERY

3W-46

PURTLE

CONSULTING ENGINEERS

purtle@purtle.net

701 TEXAS STREET

fax 318 222 6564

ASSOCIATES

PA-1072

318 425 4500

OVERTON BROOKS

MEDICAL CENTER

SURGERY ADDITION

SHREVEPORT, LOUISIANA

P l a n n i n g A r c h i t e c t u r e I n t e r i o r s s

The t o p

The Estopinal Group, Inc.

820 Jordan Street, Suite 507

Shreveport, Louisiana 71101

318.424.3700

318.424.3764 fax

Group n i a l

VASH.010

Revisions

VA FORM 08-6231 FEB. 1983

Drawing Title

Approved: Division Chief

Approved: Service Director

Project Title

Location

Checked

Project No.

DRAWING NO.

Dwg.

Of

U.S. GOVERMENT PRINTING OFFICE 1984 455-088

one-eighth inch = one foot one-quarter inch = one foot three-eighths inch = one foot one-half inch = one foot three-quarters inch = one foot one inch = one foot one and one half inches = one foot three inches = one foot

TP

26 APRIL 2002

PARTIAL 3RD FLOOR PLAN -

HVAC

H2

FSD

250 CFM

D1, 10"%%C

D1, 8"%%C

125 CFM

200 CFM

300 CFM

100 CFM

D2, 8"%%C

(TYP 2)

300 CFM

600 CFM

D1, 12"%%C

H-4

FH-1

H-3

H-2

600 CFM

D1, 12"%%C

H-1

1250 CFM

G3, 18/36

EF-3

1350 CFM

EF-2

306A

24/16

18/14

12/12

12/6

12/5

14/12

30/18 UP

10"%%C

30/14

1275 CFM

1075 CFM

G3, 18/30

D4, 12'x10'

1675 CFM

(TYP 3)

D3, 12"%%C

275 CFM

36/18 UP

8"%%c

28/18

36/18

28/18

14/14

OFFSET INTO JOIST WEB

10/12

10/8

20/14

16/12

14"%%C

32/14

12/10

11/5

11/6

9/5

(TYP 4)

D4, 14'x12'

2000 CFM

700 CFM

1875 CFM

20/12

18/18

20/16

20/20

14/10

12/6 THRU JOIST

24/14

18/14 THRU JOIST

OFFSET BELOW BEAM

18/14 B/W JOIST

700 CFM

1450 CFM

20/18

24/18

14/10

20/12 (TYP)

24/18

18/12 B/W JOIST

12/8

12/8

150 CFM

150 CFM

125 CFM

EF-1

20/12 B/W JOIST

18/12

18/10

800 CFM

D2, 8"%%C

100 CFM

14/12 E/A FROM

BELOW

OFFSET UNDER BEAM

12/12 E/A FROM

BELOW

12/12 UP

OFFSET ABV

CLG

OFFSET B/W

JOIST

EXTG RTU

18/12 DN

MTD 7"AFF

(TYP)

OFFSET BELOW BEAM

EF-6

%%UHVAC NOTES:

H1

ALL FLEXIBLE DUCT SHALL BE FULLY EXTENDED FREE OF KINKS

AND NO LONGER THAN 5'-0" SAME SIZE AS DIFFUSER NECK.

H2

ALL DUCTWORK SIZES SHOWN ARE INSIDE FREE AREA DIMENSIONS.

H3

ALL DIFFUSERS AND/OR GRILLES LESS THAN FULL CEILING T-BAR

SPACINGS SHALL BE INDEPENDENTLY SUPPORTED FROM STRUCTURE

H4

H5

ALL DUCT WORK FROM EXHAUST FANS & AIR HANDLER TO VAV'S SHALL

BE MEDIUM PRESSURE CONSTRUCTED PER SMACNA STANDARDS FOR

6"WG. ALL LOW PRESSURE DUCTWORK SHALL BE CONSTRUCTED PER

PROVIDE FLEX DUCT CONNECTIONS AT THE DISCHARGE OF ALL VAV'S.

MEDIUM PRESSURE FLEXIBLE DUCT TO VAV'S TO BE SAME SIZE

H6

AS UNIT INLET.

ABOVE WITH CEILING TIE WIRES.

SMACNA STANDARDS FOR 2"WG.

H6

H7

PER MANUFACTURER'S INSTRUCTIONS.

4"%%C EXHAUST DUCT TO VACUUM PUMP MOTOR ABV CLG. CONNECT

6"%%c

PLAN - HVAC

PARTIAL THIRD FLOOR

1/4"=1'-0"

END

CAP(TYP)

OR HVAC new dwg

Operating Rooms Dwg

36_H1

37_H2

H1

Sheets and Views

Layout1

H2

Sheets and Views

Layout1 image3.emf

Isolation Rooms Dwg and TAB schedule.pdf

Rectangle image4.emf

Air Change Test Result (SPS) - June 2024.xlsx Sheet1

SPS Satellite Rooms - AIR CHANGE TEST RESULTS (Rev: 07/2022)

Test Date: June 2024 Tested By: Barnett & Williams

Bld. Rm. Room Rm. Vol. Press. Supply Air CFM Exhaust Air CFM Min Air Total Air Pass

No. No. Function CF Diff. Grill 1 Grill 2 Total Grill 1 Grill 2 Total Changes Changes or Fail

1 BW35 SPEECH LAB 1670 Positive X X 585 -151 -359 -510 4 21.02 PASS

1 BD19 SOILED UTILITY 612 Negative X X 67 X X -129 10 12.65 PASS

1 BD22 CLEAN SUPPLY 335 Positive X X 65 Can't Reach With Hood 4 11.64 PASS

1 BE30A CLEAN SUPPLY 525 Positive FAN COIL UNIT ONLY 4 N/A N/A

1 BS21 IMPLANT COORDINATOR OFFICE 68 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A

1 1N16 CLEAN SUPPLY 730 Positive X X 211 X X -57 4 17.34 PASS

1 1N23 SOILED UTILITY 480 Negative X X X X X -91 10 11.38 PASS

1 3E 11 SOILED UTILITY 771 Negative X X 61 X X -133 10 10.35 PASS

1 3N9 SOILED UTILITY 539 Negative X X X X X -389 10 43.3 PASS

1 3N10 CLEAN SUPPLY 1337 Positive X X 484 X X X 4 21.72 PASS

1 3W40C MAIN INSTRUMENT & SUPPLY 1590 Positive X X 126 X X -35 4 4.75 PASS

1 3W40H ORTHO SUPPLY 1230 Positive X X 221 X X -109 4 10.78 PASS

1 3W40L STERILE SUPPLY 1526 Positive X X 253 X X -169 4 9.95 PASS

1 3W48A CLEAN SUPPLY 1860 Positive X X 145 X X -111 4 4.68 PASS

1 3W53 ANESTHESIA SUPPLY 1500 Positive 60 108 168 X X N/A 4 6.72 PASS

1 4W41 CLEAN SUPPLY 1452 Positive X X 135 X X N/A 4 5.58 PASS

1 4E 15 UNIT SUPPLY 1150 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A

1 4E 16 SOILED UTILITY 1550 Negative NOT CURRENTLY USED BY SPS 10 N/A N/A

1 5E 22 ULTRA-SOUND 1400 Positive X X 522 X X -304 4 22.37 PASS

1 5E 23 UROLOGY SERVICE CYSTO SUITE 2150 Positive X X 805 X X -430 4 22.47 PASS

1 5E 24 CLEAN SUPPLY 780 Positive X X 250 X X -19 4 19.23 PASS

1 5E 28 BRONCHOCSCOPE TEST ROOM 2935 Negative FAN COIL UNIT X X -326 4 6.66 PASS

1 5E 29 G. U. CLEAN SUPPLY 1430 Positive FAN COIL UNIT ONLY 4 N/A N/A

1 5W31 CLINIC SUPPLIES 1056 Positive FAN COIL UNIT ONLY 4 N/A N/A

1 5W35 SOILED UTILITY 1116 Negative X X N/A X X -272 10 14.62 PASS

1 6E 15 CLEAN SUPPLY 1230 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A

1 6E 16 SOILED UTILITY 1552 Negative X X N/A X X * 10 * *

1 6E 21A SUPPLY ROOM 1162 Positive FAN COIL UNIT ONLY 4 N/A N/A

1 6N30 INFECTIOUS WASTE 422 Negative X X 41 X X -124 10 17.63 PASS

1 6N34 CLEAN SUPPLY 2527 Positive 188 195 383 X X N/A 4 9.09 PASS

1 7E 11 SOILED UTILITY 1116 Negative X X N/A X X -203 10 10.91 PASS

1 7E 16 ENDOSCOPY PROCEDURE - ROOM 2 2085 Positive FAN COIL UNITS X X -165 4 4.75 PASS

1 7E20B1 G. I. CLEAN ROOM 789 Positive FAN COIL UNIT ONLY 4 N/A N/A

* CONSTRUCTION

SPS Satellite Rooms - AIR CHANGE TEST RESULTS (Rev: 07/2022)

Test Date: June 2024 Tested By: Barnett & Williams

Bld. Rm. Room Rm. Vol. Press. Supply Air CFM Exhaust Air CFM Min Air Total Air Pass

No. No. Function CF Diff. Grill 1 Grill 2 Total Grill 1 Grill 2 Total Changes Changes or Fail

1 9W28 CLEAN SUPPLY 550 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A

1 10E 20 CLEAN STORAGE 1624 Positive NOT CURRENTLY USED BY SPS 4 N/A N/A

55 105 DIRTY ROOM / BIOHAZARD 660 Negative X X 82 X X -177 10 16.09 PASS

55 115 CLEAN ROOM 588 Positive X X 85 X X N/A 4 8.67 PASS

55 213 SOILDED ROOM / BIOHAZARD 564 Negative X X N/A X X -105 10 11.17 PASS

55 214 CLEAN ROOM 576 Positive X X 59 X X N/A 4 6.15 PASS

55 312 NO I.D. / BIOHAZARD 514 Negative X X N/A X X -110 10 12.84 PASS

55 317 NO I.D. (CLEAN SUPPLIES) 963 Positive X X 98 X X -71 4 6.11 PASS

55 318 NO I.D. (CLEAN AREA) 518 Positive X X 53 X X N/A 4 6.14 PASS

57 122 BIOHAZARD 470 Negative X X 43 X X -92 10 11.74 PASS

57 124 STERILE SUPPLIES 491 Positive X X 149 -119 -159 -278 4 18.21 PASS

57 222 BIOHAZARD 470 Negative X X 64 X X -93 10 11.87 PASS

57 224 STERILE SUPPLIES 486 Positive 110 182 3292 X X -90 4 36.05 PASS

Sterile Processing Area

BE27-1 Clean Storage (Positive) BE27B-1 Sterile Prep. (Positive) BE28-1 Decon (Negative) Medivator Rm. (Positive)

Grill #1 CFM: 95

Grill #2 CFM: 539

Grill #3 CFM: BLOCKED Grill #12 CFM: -403

Grill #4 CFM: 150 Grill #7 CFM: 1179 Grill #13 CFM: -390

Grill #5 CFM: BLOCKED Grill #8 CFM: 627 Grill #14 CFM: REMOVED Supply Grill CFM: 227

Grill #6 CFM: 181 Grill #9 CFM: 983976 Grill #15 CFM: -298 Exhaust Grill CFM: 0

Total CFM: 965 Total CFM: 2782 Total CFM: -1091 Total CFM: N/A

Room Volume: 8960 CF Room Volume: 8100 CF Room Volume: 7400 CF Room Volume: 723 CF

Min Total Air Changes: 4 Min Total Air Changes: 4 Min Total Air Changes: 6 Min Air Changes: 6

Total Air Changes: 6.46 Total Air Changes: 20.61 Total Air Changes: 8.85 Total Air Changes: 18.84

Pass or Fail: PASS Pass or Fail: PASS Pass or Fail: PASS Pass or Fail: PASS image5.emf

HEPA Filter Locations.pdf

FIRST FLOOR (HEALTH CARE)

OVERTON BROOKS VAMC

510 E. STONER AVE.

1S66

1S37

1S10

1S4

1S1

1S6

1S15 1S63

1S53

1S511S21

1S19

1S55

1S49A

1S49

1S43 1S35

1S33

1S32 1S38

1S60

1S17

STAIRS #11

STAIRS #10

1S12

1S14

1S16

1S18

1S20

1S22

1S24

1S26

1S28

1S30

OFFICE

BREAK.

GROUP ROOM

WAITING

OFFICE OFFICE

1-S-23

GROUP ROOM

1S25

EN

. S

TO

1S47

TELE

MH

1S58

1S40

1S42

1S44

1S46

1S48

1S50

1S52

1S54

1S56WAITING

LIET

GEN. STOR.

KITCHEN

TOLIET

INFO DESK

1S2

GEN. STOR.

OIT STOR.

EQUIP.

STOR.

1S94

COORIDOR

1S96

1S6A

VESTIBULECOORIDOR

1N2

1N1

1N24H

1W10

1W12

1W2A

1W21W1

1W4

1W11

1W1A

1-W-8

1W13

1W14

1W17

1W33 1W34 1W35

1W18 1W19 1W20

1W31A

1W36 1W37 1W38 1W40

1W21 1W23 1W24 1W24A

1W451W44

1W50

1W25

1W26

1W57

1W58

SWITCHBOARD

1E82 1E81

1E79 1E801E78

1E87 1E87A

1E83 1E8485A1E861E92

A 1E91A 1E90

1E89

1E88

1E75 1E74

1E73A 1E73

1E39

1E38

1E37 1E40

1E41

1E42

1E43

1E441E45

1E46

1E47

1E48

1E491E50

1E51

1E52

1E53

1E54 1E45A

1E31 1E32 1E33 1E34 1E35

ELEV

ELEV

1E65

1E65A

1E63 1E62

1E

1E58

1E85

- 1E500 -

1E400

1W6

1W15

ELEV.

#-7

UP

ELEV. ELEV. ELEV.

#8 #9 #10

ELEV. ELEV. ELEV.

ELEV. ELEV.

#5 #6

#1#2#3 OFFICE

1E100

POLICE

ELECT.

1W25C

1W25B

1E93

EMER.GEN.ROOM

1E97

1E95

1W27D

17A

1E67

1E68

109 10199

PHARMACY

MAIL ROOM

VENDING ROOM

SWITCH GEAR

ROOM.

TELEPHONE

SWITCH

PIPE

CHASE

ALARM

PANELS

1E70 1E70A

1E70B

100B

58A

1E96

1E95A 1E95B

1E95C

1E95D

1E95E

1E95F

1E95G

1E25

21A

1W22

1W37A

1W26A1W26B

1W26C

1E66

1W25A

EXECUTIVE OFFICES

CANTEEN

ENG.

VOL.SVC.

IRM

FISCAL

ELEC. EMS

EMS

EM

ER

EM

ER

MAS

H.R.M.

H.R.M.H.R.M.H.R.M.

H.R.M. H.R.M.

MASRESTROOM

HBHC

HBHCHBHC

HBHC

BLUE TEAM

OFFICEOFFICE

OFFICEOFFICEOFFICEOFFICE

#2

#3

DW

DW

TE

AO/ASSO DIR

OFFICE OFFICE OFFICE

LIFE SUPPORT

1E98

DIR.

ASSOC DIR

COS

SEC SEC

SEC

1E98A

1W9

1W16A

AO/DIR

SEC

COPY RM.

P.A.

1E55

CONFERENCE RM

1E60

1E

1W50A 1W51

1W50B 1-W-52

CLASSROOM

1W49A 1W49B

1S3

GENERAL

STAIRS #11

STAIRS

STAIRS

OFFICE OFFICEOFFICE

STORAGE

EXAM

1E91

#20

#20

1W46

VLER

COMM.

MY HEALTH

eVET

OFF

OFF

ICE

BREAKROOM

TREATMENT

EXAM EXAM

OFFICE EXAM EXAM EXAM OFFICE

STAIRS #1

STAIRS #6

STAIRS #7

STAIRS #5

STAIRS #9

STAIRWELL

STAIRS #4

RESTROOM RESTROOM

BREAK

GEN.

STOR.

RESTROOM

ES

TI

1W27C

1W27B

1W27A

1W27B

1W28

VESTIBULE

PRESCRIPTION

TURN-IN

1E95

OFFICE HAC

RESTROOMWHEELCHAIR

CLEAN

PHARM

VAULT

CONFERENCE RM

1E95J

IV PREP

ROOM

1E95H

1E95L

1E95N

CLEAN SUPPLY

1E95M

HAC

1E111

ELEVATOR LOBBY

1W500

1W59

1E400B

1W31

1E100C

1E70C

1E500D

E4

1E500C

EXIT

1E39A

EXIT

1E400F

1N11

1N12

1N13

1N14

1N15

CLEAN SUPPLY

1N16 LIFE SUPPORT

1N17

1N18

SOILED UTILITY

1N23NURSE STATION

1N19

CRASH CART

1N9

1N08

1N10

TOILET

1N11A VESTIBULE

200A

DECON

200B

1N7A

EQUIPMENT

1N20

TRIAGE

1N21

1N22

CHECK-IN

1N7

100C

200E

200C

200FCOORIDOR

200D COORIDOR

100B

1N6

LINEN

100F

ELEC.

1N24A

1N24

FAST TRACK

1N24E

1N24F

1N24G

1N3 TOILET

1N4

100A

1N5

STRETCHER STORAGE

1N7B

PRESS TREAT.

1E11 EXAM

1E10

1E8

1E6A EXAM

1E6

1E4

1E2 HSKP

1E300C

EQUIP STOR

1E300B

ENTRY

1E300A

1E300D

1E300E

1E1

1E26

1E27

SOCIAL WK

1E28

DIETETICS

1E29

MH OFFICE

1E19

ELEC

1E20

SOIL UTIL

1E22

1E21

1E23 TLT

1E24

1E25

1E3

TLT

1E5EXAM

1E7

1E9

CLEAN UTIL

1E12

1E13

1E14

1E15

1E16

1E17

1E18

1E300F

1E400A

1E400B

1E400C

1E300G

Stamp

Line

6-W-48

6-W-49

6-W-52

-W

-5

6-W-53

6-W-55

-E

6-N-1

3A 3

6-N-33

6-N-34

6-N-31

6-N-29

6-N-28

6-N-7

6-N-8

6-N-10

6-N-12 6-N-27

6-N-17

35A 6-N-22

6-N-23

6-N-24

6-N-25

6-N-26

6-N-35

5 6

8 9 10

TA

3 2 153A

6-E-500

-N

-N-6

23 30

36 43

37 42 49

55 56

64 67

66 73

6848 58

6W31

20A 6W21

6W22

6W20 21A

6W23 6W24 23A

6W18

19A

18A

6W166W17 6W15

15A

29A

6W29 6W30

10B

6W10A

6W9A

9 9B

6W14

14A

13A

6W13 6W12

6W32

32B 6W35

12A

11A

6W11

6W36

35A

6W37

6W8

17A 16A

28A

6W28

6W27

6W26 6W2524A

CORRIDOR 6W39

6-W-4

6-W-5

6-W-6

6-W-738

ENG

BED

BEDN.S.

N.S.

22A

CATH LAB

22B

# 4

STAIR

6-E-500

500B

6-E-500A

A13

CATH LAB

HANDICAP SHOWER

HANDICAP SHOWER

SHELF

SHELF

6-E-1

2A

6-E-2 6-E-3

3A

6-E-5 6-E-7

6-E-31 6-E-30 6-E-29 6-E-28 6-E-27 6-E-26

-1

6-E-25 6-E-24 6-E-23B 6-E-23

6-E-22

6-E-20

20A

6- E-

21A 21D

21B

21C

AAAAA

A/C

MICU

N.S.

BED BED BED BED BED BED BED BED BED

BEDBED

BED BED BED BED BED BED BED BED

CATH

SIXTH FLOOR (HEALTH CARE)

OMNI

CELL

2276 SF

136 135 134 133

STAIR #5

143 144 145 146

150 149 148 147

162 159

175 174 173 172

9N-8

9N-5B

FEV

9N-7

9N-5

9N-6

9N-5A

9N-9

9N-10

9N-11

9N-12

9N-13

9N-1A

FE

9N-4

9N-3

9N-2

9N-1

DF

9W-3

9W-2

9W-1

9E-1

9E-30

62 69 7086

64 67

68 7179

80 81

85 84

93 94 95 96 97

101102103

108107106

119 116 115

120 121

130 131

9W-4

9W-169W-15

9W-59W-69W-6A 9W-7

9W-8

9W-9

MECH.

9W-12

STAIR #2

9W-22

9W-14 9W-17

9W-13

9W-13B

9W-13A

9W-31

9W-31A

STAIR #3 9E-29

9E-28C

129 132

123 122

112189

111188

98187

114 113

EIGHTH FLOOR

5959'

57'

FE

9W-18

9W-19

9W-20

9W-219W-20A

9W-239W-249W-259W-269W-279W-289W-29

9W-30

9N-14

9N-1B 9N-1C

9W-11

9E-31

9E-3 9E-5 9E-6 9E-8

9E-17

TEL.

9E-2A9E-2

9E-18

STAIR #49E-6A9E-3A

9E-19

9E-31A

9E-21 9E-20

9E-21A

9E-239E-25

9E-269E-27

9E-28B

9E-28A 9E-28 9E-20A

9E-15 9E-16A

9E-16 9E-15A

9E-4 9E-7

FEDF

9E-9 9E-10

9E-10A

9E-11 9E-12 9E-13

9E-14

9E-22 9E-24

9E-25A

9N-8

NURSING STATION

EA

MENTAL HEALTH

MENTAL HEALTH

OFFICEOFFICEOFFICEOFFICEOFFICE

BED BED

BED BEDCONF.ROOM

Exh.

112189

111188110

9E-1A

SALLY PORT

NINTH FLOOR (HEALTH CARE)

Sheets and Views

Building 1-MASTER 4-2019-S-B

Building 1-MASTER 4-2019-B

Building 1-MASTER 4-2019-1

Building 1-MASTER 4-2019-2

Building 1-MASTER 4-2019-3

Building 1-MASTER 4-2019-4

Building 1-MASTER 4-2019-5

Building 1-MASTER 4-2019-6

Building 1-MASTER 4-2019-7

Building 1-MASTER 4-2019-8

Building 1-MASTER 4-2019-9

Building 1-MASTER 4-2019-10

Building 1-MASTER 4-2019-11

Building 1-MASTER 4-2019-12 image1.emf

TAB E - VA HVAC Design Manual VA Table 2-1.pdf

VAMC SHREVEPORT LA - REPAIR OR HVAC AND ROOF

VA Medical Center November 6, 2019

Trace Load Calculation Results and Air Flow Calculations Shreveport LA

Global Variables

Cooling DT 17 F

Heating DT 20 F

AHU

AHU Number Trace Room Name and Number ASHRAE 62 Room Type

Area

(SF)

Height

(ft)

People

Count

System

Type VAV or CV

Sensible

Cooling

(BTUH)

Latent

VAV

Heating

Perimeter

Heat

Total Heat

Heating

Supply

(AC/hr)

(AC/hr)

Exhaust

OA CFM

per

Person

OA CFM

per SF

Max.

Min.

Exhaust

Min. OA

Fraction

Room Status VAV or

CV

Min.

Reheat T Original CFM

AHU-1 (OLD OR) Room - 005 OR 5 Pharmacy (prep. area) 378 8.83 8 VAV 18,643 2,000 -3,052 0 -3,052 1,015 147 20 4 0.00% 5 0.18 1,113 1,113 0 223 20.00% VAV POS 0.00% 77 1,113

AHU-1 (OLD OR) Room - 006 OR 6 Pharmacy (prep. area) 663 9 8 VAV 25,693 2,000 -10,429 0 -10,429 1,399 501 20 4 0.00% 5 0.18 1,989 1,989 0 398 20.00% VAV POS 0.00% 79 1,989

AHU-1 (OLD OR) Room - 007 OR 7 Pharmacy (prep. area) 513 9 8 VAV 24,763 2,000 -7,901 0 -7,901 1,349 380 20 4 0.00% 5 0.18 1,539 1,539 0 308 20.00% VAV POS 0.00% 79 1,539

AHU-1 (OLD OR) Room - 018 Equipment Room Pharmacy (prep. area) 185 9 0 VAV 13,430 0 -2,299 0 -2,299 732 111 6 2 0.00% 5 0.18 732 167 0 56 7.59% VAV POS 0.00% 87 167

AHU-1 (OLD OR) Room - 019 Scrub for OR 6 Pharmacy (prep. area) 96 9 2 VAV 2,554 500 -1,320 0 -1,320 139 63 6 2 0.00% 5 0.18 139 86 0 29 20.71% VAV POS 0.00% 88 86

AHU-1 (OLD OR) Room - 020 Substerile for OR 6 and 7 Pharmacy (prep. area) 144 9 1 VAV 15,122 500 -2,440 0 -2,440 824 117 6 2 0.00% 5 0.18 824 130 0 43 5.25% VAV POS 0.00% 92 130

AHU-1 (OLD OR) Room - 021 SUb sterile for OR 5 Pharmacy (prep. area) 80 9 1 VAV 14,437 500 -2,335 0 -2,335 786 112 6 2 0.00% 5 0.18 786 112 0 24 3.05% VAV POS 0.00% 94 112

AHU-1 (OLD OR) Room - 022 Scrub for OR 5 Pharmacy (prep. area) 100 9 2 VAV 2,583 500 -1,333 0 -1,333 141 64 6 2 0.00% 5 0.18 141 90 0 30 21.33% VAV POS 0.00% 88 90

AHU-1 (OLD OR) Room - 025 Old OR Corridor Pharmacy (prep. area) 631 9 1 VAV 4,421 0 -2,113 0 -2,113 241 102 8 2 0.00% 5 0.18 757 757 0 189 25.00% VAV POS 0.00% 77 568

AHU-1 (OLD OR) REST OF SPACES ON THIS SYSTEM Office space 6,440 6,440

14,459 12,422 0 1,299

Plus 5% Leakage 15,182

Plus 5% Safety 15,941 3,985 Based on critical space

AHU-2 (NEW OR) Room - 001 OR 1 Pharmacy (prep. area) 490 9 8 VAV 15,639 2,000 -2,804 0 -2,804 852 135 20 4 0.00% 5 0.18 1,469 1,469 0 294 20.00% VAV POS 0.00% 76 1,469

AHU-2 (NEW OR) Room - 002 OR2 Pharmacy (prep. area) 694 9 8 VAV 17,947 2,000 -3,022 0 -3,022 978 145 20 4 0.00% 5 0.18 2,081 2,081 0 416 20.00% VAV POS 0.00% 75 2,081

AHU-2 (NEW OR) Room - 003 OR3 Pharmacy (prep. area) 783 9.6 8 VAV 19,935 2,000 -3,366 0 -3,366 1,086 162 20 4 0.00% 5 0.18 2,506 2,506 0 501 20.00% VAV POS 0.00% 75 2,506

AHU-2 (NEW OR) Room - 004 OR 4 Pharmacy (prep. area) 759 9.6 8 VAV 21,559 2,000 -3,520 0 -3,520 1,174 169 20 4 0.00% 5 0.18 2,428 2,428 0 486 20.00% VAV POS 0.00% 75 2,428

AHU-2 (NEW OR) Room - 008 Sub Sterile for OR 1 and 2 Pharmacy (prep. area) 155 9 1 VAV 15,222 500 -2,459 0 -2,459 829 118 6 2 0.00% 5 0.18 829 140 0 47 5.61% VAV POS 0.00% 91 140

AHU-2 (NEW OR) Room - 009 Scrub OR 1 and 2 Pharmacy (prep. area) 88 9 2 VAV 2,530 500 -1,239 0 -1,239 138 60 6 2 0.00% 5 0.18 138 79 0 26 19.16% VAV POS 0.00% 89 79

AHU-2 (NEW OR) Room - 010 Sterile Supply Pharmacy (prep. area) 160 9 0 VAV 2,829 250 -1,435 0 -1,435 154 69 6 2 0.00% 5 0.18 154 144 0 48 31.06% VAV POS 0.00% 83 144

AHU-2 (NEW OR) Room - 011 Substerile for OR 3 and 4 Pharmacy (prep. area) 160 9 1 VAV 15,079 500 -2,441 0 -2,441 821 117 6 2 0.00% 5 0.18 821 144 0 48 5.83% VAV POS 0.00% 90 144

AHU-2 (NEW OR) Room - 012 Scrub for OR 3 and 4 Pharmacy (prep. area) 120 9 2 VAV 2,776 500 -1,327 0 -1,327 151 64 6 2 0.00% 5 0.18 151 108 0 36 23.81% VAV POS 0.00% 86 108

AHU-2 (NEW OR) Room - 013 Sterile Supply Pharmacy (prep. area) 189 9 0 VAV 3,058 250 -1,515 0 -1,515 167 73 6 2 0.00% 5 0.18 170 170 0 57 33.33% VAV POS 0.00% 82 170

AHU-2 (NEW OR) Room - 014 Bathroom Pharmacy (prep. area) 96 9 0 VAV 829 0 -428 0 -428 45 21 6 2 0.00% 5 0.18 86 86 0 29 33.33% VAV POS 0.00% 79 86

AHU-2 (NEW OR) Room - 015 Storage Pharmacy (prep. area) 210 9 0 VAV 1,842 0 -936 0 -936 100 45 6 2 0.00% 5 0.18 189 189 0 63 33.33% VAV POS 0.00% 79 189

AHU-2 (NEW OR) Room - 016 Storage Pharmacy (prep. area) 306 9 0 VAV 2,684 0 -1,364 0 -1,364 146 66 6 2 0.00% 5 0.18 275 275 0 92 33.33% VAV POS 0.00% 79 275

AHU-2 (NEW OR) Room - 017 Storage Pharmacy (prep. area) 144 9 0 VAV 1,263 0 -642 0 -642 69 31 6 2 0.00% 5 0.18 130 130 0 43 33.33% VAV POS 0.00% 79 130

AHU-2 (NEW OR) Room - 023 New OR Corridor Pharmacy (prep. area) 1238 9 0 VAV 10,243 0 -4,271 0 -4,271 558 205 8 2 0.00% 5 0.18 1,486 1,486 0 372 25.00% VAV POS 0.00% 77 1,115

AHU-2 (NEW OR) Room - 024 Nurse Station Pharmacy (prep. area) 273 9 3 VAV 12,430 750 -2,128 0 -2,128 677 102 6 2 0.00% 5 0.18 677 246 0 82 12.10% VAV POS 0.00% 82 246

13,590 11,679 0 2,638

Plus 5% Leakage 14,269

Plus 5% Safety 14,983 4,944 Based on critical space

Room Air

Balance

Air Flows Due to

LoadsRoom Data Minimum Air Flow Requirements Final Room ConditionsRoom Peak Loads image2.emf