EPOXY FLOORING - PRE-BID RFIs COMPLETE.docx
DOCX document 29 KB Posted
- Attached to
- Z2AA--Epoxy Floor Repairs Federal contract opportunity
- Solicitation number
- 36C25625Q0449
About this file
This document is a Pre-Bid Request for Information (RFI) for an epoxy flooring repair project at a VA facility. The solicitation (No. 36C25625Q0449) involves repairing epoxy flooring in specific rooms across multiple locations, with total approximate square footage of 470 SF across rooms 6E101, 6D125, 6E112, 5E113, and hallway 2B181. Key details include work restrictions such as weekend-only work for the 2B181 hallway area (Friday after 5pm - Sunday 8pm), daytime work (7am-6pm) for other areas, and coordination requirements with the unit and infectious control.
The VA will remove wall fixtures prior to the start date, and contractors must prepare existing surfaces, including potentially chipping and releveling shower area floors. Contractors are prohibited from using shared exhaust systems, and the solicitation allows for equal or better substitutes. The pre-bid document addresses multiple contractor inquiries, including room dimensions, work sequencing, and past performance reference requirements. Teaming partner references may be acceptable with a proper Teaming Agreement. The project is classified under NAICS code 238330 for specialty contractors, with no subcontracting limitation changes requested.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25625Q0449 0003.docx | DOCX document | |
| SITE VISIT Attendance Sheet.pdf | ||
| 36C25625Q0449 0002.docx | DOCX document | |
| Site Visit 2 Instructions - FLOOR REPAIRS.docx | DOCX document | |
| 36C25625Q0449 0001.docx | DOCX document | |
| Service Contract Act WD 2015-5117.txt | TXT text file | |
| Site Visit Instructions - FLOOR REPAIRS.docx | DOCX document | |
| 36C25625Q0449 SOLICITATION.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C25625Q0449 Prebid Requests For Information
REPAIR EPOXY FLOORING - JLM
ITEM #
QUESTIONS
VA RESPONSES
What is the square footage of the rooms that will require the epoxy Services?
Approximate square footage (SF) of rooms, ceilings 8ft high.
6E101 - 20 SF
6D125- 280 SF
6E112 – 70 SF
5E113 (Inside of 5E112) - 70 SF 2B181 Hallway area – 30 SF
Would the end user be ok with an equal to or better than substitute?
YES
Will contractors be permitted to use the exhaust system to hook up air scrubbers in Room 6D125?
Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited
| 4 |
| Does the VA want the entire bathroom floor in Room 6D125 to be redone, with the toilet area excluded? |
YES
| 5 |
| Will room 2B181 need to be done on nights and weekends, since it is the hallway to the OR? |
YES (Friday after 5pm – Sunday 8pm)
| 6 |
| Can the VA confirm that Room 5E112 and Room 5E113 are the same room? |
Yes. 5E-112 is the outside room # that leads to the bathroom which is 5E-113, which is where the work needs to be done.
| 7 |
| Could you please provide the drawings of the rooms? |
No drawings available.
| 8 |
| Will the VA provide dimensions? |
Approximate SF provided in #1 for vendor reference.
| 9 |
| Will the bid due date be extended since RFIs are due today and we typically have 7 days from the time the responses post? |
Solicitation closing date extended as per attached amendment.
| 10 |
| The “Services” box is marked, however the NAICS 238330 assigned to the solicitation is a Specialty Contractor NAICS code. Ozark Constructors request this be marked as a Specialty Contractor with a subcontracting limitation of 75% to accurately reflect the assigned NAICS code of 238330. |
This is a services contract for repair of existing flooring; NAICS 238330 is for flooring contractors; no correction needed.
| 11 |
| Volume 3 Past Performance states that a “Vendor may provide references” , if this is not a requirement it should also not be an evaluation factor. I do see that if none are provided it will not be rated favorably or unfavorably, however please clarify if other contractor submissions include “references”, will those be rated higher or more favorable than a contractor who choses not to include “references”. Ozark requests that the “Vendor may provide references” be removed from the Volume 3 Past Performance and thus removed from the evaluation process. |
| Revise to state “Vendor shall provide references….” |
| Instructions to Offerors states in No. 6 Past Performance references “may be” included. As referenced in the previous, we request the references be removed from Past Performance. If this request is denied, can the past performance of a Teaming Partner be considered as qualifiable past performance reference for evaluation? |
| Revise to state “Past Performance references shall be included”. References must be for the Offeror. Teaming partner references will be acceptable if an acceptable Teaming Agreement is provided in the proposal. |
What work areas will be available to the contractor to be worked on at a time? All, certain locations, or sequencing of which are to be done and in what order?
They can be done in any order, just need to coordinate with each unit and infectious control prior to starting. (Probably need 1-2 week notice)
Who will be responsible for removing and replacing all items affixed and not to be coated?
The VA will remove any fixtures from the wall prior to start date.
What are the allowable work hours for night and weekend work?
2B181 Hallway area will need to be done on the weekends (Fri after 5pm-Sun 6pm) The other areas can be done during the day (7am-6pm) Sun-Sat
Being as some existing coatings have failed and the tole/grout behind the existing coatings most likely exposed to trapped moisture. What is the repair procedure for these locations?
As long as the ceramic tile is still bonded good to the wall and is not coming off, just prep (rough up, etc. the existing tile for the epoxy coating to bond too it). A couple rooms the floor will probably need chipped up in the shower area and releveled. Try to figure for extra for those areas.
Please provide as-built drawings of the work areas.
Unavailable.