This document contains a pre-solicitation notice for a federal contract opportunity issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The opportunity is for a project to Replace Fire Doors in Buildings 7 and 9 at the Alexandria VA Health Care System in Pineville, Louisiana. The applicable NAICS code is 238290 Other Building Equipment Contractors, and the estimated construction cost range is between $25,000 and $100,000. The contract will be awarded using the Lowest Price Technically Acceptable source selection process, and a bid bond will be required. Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) certified through the SBA are eligible to submit proposals. The official solicitation will be issued on or around 07/26/2024 on SAM.gov, and a site visit is planned with details to be provided with the solicitation.

View the file

Other files

File Type Posted
P09 SOW Fire Doors for Building 7 and 9 Joint commission requirement.docx DOCX document
36C25624R0115.docx DOCX document
P09 FD issues LS Drawing Bldg 7 6-10-2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

E

1B.1

SP

FH R

SP

FH R

CHK. BY:

DATE:

SCALE:

DWG. BY:

DWG. No.:

LOCATION:

8/31/2023

BH JC

PINEVILLE LA

TITLE:

No. REVISIONS DATE

US DEPT of VETERANS AFFAIRS

ALEXANDRIA VA MEDICAL

Building 9 2495 Shreveport Highway

FLOOR 1

LIFE SAFETY

DRAWINGS

FIRST FLOOR PLAN

LIFE SAFETY LEGEND

Hazardous Area (Note 2)

Exterior Exit

2 Hour Fire Barrier

1 Hour Fire/Smoke Barrier

Smoke Barrier

Exit Stairwell

Area Under Construction

Exit Passageway

Suite (Color May Vary)

Trash/Linen Chute

Exit Access Corridor

2 Hour Fire/Smoke Barrier

1 Hour Fire Barrier

Exit Travel Distance

Smoke Barrier Travel Distance

Suite Travel Distance

All Hazard Area

Note 2: All hazardous areas in existing occupancies are protected by smoke tight partitions and self closing doors unless otherwise labeled.

General Note:

Corridor walls in fully sprinklered smoke compartments shall be permitted to terminate at the ceiling where the ceiling is constructed to limit the transfer of smoke

Smoke Tight Partition

Area Not Surveyed

SP

FH R

Fire Door was modified needs to be replaced

E

SP

FH R

SP

FH R

SP

FH R

SP

FH R

SP

FH R

SP

FH R

2.1

2.2

CHK. BY:

DATE:

SCALE:

DWG. BY:

DWG. No.:

LOCATION:

8/31/2023

BH JC

PINEVILLE LA

TITLE:

No. REVISIONS DATE

US DEPT of VETERANS AFFAIRS

ALEXANDRIA VA MEDICAL

Building 9 2495 Shreveport Highway

FLOOR 2

LIFE SAFETY

DRAWINGS

SECOND FLOOR PLAN

LIFE SAFETY LEGEND

Hazardous Area (Note 2)

Exterior Exit

2 Hour Fire Barrier

1 Hour Fire/Smoke Barrier

Smoke Barrier

Exit Stairwell

Area Under Construction

Exit Passageway

Suite (Color May Vary)

Trash/Linen Chute

Exit Access Corridor

2 Hour Fire/Smoke Barrier

1 Hour Fire Barrier

Exit Travel Distance

Smoke Barrier Travel Distance

Suite Travel Distance

All Hazard Area

Note 2: All hazardous areas in existing occupancies are protected by smoke tight partitions and self closing doors unless otherwise labeled.

General Note:

Corridor walls in fully sprinklered smoke compartments shall be permitted to terminate at the ceiling where the ceiling is constructed to limit the transfer of smoke

Smoke Tight Partition

Area Not Surveyed

SP

E

SP

FH R

SP

FH R

SP

FH R

SP

FH R

3.1

3.2

SP

FH R

CHK. BY:

DATE:

SCALE:

DWG. BY:

DWG. No.:

LOCATION:

8/31/2023

BH JC

PINEVILLE LA

TITLE:

No. REVISIONS DATE

US DEPT of VETERANS AFFAIRS

ALEXANDRIA VA MEDICAL

Building 9 2495 Shreveport Highway

FLOOR 3

LIFE SAFETY

DRAWINGS

THIRD FLOOR PLAN

LIFE SAFETY LEGEND

Hazardous Area (Note 2)

Exterior Exit

2 Hour Fire Barrier

1 Hour Fire/Smoke Barrier

Smoke Barrier

Exit Stairwell

Area Under Construction

Exit Passageway

Suite (Color May Vary)

Trash/Linen Chute

Exit Access Corridor

2 Hour Fire/Smoke Barrier

1 Hour Fire Barrier

Exit Travel Distance

Smoke Barrier Travel Distance

Suite Travel Distance

All Hazard Area

Note 2: All hazardous areas in existing occupancies are protected by smoke tight partitions and self closing doors unless otherwise labeled.

General Note:

Corridor walls in fully sprinklered smoke compartments shall be permitted to terminate at the ceiling where the ceiling is constructed to limit the transfer of smoke

Smoke Tight Partition

Area Not Surveyed

Fire Door has hole and been modified need to be replaced.

PB.1

CHK. BY:

DATE:

SCALE:

DWG. BY:

DWG. No.:

LOCATION:

8/31/2023

BH JC

PINEVILLE LA

TITLE:

No. REVISIONS DATE

US DEPT of VETERANS AFFAIRS

ALEXANDRIA VA MEDICAL

Building 9 2495 Shreveport Highway

PENTHOUSE

LIFE SAFETY

DRAWINGS

PENTHOUSE FLOOR PLAN

LIFE SAFETY LEGEND

Hazardous Area (Note 2)

Exterior Exit

2 Hour Fire Barrier

1 Hour Fire/Smoke Barrier

Smoke Barrier

Exit Stairwell

Area Under Construction

Exit Passageway

Suite (Color May Vary)

Trash/Linen Chute

Exit Access Corridor

2 Hour Fire/Smoke Barrier

1 Hour Fire Barrier

Exit Travel Distance

Smoke Barrier Travel Distance

Suite Travel Distance

All Hazard Area

Note 2: All hazardous areas in existing occupancies are protected by smoke tight partitions and self closing doors unless otherwise labeled.

General Note:

Corridor walls in fully sprinklered smoke compartments shall be permitted to terminate at the ceiling where the ceiling is constructed to limit the transfer of smoke

Smoke Tight Partition

Area Not Surveyed

File details come from the government source that posted it. Updated .