This document is an architectural drawing depicting the mechanical plans for Building 8MH403 at a replacement medical center project in New Orleans, Louisiana. The drawing shows the layout of various HVAC components on the west penthouse mechanical floor, including locations for exhaust fans 12A and 12B, duct routing, plenums, louvers, air handling units, cooling and preheating coils, fans, dampers, and other mechanical equipment. Key details called out include specifications for specific equipment such as dimensions, pipe sizing, and notes regarding condensate drainage and tie-ins. The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs Veterans Health Administration seeking a contractor to provide the design and installation of access platforms for the exhaust fans depicted on the drawing.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHMECHMECHMECH

PENTPENTPENTPENT

5P1025P1025P1025P102

POT FEEDER

ACD

SD

SDPR

SD

ACD-TP

ACD-TP

EF-13

08-5P

EF-17

08-5P

EF-8

08-5P

EF-11a 08-5P

EF-11b 08-5P

EF-15a 08-5P

EF-15b 08-5P

FT-2

08-5P

FT-1

08-5P

48ø ø ø ø x4 x4 x4 x4

80x44 ø

18ø

SAD-7

08-5P SAD-8

08-5P

HWP-4

08-5P

HWP-3

08-5P

ET-2

08-5P

CSG-1

08-5P

CSG-2

08-5P

HEX-4

08-5P

HEX-3

08-5P x3 x3 x3

96x36

SAD-6

08-5P x6

42x60 x4

AHU-3

08-5P

AHU-5

08-5P

EF-3

08-5P

SAD-27

08-5P

EF-16a 08-5P EF-16b

08-5P

24x20 x1 x2

AHU-2

08-5P

24x20 x2 x2 ø ø

24ø x3 x2 x2

AHU-1

08-5P

(BELOW)

(ABOVE)

36x24

60x36

SAD-32

08-5P

(VERTICAL)

EF-12a 08-5P

EF-12b 08-5P

RF-5

08-5P ø ø ø

M

H

M

H

8MH302

8MH303

INTAKE PLENUM

17'-0"(W)x5'-0"(D)x25'-0"(H)

INTAKE PLENUM

9'-6(W)x5'-0"(D)x25'-0"(H)

INTAKE PLENUM

15'-6"(W)x5'-0"(D)x25'-0"(H)

OUTSIDE AIR LOUVER

140 S.F. OF FREE AREA

AFMD-10

08-5P

SDPR

SDPR-5

08-5P

SDPR-3

08-5P

OUTSIDE AIR LOUVER

120 S.F. OF FREE AREA

OUTSIDE AIR LOUVER

80 S.F. OF FREE AREA

SD

AFMD-11

08-5P

ACD-TP ACD-TP

6"CHS&CHR

TO AHU-2

COOLING COIL.

6"CHS&CHR

TO AHU-1

COOLING COIL.

4"CHS&CHR

TO AHU-5

COOLING COIL.

6"CHS&CHR

TO AHU-3

COOLING COIL.

4" CHR

4" CHS

10" CHS

10" CHR

36x18

36x18

OPEN-ENDED DUCT

WITH 1/2"

WIRE MESH

SCREEN.

FT-4

08-5P

4" L

P S

4" L

P S

4" L

P S

4" LPS 4" LPS

3" LPS

6" CHR

6" CHS

6" C

H S

6" C

H R

3" LPS

ADD-ALTERNATE 9.36

4" LPS

FT-3

06-3M2

18"DIA. DN

12ø

12"DIA

DN

3" HWS

3" HWR

10" CHS

10" CHR

4" HWS

4" HWR

2"HWS&HWR

TO AHU-5

PREHEATING COIL.

4" HWR

4" HWS

3"HWS&HWR

TO AHU-3

PREHEATING COIL.

3" HWR

3" HWS

3"GRR

3" C

H R

3" GRR

3" G

R S

3" G

R R

3" G

R S

3" G

R R

3" GRS

3" GRR

3" GRS

3" GRR

SV-1

08-5P

EV-1

08-5P

EV-2

08-5P

EV-3

08-5P

SV-2

08-5P

EV-4

08-5P

EV-5

08-5P

EV-6

08-5P

SV-3

08-5P

EV-7

08-5P

EV-8

08-5P

SV-4

08-5P

EV-9

08-5P

EV-10

08-5P

SV-5

08-5P

SV-6

08-5P

SV-7

08-5P

EV-11

08-5P

SV-8

08-5P

EV-12

08-5P

EV-13

08-5P

EV-15

08-5P

SV-9

08-5P

EV-16

08-5P

08 G08 H08 J

08 1

08 2

08 3

08 4

J.3

3.6

1.5

3" GRR

3" G

R R

3" GRS

3" GRS

AS-2

08-5P

2 1/2" MPS 2 1/2" MPS

3" GRS

3" GRS

3" G

R S

3" C

H S

1 1/4" MPS

FCU-1

08-5P

FCU-2

08-5P

FCU-3

08-5P

FCU-4

08-5P

VFD-1

08-5P

VFD-2

08-5P

VFD-3

08-5P

VFD-5

08-5P

VFD-15

08-5P

VFD-16

08-5P

VFD-8

08-5P

VFD-9

08-5P

VFD-10

08-5P

VFD-11

08-5P

VFD-12

08-5P

VDF-17

08-5P

VDF-18

08-5P

ATC

VFD-19

08-5P

VFD-20

08-5P

1"LPR

TO CP-1

SAD-4

08-5P

SAD-3

08-5P

SDPR

SDPR-1

08-5P

SDPR

SDPR-8

08-5P

EAHU-3

08-5P

(ABOVE)

(BELOW)

3"COIL CONDENSATE

TO FLOOR DRAIN.

3"COIL CONDENSATE

TO FLOOR DRAIN.

FROM AHU-1 AND AHU-2.

3"COIL CONDENSATE

TO FLOOR DRAIN.

2"LPR DN

2" LPR DN

EV-14

08-5P

EV-17

08-5P

3" C

H S

3" C

H R

1" C

H S

1" C

H R

3/ 4"

H W

S

3/ 4"

H W

R

1/

2" C

H S

1/

2" C

H R

1" HWS

1" HWR

3" H

W S

3" H

W R

2" HWR

2" HWS

1" HWR

1" HWS

1/

2" H

W R

1/

2" H

W S

1" H

W R

1" H

W S

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1" CHS

1" CHR 1 1/2" CHR

1 1/2" CHS

1/

2" C

H R

1/

2" C

H S

3/4" HWS/R

3/4" HWS/R

3/4" HWS/R

1" CHS/R

1" CHS/R

3/4" HWS/R

CO

1 1/4" DRAIN PIPE TO BE

ROUTED TO NEAREST

FLOOR DRAIN

1 1/4" DRAIN PIPE TO

BE ROUTED TO NEAREST

FLOOR DRAIN

CO

CO

CO

CO

1 1/4" DRAIN PIPE TO BE

ROUTED TO NEAREST

FLOOR DRAIN

WATER-COOLED CONDENSING

UNITS, FOR WALK-IN CONSTANT

TEMPERATURE ROOMS 3P149A &

4P305, BY OTHERS.

REFRIGERANT LINES DOWN TO 3P149A &

4P305 BELOW. PIPING SIZED PER

MANUFACTURER'S RECOMMENDATIONS

TIE 1 1/2" CHS/CHR

INTO CHS/CHSR

PIPING AT CHASE

1 1/4"

CHS/R

1 1/2"

CHS/R

1"CHS/R

Q D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2 M3

N1 N2

A7

D3

E3

F3

R1

R4

R2 R3

A3

08 P

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H A L

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

E E T

(1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

X T

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

8MH403

BLDG 08 HVAC WEST PENTHOUSE ENLARGED

PLAN - AREA P

BE RPBJuly 16, 2012

8629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

NEW ORLEANS, LOUISIANA

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

BR+A CONSULTING ENGINEERS / LOW VOLTAGE

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of

Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_09B

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED 1/4" = 1'-0"

West Mechanical ENLARGED PLAN

GENERAL NOTES:

1. FOR SYMBOL LIST ABBREVIATIONS, AND GENERAL

NOTES THAT APPLY TO ALL DRAWINGS SEE THE

MH-0 SERIES OF DRAWINGS.

2. FOR GENERAL DETAILS SEE THE MH-5 SERIES OF

DRAWINGS.

3. FOR CONTROL DIAGRAMS SEE THE MH-8 SERIES OF

DRAWINGS.

1 Addendum 1 9/21/12

8 BULLETIN #46 10/12/15

SEE RFI 04835 :

Shows duct routing for exhaust vents.

APPROXIMATE LOCATION

OF PLATFORM

VHANOLBRODIM

Rectangle

VHANOLBRODIM

Line

File details come from the government source that posted it. Updated .