D 1 Quality Assurance Surviellance Plan signed.pdf
PDF 244 KB Posted
- Attached to
- Q702--Onsite Autologous Transfusion Services Federal contract opportunity
- Solicitation number
- 36C25623Q0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25623Q0005 0001 QA.pdf | ||
| D.2 - Wage Determination.docx | DOCX document | |
| 36C25623Q0005.docx | DOCX document | |
| D.4 - Past Performance Worksheet.pdf | ||
| D.3 E-verify Job Aid.pdf | ||
| 36C25623Q0005.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D.1 QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
Autologous Transfusion Services
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
• Assigned Contracting Officer (CO): Keo R. Stephanie Stephanie.Keo@va.gov 713-791-1414 ext 26408
• Assigned Contract Specialist: Troy Davis troy.davis@va.gov 713-770-2659
• Organization or Agency: U.S. Department of Veterans Affairs
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR(S): Primary: Tyler Jacobs – Business Manager –Tyler.Jacobs@va.gov – 501-257-6816
Organization or Agency: CAVHS Department of Veteran Affairs
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
Primary: Business Manager – (Name, e-mail, and phone number) Alternate: (Name, e-mail, and phone number)
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of mailto:Stephanie.Keo@va.gov mailto:troy.davis@va.gov mailto:Tyler.Jacobs@va.gov contractor performance in the elements defined. Performance standards define desired services. The government performs surveillance to determine the level of Contractor performance to these standards.
QUALITY ASSURANCE SURVEILLANCE PLAN
Interoperative Neuromonitoring
Measures Reference paragraph
Performance Requirement
Standard Acceptable Level Surveillance Method
Met AQL/DID
NOT MEET AQL-
CPAR
RATING/ADD
COMMENTS
Response time and scheduling
3. All Contractor’s staff shall perform in accordance with SOW standards.
99% contractor is available and responds to
CAVHS OR
schedule.
99% Direct Observations and evaluations.
Performs pre-operative activities in preparation of surgery
4. All staff shall perform in accordance with SOW standards.
99% preforms pre-operative activities to meet OR schedule.
99% Direct
Complete Blood Cell Saver Recovery Services
4. Contractor’s perform within their individual scopes of guidelines and regulations.
99% performs blood cell saver services within all appliable guidelines and regulations.
99% Direct Observation by OR team.
Performs post-operative activities as required by the patient’s condition
4. All staff shall perform in accordance with SOW standards.
99% performs any post-operative activities to sustain patient’s health.
99% Direct
Maintains licensing, registration, and certification
1.4. Updated
licensing, registration, and certification shall be provided as they are renewed.
Licensing and registration information are to be kept current
All (100%) licensing, registration(s), and certification(s), for Contractor’s physicians(s) and providers of care shall be provided as they are renewed.
Licensing and registration information kept current
(100%) licensing, registration(s), and certification(s), for Contractor’s physicians(s) and providers of care shall be provided as they are renewed.
Licensing and registration information kept current. No acceptable deviation
Periodic sampling and random sampling
Billing for services 5. Invoices shall 100% of invoices 100% Periodic Reviews be timely and accurate for all items billed.
are submitted timely.
and spot checks
CPARS 4.7.5. Reports shall be completed and submitted IAW para 4.5.2
100% compliance
100% Annually and Periodic Reviews and spot checks
Employment Eligibility Verification
4.7.5.5. Reports shall be
completed and submitted IAW para 4.5.3
100% compliance
100% Quarterly and Periodic Reviews and spot checks
5. INCENTIVES/DEDUCTS
The government shall not use past performance as incentives
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance.
a. DIRECT OBSERVATION
b. PERIODIC INSPECTION
c. USER SURVEY
d. VALIDATED USER/CUSTOMER COMPLAINTS
e. INSPECTION
f. PERIODIC SAMPLING
g. RANDOM SAMPLING
h. PROGRESS OR STATUS MEETINGS
i. ANALYSIS OF CONTRACTOR’S PROGRESS REPORTS
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
See above Acceptable Quality Level & Method of Surveillance located in QASP
The Government shall document positive OR NEGATIVE performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall work with the Contracting Officer (CO) inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion and place it in the COR file. In order to assure that the contractor receives impartial, fair, and equitable treatment under this contract, the COR will work with the contractor to increase performance to an acceptable level.
When the COR and CO determines formal written communication is required, the COR and CO shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the
CO.
9 . FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor as needed to assess performance and shall provide a written assessment.
Signature – Contractor
Signature – Contracting Officer Representative
Various methods exist to monitor performance.
| 2023-02-16T07:08:29-0600 | |
| TYLER JACOBS |