Revised SOW 598-22-157.doc
DOC document 166 KB Posted
- Solicitation number
- 36C25622R0127
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction Safety Form.docx | DOCX document | |
| 598-22-157 Water Tower Pump Location Drawing.pdf | ||
| Updated Price Breakdown.docx | DOCX document | |
| 36C25622R0127 0002.docx | DOCX document | |
| 3 X 3 Vault sub.pdf | ||
| Past Performance Form.docx | DOCX document | |
| 36C25622R0127 0001.docx | DOCX document | |
| ar125.txt | TXT text file | |
| SOW Water Tank Pump 598-22-157 VA CONSTR GEN REQ.doc | DOC document | |
| 36C25622R0127 Water Tank Pump.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLASSIFICATION: UNCLASSIFIED
STATEMENT OF WORK FOR PROJECT
CONSTRUCTION PACKAGE
FOR EMERGENCY WATER
TOWER PUMP - NLR
598-22-157
Central Arkansas Veterans Healthcare System VISN 16, Group 598
North Little Rock, Arkansas Prepared By
CAVHS Planning and Design Office 12 May 2022
DIVISION TABLE OF CONTENTS
2DIVISION TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS
PART 1 - GENERAL
1.01 safety requirements A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.02 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition, removal of existing structures, furnish labor and materials, and to perform the work to CONSTRUCTION PACKAGE FOR EMERGENCY WATER TOWER PUMP – NLR, 598-22-157 at CAVHS Little Rock, Arkansas as required by specifications.
B. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.03 STATEMENT OF BID ITEM(S)
A. ITEM I, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical and Electrical construction work on this project including:
1. Replacement of existing emergency water tower pump with a new pump systems and associated piping and electrical requirements.
1.04 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.05 DESCRIPTION OF WORK
A. Remove the existing 15 Hp Peerless pump and replace with a new horizontal split case pump with a flow rated at 800 gpm, 200 ft head pressure with a 6” suction inlet and a 4” discharge outlet with a 208V or 480V motor and a variable frequency drive for motor control and operation.
B. Provide a 6” line from the water tower 8” fill line to the new pump discharge and provide a reducer from 6” to 4” on the discharge of the pump. Provide a remote water connection header at the enclosed fence line with two (2) – four (4) 3” connections on the header. All connections shall be quick connect cam-locks. Any piping above ground will need to be heat traced and weather seal protected from the elements. Contractor shall provide shop drawings for approval of pipe routing from tower to pump assembly to remote connection.
C. Provide a mechanical means of visually showing the correct depth of the water storage tank, located at the base of the tower. The chart shall identify the height measured from the bottom of the tank to the top of the tank.
D. A/E to design potable/domestic water connections for two existing domestic water service entrances at the Eugene J. Towbin Memorial Veterans Hospital (Building 170). These connections could be used in an emergency situation where there is no water available from the regular domestic water service.
1. The connections shall have a separate/independent exterior header at each service entrance. The new header connections are only connected to its respective service and not interconnected.
2. The new headers shall contain various connection sizes and types and be constructed of materials designed for exterior applications. It is expected fire hose type connections as well as cam lock type connections and flanged connections would be provided at each header.
3. The header(s) to be above grade and easily connected to an exterior source ie tanker truck, fire truck, etc.
4. The header(s) shall be drainable to prevent freezing.
5. Large, easy to read and understand signage shall be installed at each header indicating it’s intended use and limitations. The signage to be designed for exterior applications and permanently affixed.
6. 6” piping from each exterior header shall continue to the interior of the building and connect to the intake/suction side of its respective existing building domestic water booster pump system. The penetration of the exterior building wall shall be installed with appropriate sleeve, grout, filler/sealer, escutcheon, etc. for a complete and permanent installation.
7. The piping from the header to the pumps shall include an appropriate backflow prevention device.
8. The new piping shall include appropriate (manual) valving to isolate it from the regular domestic water system.
9. The new piping shall be insulated according to Master Specifications found in the VA Technical Information Library (TIL).
10. The new piping type, valves, backflow prevention device, support systems, appurtenances and all associated new materials and parts shall also be as specified in the TIL Master Specifications.
E. Install four (4) 6” isolation valves at the indicated locations on provided site plans.
F. General Contractor shall follow all Local, State, and Federal codes with respect to civil, structural, mechanical, plumbing, gas, and electrical disciplines.
1.06 PROJECT AREA LIMITATIONS
A. All work shall be performed in the immediate project area of B-81 (Elevated Water Storage Tank) and B170 Eugene J. Towbin VAMC at NLR.
1.07 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security //escort// arrangements// can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
1.08 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Workmen are subject to rules of Medical Center as applicable to their conduct.
C. Plan and execute the work with minimal impact to the normal functioning of Medical Center as a whole, including patient care, operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
D. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof.
1.09 ALTERATIONS – Not used
1.010 SPECIAL CONSIDERATIONS
A. All contractors and visitors are required to adhere to Universal Masking Guidance which requires people to wear a cloth face covering or facemask over their mouth and nose while in any building of Central Arkansas Veterans Healthcare System (CAVHS). Daily healthcare screening is required before entrance to VA facilities due to COVID-19. No one with a cold or flu like symptoms will be allowed on VA property. In the event that symptoms occur while on site, the contractor will notify the COR immediately. The individual(s) maybe required to be COVID tested and quarantine until released by Infection Control to return to site.”
1.011 DISPOSAL AND RETENTION – not used
1.012 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS – not used
1.013 RESTORATION – not used
1.014 PHYSICAL DATA – not used
1.015 PROFESSIONAL SURVEYING SERVICES – not used
1.016 LAYOUT OF WORK
A. The Government will provide the following drawings to the Contractor as referred to in paragraph 1.05 for work indicated:
1. Mechanical Drawings.
1.017 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two (2) approved, completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.018 USE OF ROADWAYS – not used
1.019 RESIDENT ENGINEER'S FIELD OFFICE – not used
1.020 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT – not used
1.021 TEMPORARY USE OF EXISTING ELEVATORS – not used
1.022 TEMPORARY USE OF NEW ELEVATORS – not used
1.023 TEMPORARY TOILETS – not used
1.024 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
1.025 NEW TELEPHONE EQUIPMENT – not used
1.026 TESTS
A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre‑tested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.027 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub‑assembly components. Manuals shall include an index covering all component parts clearly cross‑referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory‑trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
1.028 GOVERNMENT-FURNISHED PROPERTY – not used
1.029 RELOCATED // EQUIPMENT // ITEMS // - not used
1.030 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT – not used
1.031 CONSTRUCTION SIGN – not used
1.032 SAFETY SIGN – not used
1.033 PHOTOGRAPHIC DOCUMENTATION – not used
1.034 FINAL ELEVATION DIGITAL IMAGES – not used
1.035 HISTORIC PRESERVATION – not used
1.036 VA TRIRIGA CPMS – not used
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION – GENERAL REQUIREMENTS