36C25622R0127 0002.docx

DOCX document 27 KB Posted

Attached to
Z1DA--CON | REPLACE THE EXISTING WATER TOWER PUMP | PR 598-22-4-8847-0003
Solicitation number
36C25622R0127
Issued by

View the file

Other files

File Type Posted
Construction Safety Form.docx DOCX document
598-22-157 Water Tower Pump Location Drawing.pdf PDF
Updated Price Breakdown.docx DOCX document
3 X 3 Vault sub.pdf PDF
Past Performance Form.docx DOCX document
Revised SOW 598-22-157.doc DOC document
36C25622R0127 0001.docx DOCX document
ar125.txt TXT text file
SOW Water Tank Pump 598-22-157 VA CONSTR GEN REQ.doc DOC document
36C25622R0127 Water Tank Pump.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 598-22-157 Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office 16 Keystone Crossing Fayetteville AR 72703 To all Offerors/Bidders

36C25622R0127

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 8/5/22 at

16:00 CST

The purpose of this amendment is to answer questions, attach additional documents and extend the offer due date time to 8/5/22 at 1600 CST.

Attached Items:

Questions and answers 2 Pages.

Revised SOW Updated Price Breakdown Pump Location Drawing 3x3 Vault Specs Past Performance and Construction Safety Forms

1. How long does the 8” line run to building 170?

In the amended SOW, this requirement has been replaced with four (4) isolation valves.

2. What building do we pull the new power from?

Power is being pulled from B-26 (structures Shop).

3. Please provide a spec for the new vault including, wall and bottom thickness, what type of top / access is needed.

3x3 Vault Sub attachment added.

4. On page 6 of the SOW packet, paragraph 1.16, sub paragraphs A & 1, it states the the GC will be furnished mechanical drawings. There are no drawings of any kind in any of the downloaded files for this project.

Attached drawings for the Vault and intended path.

5. On page 3 in the SOW packet, paragraph 1.05 sub paragraph D it talks about new potable/domestic water connections & piping. At the site visit it was determined that this pipe should be a 8" OD pipe. This pipe will tie in to existing piping near the security station at the front entrance and run to appox. midway of B170 where it will tie into the building there. That distance is almost 1/2 mile. This pipe will have to go under parking lots, streets, sidewalks and the ground. Is the VA wanting this to be bored all they, dug up and covered and patched all the way or a combination of both. It would help to have a plan to show the desired route to lay out the piping so that everyone is bidding apples to apples.

Attached Drawing.

6.. On page 7, paragraph 1.26 Tests sub paragraph A calls for commissioning. In the price schedule breakdown there is no line item to cover this as this will be a substantial price. Will the VA make a new price schedule or do we put it under General Requirements or Special Construction?

New Price Schedule attached.

7. The Contractor Evaluation Form and the Contractor Safety Form that says the are included in the packet but do not appear in any of it, so VA will need to furnish correct forms.

Attached Safety Form and Evaluation Form for projects not reported in CPARS.

8. Will compliant NSF pumps be allowed or is it required to be certified? I’m looking to provide FloFab pumps, and they are Compliant but not Certified NSF61.

Yes, they need to be NSF61 Certified.

9. Would it be possible to get the current serial number and/or data nameplate that is on the existing unit?

The current pump is undersized and will be removed by VA shop personnel.

10. I’m not seeing any specs or sizes the valves and headers need to be. If there is a plan view drawing available that would be great. Specifically, I’m looking for the size in inches, connection type like flanged, and classification class like 150# or 250#.

The valves will be standard water gate valves and standard water check valves with flanged connections. Both will be 6” and classification class will be 250#.

11. Can you confirm the voltage the VFD’s will be supplied with? It looks to be 3phase, 480v. Since VFD’s are not dual rated like motors I’ll need to know specifically. Do these VFD’s need to be in a panel? If yes, there are several questions I have about that. Or do the VFD’s need to be wall mounted and will they be tied into an existing panel for tank level control? If wall mounted what enclosure class needs to be provided?

The VFD requirement is being removed from this requirement. This pump will have a start/stop function.

See attached document: Revised SOW 598-22-157.

See attached document: Updated Price Breakdown.

See attached document: 598-22-157 Water Tower Pump Location Drawing.

See attached document: 3 X 3 Vault sub.

See attached document: Past Performance Form.

See attached document: Construction Safety Form.

File details come from the government source that posted it. Updated .