Answered_RFIs_564-22-503_36C256-22-R-0069_FAY AR C Arm Site Prep.docx

DOCX document 16 KB Posted

Attached to
Project 564-22-503 SITE PREP C-ARM
Solicitation number
36C25622R0069
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0001 564-22-503_36C25622R0069 0001 (1).docx DOCX document
Specs_564-22-503_Site Prep C-ARM.pdf PDF
36C25622R0069 RM Prep C Arm Posted.docx DOCX document
Past and Present Performance Questionnaire.docx DOCX document
Wage Determination AR20210035.txt TXT text file
564-22-503_ C-Arm Site Prep__SOW.pdf PDF
564-22-503_C-ARM DRAWINGS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request For Information

1. Will the new equipment be installed after prep work is completed?

Yes, the equipment will be installed by the equipment company after prep is complete. We will be working with a project manager of the equipment company so they will be there for any questions if the GC should have any or clarifications needed.

1. If yes, will the GC need to come back after install of new equipment for touch up or trim out?

Not completely necessary but we will do a final site walkthrough once equipment is installed to make sure there is no other miscellaneous issues present.

1. Could you provide the electrical specs for the equipment? Voltage and amperage.

100V @ 20 A - 120V @ 12 A

1. Will the sprinkler piping and materials in this area need to be of a nonmetallic material? And if so, will it need to have its own control valve, water flow and tamper switches to monitor the area? Or will the existing metal pipe be left as is?

Relocate Switching, Fire Sprinkler Heads, HVAC Return/Supply Grills/Ducts, and Ceiling Tiles and Grid Existing piping to remain as is, need to relocate them.