Answered_RFIs_564-22-503_36C256-22-R-0069_FAY AR C Arm Site Prep.docx
DOCX document 16 KB Posted
- Attached to
- Project 564-22-503 SITE PREP C-ARM
- Solicitation number
- 36C25622R0069
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0001 564-22-503_36C25622R0069 0001 (1).docx | DOCX document | |
| Specs_564-22-503_Site Prep C-ARM.pdf | ||
| 36C25622R0069 RM Prep C Arm Posted.docx | DOCX document | |
| Past and Present Performance Questionnaire.docx | DOCX document | |
| Wage Determination AR20210035.txt | TXT text file | |
| 564-22-503_ C-Arm Site Prep__SOW.pdf | ||
| 564-22-503_C-ARM DRAWINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information
1. Will the new equipment be installed after prep work is completed?
Yes, the equipment will be installed by the equipment company after prep is complete. We will be working with a project manager of the equipment company so they will be there for any questions if the GC should have any or clarifications needed.
1. If yes, will the GC need to come back after install of new equipment for touch up or trim out?
Not completely necessary but we will do a final site walkthrough once equipment is installed to make sure there is no other miscellaneous issues present.
1. Could you provide the electrical specs for the equipment? Voltage and amperage.
100V @ 20 A - 120V @ 12 A
1. Will the sprinkler piping and materials in this area need to be of a nonmetallic material? And if so, will it need to have its own control valve, water flow and tamper switches to monitor the area? Or will the existing metal pipe be left as is?
Relocate Switching, Fire Sprinkler Heads, HVAC Return/Supply Grills/Ducts, and Ceiling Tiles and Grid Existing piping to remain as is, need to relocate them.