36C25622R0047 0001.docx

DOCX document 181 KB Posted

Attached to
Z2ND--598-22-129-Replace Bldg. 65 Sanitary Sewer Line (VA-22-00027951)
Solicitation number
36C25622R0047
Issued by

View the file

Other files

File Type Posted
Specifications Sewage-Grinder system-8337000.pdf PDF
Past Performance Relevancy EXHIBIT A.docx DOCX document
Wage Determination.pdf PDF
36C25622R0047.docx DOCX document
SOW Rev A-598-22-129-Replace Bldg 65 Sanitary Sewer Line.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4.

REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date spe cified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE C

HANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT T

O AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48

CFR) 53.243

(Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE

CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 3/21/2022 598-22-129 Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 To all Offerors/Bidders

36C25622R0047

X X X

The purpose of this amendment is to post the questions and answers for clarification to all offerers.

This amendment adds attachment: Exhibit A to be filled out and submitted by all offerers. prior to the RFP due date.

This amendment adds attachment: Specifications Sewage Grinder.

1. We have an Arkansas contractors license, however will the project owner require us to be a licensed plumber with the state?

Yes need to have a licensed plumber or subcontract a licensed plumber (Arkansas requires anyone doing any kind of plumbing to be licensed by the Arkansas Department of Health)

2. Can we get specs on the grinder pump station?

Inline full port backwater valve with cleanout upstream of grinder pump station Specs:

· For commercial sewage application

· Check valve with system

· 4” inlet

· 2” or larger discharge

· Single phase 1hp or bigger grinder pumps for a minimum of 25 gpm

· Built in float switch

· NEMA 4X junction box for electrical connection

· Control panel with Alarm included

· Easy access cover to allow quick float switch removal and servicing Also, install a bypass to the Grinder Pump System (T-off upstream and downstream with one-way-check valve and ball valve) For any specs, demo/installation requirements please refer to the TIL http://www.cfm.va.gov/TIL/

3. If damage is found underneath the concrete after exploration, how will the repairs be compensated for? Do we need to have that figured in our bid or will this be paid for by means of change order?

Change order procedures are governed by the Federal Acquisition Regulation Part 43.2.

4. Contract is set to be 30 days, if significant damage is found during inspection, can additional contract days be requested via change order?

Change order procedures are governed by the Federal Acquisition Regulation Part 43.2.

5. Where is the electrical coming from for grinder pumps?

Per SOW, connect duplex grinder pump system to B65.

6. Is the lift station concrete or fiberglass?

Both will work or any other type of composite, etc. There is no limitation requirement so you can install whatever type you feel more comfortable that fulfills your warranty and professional installation.

7. Will this be a full design build project where the contractor is responsible for a full set of engineered plans and specifications?

No, it is a repair of ~292’ feet of sewer line between MH 288-MH002—MH64. (Replace clay line for 8” HDPE and connect B65 per SOW requirements)

8. Where will the lift station force main discharge into?

Into Main hole MH-288 that goes into 8” new sewer line.

9. If the system is gravity now, is the lift station intended to bypass a damaged section of sewer pipe.

The damage section will be removed and replaced for HDPE pipe. Minimum replacement of pipe expected is 292’ between MH-288, MH-64, and MH-002.

10. Will the existing manholes require sealing or lining?

This is part of the evaluation of existing sewer line prior to construction.

11. If design is to be included does that construction period of performance time frame of 30 days include obtaining the design specs and drawings or just 30 days for the actual construction?

No design, this is a plumbing sectionalize replacement and repair area between Bldg. 65, M-288, MH-64, and MH-0002 of sewer line.

12. Approximately how deep is the existing sewer?

Exact depth is unknown it is below the frost line.

13. Specifications for 1-2 HP Commercial pump with duplex grinder.

See Answer to question 2

14. Can specs be provided for HDPE pipe, size and mm?

HDPE SDR 11

15. Is there a basement?

There is a sub basement.

16. Where is the power source location for the pump station?

See answer to question 5.

17. If we provide a bypass can we operate under normal business hours as per section 8?

Yes, as long as we don’t disturb normal operations.

ATTACHMENTS:

See attached document: Past Performance Relevancy EXHIBIT A.

See attached document: Specifications Sewage-Grinder system-8337000.

image1.png

File details come from the government source that posted it. Updated .