36C25622R0041 0002.pdf
PDF 138 KB Posted
- Attached to
- Y1DA--CON 598-19-125 Relocate Medical Media
- Solicitation number
- 36C25622R0041
About this file
This document contains a pre-solicitation notice and clarification questions and answers for federal contract opportunity 36C25622R0041 to renovate space at a Veterans hospital. The project involves construction work to relocate a Medical Media department and create finished office space. The pre-solicitation specifies a 120-day period of performance for the fixed-price construction contract valued between $250,000-$500,000. Offerors must be registered SDVOSB businesses meeting the NAICS 236220 classification. The solicitation and drawings will be available on February 8th with a 90-day proposal acceptance period required. Clarification questions covered confirming scope details, allowable materials, and responsibility for existing conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 598-19-125 Relocate Medical Media SOW - Revised dated 3-2-22.docx | DOCX document | |
| 36C25622R0041.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
598-19-125
Department of Veterans Affairs Network Contracting Office 16 Michael E. DeBakey VA Medical Center 2002 Holcombe BLVD Houston TX 77030 4298
Department of Veterans Affairs Network Contracting Office 16 Michael E. DeBakey VA Medical Center 2002 Holcombe BLVD Houston TX 77030 4298
To all Offerors/Bidders
36C25622R0041
02-16-2022
X
X X
RE: 598-19-125 Relocate Medical Media
Clarifications are attached. Proposal due date remains unchanged.
Tabitha Contreras Contracting Officer vhahouContrT Typewritten Text 3/2/2022
36C25622R0041 0002
1. Question: The “PROPOSAL SUBMISSION REQUIREMENTS” section of the Solicitation provide explicit instructions for “Volume II Price - Solicitation - Offer - Award Documents Submission Requirements”, however no instructions are provided for Volume I – Past Performance outside of those criteria listed within the “EVALUATION FACTORS” section. Was this an intentional omission by the government? Or does the government have specific instructions for the preparation Volume I – Past Performance as it provided for Volume II Price - Solicitation - Offer - Award Documents?
Answer: Volume I will consist of your firm’s responses to the evaluation factors only.
2. Question: In 2020 there was an amendment titled Attachment 1 that highlighted all of the walls in the hallway. The instructions were to continue the framing to terminate to the deck above. Investigation reveals that multiple electrical lines, conduits, and ducts are running parallel to this wall. There are also conduits centered and run parallel directly over the top of this wall. During the site visit, the COR mentioned that this physical security requirement may not be required. That additional work requirement made the budget increase beyond the magnitude range. Our suggestion is to leave it as is. Any work above the ceiling will be very expensive and will not be cost effective. Will the VA please clarify if they want this work, a version of it, or leave it as is?
Answer: None of this work is included in this project.
3. Question: Does the VA want all of the steel decking, not just the structural steel, to be completely finished with spray-on fire proofing?
Answer: Drawing Sheet AD101, Note G is revised to:
PROTECT EXISTING FIREPROOFING TO GREATEST EXTENT POSSIBLE
DURING PROJECT. ONCE DEMOLITION IS COMPLETE, CONTRACTOR
SHALL REPAIR ALL DAMAGED FIREPROOFING AND RESTORE MISSING
FIREPROOFING TO MATCH EXISTING RATING(S).
4. Question: Between rooms 7E-111, 7E-112, and 7E-112A, we noticed some irregularities in the floor, and it was not level. Does the VA want/need a leveling compound installed to solve the unevenness of the floor?
Answer: Leveling compound is required see project specifications 09 65 19-4 paragraph 2.8 Leveling compound for concrete floors.
5. Question: On drawing number IN101, the graphic legend specifies that the LVT should be 6" x 48"; however, the specification on page 09 65 19-4 calls for 5" x 36" and 1/4" thickness. Please clarify which of the LVT specifications is required.
Answer: Follow Specification 09 65 19-4. Additionally, material can be either 6” x 48” or 5” x 36”. Also, material to be minimum ¼” thickness with 20 mil wear layer and aluminum oxide finish.
6. Question: Will the contractor be allowed use of the elevators?
Answer: Yes
7. Question: The statement of work scope 1.4 item 1 lists “Double glazed windows are failing. Many with fogged panes and failed window seals. Replace all. Floors G-3=916 2x4 windows; Floors 4-8=2060 2x4 windows. 23808 sf total.” Question- is this scope to be included as part of this solicitation? Pease provide plans for this scope as required.
36C25622R0041 0002
Answer: Contractor is responsible for only the 7th Floor windows that are in the work area. See attached revised SOW dated 3/2/22 that removes paragraph 1.4.
8. Question: The statement of work scope 1.4 item 2 lists Replace T12 fluorescent lamps and HID lamps in Utility rooms with T8 lamps and electronic ballasts or LED lighting.
Please confirm which specific rooms that are required to have this scope included.
Answer: None required in this project. See attached revised SOW dated 3/2/22 that removes paragraph 1.4.
9. Question: Is there a warranty for the existing roof? Please provide contact information for the vendor that holds the warranty.
Answer: There is no current roof warranty. The original installer was Tremco of Beechwood, OH (1-800-852-6013). The contractor is responsible to patch with the same material and methods as the original.
See attached document: 598-19-125 Relocate Medical Media SOW - Revised dated 3-2-22.