This statement of work and related federal contract opportunity document outline infrastructure upgrade requirements for four Community Based Outpatient Clinics/Home Based Primary Care sites in support of the Veterans Health Administration's transition to a new Electronic Health Record Management system. Key requirements include upgrading communication, electrical, HVAC, and physical security infrastructure to support increased bandwidth and connectivity needs. The work must be completed per industry standards and VA design manuals by January 2023. The Central Arkansas Veterans Healthcare System seeks a service-disabled veteran-owned small business contractor to provide construction services on a firm-fixed-price basis for the upgrades defined in the statement of work across the four clinic sites. The contractor must meet experience qualifications and performance milestones outlined in the documents.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Central Arkansas Veterans Healthcare System 4300 West 7th Street 12/16/2021 Little Rock, AR 72205
CONSTRUCTION SCOPE OF WORK
EHRM INFRASTRUCTURE UPGRADES – CBOC/HBPC – Little Rock, AR
I. PROJECT NO: 598-21-705GB
PROJECT NAME: EHRM - Infrastructure Upgrades - El Dorado CBOC - Little Rock, AR
II. PROJECT NO: 598-21-705PB
PROJECT NAME: EHRM - Infrastructure Upgrades - Pine Bluff CBOC - Little Rock, AR
III. PROJECT NO: 598-21-705AQ
PROJECT NAME: EHRM Infrastructure Upgrades – Searcy CBOC – Little Rock, AR
IV. PROJECT NO: 598-21-705GC
PROJECT NAME: EHRM - Infrastructure Upgrades – Westlake HBPC - Little Rock, AR
1. GENERAL INTENT:
The Contractor shall provide construction services necessary at this Community Based Outpatient
Clinics/ Home Based Primary Care (CBOC/HBPC) site to support the Veterans Health Administration’s
(VHA) change to the new Electronic Health Record Management (EHRM). VHA requests the Contractor provide construction services to include all labor, materials, tools, equipment, transportation, supervision, and other services necessary to upgrade the leased property in accordance with this scope of work.
1.1 General Requirements
1.1.1 The Contractor shall provide construction services for the following infrastructure improvements, as necessary to meet listed requirements:
1.1.1.1 Communication infrastructure including new data outlets, patch panels, upgrades to Cat 6A cable, fiber infrastructure backbone within building.
1.1.1.2 Electrical infrastructure including electrical panel upgrades, normal and emergency power, as applicable, bonding, Uninterruptible Power Supply
(UPS) system and Building Management System (BMS) interfaces to manage and monitor UPS.
Little Rock, AR 72205
1.1.1.3 HVAC infrastructure including temperature and humidity upgrades, rack and space sensors, and BMS interfaces to manage and monitor temperature and humidity.
1.1.1.4 Reconfiguration of existing space including demolition, new construction, and finishes. (WESTLAKE ONLY: The existing IT room TELCO shall be moved to room OFFICE 12 and titled IT Closet (TR)).
1.1.1.5 Physical security upgrades including telecommunication room cameras, alarms, and necessary interfaces to existing security system.
1.1.1.6 Identification and appropriate remediation of hazardous materials, as needed for project.
1.2 Clinic Operations
1.2.1 It is the Contractor’s responsibility to provide a work plan allowing for continued operations of the CBOC/HBPC. The VHA COR shall review and approve the work plan.
The work plan may require after hours or weekend work.
1.2.2 Execute work to interfere as little as possible with normal functioning of the
Community Based Outpatient Clinic as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied by Veterans or VHA staff, except as approved by COR.
1.2.3 Do not store materials and equipment in other than assigned areas.
1.2.4 Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems
(except telephone), they shall be cut and capped at suitable places as directed by
Contractor and approved by VHA COR. All such actions shall be coordinated with the
Contractor and VHA COR. Contractor shall submit a request to interrupt any such services to VHA COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
Interruptions may have to be scheduled outside of normal CBOC/HBPC operational hours.
1.2.5 The Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in CBOC/HBPC operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of
Little Rock, AR 72205 access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that CBOC/HBPC operations will continue during the construction period.
1.3 Testing
1.3.1 The Contractor shall provide a written testing plan in accordance with specifications and Building Industry Consulting Service International (BICSI) standards. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing testing. The Contractor shall document testing results and submit to VHA.
1.3.2 Lessor will coordinate final tests with VHA COR and conduct final tests in his/her presence. Lessor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
1.4 Safety During Construction
1.4.1 The Contractor shall designate a minimum of one Site Safety and Health Officer (SSHO) at each project site that will be identified as the SSHO to administer the Contractor’s safety program.
1.4.2 The designated SSHO must meet the requirements of all applicable OSHA standards and be capable (through training, experience, and qualifications) of ensuring that the requirements of 29 CFR 1926.16 and other appropriate Federal, State and local requirements are met for the project. As a minimum the SSHO must have completed the OSHA 30-hour Construction Safety class and have five (5) years of construction industry safety experience or three (3) years if he/she possesses a Certified Safety
Professional (CSP) or certified Construction Safety and Health Technician (CSHT) certification or have a safety and health degree from an accredited university or college.
1.5 Infection Control
1.5.1 An Accident Hazard Analysis associated with infection control will be performed by the
Contractor and VHA COR in accordance with FGI Guidelines (i.e. Infection Control Risk
Assessment (ICRA)). The ICRA procedure found on the American Society for Healthcare
Engineering (ASHE) website will be utilized. Construction Matrix (ashe.org)
1.5.2 The approved ICRA shall be reviewed and approved by the VHA COR and posted at the work site.
1.5.3 The Contractor shall implement all measures required by the ICRA.
https://www.ashe.org/sites/default/files/ashe/assessment_icra.pdf
2. STATEMENT OF WORK:
2.1 The Contractor shall ensure all below requirements from the VA Office of Electronic
Healthcare Modernization Site Infrastructure and End User Device Requirements are met.
2.2 Local Area Network (LAN)
2.2.1 Reference: Infrastructure Standard for Telecommunications Spaces, Version 3.1, https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf.
2.2.2 Horizontal cabling shall be Category 6 (Cat6) or higher (American National Standards
Institute (ANSI)/Technology Industries Association (TIA)-1179 Healthcare Facility
Telecommunications Infrastructure). If existing horizontal cabling is not minimally Cat6, Contractor shall upgrade to Category 6A (Cat 6A).
2.2.3 Telecommunications outlets/connectors and the horizontal cross-connects (patch panels) shall be of equal or greater Category to connected horizontal cable.
2.2.4 Installation shall be compliant with the BICSI standards (ANSI/NECA/BICSI 568, Standard for Installing Commercial Building Telecommunications Cabling and ANSI/TIA-
1179-A Healthcare Facility Telecommunications Infrastructure for new installations).
2.2.4.1 New cable installations additionally shall be compliant with TIA 568.2-D, TIA
TSB-184-A, and NFPA-70 Section 725.144 to prevent PoE heat accumulation.
Provide certification reports to the COR.
2.2.4.2 Alternatively, new UTP cabling shall carry a UL listed "LP" (Limited Power) rating.
2.2.4.3 Cat6A cable shall be terminated to a CAT6A RJ-45 patch panel in IT closet and CAT6A RJ-45 jack at wall plate and labeled at both ends.
2.2.4.4 Use a cable analyzer to determine cable length (max cable length 90M/295 linear feet) and certify that cable meets or exceeds TIA-EIA-568-C.2.
2.2.4.5 Cables shall be installed in continuous lengths from origin to destination, no splices with a 1’ service loop.
2.2.5 All patch cables shall be Category 6A for copper, OM4 for multi-mode fiber or OS2 level for single mode fiber.
2.2.6 Cable management shall be implemented for all patch cables in accordance with the latest version of Infrastructure Standard for Telecommunications Spaces, Version, ensuring proper bend radius, bundling, airflow, support and labeling.
https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf
2.2.7 1 GbE connectivity to desktops, and other End User Devices.
2.2.8 End-to-End latency from the user desktop to Cerner Data Center of equal to or less than 90ms for Citrix connection.
2.2.9 Provide additional data drops and network ports in Telecommunication Rooms (TR) to support required network printers and medical devices per Cerner Current State
Review (CSR). If the CSR is not provided as an attachment to this document, an additional Lease Amendment may be required.
2.2.10 Copper structured cabling shall be certified as meeting or exceeding TIA-EIA-568.1-D
(max fixed cable length 90M/295 linear feet) independent of media type.
2.2.11 Contractors shall provide service with a minimum of 10 GbE fiber or better.
2.2.12 Network Infrastructure devices supported by UPS and/or Emergency Power / Backup
Generator as described below in 2.5.
2.3 Power
2.3.1 UPS Functional Requirements: This Scope of Work includes UPS requirements for OIT equipment only. All OIT equipment in the Telecommunications Room shall be connected to the UPS.
2.3.1.1 All UPS units supporting Information Technology infrastructure shall be functional and maintain a 10-minute run-time.
2.3.1.2 UPS shall be managed and report the following information to a management system.
2.3.1.2.1 Overload
2.3.1.2.2 Battery Temperature High
2.3.1.2.3 Battery Charge Low
2.3.1.2.4 Battery Failure
2.3.1.2.5 Critical Condition (fan failure, low output voltage, etc)
2.3.1.3 UPS shall support both monitoring and remote management to include full compliance with RFC-1628 – UPS Management Information Base Support for Simple Network Management Protocol (SNMP) v3.0, BaCnet and
Modbus protocols.
2.3.1.4 UPS shall be connected to a monitoring system by Ethernet (wired or wireless) or serial interface (RS-232 or RS-485).
Little Rock, AR 72205
2.3.1.5 All units within one (1) year of end of life by facility Go-Live shall be replaced with new units.
2.3.1.5.1 End of Life for stand-alone units assumed to be six (6) years from date placed into service.
2.3.1.5.2 End of Life for UPS batteries assumed to be three (3) years from date replaced.
2.3.1.6 Most Community Based Outpatient Clinics and other leased spaces are defined as Life Safety Protected for Physical Security and Resiliency design.
2.3.2 Upstream bonding requirements to the Secondary Bonding Busbar or Primary Bonding
Busbar must use two lugs. Bonding for telecommunications equipment must be performed per manufacturer's specifications. All grounding shall comply with
ANSI/NECA/BICSI 607-C, Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises, November 2015.
2.4 Heating, Ventilation, and Air Conditioning (HVAC) Design Requirements
2.4.1 Reference: U.S. Department of Veterans Affairs Office of Construction & Facilities
Management HVAC Design Manual, dated May 1, 2019, https://www.cfm.va.gov/til/dManual/dmHVAC.pdf.
2.4.2 Telecommunications Rooms, Class B space temperature range 41°F to 95°F, relative humidity: 8 to 80% noncondensing.
2.4.2.1 Temperature and humidity shall be monitored in proximity to the OIT equipment rack. Place sensors either on populated rack or within 6 feet of rack.
2.4.2.2 Temperature and humidity shall be connected to a monitoring system by
Ethernet (wired or wireless) or serial interface (RS-232 or RS-485).
2.4.2.3 In areas where there are environmental issues (e.g., steam pipes, lack of ventilation, etc.), the use of thermal curtains and additional vents will be considered as a temporary alternative, not permanent resolution. Any existing temporary alternatives, such as thermal curtains and door vents, shall be corrected with an approved, engineered solution.
2.5 Physical Security Design Requirements
2.5.1 Reference: Telecommunications and Special Telecommunications Systems Design
Manual, https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf.
https://www.cfm.va.gov/til/dManual/dmHVAC.pdf https://www.cfm.va.gov/til/dManual/dmHVAC.pdf https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf
Little Rock, AR 72205
2.5.2 Provide an electronic Security Management System (SMS) with a Physical Access
Control System (PACS).
2.5.3 Doors shall include a mechanical spring loaded “deadlocking feature” (not separate
“deadbolt” lock), PACS associate electronic Personal Identity Verification (PIV) card access device with keypad, electric strike and digital Closed Caption Television (CCTV) color camera routed to and directly controlled by the facility SMS.
2.5.4 Telecommunication Room security system shall be connected to a UPS or emergency backup power system.
2.5.5 Facility programmable door controller shall be fully functional in a standalone status if connection to the SMS is lost. Once the connection is restored, the local door control system shall update the SMS, regarding all operations that occurred after the connection was interrupted. Then, the SMS shall update the local door control units to current operational function.
2.5.6 The PACS and SMS shall be fully compliant with VA’s PII, PIV "Smart" ID Card and at a minimum, FIPS 201-1 and NRTL (i.e. UL) listed and labeled.
3. PERIOD OF PERFORMANCE:
3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.
3.2 Work shall be completed in accordance with milestones in the following paragraph (project schedule table).
3.3 Work shall meet project milestones as outlined here.
Award Day 0
Initial meeting with Gov’t Day 10
Schematic Design due to VA Day 25
AE meeting (Schematic Design) Day 32
35% Design due to VA Day 57
AE meeting (35%) Day 64
95% Design due to VA Day 79
AE meeting (95%) Day 86
100% Design due to VA Day 101
AE meeting (100%) Day 108
Final CD submission due to VA Day 118
Gov’t approves CD Day 125
Construction Complete Day 365
4. MANUALS, STANDARDS AND DESIGN GUIDES: The work will be completed in compliance with the following manuals, standards, and design guides. Where there appear to be contradictions, VA shall make a final determination on applicability of manuals, standards, and design guides:
4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version
2.0. (Attachment 1)
4.2 Infrastructure Standards for Telecommunications Spaces Version 3.1 (dated July 1, 2021)
4.3 Telecommunications and Special Telecommunications System Design Manual (dated February
2016)
4.4 HVAC Design Manual (dated November 1, 2017 with Rev dated March 1, 2020)
4.5 VA Division 27 – Communications Specifications
5. SPECIFICATIONS:
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements
01 32 16.15 Project Schedule
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 – Reference Standards
01 45 00 - Quality Control
01 45 29 – Testing Laboratory Services
01 57 19 - Temporary Environmental Controls
01 74 19 Construction Waste Management
01 81 13 – Sustainable Construction Requirements
01 91 00 - General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 27 26 Wiring Devices
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations
27 05 33 Raceways and Boxes for Communications Systems
27 15 00 Communications Structured Cabling https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf https://www.cfm.va.gov/til/dManual/dmHVAC.pdf https://www.cfm.va.gov/til/dManual/dmHVAC.pdf https://www.cfm.va.gov/TIL/spec.asp#27 https://www.cfm.va.gov/TIL/spec.asp#27 https://www.cfm.va.gov/TIL/spec.asp#27 https://www.cfm.va.gov/TIL/spec.asp#27 https://www.cfm.va.gov/TIL/spec.asp#27
6. SUBMITTALS:
6.1 In addition to submittals required by specifications, the contractor shall submit the following submittals for review:
6.1.1 Product data and sample of cable.
6.1.2 As-built drawings for all data locations and labels. The Contractor shall provide the central drawing set to the Owner at the end of the project. The marked-up drawing set will accurately depict the as-built status of the system including termination locations, cable routing, and all administration labeling for the cabling system. In addition, a narrative will be provided that describes any areas of difficulty encountered during the installation that could potentially cause problems to the telecommunications system.
6.1.3 As-built drawings for new power locations. Include one line diagram depicting which circuits feed new outlets and panel schedules for panels feeding new outlet locations.
6.1.4 Certification report. All testing documents shall reflect the appropriate labeling scheme.
6.1.5 Warranties of installation and cabling system. The Contractor shall provide a system warranty covering the installed cabling system against defects in workmanship, components, and performance, and covering follow-on support after project completion.
7. PROJECT COMPLETION:
7.1 The contract shall not be closed by the Contracting Officer until after the station’s go-live date in the event that additional data drop and power outlet locations are identified by Cerner and the
Change Leadership Team.
7.2 If additional data drop and power outlet locations are identified, a modification shall be negotiated for the additional work.