Attatchment B - Site Plan.docx

DOCX document 160 KB Posted

Attached to
J041--36C25622Q0817 - AHU Maintenance Service Contract (VA-22-00065653)
Solicitation number
36C25622Q0817
Issued by

About this file

This document contains a solicitation for an AHU maintenance service contract and the related site plan attachment. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is seeking quotes for annual inspections, repairs, and scheduled maintenance on air handling units at the Southeast Louisiana Veterans Health Care System in New Orleans in accordance with manufacturer specifications. Interested service-disabled veteran-owned small businesses should submit quotes by May 19, 2022 to be considered for this 100% set-aside contract. The site plan attachment provides details on the locations and functions of various air handling units at the facility.

View the file

Other files

File Type Posted
36C25622Q0817 Amendment 2.pdf PDF
36C25622Q0817 0002.docx DOCX document
Attatchment B - Site Plan.pdf PDF
SOW - AHU 05172022.docx DOCX document
Appendix F - AHU Filter List.xlsx XLSX spreadsheet
Question and Answer.docx DOCX document
Appendix B - AHU Spreadsheet-model and serial number - Revised 05172022.xlsx XLSX spreadsheet
36C25622Q0817 0001.docx DOCX document
WD 2015-5175 r.17 - 20220315.docx DOCX document
36C25622Q0817.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOME

)AHU-2A 6th floor (DOAS unit works in conjunction with AHU-2)

AHU-2 6th floor (serves 5D patient rooms 4D pharmacy 3D OR rooms 1,2,5,&6

2D ER)

AHU-1A 6th floor (DOAS unit works in conjunction with AHU-1)

AHU-1 6th floor (serves 5D common areas 4D SPS 3D & 2D Admin 1D entire 1st floor)

BACK

)AHU-1 5th floor (serves B all floors)

AHU-2 6th floor (serves north side all floors)

PanAm Building (6 floors 2 AHU's)

AHU-3A 6th floor (DOAS unit works in conjunction with AHU-3)

Diagnostics &

AHU-1 6th floor (serves south side all floors)

Q D3 E3

B1 D2 D1 A1

F1 E1 A2 )E2 C1

AHU-1A 5th floor (DOAS unit works in conjunction with AHU-1)

B2

C2

Inpatient Building (5 floors)

Testing Building F3 )(6 floors)

AHU-4A 6th floor

(DOAS unit works in conjunction with

AHU-5)

)AHU-3 6th floor (serves 2E ER 3E OR 3,4,7,&8 4E specimen lab)

AHU-5A 6th floor (DOAS unit works in conjunction with AHU-5)

AHU-7 5th floor

(serves G2 floors 2-4)

Indoscopy/Cardio/MRI )AHU-7A 6th floor (DOAS unit works in conjunction with AHU-7)

A3 F2

A4 G2 G1

H

AHU-6 5th floor (serves G1 all floors main computer room and G2 1st floor)

AHU-1 5th floor (serves H all floors)

AHU-2A 5th floor (DOAS unit works in conjunction with AHU-2)

AHU-2

5th floor (serves

C all floors)

AHU-4

5th floor

(serves 4F labs

2F nuclear med.

Radiology) )Patient Dropoff/Pickup AHU-5 5th floor (serves 1F canteen, 3F procedure rooms, non-essential admin all floors)

AHU-6A 5th floor (DOAS unit works in conjunction with AHU-6)

Outpatient Building

AHU-1

4th floor (serves

M1 all floors) )Employee Parking Garage

A5 K J1

AHU-2 5th floor (serves J1 all floors) J2

(8 floors)

AHU-3

5th floor (serves

J2 all flo ors) )AHU-2A 5th floor (DOAS unit works in conjunction with AHU-3)

AHU-1A 4th floor (DOAS unit works in conjunction with AHU-1) R1 R2 R3

AHU-2

3rd floor (serves

M2 all floors) )R4

AHU-1&2 5th floor (serves all of 4th floor) operates lead lag

Transitional Living & Rehabilitation (4 floors) AHU-5 5th floor (serves all floors eastside) Dixie Research

M1 M2

P1

A6

L M3

AHU-5

1st floor (serves pool) )A7

AHU-2A 3rd floor

(DOAS unit works in conjunction with

AHU-2)

)N1 N2

AHU-8

floor 3.5 (serves boiler room) )AHU-1 3rd floor

AHU-2A 5th floor (DOAS unit works in conjunction with AHU-3)

Patient/Visitor Parking Garage AHU-3 3rd floor (serves gym)

AHU-4 2nd floor (serves gym)

Central Energy Plant

AHU-4

2nd floor

(serves 2nd floor main switch gear) )(6 floors)

AHU-6 & 7 floor 3.5 (lead/lag serves switch gear)

AHU-2 1st floor

Building (5 floors)

(serves 3rd floor offices halls on 3 & 3.5)

(serves 1st floor fuel storage)

AHU-3 5th floor (serves 2nd & 3rd floor labs on the eastside)

AHU-4 5th floor (serves 2nd & 3rd floor labs on the westside)

AHU-7 5th floor (serves all of old Dixie)

AHU-6 5th floor (serves all floors westside)

AHU-3 2nd floor (serves control rooms 2nd floor halls)

AHU-5 floor 3.5 (serves chiller plant) image6.png image7.png image8.png image9.png image10.png image11.jpeg image12.jpeg image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.jpeg image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image1.jpeg image2.png image3.png image4.png image5.png