36C25621R0154 0002.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C25621R0154
About this file
This document contains a pre-solicitation notice and related federal contract opportunity for renovations at a Department of Veterans Affairs medical facility. The forthcoming solicitation will require a general contractor to renovate approximately 13,599 square feet of space on the third floor of the southern H-wing at the Eugene J. Towbin Veterans Hospital in North Little Rock, Arkansas to upgrade patient rooms and infrastructure spaces. The renovations must be completed in accordance with provided drawings, specifications, and a statement of work by developing private and semi-private bed spaces to comply with current spatial and finish standards. Interested service-disabled veteran-owned small businesses must register in the System for Award Management and Vendor Information Pages databases. The projected solicitation date is August 10, 2021 on beta.SAM.gov. The contract size is estimated between $5 million and $10 million under NAICS code 236220.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 598-21-3-8760-0018 598-18-104 Department of Veterans Affairs Chief, A&MM (90C/NLR) Central Arkansas Veterans HCS 2200 Fort Roots Drive, Bldg 41, Room 208 North Little Rock
AR
72114 1706 Department of Veterans Affairs Chief, A&MM (90C/NLR) Central Arkansas Veterans HCS 2200 Fort Roots Drive, Bldg 41, Room 208 North Little Rock
AR
72114 1706 To all Offerors/Bidders
36C25621R0154 09-02-2021
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
1:00 PM, 9/9/2021
X This amendment revises the government response to previously answered Q15. Please replace previous government response Q15 with the following: (SEE ATTACHED REVISED RESPONSE)
Renardo Hollowell
CONTINUATION PAGE
15. AE601 door schedule. During the walkthrough the COR was asked about integrated doors and he mentioned that there were not any in the project. The door schedule reflects “integral” for 22 different doors. The legend displays that an Integrated door assembly is marked as ID. Does the integral in the remark’s column indicate that it’s an integrated door assembly?
A: Bid as shown.
New Response:
A:. Where the door schedule calls for “integrated hold open,” in the Remarks Column, this refers to the door closer mechanism having integral hold-open functionality. The use of the word “integrated” in the Remarks Column shall NOT be taken as meaning the full door assembly itself is an Integrated Door Assembly. That is, the designator ID (Integrated Door Assembly), found in the Remarks Legend, is not applicable to any door assemblies in this project. COR has confirmed there are no Integrated Door Assemblies within the project scope. Where restrooms having Door Type D1 are located, the scheduled accessible latch-sets with occupancy indicators are integral to the sliding door panel (latch-sets provided by door panel manufacturer). Otherwise, Contractor to provide door hardware per published Hardware Sets in the Project Specifications, where each hardware item can be procured and assembled at site for full door assembly.