5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06- -2021 586-21-2-1559-0003 586-19-101 Department of Veterans Affairs G.V. Sonny Montgomery VAMC Network Contracting Office 16 1500 E. Woodrow Wilson DR.

Jackson MS 39216 Department of Veterans Affairs G.V. Sonny Montgomery VAMC Network Contracting Office 16 1500 E. Woodrow Wilson DR.

Jackson MS 39216 To all Offerors/Bidders

36C25621R0086 05-14-2021

X X X

586-3610162-1559-854200-3133-23NRNR647

PLEASE SEE ATTACHMENT FOR

RFI'

S.

Jennifer Stasher Contracting Officer A. The purpose of this Amendment is to respond to RFI’s.

1. Reference Solicitation Section C.2 Phase I Proposal Format; Subsection A states that the proposals are to be submitted as three (3) separate .PDF documents. Also, Section C states that the Phase I proposal shall not exceed 25 pages. Question – Is the 25 pages limit a total for all three (3) documents or per .PDF document?

Provide a maximum of 25 pages each for the Evaluation Factors indicated in the Source Selection Plan:

Factor 1 – Technical Approach (25 pages) Factor 2 – Technical Qualifications (25 pages) Factor 3 – Past Performance (25 pages)

– for a total of 75 pages.

Regarding the table on page 8 of the Source Selection Plan:

Exchange the term “Technical Approach” for “Specialized Experience” Exchange the term “Technical Qualifications" for “Capability to Perform” “Past Performance" remains as “Past Performance"

2. Are ‘approval equal’ or alternative brands being considered for the above-captioned?

If so, please lend direction in the submittal / approval process for doing so.

Looking forward to your favorable response.

Need to ensure alternate products meet project specifications prior to approval.

3. I’m reaching out about Solicitation 36C25621R0086 for CCTV design-build/retrofit at the Jackson VAMC. My team is hoping to get clarification on the manufacturer requirements. The description of work in the SOW document states that the contractor shall provide a system that is “in compliance with VA Physical Security Design Manual, VHA Handbook 1162.02 Section 24 – Environment of Care, and applicable specifications from TIL”, however, the SOW then goes on to list the existing manufacturer’s software and hardware. Will offerors be able to propose the installation of software and hardware from another manufacturer? We have a couple of options that are technologically current and cost competitive. Please let me know if any further clarification of what I’m asking is required.

· The requirement is for the existing system to be upgraded to the manufacturer’s latest standard - Valerus 20. Budget limitations do not allow the entire system to be replaced. Therefore, the requirement is to perform a comprehensive upgrade of the existing system to include full surveillance coverage, full network functionality, and full backup in accordance/compliance with the VA Physical Security Design Manual, VHA Handbook 1162.02 Section 24 – Environment of Care, and applicable specifications from TIL.

All other Terms and Conditions remain unchanged.