This is a combined synopsis/solicitation for solid waste removal services at the Southeast Louisiana Veterans Health Care System facilities. The solicitation seeks quotes for comprehensive waste management and recycling services including waste collection and disposal, and compliance training. Quotes are due no later than April 9, 2021. The requirement is set aside for service-disabled veteran-owned small businesses. The solicitation will be conducted using FAR Parts 12 and 13 procedures. The incumbent contractor is Earth Smart under BPA VA256-16-A-0063 Task Order 36C25621F0072. The Department of Veterans Affairs Veterans Health Administration VISN 16 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to V112--629-21-2-622-0105, Solid Waste Removal, newest first.
File Type Posted
36C25621Q0595 0002.docx DOCX document
36C25621Q0595 0001_1.docx DOCX document
36C25621Q0595_1 - DRAFT v4.pdf PDF
36C25621Q0595.docx DOCX document
Wage Determination 2015-5189 Rev 17.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 24

0002 629-21-2-622-0105

Department of Veterans Affairs Southeast Louisiana Veterans HCS 1515 Poydras Street

New Orleans LA 70112

Department of Veterans Affairs Southeast Louisiana Veterans HCS 1515 Poydras Street New Orleans LA 70112

To all Offerors/Bidders

36C25621Q0595

04-01-2021

X

X X

See CONTINUATION Page

X 1

Amendment of Combined Synopsis/Solicitation is to provide answers to all of the questions that were submitted to this office. No other changes have been made.

Ashley Haslauer Contracting Officer

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMB

ER

DESCRIPTION OF

SUPPLIES/SERVICES

QUANTIT

Y UNIT UNIT PRICE AMOUNT

0001 52.00 WK _____________

39YD Compactor Hauls Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0002 12.00 MO _____________

39 YD Compactor Rental Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0003 52.00 WK _____________

40YD Compactor Hauls Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0004 12.00 MO _____________

Monthly Compactor Cleaning Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0005 52.00 WK _____________

30yd Open Top Rental (2400 Canal Street) Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0006 52.00 WK _____________

30 YD Open Top Hauls (2400 Canal Street) Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0007 12.00 MO _____________

30yd Open Top Rental (2400 Canal Street) Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0008 12.00 MO _____________

30 YD Open Top Hauls (2400 Canal Street) Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0009 600.00 TN _____________

Solid Waste Disposal Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0010 12.00 JB _____________

Solid Waste Disposal CBOC Contract Period: Base POP Begin: 05-20-2021 POP End: 05-19-2022

0011 12.00 JB _____________

Recycling Main Hospital

0012 12.00 JB _____________

Recycling CBOC

1001 52.00 WK _____________ _____________

39YD Compactor Hauls

Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1002 12.00 MO _____________

39 YD Compactor Rental Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1003 52.00 WK _____________

40YD Compactor Hauls Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1004 12.00 MO _____________

Monthly Compactor Cleaning Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1005 52.00 WK _____________

30yd Open Top Rental (2400 Canal Street) Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1006 52.00 WK _____________

30 YD Open Top Hauls (2400 Canal Street) Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1007 12.00 MO _____________ _____________

30yd Open Top Rental (Warehouse) Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1008 12.00 MO _____________

30 YD Open Top Hauls (Warehouse) Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1009 600.00 TN _____________

Solid Waste Disposal Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1010 12.00 JB _____________

Solid Waste Disposal CBOC Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1011 12.00 JB _____________

Recycling Main Hospital Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

1012 12.00 JB _____________

Recycling CBOC Contract Period: Option 1 POP Begin: 05-20-2022 POP End: 05-19-2023

2001 52.00 WK _____________

39YD Compactor Hauls Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2002 12.00 MO _____________

39 YD Compactor Rental Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2003 52.00 WK _____________

40YD Compactor Hauls Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2004 12.00 MO _____________

Monthly Compactor Cleaning Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2005 52.00 WK _____________

30yd Open Top Rental (2400 Canal Street) Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2006 52.00 WK _____________

30 YD Open Top Hauls (2400 Canal Street) Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2007 12.00 MO _____________

30yd Open Top Rental (Warehouse) Contract Period: Option 2

POP Begin: 05-20-2023 POP End: 05-19-2024

2008 12.00 MO _____________

30 YD Open Top Hauls (Warehouse) Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2009 600.00 TN _____________

Solid Waste Disposal Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2010 12.00 JB _____________

Solid Waste Disposal CBOC Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2011 12.00 JB _____________

Recycling Main Hospital Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

2012 12.00 JB _____________

Recycling CBOC Contract Period: Option 2 POP Begin: 05-20-2023 POP End: 05-19-2024

3001 52.00 WK _____________

39YD Compactor Hauls Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3002 12.00 MO _____________

39 YD Compactor Rental Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3003 52.00 WK _____________

40YD Compactor Hauls Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3004 12.00 MO _____________

Monthly Compactor Cleaning Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3005 52.00 WK _____________

30yd Open Top Rental (2400 Canal Street) Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3006 52.00 WK _____________

30 YD Open Top Hauls (2400 Canal Street) Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3007 12.00 MO _____________

30yd Open Top Rental (Warehouse) Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3008 12.00 MO _____________

30 YD Open Top Hauls (Warehouse) Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3009 600.00 TN _____________

Solid Waste Disposal Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3010 12.00 JB _____________

Solid Waste Disposal CBOC Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3011 12.00 JB _____________

Recycling Main Hospital Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

3012 12.00 JB _____________

Recycling CBOC Contract Period: Option 3 POP Begin: 05-20-2024 POP End: 05-19-2025

4001 52.00 WK _____________

39YD Compactor Hauls Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4002 12.00 MO _____________ _____________

39 YD Compactor Rental Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4003 52.00 WK _____________

40YD Compactor Hauls Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4004 12.00 MO _____________

Monthly Compactor Cleaning Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4005 52.00 WK _____________

30yd Open Top Rental (2400 Canal Street) Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4006 52.00 WK _____________

30 YD Open Top Hauls (2400 Canal Street) Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4007 12.00 MO _____________

30yd Open Top Rental (Warehouse) Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4008 12.00 MO _____________

30 YD Open Top Hauls (Warehouse) Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4009 600.00 TN _____________

Solid Waste Disposal Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4010 12.00 JB _____________

Solid Waste Disposal CBOC Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4011 12.00 JB _____________

Recycling Main Hospital Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

4012 12.00 JB _____________

Recycling CBOC Contract Period: Option 4 POP Begin: 05-20-2025 POP End: 05-19-2026

5001 52.00 WK _____________

39YD Compactor Hauls Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5002 12.00 MO _____________

39 YD Compactor Rental Contract Period: Option 5

POP Begin: 05-20-2026 POP End: 11-19-2026

5003 52.00 WK _____________

40YD Compactor Hauls Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5004 12.00 MO _____________

Monthly Compactor Cleaning Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5005 52.00 WK _____________

30yd Open Top Rental (2400 Canal Street) Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5006 52.00 WK _____________

30 YD Open Top Hauls (2400 Canal Street) Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5007 12.00 MO _____________

30yd Open Top Rental (Warehouse) Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5008 12.00 MO _____________

30 YD Open Top Hauls (Warehouse) Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5009 600.00 TN _____________

Solid Waste Disposal Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5010 12.00 JB _____________

Solid Waste Disposal CBOC Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5011 12.00 JB _____________

Recycling Main Hospital Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

5012 12.00 JB _____________

Recycling CBOC Contract Period: Option 5 POP Begin: 05-20-2026 POP End: 11-19-2026

GRAND TOTAL _____________

A.2 DELIVERY SCHEDULE

ITEM NUMBER

QUANTIT

Y

DELIVERY

DATE

0001 52.00

0002 12.00

0003 52.00

0004 12.00

0005 52.00

0006 52.00

0007 12.00

0008 12.00

0009 600.00

0010 12.00

0011 12.00

0012 12.00

1001 52.00

1002 12.00

1003 52.00

1004 12.00

1005 52.00

1006 52.00

1007 12.00

1008 12.00

1009 600.00

1010 12.00

1011 12.00

1012 12.00

2001 52.00

2002 12.00

2003 52.00

2004 12.00

2005 52.00

2006 52.00

2007 12.00

2008 12.00

2009 600.00

2010 12.00

2011 12.00

2012 12.00

3001 52.00

3002 12.00

3003 52.00

3004 12.00

3005 52.00

3006 52.00

3007 12.00

3008 12.00

3009 600.00

3010 12.00

3011 12.00

3012 12.00

4001 52.00

4002 12.00

4003 52.00

4004 12.00

4005 52.00

4006 52.00

4007 12.00

4008 12.00

4009 600.00

4010 12.00

4011 12.00

4012 12.00

5001 52.00

5002 12.00

5003 52.00

5004 12.00

5005 52.00

5006 52.00

5007 12.00

5008 12.00

5009 600.00

5010 12.00

5011 12.00

5012 12.00

CONTINUATION PAGE

Q1 - Could you please tell me if the Combined Synopsis/Solicitation posted as solicitation number 36C25621Q0595 will be a follow-on requirement to any work performed currently or in the past, or will this be a new requirement?

If possible, can you please provide the most recent contract or task order number?

A1 - 36C25621Q0595 is a requirement that is designed to continue similar services to those that are in place under a current contract.

BPA VA256-16-A-0063

Task Order 36C25621F0072

Q2 - Who is the current contractor?

A2 – Earth Smart

Q3 - What is the current obligation number?

A3 - BPA VA256-16-A-0063 / Task Order 36C25621F0072

Q4 - Section 10 item g. references batteries, is that part of the waste in the trash bins?

A4 – No.

Q5 - Section 10 item h. references Bulb packaging, is that part of the waste in the trash bins?

A5 – No.

Q6 - Section 10 item i. references scrap metal / pallets, is that a separate bin requirement on top of the 30yard bin at the warehouse, if so, how many times was it utilized in the previous contract?

A6 - Yes, it will be a separate container, but it will be only on call bases once a month. - This was not an item in any contract that we have previously had in place.

Q7 - Normally trash bins are picked up early in the AM <0700 hrs. the contract references 0700-1500 do the 8yrd containers need to be serviced within that timeframe or can they be serviced earlier (i..e 0500)

A7 - Per the contract I am identifying ours of operation, in the contract the only requirement I have is that the containers be returned prior to 09:00 am. If you arrive at 05:00 am and return the containers by 06:00 am that is fine as long as all containers are returned by 09:00 am.

DAYS AND HOURS OF OPERATION:

Monday – Friday, 7:00 am to 3:30 pm excluding federal holidays. The expectation is that solid waste containers are removed early enough and returned by 9:00 am on pick up days.

Q8 - What is CLIN 0009 600 Tons of Solid Waste disposal in reference to?

A8 - The total waste collected by the onsite compactor and open top container at 2400 Canal Street and the all CBOCs.

Q9 - CLIN 0012 is recycling at the CBOC. what size bins are required for this and what is the service frequency?

A9 – 96g container picked up 2X a week

Q10 - How many bails of cardboard are shipped on a weekly / monthly basis?

A10 - 3 - 4 bails weekly

Q11 - What is the size of the cardboard bails?

A11 – 32” X 32”

Q12 - How are the cardboard bails stored and loaded for shipment?

A12 - Forklifted and stored on the back dock.

Q13 - CLIN 0011 is recycling at the Main Hospital. What size bins are required for this and what is the service frequency?

A13 – 8-yard container 2X a Week. VA employees will bring everything outside to this container. No inside containers are required but will consider a proposal if it provides a cost benefit.

Q14 - Are we able to schedule a site visit at the main facility (where the current 39-yard compactor is located)? We would like to get the specifications necessary for providing accurate quoting of this unit.

A14 - 29 March 2021 at 1100am CST at 2400 Canal Street, inside the main concord.

Q15 - Need additional information on the process and approval to convert Biohazardous waste into MSW material and regular landfill disposal. Is the process heat, chemical or pressure to clean material?

A15 – Contact the San-I-Pak World Heath Systems and reference their 6:1 compactor with 40 cubic yard roll off container.

Q16 - Can you provide Waste Management Proof of certification to sanitize medical waste?

A16 - We are currently working on getting our certificate to process/sanitize medical waste. This service will not start until we have the certificate from the state and DEQ.

Q17 - Can you provide documentation such as manifest for each load and approval from landfill to accept the material?

A17 – I am not sure what you are asking, the product will be considered solid waste at the end of processing and there is no manifest.

Q18 - Time frame window- The 7:00am -3:30pm. Is there any adjustment for 6:00am Hauls? Especially on days when the monthly cleaning is needed.

A18 – See answer A7.

Q19 - If Waste Management is required can you provide a manifest or supporting documentation on each haul of the medical waste stream to include a manifest or supporting documents to what is in the waste stream?

A19 – The product will be considered solid waste at the end of processing and there is no manifest. There is no medical waste stream in this contract.

Q20 - What is the cubic yardage of the receiver box for the Sani-Pack?

A20 – This is a San-I-Pak World Heath Systems 6:1 compactor with 40 cubic yard roll off container. We are not familiar with what you are calling a receiver box. If you need a specification sheet for that product, please contact San-I-Pak.

Q21 - Has the New Orleans VA Medical Center received approval from any landfill to dispose of the San-I-Pak waste as MSW? If the VA has received approval, which local landfill will accept this waste?

A21 – The waste being disposed of from the San-i-Pak is not considered medical waste. Once it has been processed the waste will be considered solid waste.

Q22 - Has the waste being generated from the San-I-Pak been analyzed and profiled? If the waste has been profiled, please provide a copy.

A22 - The waste that’s being converted to solid waste does not require profiling.

The waste that we will be converting to solid waste is medical waste which once processed through the San-i-Pak system will be converted to solid waste.

Q23 - Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?

A23 - The contract will be exempt from additional taxes and the awardee will receive a tax-exempt certificate if they request one.

Q24 - Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations.

Q24 - If this is for the monitoring of waste, I would prefer a web-based program verses software.

Q25 - Will the VA allow a single individual to act as the Quality Control Manager (QCM), Site Safety & Health Officer (SSHO), and on-site Superintendent (Super) for the prime contractor on this project?

A25 – Yes.

Q26 - The NAICS code provided in the solicitation is 562111, which represents this project as a “service” contract. Can the VA please confirm if the prime contractor’s self-performance requirement is 50% as specified by 13 CFR 125.6 (Limitations on subcontracting requirements in the FAR).

A26 – The CFR number that you quoted is accurate, but you reference “self-performance”. The code has changed. Instead of requiring a percentage of work to be performed by a prime contractor, the limitations on subcontracting rules now limit subcontracting to a percentage of the overall award amount to be spent by the prime on subcontractors. As a result, the prime contractor no longer has to track the percentage of costs incurred that it spends performing work itself; it only has to track the percentage of the overall award amount (i.e., contract price) that it spends on subcontractors. FAR Clause 52.219-4(c)(1) [March 2020] will be on the contract and it states, “By submission of an offer and execution of a contract, the Contractor agrees that in performance of the contract in the case of a contract for Services, at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

Q27 - What is the expected start date for new services?

A27 - May 21, 2021

Q28 - Can the VA please clarify what service CLIN item #9 represents in the price/cost schedule?

A28 - We estimate 600 tons of solid waste annually for SLVHCS which includes the 5 CBOCs combined. It is not known if we will be charged a flat monthly rate, by weight, or a combination of both.

Q29 - During the site visit it was made clear that all waste from the Sani-Pak system will be considered municipal solid waste (MSW), and a waste disposal manifest will not be required upon disposal. Can the VA please confirm this discussion?

A29 - That is correct

Q30 - During the site visit it was made clear that the VA will remove waste from the Sani-Pak system and place it in the adjacent dumpster in the CEP dock area.

Will the contractor be required to remove any waste directly from the Sani-Pak system?

A30 - That is incorrect, the process that was described is that once the waste has completed the sterilizing cycle of the San-i-Pak system it will be dumped into the compactor connected to the San-i-Pak.

Q31 - Who is the current Vendor?

A31 – See answers to Q1-Q3.

Q32 - What is the current obligation number?

A32 – See answers to Q1-Q3.

Q33 - The San-I-Pak unit is this a new or historical unit?

A33 - New System.

Q34 - Does the San-I-Pak require a manifest for each shipment?

A34 - No, the waste being disposed of from this compactor is the same as all solid waste and disposed of in the same way. SLVHCS only require the weekly weights disposed of from the system.

Q35 - The Recycling at the CBOC locations there is no container size listed, what container size, quantity, frequency, and tonnage is expected?

A35 - Please review the PWS

Q36 - The bailed carboard what size are the bails being managed and what is the annual tonnage on them?

A36 - 32” X 32” and 20 – 25 bails; monthly

Q37 - The SOW references light bulbs and batteries, are those items being placed into the waste containers?

A37 - No, these items are kept in the recycling room where they can be picked up weekly or on call

Q38 - The SOW refences a metal roll off, how often is this needed?

A38 - Quarterly or by calling and scheduling

Q39 - The San-I-Pak is treating medical waste. Is a certification going to be signed stating that all treatment has been completed per Federal, State, Local, and disposal facility standards?

A39 - Computer Records are generated after each batch of waste is processed identifying that the medical waste has been properly treated.

Q40 - If a new contractor is chosen, what is the expected turn over / change over schedule?

A40 - The expectation is that there is no lapse in service the last day of the contract is May 20, 2021 services are expected to start May 21, 2021. The next day of service is expected to be on May 24, 2021.