This document contains a solicitation for potable water management services and the related questions and answers document. The Department of Veterans Affairs is seeking these services for the Southeast Louisiana Veterans Health Care System in New Orleans. The requirement is set aside for Service-Disabled Veteran Owned Small Businesses. Interested parties must be registered in SAM, VETBIZ if applicable, and VetBiz 4212 if applicable. The services include maintenance of existing monitoring equipment and a web-based monitoring system. The contractor will be responsible for repairs, calibrations, and preventative maintenance. Pricing terms and additional compliance costs will be incorporated into the contract as needed.
36C25620Q0375 0002 36C25620Q0375 0002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25620Q0375-0001000.docx | DOCX document | |
| 36C25620Q0375-004.docx | DOCX document | |
| 36C25620Q0375-001.docx | DOCX document | |
| 36C25620Q0375-003.docx | DOCX document | |
| 36C25620Q0375-005.docx | DOCX document | |
| 36C25620Q0375-006.pdf | ||
| 36C25620Q0375-002.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 629-20-1-690-0024 none Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi
MS
39531 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi
MS
39531 To all Offerors/Bidders
36C25620Q0375 03-23-2020
X x x x A. The purpose of this amendment is to provide responses to questions submitted per solicitation request date of March 16, 2020. Please see pages 2-10 for questions and responses.
B. All other terms and conditions remain unchanged.
Beth A. Cook Contracting Officer
1. A. What are the parameters of the web-based software? B. What information is needed to monitor the web-based software? C. Would the VA be willing to do away with web-based software if we are willing to monitor on site?
Response:
a.. Parameters of the web-based software:
· Software-as-a-Service (SaaS) enterprise-class platform specialized for building water systems.
· Capable of monitoring all sensor data from the potable water quality monitoring system.
· Tables and graphs that can be plotted based on user selected time intervals and system parameters
· Supports manual data entry via computer and mobile devices, automatic uploading of all water and microbiological test results, documentation of water management plans and activities, and automated sensor monitoring, as specified in VA directive 1061
· Administrative functionality to control user access rights, and automated alert notifications
· Exportable data to excel and other formats
b. The web-based system should be capable of being accessed remotely by the New Orleans VA and by our VISN. Any end users who have access to the system should be able to pull up all reportable parameters and legionella positives manually entered.
c. No, the VA is not willing to do away with the web-based software as this system is monitored remotely by our network in Jackson.
2. Would the VA be willing to use third party monitoring on site in lieu of web-based management?
Response: The contractor must be capable of providing a system that allows for remote access and monitoring. It is unclear what this question is asking. Services must be capable of being able to provide real time data and information concerning the control points being monitored to system users.
3. What is the range for all three total chlorine measurements?
Response: 0-6 mg/L
4. Will the VA allow amperometric measuring in lieu of DPD?
Response: The contractor must provide literature on this process, proof of concept and demonstrate that the use of this measurement is equivalent to DPD and meets VA directive 1061 requirements and guidelines.
5. Will the VA allow frequency of measurement of FRO and TRO to be truly online in regard to interval testing?
Response: While results may be recorded real time online, periodic testing should be physically conducted to ensure that all components maintain their calibrations and are giving accurate readings.
6. Will the VA allow the following variables on each analyzer: FRO, TRO, conductivity, ORP, temperature and pressure?
Response: Yes
7. For secondary disinfection will the control be from a processed water meter with a 4 to 20 milliamp signal?
Response: Yes.
8. Will new analyzers be accepted in lieu of existing to get rid of reagents and associated costs?
Response: Any analyzers installed must be compatible with the existing VA system.
9. Will the VA allow monthly check on Saturdays?
Response: Yes. Contractors will need to check in with the Boiler Plant staff for access. A schedule must be submitted to VA for approval prior to implementation, including a list of staff who will be conducting the checks. Please note, parking is not guaranteed on site, regardless of the day of work.
10. Will the Government provide comprehensive written badging requirements for the project if badging is required.
Response: Yes. For vendors who request Non-PIV badges (do not require an escort), the vendor must complete a background check which is inclusive of fingerprinting. Fingerprinting is typically completed at the home VA site, however, if the vendor is currently closer to another VA hospital with fingerprinting capabilities, we may be able to arrange a courtesy printing to be completed. Upon approved background check, the vendor may then receive a Non-PIV badge. Physical access will be subject to approval by Engineering Leadership and Police Services.
11. Since this is a maintenance and service contract, can the VA please confirm this solicitation is subject to the standard FAR “Prime contractor’s limitation on subcontracting” requirements, including where the contractor must self-perform 50% of all work completed as a part of this contract?
Response: Yes, this is correct.
12. Is the contractor responsible for the repair/replacement of any existing equipment?
Response: Yes.
13. Is the contractor responsible for repairs/replacement of equipment throughout the life of this contract? If so, is the VA willing to.
Response: The contractor shall be responsible for the repair and maintenance of all equipment covered under this contract. Replacement shall occur only if the contractor adequately demonstrates that the equipment is not capable of repair.
14. Does the VA have any information regarding previous “web-based Water Management Program (WMP) Management Information System”?
Response: Yes. The existing system is the Phimetrics systems by Phigenics.
15. Does the VA have a disinfectant system currently active? If so, please provide the detail of these systems including the make, model, and condition of the equipment.
Response: The VA is unclear in your question. The VA’s existing system is not used to provide continuous treatment of its domestic water system. The agent used (chlorine) is only used to address hyperchlorination efforts as necessary to address legionella or other maintenance efforts on the domestic water system.
16. Given the uncertainty surrounding the make, model, and condition of the existing equipment, would the VA be willing to include a fixed budget allocation for materials? Essentially, the contractor would pay for all materials up to the fixed budget, then the VA will pay for all materials once the annual cost exceeds that budget.
Response: There is no uncertainty concerning the make, model and condition and of the existing equipment. The existing equipment has been maintained since it’s installation. The contractor shall be responsible for all materials. This should be considered a turnkey, full-service contract.
17. If the VA is open to a fixed budget for materials, can a line item be added to the price schedule that allows the contractor to suggest a material budget?
Response: Please see response on question 16.
18. Can the VA please provide details regarding the past Water Management Program (WMP), Can the VA provide any reading or results recorded by the existing continuous monitoring devices?
Response: See attached PhiMetrics Dashboard screenshots at the end of the document
19. Can the VA please clarify what “training” is required, as stated in 2.6.1.1 of the SOW?
Response: Training shall include reviewing (classroom and field) all maintenance actions taken on the existing system. This shall include reviewing: equipment purpose, parts functions, system overview, expected performance, troubleshooting techniques, and programming. Training will also include review of the web-based monitoring system with new staff, including means for pulling reports, data entry, programming changes, etc.
20. Service Calls are described As Needed, please clarify?
Response: The contractor shall provide the following: On site equipment maintenance needed outside of the scheduled monthly maintenance.
21. Please clarify which aspects of the VA Information Security and System Security are applicable to this contract? As there is no contact to patient data or access to linked computer system, how far above and beyond the customary level of security for Maintenance & Repair will be required to service this contract?
Response: This is on a separate system from the VA OIT network. No additional security is required beyond standard requirements.
22. Does this data meet the requirements for VA Approved data encryption tools?
Response: Current system is not on VA OIT network. VA approved encryption is not required.
23. Will annual security assessments be required to be submitted to the VA from the Prime contractor? Any subcontractor involved in the project?
Response: No
24. Are Liquidated Damages a component of this maintenance project?
25. Is this project subject to the VA Information Training Requirements?
26. Please Specify what other approved methods of VA Directive 1061 will be utilized as part of the SEL VA treatment protocols?
Response: Treatment is restricted to system maintenance in the event of positive legionella detection. Treatment or system assessment with respect to anti scalding measures should follow directive 1061.
27. As a maintenance contract, will the SDVOSB be required to self-perform 51% of the contract as per the FAR requirements?
Response: Yes
28. All systemic problems including engineering and testing and work to eliminate issues that have been previously identified (including faulty valves, incorrect plumbing, incorrect insulations, etc.) are not part of this scope of work?
Response: Repairs and maintenance on the plumbing system with respect to piping and valves not directly associated with the monitoring system are not part of this scope. The contractor shall serve as a water and water system consultant. They shall provide recommendations, research and data concerning domestic water system performance.
29. Is there currently a pressure & temperature sensing system installed in the facility for each building? If yes or no please be specific about the locations of the existing testing systems?
Response: Yes. Temperature sensors are in place for each building being monitored (Inpatient, D&T, TLR, and main domestic line in CEP). All sensing equipment is located in mechanical spaces for each of the buildings where the domestic water mains enter the buildings.
30. Are the existing testing systems operational?
31. If not is the VA expecting a temporary check system for the duration of the contract or a permanent monitoring system to be installed at each building for water entering the building?
Response: Not applicable. See answer to question 30.
32. Is the VA expecting a temporary check or a permanent monitoring system to be installed at each building, for each location, identified in the SOW?
Response: No system installation is expected unless due to completion of maintenance.
33. What system does the VA currently have I place for chlorine treatment?
Response: Phimetrics through Phigenics
34. What system does the VA currently have in place for Chlorine monitoring?
Response: Phimetrics through Phigenics
35. Is the Chlorine monitoring in each building?
Response: No, chlorine monitoring is in the following buildings only: Inpatient, also known as IP or bldg. 01 (B&C); Diagnostic and Treatment, also known as D&T or bldg. 02 (D, E, F, G); Transitional Living, also known as TL, TLR, CLC, or bldg. 06 (M); and Central Energy Plant, also known as CEP or bldg. 07 (N).
36. Section 2.5 from the scope of work (SOW) lists the existing monitoring devices at the NOLA VA hospital. The following questions are in reference to this list:
Response: Section 2.5 was for informational reference only. All questions should pertain to Section 3.1, Clin Items
Q: Does this list include all equipment that will require calibration, testing, and monitoring? If not, what additional equipment will be included?
Response: See the above response
Q: Is the contractor responsible for supplying any equipment? If so, please provide a detailed list of the required equipment.
Q: Can the VA provide a list of all equipment that will require calibration, testing, and monitoring as a part of this contract? Please include the make, model, and condition of the existing equipment in this list. See attached equipment list for reference.
Response:
Q: How many and which of the existing devices are currently working properly?
Response: All.
Q: Please identify which, if any, of these devices are having problems or issues?
Item 2.6.2.1 – The following systems to be covered under a pre-established maintenance system shall include, but are not limited to:
Response: None.
Q: Based on the statement above, please provide a list of what items will need to be a part of the “pre-established maintenance system” that are not itemized in line items 2.6.2.1.1, 2.6.2.1.2, 2.6.2.1.3, 2.6.2.1.4? This is to plan for maintenance cost of all the existing systems at the VA.
Item 2.7.1 – In the event of contingency and/or unscheduled maintenance services, requests for water management services (outside of the scheduled preventive maintenance scheduled)
Response: There is nothing else, aside from the web-based monitoring system which shall have all components maintained.
Q: Will the Scheduled Preventative Maintenance, referred to in Item 2.7.1, be agreed upon once the contract has been awarded and attached as part of the solicitation contract?
Response: This is not part of scheduled maintenance. 2.7.1. pertains to contingencies, not scheduled maintenance services.
12.2 As the Government develops and implements new or modified policies and procedures either to comply with internal agency rules and procedures or to comply with applicable rules, regulations,statutes, or other binding obligations ("Additional Compliance Terms"), the Government reserves theright to incorporate such Additional Compliance Terms into this Agreement. The Contractor hereby acknowledges and agrees that such Additional Compliance Terms shall become part of this agreement.
Q: As part of Section 12.2, the document states that all Additional Compliance Terms shall become part of the contract. Will all additional cost, after review and agreement by both the prime and the government, become a part of the contract that are a component of any Additional Compliance Term?
Response: Yes.
Q: Any new compliance term added to the contract will allow the Prime to adjust the contract pricing to reflect the additional cost of providing compliance required by the Additional Compliance Term?
End of Document image1.png image2.png image3.png image4.png