36C25619R0152-053.pdf
PDF Posted
- Solicitation number
- 36C25619R0152
About this file
This is a federal contract opportunity solicitation for corrective actions to mechanical systems at the John L. McClellan Memorial Veterans Hospital in Little Rock, Arkansas. The contractor shall provide all materials, equipment, labor, supervision and expertise for the project. The period of performance is 180 days from notice to proceed, with an estimated value between $250,000 and $500,000. The NAICS code is 236220 for nonresidential plumbing, heating, and air-conditioning contractors. The procurement is 100% set aside for service-disabled veteran owned small businesses. Offerors must register at various websites including www.beta.sam.gov, www.ccr.gov, www.orca.bpn.gov, and www.vets100.vets.dol.gov and have the Certified Veteran Enterprise seal to be considered. The point of contact is Bradley Martin and the solicitation will issue on or about October 24, 2019, with award date on or about November 26, 2019. The Department of Veterans Affairs Veterans Health Administration VISN 16 is the agency.
36C25619R0152 598-18-391 OR 2F 100 Pct Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25619R0152-0004000.docx | DOCX document | |
| 36C25619R0152-0004001.docx | DOCX document | |
| 36C25619R0152-0003000.docx | DOCX document | |
| 36C25619R0152-0003004.jpg | JPG image | |
| 36C25619R0152-0003005.docx | DOCX document | |
| 36C25619R0152-0003003.jpg | JPG image | |
| 36C25619R0152-0003002.jpg | JPG image | |
| 36C25619R0152-0003001.pdf | ||
| 36C25619R0152-0002015.pdf | ||
| 36C25619R0152-0002014.docx | DOCX document | |
| 36C25619R0152-0001001.docx | DOCX document | |
| 36C25619R0152-0001000.docx | DOCX document | |
| 36C25619R0152-055.docx | DOCX document | |
| 36C25619R0152-051.docx | DOCX document | |
| 36C25619R0152-054.docx | DOCX document | |
| 36C25619R0152-052.mht | MHT file | |
| 36C25619R0152-050.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF WORK
PROJECT PROVIDES CORRECTIVE ACTIONS TO STATIC PRESSURE
DEFICIENCIES IN HVAC SYSTEM FOR THE OR 2F SURGICAL SUITES;
DEFICIENCIES THE MEDICAL GAS SYSTEM IN THE PACU (2B-181);
REPLACES HEADWALLS IN PACU (2B-181); AND PROVIDES A NEW CO2
AND WAG-D SYSTEM FOR THE OR 2F SURGICAL SUITE.
CONSTRUCTION TYPE: TYPE I A (NON-COMBUSTIBLE MATERIALS)
OCCUPANCY TYPE: I 2 - INSTITUTIONAL, HOSPITAL
BUILDING SUMMARY
GROSS AREA:
• GROUND FLOOR: 2,621 SQ.FT.
• SECOND FLOOR: 9,453 SQ.FT.
• TOTAL 12,074 SQ.FT.
PRIMARY OCCUPANCY: HEALTHCARE
CLASSIFICATION: HEALTHCARE
FUNCTION: AMBULATORY HEALTHCARE
MAIN USE: HEALTHCARE
SECONDARY USE: N/A
N
N
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
NOT TO SCALE CAMPUS MAP
NOT TO SCALE VICINITY MAP
4/
/2
:2 9:
A
M C
:\U se rs \ts te ve ns \R ev it
Lo ca l\5
-1 8-
1_
H
VA
C C or re ct io ns O
R
F_ Ar ch _t od d.
st ev en s.
rv t
COVER SHEET CONSTRUCTION
DOCUMENTS
DESIGN CORRECTIVE ACTIONS for
OR 2F MECHANICAL SYSTEMS @JLM
JLM MEMORIAL VETERANS HOSPITAL
2019.04.17 JDM TSS
598-18-391
GI001
JLM
JDA PROJECT #: D-18-04
DESIGN CORRECTIVE ACTIONS for OR 2F
MECHANICAL SYSTEMS @ JLM
PROJECT No: 598-18-391
JOHN L. McCLELLAN MEMORIAL VETERANS HOSPITAL
4300 WEST 7TH STREET
LITTLE ROCK, AR
CONSTRUCTION DOCUMENTS
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
BURROWS & ASSOCIATES
ENGINEERING CONSULTANTS, LTD.
3924 NORTH HIGHWAY 71
ALMA, AR 72921
JOHN L. McCLELLAN MEMORIAL
VETERANS HOSPITAL
PLAN
NORTH
A E
BC
D
KEY PLAN
F
SHEET LIST
SHEET # SHEET NAME
35% SD
11-30-2018
85% DD
02-08-2019
CONSTRUCTION
DOCUMENTS 03-15-2019
GENERAL
GI001 COVER SHEET X X X
GI002 SYMBOLS, LEGENDS, & GENERAL NOTES X X
GI003 ABBREVIATIONS X
ARCHITECTURAL
AD101 DEMOLITION PLAN X X X
AD111 GROUND FLOOR DEMOLITION RCP @ LAB X X
AD112 OR 2F & PACU REFLECTED CEILING DEMO PLANS X X
AD201 DEMOLITION ELEVATION X X
AE101 NEW CONSTRUCTION - OR 2F AND 2B PACU FLOOR PLANS X X X
AE111 NEW CONSTRUCTION WAG-D PAD / OR 2F AND PACU - RCPs X X
AE201 EXTERIOR ELEVATIONS X X
AE301 CHASE WALL SECTIONS X X
AE501 DETAILS X X
PLUMBING
PD101 DEMOLITION PACU 2B-181 MEDICAL GAS PIPING PLAN X X X
PP100 PLUMBING ABBREVIATIONS AND SCHEDULE X X
PP101 GROUND FLOOR PIPING INSTALLATION PLAN X X
PP102 PACU 2B-181 MEDICAL GAS PIPING PLAN X X
PP103 MEDICAL GAS PIPING PLAN NORTH END X X X
PP104 MEDICAL GAS PIPING PLAN SOUTH END X X X
PP105 MEDICAL GAS DETAILS X X X
MECHANICAL
MD101 HVAC DEMOLITION PLAN X X X
MH100 MECHANICAL ABBREVIATIONS AND NOTES X
MH101 GROUND FLOOR HVAC PLAN X X X
MH102 1ST & 2ND LEVEL HVAC PLANS X X
MH501 HVAC DETAILS X X
ELECTRICAL
EP100 ELECTRICAL ABBREVIATIONS AND SCHEDULE X X
EP101 GROUND LEVEL AND 2F POWER PLAN X X
PROJECT INFORMATION
1F157B
D2 / AE512
AE501
AE201
AE201
AE211
20' - 6"
FIRST FLOOR
P-01
SCOPE INDICATORS
VIEW TITLE
DETAIL CALLOUT
DETAIL INDICATOR FOR SMALL CONDITIONS
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR,
INTERIOR, MULTIPLE
VIEW
BUILDING SECTION INDICATOR
SPACE IDENTIFICATION
OPENING INDICATOR
WINDOW INDICATOR
EQUIPMENT INDICATOR
SHEET NOTES
PARTITION TYPE INDICATOR
NORTH ARROW
INDICATES PROJECT NORTH
INDICATES TRUE NORTH
COLUMN LINE INDICATORS
DRAWING REVISION INDICATOR
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
REMOVED
NEW CONSTRUCTION
VV ITEM - GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
VC ITEM - GOVERNMENT
FURNISHED / CONTRACTOR
INSTALLED
ELEVATION INDICATOR
WALL FINISH INDICATOR
CC ITEM - CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
N
A_4A
BA3034
CASEWORK TAG
LETTER PAIR INDICATES CASEWORK FAMILY:
RE: AE511-514 FOR DETAILS
FIRST PAIR OF NUMBERS INDICATES UNIT
WIDTH (I.E. 30")
SECOND PAIR INDICATES COUNTERTOP
HEIGHT (I.E. 34")
TOILET ACCESSORY TAG
XXXX
JSN
A
INDICATES
COLUMN LINE
DESIGNATION
CEILING HEIGHT INDICATOR
Room name 1A105
9' - 0"
F3
GENERAL NOTES
1. DEPICTION OF EXISTING CONDITIONS BASED ON OWNER-FURNISHED DOCUMENTS AND LIMITED FIELD OBSERVATIONS. EXISTING ELEMENTS AND CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE DEMOLITION WORK IS COMPLETE, REPORT ANY CONFLICTS TO DESIGNER. THE CONTRACTOR SHALL MAKE ADJUSTMENTS AND/OR ALTERATIONS AS NECESSARY TO INSTALL COMPLETE AND OPERABLE SYSTEMS IN ACCORDANCE WITH THE
CODES HAVING JURISDICTION AT NO ADDITIONAL COST TO THE GOVERNMENT.
2. IN THE EVENT THAT THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR SHALL BID THE MOST EXPENSIVE OPTION. IN THE EVENT THAT THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE OWNER REQUIRES THE MORE EXPENSIVE OPTION - THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL COST TO THE
OWNER.
3. UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO FACE OF STUD AND TO COLUMN CENTERLINES.
4. IN NEW GYPSUM WALL BOARD PARTITIONS, PROVIDE CONTROL JOINTS AT 30'-0" O.C. MAX.
5. CONTRACTORS SHALL VERIFY ALL DIMENSIONS NOTED AS “CLEAR” OR “MIN". DIMENSIONS NOTED AS “HOLD”
ARE CRITICAL TO COORDINATE OTHER WORK (E.G. CEILING GRIDS, LIGHTING, FINISHES).
6. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO INITIATING CONSTRUCTION AND REPORT
DISCREPANCIES TO ARCHITECT PRIOR TO COMMENCING WORK.
7. ALL PENETRATIONS THROUGH RATED FLOOR/CEILING ASSEMBLIES AND THROUGH FIRE RATED WALL AND
SMOKE BARRIER ASSEMBLIES - THOSE CREATED BY REMOVAL OF DEMOLISHED ITEMS UNDER THIS CONTRACT AND THOSE DISCOVERED DURING CONSTRUCTION UNDER THIS CONTRACT AS A RESULT OF PREVIOUS WORK AND THOSE CREATED BY NEW WORK UNDER THIS CONTRACT - MUST BE SEALED AS PART
OF THIS CONTRACT. ALL RATED SEPARATIONS MUST MEET CURRENT CODE REQUIREMENTS WITH
APPROVED UL ASSEMBLIES. SEE PENETRATION DETAILS ON SHEET AE101 FOR WORK BY GENERAL CONTRACTOR. SEE MEPFP SHEETS FOR PENETRATION FIRE STOPPING REQUIREMENTS FOR MEPFP
CONTRACTORS.
8. CONTRACTOR TO PROVIDE FIRESTOPPING AT PENETRATIONS FOR ALL RATED ASSEMBLIES.
9. CONTRACTOR FULLY RESPONSIBLE FOR THE ENTIRETY OF THE CONTENT OF THE CONTRACT DOCUMENTS
(SPECIFICATIONS AND DRAWINGS), AND IS SOLELY RESPONSIBLE FOR BIDDING THE CONTENTS THEREIN; IN THE EVENT THAT THE CONTRACTOR DOES NOT INCLUDE ANY COMPONENT OR ELEMENT WITHIN THE CONTRACT DOCUMENTS WITHIN THEIR BID, THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR
PROVIDING THAT COMPONENT OR ELEMENT AT NO ADDITIONAL COST TO THE OWNER.
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
4/
/2
:4 7:
P
M C
:\U se rs \ts te ve ns \R ev it
Lo ca l\5
-1 8-
1_
H
VA
C C or re ct io ns O
R
F_ Ar ch _t od d.
st ev en s.
rv t
SYMBOLS, LEGENDS, & GENERAL
NOTES
CONSTRUCTION
DOCUMENTS
DESIGN CORRECTIVE ACTIONS for OR 2F
MECHANICAL SYSTEMS @JLM
JLM MEMORIAL VETERANS HOSPITAL
2019.04.17 JDM TSS
598-18-391
GI002
JLM
JDA PROJECT #: D-18-04
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
BURROWS & ASSOCIATES
ENGINEERING CONSULTANTS, LTD.
3924 NORTH HIGHWAY 71
ALMA, AR 72921
DRAFTING SYMBOLS
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
4/
/2
:4 7:
P
M C
:\U se rs \ts te ve ns \R ev it
Lo ca l\5
-1 8-
1_
H
VA
C C or re ct io ns O
R
F_ Ar ch _t od d.
st ev en s.
rv t
ABBREVIATIONS CONSTRUCTION
DOCUMENTS
DESIGN CORRECTIVE ACTIONS for OR 2F
MECHANICAL SYSTEMS @JLM
JLM MEMORIAL VETERANS HOSPITAL
2019.04.17 JDM TSS
598-18-391
GI003
JLM
JDA PROJECT #: D-18-04
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
BURROWS & ASSOCIATES
ENGINEERING CONSULTANTS, LTD.
3924 NORTH HIGHWAY 71
ALMA, AR 72921
SJ SCORED JOINT
SJI STEEL JOIST SLIDING WINDOW
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SMS SHEET METAL SCREW
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL
UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE
SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION
CLASSIFICATION
STIF STIFFENER
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUB
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT
STL
STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SNTHETIC
SYS SYSTEM
T
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL,
TEMPERATURE CONTROL PANEL,
OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TLT TOILET
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ______
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TYP TYPICAL
U
U.N.O. UNLESS NOTED OTHERWISE
U.O.N. UNLESS OTHERWISE NOTED
V
VC VA FURNISHED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE OR
VITRIFIED CLAY TILE
VENT VENTILATION
VERT VERTICAL
VV VA FURNISHED / VA INSTALLED
W
W/ WITH
WD WOOD
WP WALL PROTECTION
QT QUARRY TILE OR QUART
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R
R RADIUS OR RISER
RA RETURN AIR
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER
BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE, REINFORCED, OR
REINFORCING
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
S
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID
CORE
SCH SCHOOL
SCHED SCHEDULE, SCHEDULED
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL
FLASH
SHEET METAL (FLASHING)
SHTHG SHEATHING
SIM SIMILAR
SJ SCORED JOINT
NRC NOICE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O
O OXYGEN
O/H OVER HEAD
O/O OUT TO OUT
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE
DIMENSION
OFD OVERFLOW DRAIN
OFF OFFICE
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSIE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
OUT OUTLET
OZ OUNCE
P
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR
PORTLAND CEMENT
PCA PORTLAND CEMENT
ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTYLINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
OR PURCHASE ORDER POST
OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMAIC TUBE, OR
PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING
CONCRETE
LYR LAYER
M
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTAIN, MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM O MEDIUM
MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMBO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MIN MINIMUM MINUTE OR MINUTE
MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
H
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGAR
HM HOLLOW METAL OR
HECTOMETER
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HR HOUR
HRS HOURS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATION, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATED, INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANANEOUS WATER HEATER
J
J-BOX JUNCTION BOX
JAN JANITOR
K
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCEN FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF
CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF CURB
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR
FIREPROOF OR FLAT PANEL
DOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUT
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON, GALLONS
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
GFRG GLASS-FIBER-REINFORCED
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CTLINDER LOCK
D
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR
DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM,
OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC, ELECTRICAL
ELEC DR
OP
ELECTRIC DOOR OPENER
ELEV ELEVATOR
ELEVS ELEVATIONS
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C
C CELSIUS CHANNEL OR CHANNEL
CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
C/C CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
C/VA CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CAB CABINET
CAC CEILING ATENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT, CEMENTITIOUS
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR
CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULATING, CIRCULAR
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LIINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CM CONSTRUCTION MANAGEMENT
cm2 SQUARE CENTIMETER cm3 CUBIC CENTIMETER
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEAN OUT, OR COMPANY
co2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINAION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS, CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR COORDINATION OFFICER
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
A
A LABEL CLASS A DOOR
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT
ADB AUTOMATIC DOOR BOTTOM
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION,
ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE, ALTERNATIVE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLAYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE, APPROXIMATELY
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT, ARCHITECTURAL
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO-VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL
WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'S
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
STANDARD ABBREVIATIONS NOT ALL ABBREVIATIONS SHOWN ARE USED
PACU
2B-181
JANITOR
2B-189
VESTIBULE
2B-188
ISOLATION ROOM
2B-187
NURISHMENT
2B-186
SOILED UTILTY
2B-185
LINEN
2B-193
MEDS
2B-184
CLEAN
EQUIPMENT
2B-183
RESTROOM
2B-182
HEAD NURSE
2B-192
FAMILY
CONSULTING #1
2B-191
FAMILY
CONSULTING #2
2B-190
3455.55.667
1 1 1 1 1 1 1
1111 111
TYP.
TYP.
5555555
5 5 5 5 5 5
GENERAL NOTES
1. CONTRACTOR RESPONSIBLE FOR COORDINATING ANY DISRUPTIONS IN UTILITY SERVICES OR
BUILDING SYSTEMS WITH VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE)
PRIOR TO EXECUTION.
2. CONTRACTOR FULLY RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS OF THE AREAS OF
WORK.
3. CONTRACTOR FULLY RESPONSIBLE FOR PROVIDING THE DESIGN INTENT AND SYSTEMS
PERFORMANCE CRITERIA IN IT’S ENTIRITY AS OUTLINED IN THE SPECIFICATIONS AND
CONSTRUCTION DRAWINGS.
4. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT IF THERE ARE ANY DISCREPANCIES BETWEEN THE EXISTING
CONDITIONS AND THE CONTRACT DOCUMENTS (SPECIFICATIONS AND CONSTRUCTION
DRAWINGS).
5. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING
OFFICER (REPRESENTATIVE) AND ARCHITECT VIA RFI PROCESS.
6. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS –
DURING THE BIDDING PROCESS – THE CONTRACTOR SHALL BID THE MORE EXPENSIVE OPTION;
IN THE EVENT OF THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE DESIGN
REQUIRES THE MORE EXPENSIVE OPTION – THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL EXPENSE TO THE VA.
7. CONTRACTOR SHALL DEVELOP AN INFECTION CONTROL PLAN AND SAFETY PLAN TO THE VA
POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) FOR REVIEW AND APPROVAL
PRIOR TO THE BEGINNING OF THEIR WORK. BOTH PLANS MUST INCLUDE MEANS AND METHODS
OF DEBRIS STAGING AND REMOVAL.
8. CONTRACTOR RESPONSIBLE FOR INSTALLING TEMPORARY DUST AND DEBRIS BARRIERS AND
VESTIBULES AROUND THE PROJECT LIMINTS IN ACCORDANCE WITH THE APPROVED INFECTION
CONTROL PLAN AND SAFTEY PLAN. TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED
MEANS OF EGRESS PATHS AND/OR WIDTHS.
9. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER
(REPRESENTATIVE) AND ARCHITECT IF THEY ENCOUNTER ANY UNDOCUMENTED HAZARDOUS
MATERIALS DURING DEMO AND/OR NEW CONSTRUCTION.
10. CONTRACTOR RESPONSIBLE FOR COORDINATING DEMO AND NEW CONSTRUCTION PHASES
WITHIN COMPLIANCE WITH THE HAZARDOUS MATERIALS ABATEMENT PLANS.
11. CONTRACTOR RESPONSIBLE FOR IMMEDIATELY NOTIFYING VA POINT OF
CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT UPON COMPLETION OF
CUTTING AND SELECTIVE DEMOLITION WORK AND REPORT ANY “UNFORESEEN CONDITIONS”
THAT CREATE CONFLICTS WITH THE NEW CONSTRUCTION DRAWINGS; “UNFORESEEN
CONDITIONS” ARE CONDITIONS THAT ARE EXISTING ELEMENTS AND CONDITIONS CONEALED BY
FIXED EQUIPMENT AND FINISHES – SUCH AS HARD LID CEILINGS AND SOLID WALLS.
12. FACILITY WILL BE OCCUPIED DURING CONSTRUCTION. CONTRACTOR WILL TAKE NECESSARY MEASURES TO ENSURE THE HEALTH, SAFETY, AND WELFARE OF ALL BUILDING OCCUPANTS – TO
INCLUDE PATIENTS, STAFF, AND VISITORS.
13. CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING DEMO AND NEW
CONSTRUCTION PHASES.
14. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL FIRE RATED ASSEMBLIES DURING DEMO AND
NEW CONSTRUCTION.
15. CONTRACTOR RESPONSIBLE FOR REPAIR AND RESTORATION OF ANY DAMAGED FIRE RATED
ASSEMBLIES DURING BOTH DEMO AND NEW CONSTRUCTION PHASES. AT NO ADDITIONAL
EXPENSE TO VA.
16. GC RESPONSIBLE FOR PROVIDING PROPER SHORING FOR ALL DEMO NEW CONSTRUCTION
ACTIVITIES THAT ARE COMPLIANT WITH ALL OSHA AND LIFE SAFETY GUIDELINES.
GRAPHIC LEGEND
NEW UNRATED PARTITION
EXISTING 2-HOUR BARRIER
EXISTING PARTITION, TO BE REMOVED
EXISTING PARTITION, TO REMAIN
INDICATES AREA NOT IN CONTRACT
EXISTING 1-HOUR BARRIER
PROJECT LIMITS
STAIR
2F-103
B.6
A.6
F5
AD2018.2 8.18.3
HAC
2F-232
6" 3' - 8"
F.V.
3' - 11"
F.
V.
6'
1/
4" 5'
4"
F.
V.
5'
3/
8"
E7
AE501
F7
AE501
A.2
A.1
A
B
123567
AD101
F1
CLEAN CORE
2F-228
ORTHOPEDIC
OPERATING
ROOM
2F-227
ORTHOPEDIC
OPERATING
ROOM #2
2F-229
STORAGE
2F-230NEUROSURGERY
OPERATING
ROOM
2F-201
S.P.O.R.
CONTROLS
2F-202
SPECIAL
PURPOSE
OPERATING
ROOM
2F-206
CARDIOVASCULAR
OPERATING
ROOM
2F-211
GAS CYLIND.
STOR.
2F-203
DATA
2F-207
STAIR
2F-103
STORAGE
2F-209
ELECT.
2F-210
STOR.
SF-204
CONTROL ROOM
2F-205
AE201
F3
B.6
A.6
8.2 8.18.3
1 EXISTING HEADWALL - TO BE REMOVED; REFER TO MEP SHEETS FOR FULL SCOPE OF DEMOLITION
EXISTING FLOOR - CUT NEW OPENING IN EXISITING CONCRETE SLAB FOR NEW MECHANICAL
CHASE; COORDINATE WITH MEP SHEETS. FIELD VERIFY EXISITING CONDITIONS.
EXISTING MOP SINK - TO REMAIN; CONTRACTOR TO PROTECT DURING DEMOLITION AND NEW
CONSTRUCTION PHASE.
EXISTING CURTAIN TRACK SYSTEM TO BE PROTECTED DURING DEMOLITION & NEW ONSTRUCTION.
EXISTING FURRING WALL BEHIND SURFACE MOUNTED HEADWALL, TO BE REMOVED; PATCH AND
PREPARE ADJACENT WALLS FOR NEW CONSTRUCTION.
KEYED DEMOLITION NOTES
MARK KEYED NOTE TEXT
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
4/
/2
:4 6:
P
M C
:\U se rs \ts te ve ns \R ev it
Lo ca l\5
-1 8-
1_
H
VA
C C or re ct io ns O
R
F_ Ar ch _t od d.
st ev en s.
rv t
DEMOLITION PLAN CONSTRUCTION
DOCUMENTS
DESIGN CORRECTIVE ACTIONS for OR 2F
MECHANICAL SYSTEMS @JLM
JLM MEMORIAL VETERANS HOSPITAL
2019.04.17 JDM TSS
598-18-391
AD101
JLM
JDA PROJECT #: D-18-04
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
1/8" = 1'-0"C4 PACU DEMOLITION FLOOR PLAN
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
BURROWS & ASSOCIATES
ENGINEERING CONSULTANTS, LTD.
3924 NORTH HIGHWAY 71
ALMA, AR 72921
PLAN
NORTH
A E
C
D
KEY PLAN
F
B
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
SECOND LEVEL F.F.E. = 414.00'
1/4" = 1'-0"F1 ENLARGED DEMO PLAN - OR 2F JANITOR CLOSET
1/8" = 1'-0"F3 DEMO PLAN OR 2F - OR 2F
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SECOND LEVEL F.F.E. = 414.00'
SECOND LEVEL F.F.E. = 414.00'
GENERAL NOTES
1. CONTRACTOR RESPONSIBLE FOR COORDINATING ANY DISRUPTIONS IN UTILITY SERVICES OR
BUILDING SYSTEMS WITH VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE)
PRIOR TO EXECUTION.
2. CONTRACTOR FULLY RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS OF THE AREAS OF
WORK.
3. CONTRACTOR FULLY RESPONSIBLE FOR PROVIDING THE DESIGN INTENT AND SYSTEMS
PERFORMANCE CRITERIA IN IT’S ENTIRITY AS OUTLINED IN THE SPECIFICATIONS AND
CONSTRUCTION DRAWINGS.
4. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT IF THERE ARE ANY DISCREPANCIES BETWEEN THE EXISTING
CONDITIONS AND THE CONTRACT DOCUMENTS (SPECIFICATIONS AND CONSTRUCTION
DRAWINGS).
5. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING
OFFICER (REPRESENTATIVE) AND ARCHITECT VIA RFI PROCESS.
6. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS –
DURING THE BIDDING PROCESS – THE CONTRACTOR SHALL BID THE MORE EXPENSIVE OPTION;
IN THE EVENT OF THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE DESIGN
REQUIRES THE MORE EXPENSIVE OPTION – THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL EXPENSE TO THE VA.
7. CONTRACTOR SHALL DEVELOP AN INFECTION CONTROL PLAN AND SAFETY PLAN TO THE VA
POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) FOR REVIEW AND APPROVAL
PRIOR TO THE BEGINNING OF THEIR WORK. BOTH PLANS MUST INCLUDE MEANS AND METHODS
OF DEBRIS STAGING AND REMOVAL.
8. CONTRACTOR RESPONSIBLE FOR INSTALLING TEMPORARY DUST AND DEBRIS BARRIERS AND
VESTIBULES AROUND THE PROJECT LIMINTS IN ACCORDANCE WITH THE APPROVED INFECTION
CONTROL PLAN AND SAFTEY PLAN. TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED
MEANS OF EGRESS PATHS AND/OR WIDTHS.
9. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER
(REPRESENTATIVE) AND ARCHITECT IF THEY ENCOUNTER ANY UNDOCUMENTED HAZARDOUS
MATERIALS DURING DEMO AND/OR NEW CONSTRUCTION.
10. CONTRACTOR RESPONSIBLE FOR COORDINATING DEMO AND NEW CONSTRUCTION PHASES
WITHIN COMPLIANCE WITH THE HAZARDOUS MATERIALS ABATEMENT PLANS.
11. CONTRACTOR RESPONSIBLE FOR IMMEDIATELY NOTIFYING VA POINT OF
CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT UPON COMPLETION OF
CUTTING AND SELECTIVE DEMOLITION WORK AND REPORT ANY “UNFORESEEN CONDITIONS”
THAT CREATE CONFLICTS WITH THE NEW CONSTRUCTION DRAWINGS; “UNFORESEEN
CONDITIONS” ARE CONDITIONS THAT ARE EXISTING ELEMENTS AND CONDITIONS CONEALED BY
FIXED EQUIPMENT AND FINISHES – SUCH AS HARD LID CEILINGS AND SOLID WALLS.
12. FACILITY WILL BE OCCUPIED DURING CONSTRUCTION. CONTRACTOR WILL TAKE NECESSARY MEASURES TO ENSURE THE HEALTH, SAFETY, AND WELFARE OF ALL BUILDING OCCUPANTS – TO
INCLUDE PATIENTS, STAFF, AND VISITORS.
13. CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING DEMO AND NEW
CONSTRUCTION PHASES.
14. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL FIRE RATED ASSEMBLIES DURING DEMO AND
NEW CONSTRUCTION.
15. CONTRACTOR RESPONSIBLE FOR REPAIR AND RESTORATION OF ANY DAMAGED FIRE RATED
ASSEMBLIES DURING BOTH DEMO AND NEW CONSTRUCTION PHASES. AT NO ADDITIONAL
EXPENSE TO VA.
16. GC RESPONSIBLE FOR PROVIDING PROPER SHORING FOR ALL DEMO NEW CONSTRUCTION
ACTIVITIES THAT ARE COMPLIANT WITH ALL OSHA AND LIFE SAFETY GUIDELINES.
REFLECTED CEILING PLAN LEGEND
2'x4' LIGHT FIXTURE
FIRE SPRINKLER HEAD
SUPPLY DIFFUSER
EMERGENCY EXIT SIGNAGE
WIRELESS ACCESS POINT
SENSOR
SMOKE DETECTOR
SECURITY CAMERA
SAFETY SHOWER
SECURITY CAMERA
MIRROR
1'x4' LIGHT FIXTURE
RETURN DIFFUSER
ACT & GRID TO
REMAIN
PAINTED GYP
CEILING TO
REMAIN
ACT & GRID TO
BE REMOVED
PAINTED GYP
CEILING TO BE
REMOVED
A.2
A.1
A
B
1235678
MECHANICAL
ROOM
GF-143
9' - 0"
9' - 0"
D1
D3
LAB
GF-115
OPEN TO STRUCTURE
ABOVE
AD111
F1
AD111
F3
RESTROOM
GF-116
D1
D2
D3
D12
D13
D14
D12 D15
D15
GC TO PROTECT ALL EQUIPMENT, FIXTURES, AND
FURNITRURE BELOW DURING DEMO AND NEW
CONSTRUCTION ACTIVITIES; GC RESPOSIBLE FOR THE
REPAIR AND/OR REPLACEMENT OF ANY DAMAGED
EQUIPMENT, FIXTURES, AND FURNITURE IN AREA OF
WORK DUE TO DEMO OR NEW CONSTRUCTION
ACITIVITIES.
NOTE:
EXISTING EXTERIOR LOUVER
COORDINATE WITH MEP DRAWINGS
EXISTING EXTERIOR LOUVER
COORDINATE WITH MEP DRAWINGS
GRAPHIC LEGEND
NEW UNRATED PARTITION
EXISTING 2-HOUR BARRIER
EXISTING PARTITION, TO BE REMOVED
EXISTING PARTITION, TO REMAIN
INDICATES AREA NOT IN CONTRACT
EXISTING 1-HOUR BARRIER
PROJECT LIMITS
FIRST FLOOR
20' - 0"
GROUND FLOOR
0' - 0"
COORD. W/ MECH.
4' - 0"
COOR. W/ MECH
7' - 4"
C O
O R
D . W
/ M
EC
H
3'
5"
F.
V.
MECHANICAL
ROOM
GF-143
DUCT
OPENING
THROUGH
FIRE WALL
IN
S
ID
E
FA
C
E O
F W
AL
L
EXISTING WALL
BEYOND
FIRST FLOOR
20' - 0"
GROUND FLOOR
0' - 0"
COORD. W/ MECH.
8' - 0"F.V.
C O
O R
D . W
/ M
EC
H
3'
6"
F.
V.
F.
V.
9'
0"
DUCT
OPENING
EXISTING WALL
BEYOND
LAB
GF-115
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
4/
/2
:4 6:
P
M C
:\U se rs \ts te ve ns \R ev it
Lo ca l\5
-1 8-
1_
H
VA
C C or re ct io ns O
R
F_ Ar ch _t od d.
st ev en s.
rv t
GROUND FLOOR DEMOLITION RCP
@ LAB
CONSTRUCTION
DOCUMENTS
DESIGN CORRECTIVE ACTIONS for OR 2F
MECHANICAL SYSTEMS @JLM
JLM MEMORIAL VETERANS HOSPITAL
2019.04.17 JDM TSS
598-18-391
AD111
JLM
JDA PROJECT #: D-18-04
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
BURROWS & ASSOCIATES
ENGINEERING CONSULTANTS, LTD.
3924 NORTH HIGHWAY 71
ALMA, AR 72921
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
A E
BC
D
KEY PLAN
F
KEYED RCP DEMOLITION NOTES
MARK KEYED NOTE TEXT
D1 EXISTING ACT & GRID SYSTEM – TO BE CAREFULLY DISASSEMBLED, REMOVED, STORED, AND
PROTECTED BY GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW
BUILDING SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR
REPLACING/REPAIRING ANY DAMAGED ACT AND/OR GRID AT NO EXPENSE TO
CLIENT/VA/GOVERNMENT. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
D2 EXISTING LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL CONTRACTOR
DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS ABOVE CEILING;
GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY DAMAGED LIGHTING AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH ELECTRICAL SHEETS FOR FULL SCOPE
OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
D3 EXISTING SUPPLY/RETURN DIFFUSERS – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL
CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS ABOVE
CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY DAMAGED
SUPPLY/RETURN DIFFUSERS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH
MECHANICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK
IDENTIFIED IN DRAWINGS.
1/8" = 1'-0"E3 GROUND FLOOR REFLECTED CEILING DEMO PLAN @ LAB
GROUND LEVEL F.F.E. = 378.00'
1/4" = 1'-0"F1 DUCT OPENING @ MECH ROOM
1/4" = 1'-0"F3 DUCT OPENING @ LAB
EXISTING EMERGENCY EGRESS LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY
GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING
SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING
ANY DAMAGED EMERGENCY EGRESS LIGHTING AT NO EXPENSE TO CLIENT/VA/GOVERNMENT;
COORDINATE WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL
THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING SECURITY DEVICES – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL
CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS
ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY
DAMAGED SECURITY DEVICES AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE
WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF
WORK IDENTIFIED IN DRAWINGS.
EXISTING WIRELESS DEVICES – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL
CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS
ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY
DAMAGED WIRELESS DEVICES AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE
WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF
WORK IDENTIFIED IN DRAWINGS.
EXISTING SAFETY SENSOR - TO BE REMOVED, STORED, AND PROTECTED BY GENERAL
CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS
ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY
DAMAGED SAFETY SENSORS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH
ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK
IDENTIFIED IN DRAWINGS.
EXISTING SAFTEY SHOWER - TO REMAIN; GENERAL CONTRACTOR TO PROTECT DURING
DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS. TYPICAL THROUGHOUT
AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING PATIENT PRIVACY CURTAIN/TRACK - TO REMAIN; GENERAL CONTRACTOR TO
PROTECT DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS.
TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING SPRINKLER HEAD - TO REMAIN; GENERAL CONTRACTOR TO PROTECT DURING
DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS. TYPICAL THROUGHOUT
AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING CURTAIN TRACK SYSTEM - TO BE PROTECTED DURING ALL PHASES OF
CONSTRUCTION.
CUT OPENING FOR NEW RETURN AIR DUCT; COORDINATE W/MEP DRAWINGS AND ADJUST
OPENING LOCATION TO ACCOMMODATE EXISTING STRUCTURAL ELEMENTS.
EXISTING EXHAUST HOOD VENT PIPE (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO
CONFIRM SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.
EXISTING COPPER PIPES (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO CONFIRM
SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.
PROFILE OF EXISTING AHU BELOW; COORDINATE W/MEP DRAWINGS FOR SCOPE OF DEMO
AND/OR NEW CONSTRUCTION.
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
A.2
A.1
A
B
5.567
D1
D3 D2
D7
STAIR
2F-103
S.P.O.R.
CONTROLS
2F-202
B.6
A.6
AD112
F1
8.2 8.18.3
9' - 0"
9' - 0"
9' - 0"
9' - 0"
HAC
2F-232
D10
D5
D19
D19
D19
D8
9' - 0"
7' - 11"
D19
9' - 0"
D5
D1
D2
D3
D10
D7
D20
D4
D4
5.5
5.5
5.6
5.6
PACU
2B-181
JANITOR
2B-189
VESTIBULE
2B-188
ISOLATION ROOM
2B-187
9' - 0"
9' - 0"
8' - 0"
8' - 0"
D1
D3
D2
D4
D11D11
D11D11
D6
D3 D2
D10
D8 7' - 11"
D11
D8 D87' - 11"
D4
D20
D4
D20
GENERAL NOTES
1. CONTRACTOR RESPONSIBLE FOR COORDINATING ANY DISRUPTIONS IN UTILITY SERVICES OR
BUILDING SYSTEMS WITH VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE)
PRIOR TO EXECUTION.
2. CONTRACTOR FULLY RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS OF THE AREAS OF
WORK.
3. CONTRACTOR FULLY RESPONSIBLE FOR PROVIDING THE DESIGN INTENT AND SYSTEMS
PERFORMANCE CRITERIA IN IT’S ENTIRITY AS OUTLINED IN THE SPECIFICATIONS AND
CONSTRUCTION DRAWINGS.
4. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT IF THERE ARE ANY DISCREPANCIES BETWEEN THE EXISTING
CONDITIONS AND THE CONTRACT DOCUMENTS (SPECIFICATIONS AND CONSTRUCTION
DRAWINGS).
5. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING
OFFICER (REPRESENTATIVE) AND ARCHITECT VIA RFI PROCESS.
6. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS –
DURING THE BIDDING PROCESS – THE CONTRACTOR SHALL BID THE MORE EXPENSIVE OPTION;
IN THE EVENT OF THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE DESIGN
REQUIRES THE MORE EXPENSIVE OPTION – THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL EXPENSE TO THE VA.
7. CONTRACTOR SHALL DEVELOP AN INFECTION CONTROL PLAN AND SAFETY PLAN TO THE VA
POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) FOR REVIEW AND APPROVAL
PRIOR TO THE BEGINNING OF THEIR WORK. BOTH PLANS MUST INCLUDE MEANS AND METHODS
OF DEBRIS STAGING AND REMOVAL.
8. CONTRACTOR RESPONSIBLE FOR INSTALLING TEMPORARY DUST AND DEBRIS BARRIERS AND
VESTIBULES AROUND THE PROJECT LIMINTS IN ACCORDANCE WITH THE APPROVED INFECTION
CONTROL PLAN AND SAFTEY PLAN. TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED
MEANS OF EGRESS PATHS AND/OR WIDTHS.
9. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER
(REPRESENTATIVE) AND ARCHITECT IF THEY ENCOUNTER ANY UNDOCUMENTED HAZARDOUS
MATERIALS DURING DEMO AND/OR NEW CONSTRUCTION.
10. CONTRACTOR RESPONSIBLE FOR COORDINATING DEMO AND NEW CONSTRUCTION PHASES
WITHIN COMPLIANCE WITH THE HAZARDOUS MATERIALS ABATEMENT PLANS.
11. CONTRACTOR RESPONSIBLE FOR IMMEDIATELY NOTIFYING VA POINT OF
CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT UPON COMPLETION OF
CUTTING AND SELECTIVE DEMOLITION WORK AND REPORT ANY “UNFORESEEN CONDITIONS”
THAT CREATE CONFLICTS WITH THE NEW CONSTRUCTION DRAWINGS; “UNFORESEEN
CONDITIONS” ARE CONDITIONS THAT ARE EXISTING ELEMENTS AND CONDITIONS CONEALED BY
FIXED EQUIPMENT AND FINISHES – SUCH AS HARD LID CEILINGS AND SOLID WALLS.
12. FACILITY WILL BE OCCUPIED DURING CONSTRUCTION. CONTRACTOR WILL TAKE NECESSARY MEASURES TO ENSURE THE HEALTH, SAFETY, AND WELFARE OF ALL BUILDING OCCUPANTS – TO
INCLUDE PATIENTS, STAFF, AND VISITORS.
13. CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING DEMO AND NEW
CONSTRUCTION PHASES.
14. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL FIRE RATED ASSEMBLIES DURING DEMO AND
NEW CONSTRUCTION.
15. CONTRACTOR RESPONSIBLE FOR REPAIR AND RESTORATION OF ANY DAMAGED FIRE RATED
ASSEMBLIES DURING BOTH DEMO AND NEW CONSTRUCTION PHASES. AT NO ADDITIONAL
EXPENSE TO VA.
16. GC RESPONSIBLE FOR PROVIDING PROPER SHORING FOR ALL DEMO NEW CONSTRUCTION
ACTIVITIES THAT ARE COMPLIANT WITH ALL OSHA AND LIFE SAFETY GUIDELINES.
REFLECTED CEILING PLAN LEGEND
2'x4' LIGHT FIXTURE
FIRE SPRINKLER HEAD
SUPPLY DIFFUSER
EMERGENCY EXIT SIGNAGE
WIRELESS ACCESS POINT
SENSOR
SMOKE DETECTOR
SECURITY CAMERA
SAFETY SHOWER
SECURITY CAMERA
MIRROR
1'x4' LIGHT FIXTURE
RETURN DIFFUSER
ACT & GRID TO
REMAIN
PAINTED GYP
CEILING TO
REMAIN
ACT & GRID TO
BE REMOVED
PAINTED GYP
CEILING TO BE
REMOVED
B
B.6
A.6
STAIR
2F-103
F5
AD201
D2
8.2 8.18.3
HAC
2F-232
D3
D2
D1
D10
D10
D2
D3
9' - 0"
D20 F7
AE501
D4
B
B.6
A.6
EXISTING PLUMBING TO REMAIN
DEMO FLOOR SLAB AND DECK;
COORDINATE WITH MEP DRAWINGS
AND EXISTING STRUCTURE.
EXISTING STRUCTURE - PROTECT DURING
DEMO AND NEW CONSTRUCTION ; TYP.
8.2 8.18.3
F.V.
3' - 5"
F.V.
4' - 0" 8"
F.V.
6"
R.O.
3' - 8"
F.V.
3' - 1 3/8"
M
IN
. 1 " C
LE
AR
AN
C
E
R .0
5'
4" M
IN
. 1
" C
LE
AR
AN
C E
EXISTING METAL FLOOR DECK;
PROTECT DURING DEMO AND
NEW CONSTRUCTION; TYP.
UNLESS NOTED OTHERWISE
E7
AE501
F7
AE501
GRAPHIC LEGEND
NEW UNRATED PARTITION
EXISTING 2-HOUR BARRIER
EXISTING PARTITION, TO BE REMOVED
EXISTING PARTITION, TO REMAIN
INDICATES AREA NOT IN CONTRACT
EXISTING 1-HOUR BARRIER
PROJECT LIMITS
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
4/
/2
:4 6:
P
M C
:\U se rs \ts te ve ns \R ev it
Lo ca l\5
-1 8-
1_
H
VA
C C or re ct io ns O
R
F_ Ar ch _t od d.
st ev en s.
rv t
OR 2F & PACU REFLECTED CEILING
DEMO PLANS
CONSTRUCTION
DOCUMENTS
DESIGN CORRECTIVE ACTIONS for OR 2F
MECHANICAL SYSTEMS @JLM
JLM MEMORIAL VETERANS HOSPITAL
2019.04.17 JDM TSS
598-18-391
AD112
JLM
JDA PROJECT #: D-18-04
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
BURROWS & ASSOCIATES
ENGINEERING CONSULTANTS, LTD.
3924 NORTH HIGHWAY 71
ALMA, AR 72921
1/8" = 1'-0"F4 OR 2F REFLECTED CEILING DEMO PLAN
1/8" = 1'-0"C5 PACU REFLECTED CEILING DEMOLITION PLAN
PLAN
NORTH
A E
BC
D
KEY PLAN
F
SECOND LEVEL F.F.E. = 414.00'
SECOND LEVEL F.F.E. = 414.00'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
1/4" = 1'-0"F1 ENLARGED PLAN - OR 2F REFLECTED CEILING DEMO PLAN @ HAC 2F-232
1/4" = 1'-0"C1 REFLECTED CEILING DEMO PLAN @ MECH CHASE
SECOND LEVEL F.F.E. = 414.00'
SECOND LEVEL F.F.E. = 414.00'
EXISTING ACT & GRID SYSTEM – TO BE CAREFULLY DISASSEMBLED, REMOVED, STORED, AND
PROTECTED BY GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF
NEW BUILDING SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR
REPLACING/REPAIRING ANY DAMAGED ACT AND/OR GRID AT NO EXPENSE TO
CLIENT/VA/GOVERNMENT. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL CONTRACTOR
DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS ABOVE CEILING;
GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY DAMAGED LIGHTING
AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH ELECTRICAL SHEETS FOR
FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN
DRAWINGS.
EXISTING SUPPLY/RETURN DIFFUSERS – TO BE REMOVED, STORED, AND PROTECTED BY
GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING
SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING
ANY DAMAGED SUPPLY/RETURN DIFFUSERS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT;
COORDINATE WITH MECHANICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL
THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING EMERGENCY EGRESS LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY
GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING
SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING
ANY DAMAGED EMERGENCY EGRESS LIGHTING AT NO EXPENSE TO CLIENT/VA/GOVERNMENT;
COORDINATE WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL
THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
BREAK GRID AT NEAREST JOINT TO ESTABLISH DEMO AREA AND EXISTING ACT & GRID, TO
REMAIN.
EXISTING GYP CEILING, TO BE REMOVED; COORDINATE W/ MEP DRAWINGS FOR SCOPE OF
DEMP FOR LIGHTING, HVAC, AND ALL OTHER CEILING MOUNTED SYTEMS.
EXISTING SAFETY SENSOR - TO BE REMOVED, STORED, AND PROTECTED BY GENERAL
CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS
ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY
DAMAGED SAFETY SENSORS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH
ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK
IDENTIFIED IN DRAWINGS.
EXISTING PAINTED GYP CEILING/BULKHEAD, TO REMAIN; PROTECT DURING DEMO AND NEW
CONSTRUCTION.
EXISTING PATIENT PRIVACY CURTAIN/TRACK - TO REMAIN; GENERAL CONTRACTOR TO
PROTECT DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS.
TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING SPRINKLER HEAD - TO REMAIN; GENERAL CONTRACTOR TO PROTECT DURING
DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS. TYPICAL THROUGHOUT
AREA OF WORK IDENTIFIED IN DRAWINGS.
EXISTING CURTAIN TRACK SYSTEM - TO BE PROTECTED DURING ALL PHASES OF
CONSTRUCTION.
RELOCATE EXISTING SPRINKLER HEAD AS NECESSARY.
CUT OPENING FOR NEW RETURN AIR DUCT; COORDINATE W/MEP DRAWINGS AND ADJUST
OPENING LOCATION TO ACCOMMODATE EXISTING STRUCTURAL ELEMENTS.
EXISTING EXHAUST HOOD VENT PIPE (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO
CONFIRM SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.
EXISTING COPPER PIPES (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO CONFIRM
SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.
EXISTING EXHAUST LOUVER, TO REMAIN; PROTECT DURING DEMO AND NEW CONSTRUCTION.
EXISTING FRESH AIR INTAKE LOUVER, TO REMAIN; PROTECT DURING DEMO AND NEW
CONSTRUCTION.
PROFILE OF EXISTING AHU BELOW; COORDINATE W/MEP DRAWINGS FOR SCOPE OF DEMO
AND/OR NEW CONSTRUCTION.
EXISTING ACT & GRID SYSTEM, TO REMAIN; PROTECT DURING DEMO AND NEW CONSTRUCTION,
TYP THROUGHHOUT - UNLESS NOTED OTHERWISE.
EXISTING SMOKE DETECTOR - TO BE REMOVED, STORED, AND PROTECTED BY GENERAL
CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS
ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY
DAMAGED SMOKE DECTORS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH
ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK
IDENTIFIED IN DRAWINGS.
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
KEYED RCP DEMOLITION NOTES
KEYED NOTED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .