About this file

This is a federal contract opportunity solicitation for corrective actions to mechanical systems at the John L. McClellan Memorial Veterans Hospital in Little Rock, Arkansas. The contractor shall provide all materials, equipment, labor, supervision and expertise for the project. The period of performance is 180 days from notice to proceed, with an estimated value between $250,000 and $500,000. The NAICS code is 236220 for nonresidential plumbing, heating, and air-conditioning contractors. The procurement is 100% set aside for service-disabled veteran owned small businesses. Offerors must register at various websites including www.beta.sam.gov, www.ccr.gov, www.orca.bpn.gov, and www.vets100.vets.dol.gov and have the Certified Veteran Enterprise seal to be considered. The point of contact is Bradley Martin and the solicitation will issue on or about October 24, 2019, with award date on or about November 26, 2019. The Department of Veterans Affairs Veterans Health Administration VISN 16 is the agency.

36C25619R0152 598-18-391 OR 2F 100 Pct Drawings.pdf

View the file

Other files

File Type Posted
36C25619R0152-0004000.docx DOCX document
36C25619R0152-0004001.docx DOCX document
36C25619R0152-0003000.docx DOCX document
36C25619R0152-0003004.jpg JPG image
36C25619R0152-0003005.docx DOCX document
36C25619R0152-0003003.jpg JPG image
36C25619R0152-0003002.jpg JPG image
36C25619R0152-0003001.pdf PDF
36C25619R0152-0002015.pdf PDF
36C25619R0152-0002014.docx DOCX document
36C25619R0152-0001001.docx DOCX document
36C25619R0152-0001000.docx DOCX document
36C25619R0152-055.docx DOCX document
36C25619R0152-051.docx DOCX document
36C25619R0152-054.docx DOCX document
36C25619R0152-052.mht MHT file
36C25619R0152-050.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF WORK

PROJECT PROVIDES CORRECTIVE ACTIONS TO STATIC PRESSURE

DEFICIENCIES IN HVAC SYSTEM FOR THE OR 2F SURGICAL SUITES;

DEFICIENCIES THE MEDICAL GAS SYSTEM IN THE PACU (2B-181);

REPLACES HEADWALLS IN PACU (2B-181); AND PROVIDES A NEW CO2

AND WAG-D SYSTEM FOR THE OR 2F SURGICAL SUITE.

CONSTRUCTION TYPE: TYPE I A (NON-COMBUSTIBLE MATERIALS)

OCCUPANCY TYPE: I 2 - INSTITUTIONAL, HOSPITAL

BUILDING SUMMARY

GROSS AREA:

• GROUND FLOOR: 2,621 SQ.FT.

• SECOND FLOOR: 9,453 SQ.FT.

• TOTAL 12,074 SQ.FT.

PRIMARY OCCUPANCY: HEALTHCARE

CLASSIFICATION: HEALTHCARE

FUNCTION: AMBULATORY HEALTHCARE

MAIN USE: HEALTHCARE

SECONDARY USE: N/A

N

N

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

NOT TO SCALE CAMPUS MAP

NOT TO SCALE VICINITY MAP

4/

/2

:2 9:

A

M C

:\U se rs \ts te ve ns \R ev it

Lo ca l\5

-1 8-

1_

H

VA

C C or re ct io ns O

R

F_ Ar ch _t od d.

st ev en s.

rv t

COVER SHEET CONSTRUCTION

DOCUMENTS

DESIGN CORRECTIVE ACTIONS for

OR 2F MECHANICAL SYSTEMS @JLM

JLM MEMORIAL VETERANS HOSPITAL

2019.04.17 JDM TSS

598-18-391

GI001

JLM

JDA PROJECT #: D-18-04

DESIGN CORRECTIVE ACTIONS for OR 2F

MECHANICAL SYSTEMS @ JLM

PROJECT No: 598-18-391

JOHN L. McCLELLAN MEMORIAL VETERANS HOSPITAL

4300 WEST 7TH STREET

LITTLE ROCK, AR

CONSTRUCTION DOCUMENTS

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

BURROWS & ASSOCIATES

ENGINEERING CONSULTANTS, LTD.

3924 NORTH HIGHWAY 71

ALMA, AR 72921

JOHN L. McCLELLAN MEMORIAL

VETERANS HOSPITAL

PLAN

NORTH

A E

BC

D

KEY PLAN

F

SHEET LIST

SHEET # SHEET NAME

35% SD

11-30-2018

85% DD

02-08-2019

CONSTRUCTION

DOCUMENTS 03-15-2019

GENERAL

GI001 COVER SHEET X X X

GI002 SYMBOLS, LEGENDS, & GENERAL NOTES X X

GI003 ABBREVIATIONS X

ARCHITECTURAL

AD101 DEMOLITION PLAN X X X

AD111 GROUND FLOOR DEMOLITION RCP @ LAB X X

AD112 OR 2F & PACU REFLECTED CEILING DEMO PLANS X X

AD201 DEMOLITION ELEVATION X X

AE101 NEW CONSTRUCTION - OR 2F AND 2B PACU FLOOR PLANS X X X

AE111 NEW CONSTRUCTION WAG-D PAD / OR 2F AND PACU - RCPs X X

AE201 EXTERIOR ELEVATIONS X X

AE301 CHASE WALL SECTIONS X X

AE501 DETAILS X X

PLUMBING

PD101 DEMOLITION PACU 2B-181 MEDICAL GAS PIPING PLAN X X X

PP100 PLUMBING ABBREVIATIONS AND SCHEDULE X X

PP101 GROUND FLOOR PIPING INSTALLATION PLAN X X

PP102 PACU 2B-181 MEDICAL GAS PIPING PLAN X X

PP103 MEDICAL GAS PIPING PLAN NORTH END X X X

PP104 MEDICAL GAS PIPING PLAN SOUTH END X X X

PP105 MEDICAL GAS DETAILS X X X

MECHANICAL

MD101 HVAC DEMOLITION PLAN X X X

MH100 MECHANICAL ABBREVIATIONS AND NOTES X

MH101 GROUND FLOOR HVAC PLAN X X X

MH102 1ST & 2ND LEVEL HVAC PLANS X X

MH501 HVAC DETAILS X X

ELECTRICAL

EP100 ELECTRICAL ABBREVIATIONS AND SCHEDULE X X

EP101 GROUND LEVEL AND 2F POWER PLAN X X

PROJECT INFORMATION

1F157B

D2 / AE512

AE501

AE201

AE201

AE211

20' - 6"

FIRST FLOOR

P-01

SCOPE INDICATORS

VIEW TITLE

DETAIL CALLOUT

DETAIL INDICATOR FOR SMALL CONDITIONS

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR,

INTERIOR, MULTIPLE

VIEW

BUILDING SECTION INDICATOR

SPACE IDENTIFICATION

OPENING INDICATOR

WINDOW INDICATOR

EQUIPMENT INDICATOR

SHEET NOTES

PARTITION TYPE INDICATOR

NORTH ARROW

INDICATES PROJECT NORTH

INDICATES TRUE NORTH

COLUMN LINE INDICATORS

DRAWING REVISION INDICATOR

EXISTING CONSTRUCTION TO

REMAIN

EXISTING CONSTRUCTION TO BE

REMOVED

NEW CONSTRUCTION

VV ITEM - GOVERNMENT FURNISHED /

GOVERNMENT INSTALLED

VC ITEM - GOVERNMENT

FURNISHED / CONTRACTOR

INSTALLED

ELEVATION INDICATOR

WALL FINISH INDICATOR

CC ITEM - CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

N

A_4A

BA3034

CASEWORK TAG

LETTER PAIR INDICATES CASEWORK FAMILY:

RE: AE511-514 FOR DETAILS

FIRST PAIR OF NUMBERS INDICATES UNIT

WIDTH (I.E. 30")

SECOND PAIR INDICATES COUNTERTOP

HEIGHT (I.E. 34")

TOILET ACCESSORY TAG

XXXX

JSN

A

INDICATES

COLUMN LINE

DESIGNATION

CEILING HEIGHT INDICATOR

Room name 1A105

9' - 0"

F3

GENERAL NOTES

1. DEPICTION OF EXISTING CONDITIONS BASED ON OWNER-FURNISHED DOCUMENTS AND LIMITED FIELD OBSERVATIONS. EXISTING ELEMENTS AND CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE DEMOLITION WORK IS COMPLETE, REPORT ANY CONFLICTS TO DESIGNER. THE CONTRACTOR SHALL MAKE ADJUSTMENTS AND/OR ALTERATIONS AS NECESSARY TO INSTALL COMPLETE AND OPERABLE SYSTEMS IN ACCORDANCE WITH THE

CODES HAVING JURISDICTION AT NO ADDITIONAL COST TO THE GOVERNMENT.

2. IN THE EVENT THAT THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR SHALL BID THE MOST EXPENSIVE OPTION. IN THE EVENT THAT THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE OWNER REQUIRES THE MORE EXPENSIVE OPTION - THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL COST TO THE

OWNER.

3. UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO FACE OF STUD AND TO COLUMN CENTERLINES.

4. IN NEW GYPSUM WALL BOARD PARTITIONS, PROVIDE CONTROL JOINTS AT 30'-0" O.C. MAX.

5. CONTRACTORS SHALL VERIFY ALL DIMENSIONS NOTED AS “CLEAR” OR “MIN". DIMENSIONS NOTED AS “HOLD”

ARE CRITICAL TO COORDINATE OTHER WORK (E.G. CEILING GRIDS, LIGHTING, FINISHES).

6. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO INITIATING CONSTRUCTION AND REPORT

DISCREPANCIES TO ARCHITECT PRIOR TO COMMENCING WORK.

7. ALL PENETRATIONS THROUGH RATED FLOOR/CEILING ASSEMBLIES AND THROUGH FIRE RATED WALL AND

SMOKE BARRIER ASSEMBLIES - THOSE CREATED BY REMOVAL OF DEMOLISHED ITEMS UNDER THIS CONTRACT AND THOSE DISCOVERED DURING CONSTRUCTION UNDER THIS CONTRACT AS A RESULT OF PREVIOUS WORK AND THOSE CREATED BY NEW WORK UNDER THIS CONTRACT - MUST BE SEALED AS PART

OF THIS CONTRACT. ALL RATED SEPARATIONS MUST MEET CURRENT CODE REQUIREMENTS WITH

APPROVED UL ASSEMBLIES. SEE PENETRATION DETAILS ON SHEET AE101 FOR WORK BY GENERAL CONTRACTOR. SEE MEPFP SHEETS FOR PENETRATION FIRE STOPPING REQUIREMENTS FOR MEPFP

CONTRACTORS.

8. CONTRACTOR TO PROVIDE FIRESTOPPING AT PENETRATIONS FOR ALL RATED ASSEMBLIES.

9. CONTRACTOR FULLY RESPONSIBLE FOR THE ENTIRETY OF THE CONTENT OF THE CONTRACT DOCUMENTS

(SPECIFICATIONS AND DRAWINGS), AND IS SOLELY RESPONSIBLE FOR BIDDING THE CONTENTS THEREIN; IN THE EVENT THAT THE CONTRACTOR DOES NOT INCLUDE ANY COMPONENT OR ELEMENT WITHIN THE CONTRACT DOCUMENTS WITHIN THEIR BID, THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR

PROVIDING THAT COMPONENT OR ELEMENT AT NO ADDITIONAL COST TO THE OWNER.

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

4/

/2

:4 7:

P

M C

:\U se rs \ts te ve ns \R ev it

Lo ca l\5

-1 8-

1_

H

VA

C C or re ct io ns O

R

F_ Ar ch _t od d.

st ev en s.

rv t

SYMBOLS, LEGENDS, & GENERAL

NOTES

CONSTRUCTION

DOCUMENTS

DESIGN CORRECTIVE ACTIONS for OR 2F

MECHANICAL SYSTEMS @JLM

JLM MEMORIAL VETERANS HOSPITAL

2019.04.17 JDM TSS

598-18-391

GI002

JLM

JDA PROJECT #: D-18-04

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

BURROWS & ASSOCIATES

ENGINEERING CONSULTANTS, LTD.

3924 NORTH HIGHWAY 71

ALMA, AR 72921

DRAFTING SYMBOLS

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

4/

/2

:4 7:

P

M C

:\U se rs \ts te ve ns \R ev it

Lo ca l\5

-1 8-

1_

H

VA

C C or re ct io ns O

R

F_ Ar ch _t od d.

st ev en s.

rv t

ABBREVIATIONS CONSTRUCTION

DOCUMENTS

DESIGN CORRECTIVE ACTIONS for OR 2F

MECHANICAL SYSTEMS @JLM

JLM MEMORIAL VETERANS HOSPITAL

2019.04.17 JDM TSS

598-18-391

GI003

JLM

JDA PROJECT #: D-18-04

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

BURROWS & ASSOCIATES

ENGINEERING CONSULTANTS, LTD.

3924 NORTH HIGHWAY 71

ALMA, AR 72921

SJ SCORED JOINT

SJI STEEL JOIST SLIDING WINDOW

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SMS SHEET METAL SCREW

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL

UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE

SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION

CLASSIFICATION

STIF STIFFENER

STL STEEL

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUB

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT

STL

STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPENDED

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SNTHETIC

SYS SYSTEM

T

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL,

TEMPERATURE CONTROL PANEL,

OR TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TLT TOILET

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ______

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TYP TYPICAL

U

U.N.O. UNLESS NOTED OTHERWISE

U.O.N. UNLESS OTHERWISE NOTED

V

VC VA FURNISHED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE OR

VITRIFIED CLAY TILE

VENT VENTILATION

VERT VERTICAL

VV VA FURNISHED / VA INSTALLED

W

W/ WITH

WD WOOD

WP WALL PROTECTION

QT QUARRY TILE OR QUART

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R

R RADIUS OR RISER

RA RETURN AIR

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER

BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

OR REFRIGERATION

REFRACTORY

REG REGISTER

REINF REINFORCE, REINFORCED, OR

REINFORCING

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

S

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID

CORE

SCH SCHOOL

SCHED SCHEDULE, SCHEDULED

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL

FLASH

SHEET METAL (FLASHING)

SHTHG SHEATHING

SIM SIMILAR

SJ SCORED JOINT

NRC NOICE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O

O OXYGEN

O/H OVER HEAD

O/O OUT TO OUT

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OR OUTSIDE

DIMENSION

OFD OVERFLOW DRAIN

OFF OFFICE

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSIE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDNANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OUT OUTLET

OZ OUNCE

P

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT

ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTYLINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

OR PURCHASE ORDER POST

OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMAIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING

CONCRETE

LYR LAYER

M

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTAIN, MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM O MEDIUM

MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMBO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MIN MINIMUM MINUTE OR MINUTE

MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

H

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGAR

HM HOLLOW METAL OR

HECTOMETER

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HR HOUR

HRS HOURS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATION, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATED, INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE

ASSEMBLY

IWH INSTANANEOUS WATER HEATER

J

J-BOX JUNCTION BOX

JAN JANITOR

K

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE OR LATENT

HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCEN FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF

CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF CURB

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR

FIREPROOF OR FLAT PANEL

DOOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER

OR FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUT

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON, GALLONS

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

GFRG GLASS-FIBER-REINFORCED

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CTLINDER LOCK

D

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM OR

DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM,

OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC, ELECTRICAL

ELEC DR

OP

ELECTRIC DOOR OPENER

ELEV ELEVATOR

ELEVS ELEVATIONS

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C

C CELSIUS CHANNEL OR CHANNEL

CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

C/C CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

C/VA CONTRACTOR FURNISHED/

GOVERNMENT INSTALLED

CAB CABINET

CAC CEILING ATENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT, CEMENTITIOUS

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR

CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULATING, CIRCULAR

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LIINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CM CONSTRUCTION MANAGEMENT

cm2 SQUARE CENTIMETER cm3 CUBIC CENTIMETER

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,

CLEAN OUT, OR COMPANY

co2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINAION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUOUS, CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

COR COORDINATION OFFICER

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

A

A LABEL CLASS A DOOR

A/C AIR CONDITIONING

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABA ARCHITECTURAL BARRIERS ACT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT

ADB AUTOMATIC DOOR BOTTOM

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION,

ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE, ALTERNATIVE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLAYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE, APPROXIMATELY

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT, ARCHITECTURAL

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO-VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL

WOODWORKING INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'S

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKG BLOCKING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

STANDARD ABBREVIATIONS NOT ALL ABBREVIATIONS SHOWN ARE USED

PACU

2B-181

JANITOR

2B-189

VESTIBULE

2B-188

ISOLATION ROOM

2B-187

NURISHMENT

2B-186

SOILED UTILTY

2B-185

LINEN

2B-193

MEDS

2B-184

CLEAN

EQUIPMENT

2B-183

RESTROOM

2B-182

HEAD NURSE

2B-192

FAMILY

CONSULTING #1

2B-191

FAMILY

CONSULTING #2

2B-190

3455.55.667

1 1 1 1 1 1 1

1111 111

TYP.

TYP.

5555555

5 5 5 5 5 5

GENERAL NOTES

1. CONTRACTOR RESPONSIBLE FOR COORDINATING ANY DISRUPTIONS IN UTILITY SERVICES OR

BUILDING SYSTEMS WITH VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE)

PRIOR TO EXECUTION.

2. CONTRACTOR FULLY RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS OF THE AREAS OF

WORK.

3. CONTRACTOR FULLY RESPONSIBLE FOR PROVIDING THE DESIGN INTENT AND SYSTEMS

PERFORMANCE CRITERIA IN IT’S ENTIRITY AS OUTLINED IN THE SPECIFICATIONS AND

CONSTRUCTION DRAWINGS.

4. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT IF THERE ARE ANY DISCREPANCIES BETWEEN THE EXISTING

CONDITIONS AND THE CONTRACT DOCUMENTS (SPECIFICATIONS AND CONSTRUCTION

DRAWINGS).

5. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING

OFFICER (REPRESENTATIVE) AND ARCHITECT VIA RFI PROCESS.

6. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS –

DURING THE BIDDING PROCESS – THE CONTRACTOR SHALL BID THE MORE EXPENSIVE OPTION;

IN THE EVENT OF THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE DESIGN

REQUIRES THE MORE EXPENSIVE OPTION – THE CONTRACTOR SHALL BE RESPONSIBLE FOR

PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL EXPENSE TO THE VA.

7. CONTRACTOR SHALL DEVELOP AN INFECTION CONTROL PLAN AND SAFETY PLAN TO THE VA

POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) FOR REVIEW AND APPROVAL

PRIOR TO THE BEGINNING OF THEIR WORK. BOTH PLANS MUST INCLUDE MEANS AND METHODS

OF DEBRIS STAGING AND REMOVAL.

8. CONTRACTOR RESPONSIBLE FOR INSTALLING TEMPORARY DUST AND DEBRIS BARRIERS AND

VESTIBULES AROUND THE PROJECT LIMINTS IN ACCORDANCE WITH THE APPROVED INFECTION

CONTROL PLAN AND SAFTEY PLAN. TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED

MEANS OF EGRESS PATHS AND/OR WIDTHS.

9. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER

(REPRESENTATIVE) AND ARCHITECT IF THEY ENCOUNTER ANY UNDOCUMENTED HAZARDOUS

MATERIALS DURING DEMO AND/OR NEW CONSTRUCTION.

10. CONTRACTOR RESPONSIBLE FOR COORDINATING DEMO AND NEW CONSTRUCTION PHASES

WITHIN COMPLIANCE WITH THE HAZARDOUS MATERIALS ABATEMENT PLANS.

11. CONTRACTOR RESPONSIBLE FOR IMMEDIATELY NOTIFYING VA POINT OF

CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT UPON COMPLETION OF

CUTTING AND SELECTIVE DEMOLITION WORK AND REPORT ANY “UNFORESEEN CONDITIONS”

THAT CREATE CONFLICTS WITH THE NEW CONSTRUCTION DRAWINGS; “UNFORESEEN

CONDITIONS” ARE CONDITIONS THAT ARE EXISTING ELEMENTS AND CONDITIONS CONEALED BY

FIXED EQUIPMENT AND FINISHES – SUCH AS HARD LID CEILINGS AND SOLID WALLS.

12. FACILITY WILL BE OCCUPIED DURING CONSTRUCTION. CONTRACTOR WILL TAKE NECESSARY MEASURES TO ENSURE THE HEALTH, SAFETY, AND WELFARE OF ALL BUILDING OCCUPANTS – TO

INCLUDE PATIENTS, STAFF, AND VISITORS.

13. CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING DEMO AND NEW

CONSTRUCTION PHASES.

14. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL FIRE RATED ASSEMBLIES DURING DEMO AND

NEW CONSTRUCTION.

15. CONTRACTOR RESPONSIBLE FOR REPAIR AND RESTORATION OF ANY DAMAGED FIRE RATED

ASSEMBLIES DURING BOTH DEMO AND NEW CONSTRUCTION PHASES. AT NO ADDITIONAL

EXPENSE TO VA.

16. GC RESPONSIBLE FOR PROVIDING PROPER SHORING FOR ALL DEMO NEW CONSTRUCTION

ACTIVITIES THAT ARE COMPLIANT WITH ALL OSHA AND LIFE SAFETY GUIDELINES.

GRAPHIC LEGEND

NEW UNRATED PARTITION

EXISTING 2-HOUR BARRIER

EXISTING PARTITION, TO BE REMOVED

EXISTING PARTITION, TO REMAIN

INDICATES AREA NOT IN CONTRACT

EXISTING 1-HOUR BARRIER

PROJECT LIMITS

STAIR

2F-103

B.6

A.6

F5

AD2018.2 8.18.3

HAC

2F-232

6" 3' - 8"

F.V.

3' - 11"

F.

V.

6'

1/

4" 5'

4"

F.

V.

5'

3/

8"

E7

AE501

F7

AE501

A.2

A.1

A

B

123567

AD101

F1

CLEAN CORE

2F-228

ORTHOPEDIC

OPERATING

ROOM

2F-227

ORTHOPEDIC

OPERATING

ROOM #2

2F-229

STORAGE

2F-230NEUROSURGERY

OPERATING

ROOM

2F-201

S.P.O.R.

CONTROLS

2F-202

SPECIAL

PURPOSE

OPERATING

ROOM

2F-206

CARDIOVASCULAR

OPERATING

ROOM

2F-211

GAS CYLIND.

STOR.

2F-203

DATA

2F-207

STAIR

2F-103

STORAGE

2F-209

ELECT.

2F-210

STOR.

SF-204

CONTROL ROOM

2F-205

AE201

F3

B.6

A.6

8.2 8.18.3

1 EXISTING HEADWALL - TO BE REMOVED; REFER TO MEP SHEETS FOR FULL SCOPE OF DEMOLITION

EXISTING FLOOR - CUT NEW OPENING IN EXISITING CONCRETE SLAB FOR NEW MECHANICAL

CHASE; COORDINATE WITH MEP SHEETS. FIELD VERIFY EXISITING CONDITIONS.

EXISTING MOP SINK - TO REMAIN; CONTRACTOR TO PROTECT DURING DEMOLITION AND NEW

CONSTRUCTION PHASE.

EXISTING CURTAIN TRACK SYSTEM TO BE PROTECTED DURING DEMOLITION & NEW ONSTRUCTION.

EXISTING FURRING WALL BEHIND SURFACE MOUNTED HEADWALL, TO BE REMOVED; PATCH AND

PREPARE ADJACENT WALLS FOR NEW CONSTRUCTION.

KEYED DEMOLITION NOTES

MARK KEYED NOTE TEXT

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

4/

/2

:4 6:

P

M C

:\U se rs \ts te ve ns \R ev it

Lo ca l\5

-1 8-

1_

H

VA

C C or re ct io ns O

R

F_ Ar ch _t od d.

st ev en s.

rv t

DEMOLITION PLAN CONSTRUCTION

DOCUMENTS

DESIGN CORRECTIVE ACTIONS for OR 2F

MECHANICAL SYSTEMS @JLM

JLM MEMORIAL VETERANS HOSPITAL

2019.04.17 JDM TSS

598-18-391

AD101

JLM

JDA PROJECT #: D-18-04

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

1/8" = 1'-0"C4 PACU DEMOLITION FLOOR PLAN

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

BURROWS & ASSOCIATES

ENGINEERING CONSULTANTS, LTD.

3924 NORTH HIGHWAY 71

ALMA, AR 72921

PLAN

NORTH

A E

C

D

KEY PLAN

F

B

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

SECOND LEVEL F.F.E. = 414.00'

1/4" = 1'-0"F1 ENLARGED DEMO PLAN - OR 2F JANITOR CLOSET

1/8" = 1'-0"F3 DEMO PLAN OR 2F - OR 2F

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

SECOND LEVEL F.F.E. = 414.00'

SECOND LEVEL F.F.E. = 414.00'

GENERAL NOTES

1. CONTRACTOR RESPONSIBLE FOR COORDINATING ANY DISRUPTIONS IN UTILITY SERVICES OR

BUILDING SYSTEMS WITH VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE)

PRIOR TO EXECUTION.

2. CONTRACTOR FULLY RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS OF THE AREAS OF

WORK.

3. CONTRACTOR FULLY RESPONSIBLE FOR PROVIDING THE DESIGN INTENT AND SYSTEMS

PERFORMANCE CRITERIA IN IT’S ENTIRITY AS OUTLINED IN THE SPECIFICATIONS AND

CONSTRUCTION DRAWINGS.

4. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT IF THERE ARE ANY DISCREPANCIES BETWEEN THE EXISTING

CONDITIONS AND THE CONTRACT DOCUMENTS (SPECIFICATIONS AND CONSTRUCTION

DRAWINGS).

5. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING

OFFICER (REPRESENTATIVE) AND ARCHITECT VIA RFI PROCESS.

6. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS –

DURING THE BIDDING PROCESS – THE CONTRACTOR SHALL BID THE MORE EXPENSIVE OPTION;

IN THE EVENT OF THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE DESIGN

REQUIRES THE MORE EXPENSIVE OPTION – THE CONTRACTOR SHALL BE RESPONSIBLE FOR

PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL EXPENSE TO THE VA.

7. CONTRACTOR SHALL DEVELOP AN INFECTION CONTROL PLAN AND SAFETY PLAN TO THE VA

POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) FOR REVIEW AND APPROVAL

PRIOR TO THE BEGINNING OF THEIR WORK. BOTH PLANS MUST INCLUDE MEANS AND METHODS

OF DEBRIS STAGING AND REMOVAL.

8. CONTRACTOR RESPONSIBLE FOR INSTALLING TEMPORARY DUST AND DEBRIS BARRIERS AND

VESTIBULES AROUND THE PROJECT LIMINTS IN ACCORDANCE WITH THE APPROVED INFECTION

CONTROL PLAN AND SAFTEY PLAN. TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED

MEANS OF EGRESS PATHS AND/OR WIDTHS.

9. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER

(REPRESENTATIVE) AND ARCHITECT IF THEY ENCOUNTER ANY UNDOCUMENTED HAZARDOUS

MATERIALS DURING DEMO AND/OR NEW CONSTRUCTION.

10. CONTRACTOR RESPONSIBLE FOR COORDINATING DEMO AND NEW CONSTRUCTION PHASES

WITHIN COMPLIANCE WITH THE HAZARDOUS MATERIALS ABATEMENT PLANS.

11. CONTRACTOR RESPONSIBLE FOR IMMEDIATELY NOTIFYING VA POINT OF

CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT UPON COMPLETION OF

CUTTING AND SELECTIVE DEMOLITION WORK AND REPORT ANY “UNFORESEEN CONDITIONS”

THAT CREATE CONFLICTS WITH THE NEW CONSTRUCTION DRAWINGS; “UNFORESEEN

CONDITIONS” ARE CONDITIONS THAT ARE EXISTING ELEMENTS AND CONDITIONS CONEALED BY

FIXED EQUIPMENT AND FINISHES – SUCH AS HARD LID CEILINGS AND SOLID WALLS.

12. FACILITY WILL BE OCCUPIED DURING CONSTRUCTION. CONTRACTOR WILL TAKE NECESSARY MEASURES TO ENSURE THE HEALTH, SAFETY, AND WELFARE OF ALL BUILDING OCCUPANTS – TO

INCLUDE PATIENTS, STAFF, AND VISITORS.

13. CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING DEMO AND NEW

CONSTRUCTION PHASES.

14. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL FIRE RATED ASSEMBLIES DURING DEMO AND

NEW CONSTRUCTION.

15. CONTRACTOR RESPONSIBLE FOR REPAIR AND RESTORATION OF ANY DAMAGED FIRE RATED

ASSEMBLIES DURING BOTH DEMO AND NEW CONSTRUCTION PHASES. AT NO ADDITIONAL

EXPENSE TO VA.

16. GC RESPONSIBLE FOR PROVIDING PROPER SHORING FOR ALL DEMO NEW CONSTRUCTION

ACTIVITIES THAT ARE COMPLIANT WITH ALL OSHA AND LIFE SAFETY GUIDELINES.

REFLECTED CEILING PLAN LEGEND

2'x4' LIGHT FIXTURE

FIRE SPRINKLER HEAD

SUPPLY DIFFUSER

EMERGENCY EXIT SIGNAGE

WIRELESS ACCESS POINT

SENSOR

SMOKE DETECTOR

SECURITY CAMERA

SAFETY SHOWER

SECURITY CAMERA

MIRROR

1'x4' LIGHT FIXTURE

RETURN DIFFUSER

ACT & GRID TO

REMAIN

PAINTED GYP

CEILING TO

REMAIN

ACT & GRID TO

BE REMOVED

PAINTED GYP

CEILING TO BE

REMOVED

A.2

A.1

A

B

1235678

MECHANICAL

ROOM

GF-143

9' - 0"

9' - 0"

D1

D3

LAB

GF-115

OPEN TO STRUCTURE

ABOVE

AD111

F1

AD111

F3

RESTROOM

GF-116

D1

D2

D3

D12

D13

D14

D12 D15

D15

GC TO PROTECT ALL EQUIPMENT, FIXTURES, AND

FURNITRURE BELOW DURING DEMO AND NEW

CONSTRUCTION ACTIVITIES; GC RESPOSIBLE FOR THE

REPAIR AND/OR REPLACEMENT OF ANY DAMAGED

EQUIPMENT, FIXTURES, AND FURNITURE IN AREA OF

WORK DUE TO DEMO OR NEW CONSTRUCTION

ACITIVITIES.

NOTE:

EXISTING EXTERIOR LOUVER

COORDINATE WITH MEP DRAWINGS

EXISTING EXTERIOR LOUVER

COORDINATE WITH MEP DRAWINGS

GRAPHIC LEGEND

NEW UNRATED PARTITION

EXISTING 2-HOUR BARRIER

EXISTING PARTITION, TO BE REMOVED

EXISTING PARTITION, TO REMAIN

INDICATES AREA NOT IN CONTRACT

EXISTING 1-HOUR BARRIER

PROJECT LIMITS

FIRST FLOOR

20' - 0"

GROUND FLOOR

0' - 0"

COORD. W/ MECH.

4' - 0"

COOR. W/ MECH

7' - 4"

C O

O R

D . W

/ M

EC

H

3'

5"

F.

V.

MECHANICAL

ROOM

GF-143

DUCT

OPENING

THROUGH

FIRE WALL

IN

S

ID

E

FA

C

E O

F W

AL

L

EXISTING WALL

BEYOND

FIRST FLOOR

20' - 0"

GROUND FLOOR

0' - 0"

COORD. W/ MECH.

8' - 0"F.V.

C O

O R

D . W

/ M

EC

H

3'

6"

F.

V.

F.

V.

9'

0"

DUCT

OPENING

EXISTING WALL

BEYOND

LAB

GF-115

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

4/

/2

:4 6:

P

M C

:\U se rs \ts te ve ns \R ev it

Lo ca l\5

-1 8-

1_

H

VA

C C or re ct io ns O

R

F_ Ar ch _t od d.

st ev en s.

rv t

GROUND FLOOR DEMOLITION RCP

@ LAB

CONSTRUCTION

DOCUMENTS

DESIGN CORRECTIVE ACTIONS for OR 2F

MECHANICAL SYSTEMS @JLM

JLM MEMORIAL VETERANS HOSPITAL

2019.04.17 JDM TSS

598-18-391

AD111

JLM

JDA PROJECT #: D-18-04

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

BURROWS & ASSOCIATES

ENGINEERING CONSULTANTS, LTD.

3924 NORTH HIGHWAY 71

ALMA, AR 72921

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

A E

BC

D

KEY PLAN

F

KEYED RCP DEMOLITION NOTES

MARK KEYED NOTE TEXT

D1 EXISTING ACT & GRID SYSTEM – TO BE CAREFULLY DISASSEMBLED, REMOVED, STORED, AND

PROTECTED BY GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW

BUILDING SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR

REPLACING/REPAIRING ANY DAMAGED ACT AND/OR GRID AT NO EXPENSE TO

CLIENT/VA/GOVERNMENT. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

D2 EXISTING LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL CONTRACTOR

DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS ABOVE CEILING;

GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY DAMAGED LIGHTING AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH ELECTRICAL SHEETS FOR FULL SCOPE

OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

D3 EXISTING SUPPLY/RETURN DIFFUSERS – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL

CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS ABOVE

CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY DAMAGED

SUPPLY/RETURN DIFFUSERS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH

MECHANICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK

IDENTIFIED IN DRAWINGS.

1/8" = 1'-0"E3 GROUND FLOOR REFLECTED CEILING DEMO PLAN @ LAB

GROUND LEVEL F.F.E. = 378.00'

1/4" = 1'-0"F1 DUCT OPENING @ MECH ROOM

1/4" = 1'-0"F3 DUCT OPENING @ LAB

EXISTING EMERGENCY EGRESS LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY

GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING

SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING

ANY DAMAGED EMERGENCY EGRESS LIGHTING AT NO EXPENSE TO CLIENT/VA/GOVERNMENT;

COORDINATE WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL

THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING SECURITY DEVICES – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL

CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS

ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY

DAMAGED SECURITY DEVICES AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE

WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF

WORK IDENTIFIED IN DRAWINGS.

EXISTING WIRELESS DEVICES – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL

CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS

ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY

DAMAGED WIRELESS DEVICES AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE

WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF

WORK IDENTIFIED IN DRAWINGS.

EXISTING SAFETY SENSOR - TO BE REMOVED, STORED, AND PROTECTED BY GENERAL

CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS

ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY

DAMAGED SAFETY SENSORS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH

ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK

IDENTIFIED IN DRAWINGS.

EXISTING SAFTEY SHOWER - TO REMAIN; GENERAL CONTRACTOR TO PROTECT DURING

DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS. TYPICAL THROUGHOUT

AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING PATIENT PRIVACY CURTAIN/TRACK - TO REMAIN; GENERAL CONTRACTOR TO

PROTECT DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS.

TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING SPRINKLER HEAD - TO REMAIN; GENERAL CONTRACTOR TO PROTECT DURING

DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS. TYPICAL THROUGHOUT

AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING CURTAIN TRACK SYSTEM - TO BE PROTECTED DURING ALL PHASES OF

CONSTRUCTION.

CUT OPENING FOR NEW RETURN AIR DUCT; COORDINATE W/MEP DRAWINGS AND ADJUST

OPENING LOCATION TO ACCOMMODATE EXISTING STRUCTURAL ELEMENTS.

EXISTING EXHAUST HOOD VENT PIPE (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO

CONFIRM SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.

EXISTING COPPER PIPES (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO CONFIRM

SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.

PROFILE OF EXISTING AHU BELOW; COORDINATE W/MEP DRAWINGS FOR SCOPE OF DEMO

AND/OR NEW CONSTRUCTION.

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

A.2

A.1

A

B

5.567

D1

D3 D2

D7

STAIR

2F-103

S.P.O.R.

CONTROLS

2F-202

B.6

A.6

AD112

F1

8.2 8.18.3

9' - 0"

9' - 0"

9' - 0"

9' - 0"

HAC

2F-232

D10

D5

D19

D19

D19

D8

9' - 0"

7' - 11"

D19

9' - 0"

D5

D1

D2

D3

D10

D7

D20

D4

D4

5.5

5.5

5.6

5.6

PACU

2B-181

JANITOR

2B-189

VESTIBULE

2B-188

ISOLATION ROOM

2B-187

9' - 0"

9' - 0"

8' - 0"

8' - 0"

D1

D3

D2

D4

D11D11

D11D11

D6

D3 D2

D10

D8 7' - 11"

D11

D8 D87' - 11"

D4

D20

D4

D20

GENERAL NOTES

1. CONTRACTOR RESPONSIBLE FOR COORDINATING ANY DISRUPTIONS IN UTILITY SERVICES OR

BUILDING SYSTEMS WITH VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE)

PRIOR TO EXECUTION.

2. CONTRACTOR FULLY RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS OF THE AREAS OF

WORK.

3. CONTRACTOR FULLY RESPONSIBLE FOR PROVIDING THE DESIGN INTENT AND SYSTEMS

PERFORMANCE CRITERIA IN IT’S ENTIRITY AS OUTLINED IN THE SPECIFICATIONS AND

CONSTRUCTION DRAWINGS.

4. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT IF THERE ARE ANY DISCREPANCIES BETWEEN THE EXISTING

CONDITIONS AND THE CONTRACT DOCUMENTS (SPECIFICATIONS AND CONSTRUCTION

DRAWINGS).

5. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING

OFFICER (REPRESENTATIVE) AND ARCHITECT VIA RFI PROCESS.

6. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND CONSTRUCTION DRAWINGS –

DURING THE BIDDING PROCESS – THE CONTRACTOR SHALL BID THE MORE EXPENSIVE OPTION;

IN THE EVENT OF THE CONTRACTOR BIDS THE LEAST EXPENSIVE OPTION, AND THE DESIGN

REQUIRES THE MORE EXPENSIVE OPTION – THE CONTRACTOR SHALL BE RESPONSIBLE FOR

PROVIDING THE MORE EXPENSIVE OPTION AT NO ADDITIONAL EXPENSE TO THE VA.

7. CONTRACTOR SHALL DEVELOP AN INFECTION CONTROL PLAN AND SAFETY PLAN TO THE VA

POINT OF CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) FOR REVIEW AND APPROVAL

PRIOR TO THE BEGINNING OF THEIR WORK. BOTH PLANS MUST INCLUDE MEANS AND METHODS

OF DEBRIS STAGING AND REMOVAL.

8. CONTRACTOR RESPONSIBLE FOR INSTALLING TEMPORARY DUST AND DEBRIS BARRIERS AND

VESTIBULES AROUND THE PROJECT LIMINTS IN ACCORDANCE WITH THE APPROVED INFECTION

CONTROL PLAN AND SAFTEY PLAN. TEMPORARY BARRIERS ARE NOT TO RESTRICT REQUIRED

MEANS OF EGRESS PATHS AND/OR WIDTHS.

9. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE VA POINT OF CONTACT/CONTRACTING OFFICER

(REPRESENTATIVE) AND ARCHITECT IF THEY ENCOUNTER ANY UNDOCUMENTED HAZARDOUS

MATERIALS DURING DEMO AND/OR NEW CONSTRUCTION.

10. CONTRACTOR RESPONSIBLE FOR COORDINATING DEMO AND NEW CONSTRUCTION PHASES

WITHIN COMPLIANCE WITH THE HAZARDOUS MATERIALS ABATEMENT PLANS.

11. CONTRACTOR RESPONSIBLE FOR IMMEDIATELY NOTIFYING VA POINT OF

CONTACT/CONTRACTING OFFICER (REPRESENTATIVE) AND ARCHITECT UPON COMPLETION OF

CUTTING AND SELECTIVE DEMOLITION WORK AND REPORT ANY “UNFORESEEN CONDITIONS”

THAT CREATE CONFLICTS WITH THE NEW CONSTRUCTION DRAWINGS; “UNFORESEEN

CONDITIONS” ARE CONDITIONS THAT ARE EXISTING ELEMENTS AND CONDITIONS CONEALED BY

FIXED EQUIPMENT AND FINISHES – SUCH AS HARD LID CEILINGS AND SOLID WALLS.

12. FACILITY WILL BE OCCUPIED DURING CONSTRUCTION. CONTRACTOR WILL TAKE NECESSARY MEASURES TO ENSURE THE HEALTH, SAFETY, AND WELFARE OF ALL BUILDING OCCUPANTS – TO

INCLUDE PATIENTS, STAFF, AND VISITORS.

13. CONTRACTOR TO PROTECT EXISTING STRUCTURE DURING DEMO AND NEW

CONSTRUCTION PHASES.

14. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL FIRE RATED ASSEMBLIES DURING DEMO AND

NEW CONSTRUCTION.

15. CONTRACTOR RESPONSIBLE FOR REPAIR AND RESTORATION OF ANY DAMAGED FIRE RATED

ASSEMBLIES DURING BOTH DEMO AND NEW CONSTRUCTION PHASES. AT NO ADDITIONAL

EXPENSE TO VA.

16. GC RESPONSIBLE FOR PROVIDING PROPER SHORING FOR ALL DEMO NEW CONSTRUCTION

ACTIVITIES THAT ARE COMPLIANT WITH ALL OSHA AND LIFE SAFETY GUIDELINES.

REFLECTED CEILING PLAN LEGEND

2'x4' LIGHT FIXTURE

FIRE SPRINKLER HEAD

SUPPLY DIFFUSER

EMERGENCY EXIT SIGNAGE

WIRELESS ACCESS POINT

SENSOR

SMOKE DETECTOR

SECURITY CAMERA

SAFETY SHOWER

SECURITY CAMERA

MIRROR

1'x4' LIGHT FIXTURE

RETURN DIFFUSER

ACT & GRID TO

REMAIN

PAINTED GYP

CEILING TO

REMAIN

ACT & GRID TO

BE REMOVED

PAINTED GYP

CEILING TO BE

REMOVED

B

B.6

A.6

STAIR

2F-103

F5

AD201

D2

8.2 8.18.3

HAC

2F-232

D3

D2

D1

D10

D10

D2

D3

9' - 0"

D20 F7

AE501

D4

B

B.6

A.6

EXISTING PLUMBING TO REMAIN

DEMO FLOOR SLAB AND DECK;

COORDINATE WITH MEP DRAWINGS

AND EXISTING STRUCTURE.

EXISTING STRUCTURE - PROTECT DURING

DEMO AND NEW CONSTRUCTION ; TYP.

8.2 8.18.3

F.V.

3' - 5"

F.V.

4' - 0" 8"

F.V.

6"

R.O.

3' - 8"

F.V.

3' - 1 3/8"

M

IN

. 1 " C

LE

AR

AN

C

E

R .0

5'

4" M

IN

. 1

" C

LE

AR

AN

C E

EXISTING METAL FLOOR DECK;

PROTECT DURING DEMO AND

NEW CONSTRUCTION; TYP.

UNLESS NOTED OTHERWISE

E7

AE501

F7

AE501

GRAPHIC LEGEND

NEW UNRATED PARTITION

EXISTING 2-HOUR BARRIER

EXISTING PARTITION, TO BE REMOVED

EXISTING PARTITION, TO REMAIN

INDICATES AREA NOT IN CONTRACT

EXISTING 1-HOUR BARRIER

PROJECT LIMITS

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

4/

/2

:4 6:

P

M C

:\U se rs \ts te ve ns \R ev it

Lo ca l\5

-1 8-

1_

H

VA

C C or re ct io ns O

R

F_ Ar ch _t od d.

st ev en s.

rv t

OR 2F & PACU REFLECTED CEILING

DEMO PLANS

CONSTRUCTION

DOCUMENTS

DESIGN CORRECTIVE ACTIONS for OR 2F

MECHANICAL SYSTEMS @JLM

JLM MEMORIAL VETERANS HOSPITAL

2019.04.17 JDM TSS

598-18-391

AD112

JLM

JDA PROJECT #: D-18-04

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

BURROWS & ASSOCIATES

ENGINEERING CONSULTANTS, LTD.

3924 NORTH HIGHWAY 71

ALMA, AR 72921

1/8" = 1'-0"F4 OR 2F REFLECTED CEILING DEMO PLAN

1/8" = 1'-0"C5 PACU REFLECTED CEILING DEMOLITION PLAN

PLAN

NORTH

A E

BC

D

KEY PLAN

F

SECOND LEVEL F.F.E. = 414.00'

SECOND LEVEL F.F.E. = 414.00'

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

1/4" = 1'-0"F1 ENLARGED PLAN - OR 2F REFLECTED CEILING DEMO PLAN @ HAC 2F-232

1/4" = 1'-0"C1 REFLECTED CEILING DEMO PLAN @ MECH CHASE

SECOND LEVEL F.F.E. = 414.00'

SECOND LEVEL F.F.E. = 414.00'

EXISTING ACT & GRID SYSTEM – TO BE CAREFULLY DISASSEMBLED, REMOVED, STORED, AND

PROTECTED BY GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF

NEW BUILDING SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR

REPLACING/REPAIRING ANY DAMAGED ACT AND/OR GRID AT NO EXPENSE TO

CLIENT/VA/GOVERNMENT. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY GENERAL CONTRACTOR

DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS ABOVE CEILING;

GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY DAMAGED LIGHTING

AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH ELECTRICAL SHEETS FOR

FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN

DRAWINGS.

EXISTING SUPPLY/RETURN DIFFUSERS – TO BE REMOVED, STORED, AND PROTECTED BY

GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING

SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING

ANY DAMAGED SUPPLY/RETURN DIFFUSERS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT;

COORDINATE WITH MECHANICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL

THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING EMERGENCY EGRESS LIGHTING – TO BE REMOVED, STORED, AND PROTECTED BY

GENERAL CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING

SYSTEMS ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING

ANY DAMAGED EMERGENCY EGRESS LIGHTING AT NO EXPENSE TO CLIENT/VA/GOVERNMENT;

COORDINATE WITH ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL

THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

BREAK GRID AT NEAREST JOINT TO ESTABLISH DEMO AREA AND EXISTING ACT & GRID, TO

REMAIN.

EXISTING GYP CEILING, TO BE REMOVED; COORDINATE W/ MEP DRAWINGS FOR SCOPE OF

DEMP FOR LIGHTING, HVAC, AND ALL OTHER CEILING MOUNTED SYTEMS.

EXISTING SAFETY SENSOR - TO BE REMOVED, STORED, AND PROTECTED BY GENERAL

CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS

ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY

DAMAGED SAFETY SENSORS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH

ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK

IDENTIFIED IN DRAWINGS.

EXISTING PAINTED GYP CEILING/BULKHEAD, TO REMAIN; PROTECT DURING DEMO AND NEW

CONSTRUCTION.

EXISTING PATIENT PRIVACY CURTAIN/TRACK - TO REMAIN; GENERAL CONTRACTOR TO

PROTECT DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS.

TYPICAL THROUGHOUT AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING SPRINKLER HEAD - TO REMAIN; GENERAL CONTRACTOR TO PROTECT DURING

DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS. TYPICAL THROUGHOUT

AREA OF WORK IDENTIFIED IN DRAWINGS.

EXISTING CURTAIN TRACK SYSTEM - TO BE PROTECTED DURING ALL PHASES OF

CONSTRUCTION.

RELOCATE EXISTING SPRINKLER HEAD AS NECESSARY.

CUT OPENING FOR NEW RETURN AIR DUCT; COORDINATE W/MEP DRAWINGS AND ADJUST

OPENING LOCATION TO ACCOMMODATE EXISTING STRUCTURAL ELEMENTS.

EXISTING EXHAUST HOOD VENT PIPE (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO

CONFIRM SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.

EXISTING COPPER PIPES (ABOVE CEILING); COORDINATE W/MEP DRAWINGS TO CONFIRM

SCOPE OF DEMOLITION / RELOCATION TO ACCOMMODATE NEW RETURN AIR DUCT.

EXISTING EXHAUST LOUVER, TO REMAIN; PROTECT DURING DEMO AND NEW CONSTRUCTION.

EXISTING FRESH AIR INTAKE LOUVER, TO REMAIN; PROTECT DURING DEMO AND NEW

CONSTRUCTION.

PROFILE OF EXISTING AHU BELOW; COORDINATE W/MEP DRAWINGS FOR SCOPE OF DEMO

AND/OR NEW CONSTRUCTION.

EXISTING ACT & GRID SYSTEM, TO REMAIN; PROTECT DURING DEMO AND NEW CONSTRUCTION,

TYP THROUGHHOUT - UNLESS NOTED OTHERWISE.

EXISTING SMOKE DETECTOR - TO BE REMOVED, STORED, AND PROTECTED BY GENERAL

CONTRACTOR DURING DEMOLITION AND NEW CONSTRUCTION OF NEW BUILDING SYSTEMS

ABOVE CEILING; GENERAL CONTRACTOR RESPONSIBLE FOR REPLACING/REPAIRING ANY

DAMAGED SMOKE DECTORS AT NO EXPENSE TO CLIENT/VA/GOVERNMENT; COORDINATE WITH

ELECTRICAL SHEETS FOR FULL SCOPE OF DEMOLITION. TYPICAL THROUGHOUT AREA OF WORK

IDENTIFIED IN DRAWINGS.

D1

D2

D3

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D20

KEYED RCP DEMOLITION NOTES

KEYED NOTED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .