This federal solicitation requests architectural and engineering services for a project to design tuckpointing and weatherproofing of the building envelope for the main hospital at the Overton Brooks VA Medical Center in Shreveport, Louisiana. Key details include the required scope of work such as cleaning, evaluating, and repairing brick, mortar, windows, and other exterior elements to prevent water penetration; surveying the building to identify all areas needing repair; and designing to a LEED Silver level. The solicitation is set aside for service-disabled veteran-owned small businesses. Responses are due by August 22, 2019 and selection criteria include professional qualifications, experience, past performance, location, and reputation. The contract term is 270 days from notice to proceed. Construction period services are also required.

36C25619R0105 00003 36C25619R0105 00003.docx

View the file

Other files

File Type Posted
36C25619R0105-00003000.docx DOCX document
36C25619R0105-00002000.docx DOCX document
36C25619R0105-00002000.docx DOCX document
36C25619R0105-00001000.docx DOCX document
36C25619R0105-00001001.pdf PDF
36C25619R0105-00001002.pdf PDF
36C25619R0105-00001002.pdf PDF
36C25619R0105-00001001.pdf PDF
36C25619R0105-00001000.docx DOCX document
36C25619R0105-000.docx DOCX document
36C25619R0105-001.pdf PDF
36C25619R0105-000.docx DOCX document
36C25619R0105-001.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25619R0105

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00003 07-30-2019 667-19-101 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi

MS 39531

Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 To all Offerors/Bidders

36C25619R0105 07-10-2019

X X X

SEE PAGE TWO

Cynthia L. Kinsman Contracting Officer

NCO1615L2-4313

Amendment A00003 667-19-101 A/E Design Tuckpoint Building 1, Main Hospital

The purpose of this amendment is to clarify the following information located in Section 5. PROJECT INFORMATION:

FROM: FIRE PROTECTION ENGINEER REVIEW & CERTIFICATION

The A/E shall have the design plans and specifications reviewed by a registered Fire Protection Engineer (FPE) to ensure the design proceeds in accordance with Life Safety Code (LSC) and applicable National Fire Protection Association (NFPA) codes. The FPE’s review comments shall be provided along with each design submittal starting with the 50% Design Development drawings. With the Final 100% Construction Documents submittal, provide a FINAL certification letter from a registered FPE stating the FINAL plans and specifications are in compliance with the current LSC and NFPA codes.

TO: FIRE PROTECTION ENGINEER REVIEW & CERTIFICATION

Not required.

FROM: LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED)

The project will be designed to the LEED Silver level.

TO: LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED)

Not required.

FROM: COMMISSIONING

Will be required as applicable to the project.

TO: COMMISSIONING

Not required.