This document summarizes a federal solicitation for architectural and engineering services. The solicitation seeks qualified firms to design weatherproofing improvements to the main hospital building at the Overton Brooks VA Medical Center in Shreveport, Louisiana. Interested firms must submit Standard Form 330 packages by August 28, 2019 demonstrating their qualifications in areas such as project experience, past performance, technical competence, and location within 500 miles of the project site. The project is set aside for service-disabled veteran-owned small businesses. Design costs must not exceed 6% of the estimated $2-5 million construction budget. The selected firm will provide design services over 270 days and construction period support, with the project aimed at LEED Silver certification.
36C25619R0105 00001 Solicitation - 36C25619R0105.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25619R0105-00003000.docx | DOCX document | |
| 36C25619R0105-00003000.docx | DOCX document | |
| 36C25619R0105-00002000.docx | DOCX document | |
| 36C25619R0105-00002000.docx | DOCX document | |
| 36C25619R0105-00001000.docx | DOCX document | |
| 36C25619R0105-00001001.pdf | ||
| 36C25619R0105-00001002.pdf | ||
| 36C25619R0105-00001002.pdf | ||
| 36C25619R0105-00001000.docx | DOCX document | |
| 36C25619R0105-000.docx | DOCX document | |
| 36C25619R0105-001.pdf | ||
| 36C25619R0105-000.docx | DOCX document | |
| 36C25619R0105-001.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Combined Synopsis/Solicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION * See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Combined Synopsis/Solicitation Notice Rev. March 2010
C
Project 667-19-101; Tuckpoint Building 1, Main Hospital
39531
36C25619R0105
08-28-2019
N
541330
Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531
Charles Powell Contract Specialist
Overton Brooks VA Medical Center 510 E. Stoner Avenue Shreveport, LA
71101
United States charles.powell2@va.gov
Solicitation No. 36C25619R0105
1. CONTRACT INFORMATION: General. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) 36.6. All submissions will be evaluated in accordance with the evaluation criteria.
The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work.
The NAICS Code for this acquisition is 541330 Engineering Services and the applicable Small Business Size Standard is $15M. The area of consideration is RESTRICTED to a 500 mile driving radius of the Overton Brooks VA Medical Center, 510 E. Stoner Avenue, Shreveport, LA 71101-4295 in which either the A/E firm’s Primary or established Auxiliary/Satellite office must be located. Note: The 500 mile driving radius will be measured by one or more of the nationally recognized commercial free on-line mapping services from the Primary or established Auxiliary/Satellite Office Address to the above VA address (shortest driving distance option).
In-order to use the address of an already established Auxiliary/Satellite Office, the A/E Firm must have employees of their firm who are currently (before and at the time of SF330 submission) physically located at the Auxiliary/Satellite Office and are on the A/E’s Payroll—not employees of an actual or proposed subcontractor or on the payroll of an actual or proposed subcontractor.
a. Contract Award Procedure: The proposed A/E services will be obtained by a
Negotiated Firm-Fixed Price Contract. Interested parties shall ensure current Licensing and have a current registration in the System for Award Management (SAM) database at https://www.sam.gov and the Vendor Information Pages database at http://www.va.gov/osdbu well as have submitted the current cycle VETS-4212 Report http://www.dol.gov/vets/programs/fcp/main.htm (for contracts in the amount of $150,000 or more). The SAM clause at FAR 52.204-7 changed effective (Oct 2018) and now requires that offerors be registered in the SAM database at the time an offer is submitted and at the time of contract award. According to FAR 52.204-7, “registered” means, among other things, that the record in SAM be marked as “Active”.
Therefore, failure of a proposed SDVOSB to be registered at the time the SF 330 is submitted and at the time of contract award shall result in elimination from consideration as a proposed contractor.
b. SDVOSB Requirements: In accordance with VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside, a service disabled veteran-owned small business concern agrees that, in the performance of the contract, at least 50 percent of the cost of personnel for contract performance will be spent for employees of the https://www.sam.gov/ http://www.va.gov/osdbu http://www.dol.gov/vets/programs/fcp/main.htm concern or employees of other service-disabled veteran-owned small business concerns.
c. Design Costs: All offerors are advised that in accordance with VAAR 836.606-73(a) the total cost of the architect or engineer services contracted for must not exceed 6 percent of the estimated cost of the construction project plus any fees for related services and activities. Additionally, FAR 52.236-22 Design Within Funding Limitations, will be applicable to this procurement action. Design limitation costs will be provided to the most highly rated AE firm selected to complete the design.
The magnitude for construction (not design) of this project is between $2,000,000 and $5,000,000.
2. SELECTION CRITERIA: The selection criteria for this acquisition will be in accordance with FAR 36.602-1 and VAAR 836.602-1 and are listed below in descending order of importance. The completed SF 330 will be evaluated by the Overton Brooks VA Medical Center Evaluation Board in accordance with FAR 36.602-5(a) Short Selection Process for Contracts Not to Exceed the Simplified Acquisition Threshold and the selection report shall serve as the final selection list which will be provided directly to the Contracting Officer.
(1) Professional qualifications necessary for satisfactory performance of required services;
(2) Specialized experience and technical competence in the type of work required;
(3) Capacity to accomplish the work in the required time;
(4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules;
(5) Location in the general geographical area of the project and knowledge of the locality of the project (500 miles);
(6) Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness.
(7) Record of significant claims against the firm because of improper or incomplete architectural and engineering services.
(8) Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team.
3. SUBMITTAL REQUIREMENT: This project is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under VAAR 852.219-10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (July 2016-deviation). All original Standard Form (SF) 330 packages shall be submitted to:
(a) All original Standard Form (SF) 330 packages and Narrative Information shall be submitted as four (4) hard copies [as mentioned below in paragraph d] to:
Overton Brooks VA Medical Center
NCO 16 - ATTN: Kaitlyn West RE: AE Solicitation - 36C25619R0105 1800 Buckner Street, Suite C200, Rm 18 Shreveport, LA 71101-4295
(b) Only one (1) CD of the SF330 full submittal package as a single pdf file [as mentioned below in paragraph d] shall be submitted to:
Gulf Coast Veterans Health Care System NCO 16 - ATTN: Charles Powell RE: AE Solicitation - 36C25619R0105 400 Veterans Ave, Bldg. T102, Rm A112 Biloxi, MS 39531-4210
(c) All SF 330 submissions shall be clearly marked with the subject line displaying the Solicitation Number 36C25619R0105. The SF 330 form may be downloaded from http://www.gsa.gov/portal/forms/type/SF. Completed SF 330’s shall include the primary firms, subcontractor firms, and any consultants expected to be used on the project.
IMPORTANT: All submissions shall be in black and white (no color of any type) and shall be on loose leafed pages. NO color submissions and NO binders of any type.
(d) Firms that meet the requirements listed in this announcement are invited to submit four
(4) hard copies and one (1) pdf copy on CD of the completed SF 330 including Parts I and II as described herein, to the above addresses no later than 4:00 P.M. (CST) on Wednesday – August 28, 2019.
FAX AND/OR E-MAIL SUBMISSIONS WILL NOT BE ACCEPTED. Late proposal rules found in FAR 15.208 will be followed for late submittals.
(e) Interested firms shall address each of the Eight (8) Selection Criteria in their SF 330’s and additional documents/submittals.
4. THIS IS NOT A REQUEST FOR PROPOSAL. THERE ARE NO SOLICITATION
DOCUMENTS AVAILABLE. This is a request for SF 330’s Architect/Engineer Qualifications packages only. Any requests for a solicitation will not receive a response. This requirement is subject to Availability of Funds.
5. PROJECT INFORMATION:
A/E Design Tuckpoint Building 1, Main Hospital Project No. 667-19-101
Overton Brooks VA Medical Center 510 E. Stoner Avenue
Shreveport, LA 71101 http://www.gsa.gov/portal/forms/type/SF
A. General Information
A 1.0 Project Background, Description and Scope of Work
Overton Brooks VAMC has a requirement to design the weatherproofing of the building envelope of the Main Hospital., Bldg. #1 (basement thru the 12th floor). All brick faced elevations, cap stones, window and decorative sills, underside of cantilevered roofs, metal trim and louvers shall be cleaned and evaluated for repairs to preclude any water penetration of the building envelope.
Weatherproofing shall address but not be limited to: remove and replace loose/deteriorated mortar (tuckpoint); remove and replace broken/spalled bricks and /or cap stones; remove/repair rusted reinforcing/support metal products; replace/redesign flashing, terminal strips and facia; remove and replace sealant around the frames for doors, windows, louvers, fans etc.; constructing expansion/construction joints in existing walls; installation of weeps in existing walls; install new flashing into existing walls in accordance best practices for flashing in brick veneer walls; remove and replace old sealant at horizontal and vertical cast in place and brick wall intersections; clean (sandblast if needed) and paint all exterior attachments (conduits, downspouts, lintels, stairs, hand/guard rails, mounting/support structures); paint/cementitious coat the wall area behind the old cooling tower on the 10th floor; repair all brick penetrations (screw holes etc.); repair/replace damaged brick in the basement level wall, South Wing (facing Lot 8); Construct a 40 inch high brick veneer wall along the Southside of the East Wing (Ground Level) and back fill to drain away from the building; remove and replace brick screen wall on North side of the West Wing (around HVAC); remove and replace low concrete area between MRI entrance and the North Stair Tower;
coat sidewalk (water proof joint) along the North side of the new ER; create a way to keep water away/ out of the surface joints at the ER entrance (ie. Remove/replace joint sealant, direct water away from the area.) Regrade sodded, flower beds, and mulched areas adjacent to the building to make water flow away from the building; install splash blocks at downspouts.
The mortar color for tuckpointing shall match the existing/adjacent mortar. Mortar for brick repair shall match the brick color. Sealant color shall match the dominant surrounding color.
All surface areas adjacent to the base of the building shall be graded to slope away and remove water from the base of the building.
The Design Team shall select and design compatible materials and systems. Provide proper detailing of similar and dissimilar material junctions and terminations. Use specific products that can function together to provide the ability of the composite envelope systems to function together during weathering cycles.
Inspect these details during construction
PERIOD OF PERFORMANCE
The delivery date for this contract shall be 270 days from Notice to Proceed. Performance time to include VA review of each submission as identified.
LOCATION
Overton Brooks Veterans Affairs Medical Center 510 E. Stoner Ave.
Shreveport, LA 71101
TERMS OF THE SOLICITION
A. The term “responsibility”, used in the instructions that follow, included architectural and engineering design, cost, schedule and construction responsibility for completion of this project in accordance with the documents of this RFP. It is the responsibility of the Design Offeror of A/E to provide complete Design Documents (drawings and specifications) for a fully functional project Omissions in this RFP and Technical Requirements do not relieve the Design Offeror from providing a complete and fully functioning project as outlined.
B. The terms “Design Team”, “Design Offeror”, or “A/E” refers to the successful design team. The design team shall consist of a CVE verified Service-Disabled Veteran-Owned Small Business architectural/engineering firm and all associated consultants and subcontractors.
C. The term “Design Team” or “engineer” refers to registered Architects and Engineering professionals licensed/registered.
D. The terms “work and project” refers to the all site investigation, site survey, calculations, testing and design for documents to construct the subject project.
E. The term “VA” refers to the United States Department of Veterans Affairs and the term ”OBVAMC” refers to the Overton Brooks Veterans Affairs Medical Center in Shreveport, LA.
F. The “VAMC Coordinator” or “COR” (Contracting Officer’s Representative) for this project is; Archie Lanham at 318-990-4721, archie.lanham@va.gov
G. The “CO” (Contracting Officer) for this project is TBD.
QUALITY ASSURANCE/QUALITY CONTROL (QA/QC)
The Design Offeror or A/E shall develop, execute and demonstrate that the project plans and specifications have gone through a rigorous review and coordination effort. The A/E shall provide an outline of the actions the firm will take during the design process to ensure a quality finished design is achieved.
COST ESTIMATE
A detailed estimate of construction cost (using RS Means, Cost Works) and Market Study/Survey shall be provided with each design submission. Emphasis shall be placed on cost and scope management. The design shall be within the project construction budget and be consistent with mailto:archie.lanham@va.gov the identified project scope. The development of construction documents by the Design Team shall include deductive alternates, up to 20% of the project cost estimate.
DRAWINGS
This project will utilize AutoCAD, version 2017 and BIM. All VA design guides and requirements can be found online at: http://www.cfm.gov/TIL/. Where conflicts occur between VA standards and model codes, the most stringent shall govern.
SITE AND TOPOGRAPHY SURVEY
The A/E shall perform a survey of exterior and interior wall surfaces and connections (brick, caps, sills, doors, window and roof joints/connections, etc.). The Design Team shall investigate this building and propose repair(s) to make the building envelope water and weather tight, along with the pro’s and con’s. VA leadership will make a final selection (areas and repairs thereto). The A/E shall provide the necessary professional services and equipment to conduct a complete site (Bldg.
#1) survey, per attachment, to identify all areas needing repair/replacement on this building. This cost of this shall be included in the A/E’s cost proposal.
GEOTECHNICAL SURVEY
Not Used
UTILITY SURVEY
Not used
FIRE PROTECTION ENGINEER REVIEW & CERTIFICATION
The A/E shall have the design plans and specifications reviewed by a registered Fire Protection Engineer (FPE) to ensure the design proceeds in accordance with Life Safety Code (LSC) and applicable National Fire Protection Association (NFPA) codes. The FPE’s review comments shall be provided along with each design submittal starting with the 50% Design Development drawings. With the Final 100% Construction Documents submittal, provide a FINAL certification letter from a registered FPE stating the FINAL plans and specifications are in compliance with the current LSC and NFPA codes.
SEISMIC DESIGN
In accordance with the VA’s manual for Seismic Design Requirements (H-18-8), OBVAMC Shreveport, LA seismicity is identified as being “Low” (per Table 4: Spectral Response Accelerations at VA Facilities, pg. 23); therefore, seismic design is not required.
PHYSICAL SECURITY & BLAST DESIGN
The design shall be in accordance with the Physical Security Design Manual for VA Facilities, Life-Safety Protected Facilities.
http://www.cfm.gov/TIL/
HANDICAP ACCESSIBILITY
The design will be required to comply with the Uniform Federal Accessibility Standards (UFAS), the Americans with Disabilities Act (ADA) and PG-18-13 (Barrier Free Design Guide) in all areas.
LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED)
The project will be designed to the LEED Silver level.
COMMISSIONING
Will be required as applicable to the project.
GOVERNMENT FURNISHED INFORMATION
The following is a list of government furnished information found on the VA’s Technical Information Library website (http://www.cfm.va.gov/TIL) to be used for this project, as applicable:
PG-18-1 Master Construction Specifications
PG-18-3 Design and Construction Procedures
PG-18-4 Standard Details and CAD Standards
PG-18-5 Equipment Guide List
H-18-8 Seismic Design Handbook
PG-18-9 Space Planning Criteria
PG-18-10 Design Manuals (by discipline)
PG-18-12 Design Guides (graphical, by function)
PG-18-13 Barrier Free Design Guides
PG-18-14 Room Finishes, Door and Hardware Schedules
PG-18-15 Minimum Requirements for A/E Submissions (Included as Attachment A)
PG-18-17 Environmental Compliance Manual
H-7545 VA Cultural Resource Management Physical Security Design Manual for VA Facilities, Life-Safety Protected.
DESIGN SUBMISSIONS/DELIVERABLES:
Will be in accordance with the A/E Submission Instructions for Minor and NRM Construction Programs; PG-18-15, Volume C. SEE ATTACHMENT A.
http://www.cfm.va.gov/TIL
CONSTRUCTION PERIOD SERVICES (CPS): AE shall provide full post design services construction period service IAW the Special Provisions of this contract.
A. PRE-AWARD: CPS’s to include assistance with questions, request for information (RFI’s), meeting conference calls, clarifications and addendums during the construction solicitation phase.
B. POST-AWARD: CPS’s also include full support through the construction phase to include but not limited to, assisting with questions, clarifications, inspections, reviewing and responding to RFI’s and review/coordination of contract modifications/change orders.
Designing and estimating of design omissions.
C. POST-AWARD SITE VISITS: CPS’s shall also include a minimum of 8 Site Visits during the construction phase of the project. Type and discipline of site visit shall be determined at the time of need by the COR.
D. ASBUILTS: AE shall also incorporate contractor’s as-builts/redline drawings on AutoCAD (2017) binded & BIM and provide both electronic (two CD’s clearly labeled) and hard copy sets. Hard copy sets of as-built drawings shall consist of two 22”x34” size sets, five 17”x22” size sets and two 11”x17” size sets.
See attached document: Attachment A, Project 667-19-101.
End of Document
File details come from the government source that posted it. Updated .