About this file

36C25619R0040 SOW 564-14-133 Revised.pdf

View the file

Other files

File Type Posted
36C25619C0148-000.docx DOCX document
36C25619R0040-0002003.pdf PDF
36C25619R0040-0002000.docx DOCX document
36C25619R0040-0002001.docx DOCX document
36C25619R0040-0002002.pdf PDF
36C25619R0040-0001014.pdf PDF
36C25619R0040-0001012.pdf PDF
36C25619R0040-0001008.pdf PDF
36C25619R0040-0001011.pdf PDF
36C25619R0040-0001013.docx DOCX document
36C25619R0040-0001009.pdf PDF
36C25619R0040-0001007.docx DOCX document
36C25619R0040-0001010.pdf PDF
36C25619R0040-015.docx DOCX document
36C25619R0040-010.docx DOCX document
36C25619R0040-011.pdf PDF
36C25619R0040-012.pdf PDF
36C25619R0040-013.pdf PDF
36C25619R0040-000.docx DOCX document
36C25619R0040-000.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work for

Upgrade Air Conditioning and

Renovate Auditorium Bldg. 3 at

Veterans Healthcare System of the

Ozarks

Fayetteville, AR

Project No.: 564-17-133

Architect

330 West Gray, Suite 100 Norman, OK 73069

Phone: (866) 226-8071 Fax: (866) 226-9969

Reissued: 11 JAN 19

Contents

PROJECT DESCRIPTION

ARCHITECTURAL

STRUCTURAL

MECHANICAL

ELECTRICAL

APPENDIX A – MECHANICAL LOAD CALCULATIONS (OPTION A)

APPENDIX B – MECHANICAL LOAD CALCULATIONS (OPTION B)

PROJECT DESCRIPTION

The project consists of addressing Facility Condition Assessment Deficiencies throughout the approximately 17,000 sf facility. Deficiencies that will be listed as deduct alternates are italicized. These include:

- Total replacement of HVAC system.

- Replacement of all windows and select doors

- Replacement of all suspended ceilings

- Renovation of auditorium finishes

- Lead paint abatement of mechanical room walls

- Replacement of all interior signage

- Correction of ABAAS compliance issues in restrooms

- Installation of areas of refuge

- Installation of accessible and panic hardware at select doors

- Installation of chair lift access to stage and 3rd floor

- Installation of continuous handrails in all stairwells

- Correction of fire alarm code violations

- Replacement of select light fixtures

- Replacement of main distribution panel and a subpanel

- Total replacement of plumbing and water heater

- Correction of telecom cabling wall penetration issues

Additionally, the existing fire sprinkler system that only serves the stage will be expanded to cover the entire building.

ARCHITECTURAL

The existing windows are single glazed and will be replaced with new insulated units. Profiles are to match those of the existing so that they retain their historic character, but they will not be operable. This is achieved by utilizing an aluminum simulated hung window. Metal security screens will be added to all 1st floor windows in the OIT area (12 total).

The main east entry door pair and frame will be removed and replaced with insulated aluminum storefront with an anodized aluminum finish. The 1st floor door and frame on the left side of the north elevation will be removed and replaced with an insulated prefinished hollow metal door and frame. The 2nd floor door pair and frame on the north elevation that lead to the stage rear will be removed and replaced with an insulated prefinished hollow metal door and frame. They are not required for egress but facilitate transport of large equipment. The west exterior egress door, frame, transom and sidelites will be replaced with an insulated aluminum system that will match the configuration and finish of the existing. The 1st and 2nd floor door pairs, frames and transoms on the south elevation will be removed and replaced with an insulated aluminum system that will match the configuration and finish of the existing.

All existing acoustical ceiling tile and grid will be replaced with new of same finish (white, lay-in, 2x4).

The auditorium floor and wall finishes will all be updated. The wood floor will be sanded and refinished. The plaster walls and wood trim will be repaired where necessary and will be repainted to match existing colors. The historic ceiling tile is in good condition and will remain.

Lead based paint on door and frame of mechanical room will be abated. Door and frame will be repainted.

All interior signage (room identification and wayfinding) will be removed and replaced with ADA compliant signage.

All 5 restrooms (2 on the 1st floor, 2 on the 2nd floor and 1 on the 3rd floor) have accessibility violations that need to be corrected. The men’s toilet on the 2nd floor will require relocating one water closet. The rest of the violations will be addressed by adding grab bars and changing mounting heights of fixtures or accessories.

2 areas of refuge, including 2-way communication devices, will be provided in the west stair. 1 will be at the 3rd floor landing and the other will be in the NE corner of the 2nd floor landing.

29 interior doors will have door knobs replaced with accessible lever hardware. Both Doors leading from the auditorium to stairs will be retrofitted with panic hardware. Deadbolts will be removed from all 3 OIT egress doors.

A vertical platform lift will be installed to provide accessibility to the stage from the auditorium floor. The lift will be located at the east end of the stage. A compact stair lift will be installed on the west stair to provide accessibility from the 2nd floor to the 3rd floor.

A new continuous painted metal inside handrail will be provided in all 3 stairs.

STRUCTURAL

The primary structural scope for the project is to develop and issue necessary structural details as required to reinforce, retrofit, or modify the existing structure to accommodate support of new mechanical units and required penetrations in existing floor and roof framing for routing of new mechanical utilities.

Original construction documents for the existing facility have been provided and are being utilized for coordination in developing reinforcement details as necessary. The primary construction of the building consists of wood roof sheathing on 2x roof framing at 16” on center.

The wood framing is supported by cast-in-place concrete slab above the third floor on the north and south areas and steel trusses spanning over the auditorium area. All elevated floors are cast-in-place concrete system spanning between concrete beams and columns. A partial basement is present on the north end of the building with the remainder covered by a crawlspace. All columns and exterior walls bear on shallow foundations.

General strategies for dealing with new floor openings and new unit support are as follows:

1. Minimize opening size so that it fits within the area between the ribs of the structural slab. This can typically be done with no additional reinforcement required.

2. If opening size is large enough that it requires demolition of a single concrete rib, try to locate that opening at the end of the span so that the load can be distributed to the adjacent ribs and avoid reinforcement.

3. If multiple concrete ribs or beams are required to be demolished, install supplementary structural steel beneath the existing concrete to provide support around the perimeter of the area being demolished.

4. Small penetrations through the roof deck can be accommodated by reinforcing adjacent, full span wood members with additional wood framing.

5. Provide supplementary steel members to support any existing concrete structure as required if it is determined that the existing floor capacity is exceeded with the installation of a new mechanical unit.

GENERAL DESIGN CRITERIA

• Applicable Code:

2015 International Building Code

• Structure Classification:

Category III

• Wind Loading Criteria (Hardened Area):

Basic Wind Speed: 120 mph

• Snow Loading Criteria:

Ground Snow Load: 10 psf Importance Factor: 1.1 Snow Exposure Factor: 1.0

• Seismic Loading Criteria:

0.2 Sec. Spectral Response Accel. (Ss): Ss=0.170

1.0 Sec. Spectral Response Accel. (S1): S1=0.093

Importance Factor: 1.25

• Material Specifications:

Concrete:

Walls: 4000 psi Slabs: 3500 psi Foundations: 3000 psi

Structural Steel:

W-Shape Beams: A992 Fy=50 ksi Rectangular and Square HSS: A500 Fy=46 ksi Misc. Steel: A36 Fy=36 ksi

MECHANICAL

Demolition

The entirety of the existing mechanical equipment, ductwork, and piping will be removed in the demolition phase, throughout the building.

Fire Protection

The existing fire protection will be removed back to existing riser and expanded to entire building. Stage will be classified Ordinary Group 2 and no deluge system will be required for proscenium arch as stage is not over 50’-0” in height. Fire protection will be designed per NFPA 13.

Plumbing

The existing plumbing will be replaced in its entirety.

The domestic water service and sanitary service will be supplied from the city utility. It is anticipated that the existing 2” diameter water service will supply the building. It is anticipated that the existing 4” diameter sanitary service will serve the building.

Domestic water piping will be specified as copper piping. Sanitary piping will be cast iron no‐hub drain waste and vent (DWV). The existing water heater will be replaced with a closed combustion high efficiency water heater. Water will be stored in the tanks at 140°F and will be mixed down to 130°F through a ASSE 1017 tempering valve prior to distribution to the rest of the building. Each fixture will have a ASSE 1070 tempering valve to reduce water temperature to 115°F.

New plumbing fixtures will be installed throughout the facility in accordance with the architectural drawings.

• Water closets: Floor mount w/ flush valve.

• Urinals: Wall mount with flush valve.

• Lavatories: Wall mount with manual wrist blade faucets.

• Water Cooler: Single/dual height with bottle filler.

Current design does not include Legionella design requirements. Piping is just being replaced in kind. This will need to be discussed if we will need to include some/all items in this project.

Below are some of the major VA design standards related to Legionella.

• Cold water recirculation with the possibility of a chiller to cool domestic cold water below 67 degrees.

• Possibility of a shock chlorination system.

• Very short runouts/dead legs requiring many hot and cold recirculation connections.

• Capability of bypassing the mixing valve to allow for 170-degree high temp flushing of hot and cold-water systems.

• Many BAS points to monitor pressures, temperatures and water quality.

Heating and Air-Conditioning

The building’s heating and cooling load will be met using a Fan Coil Unit System. The new system includes a 100% Outside Air (OA) Air Handling Unit, Steam to Hot Water Heat Exchanger, Chiller and individual Fan Coil Units throughout the building.

There is an existing steam main that currently serves steam convectors throughout the building.

All steam convectors and associated steam piping is going to be removed and replaced with new hot water convectors and piping. The hot water is going to be provided through Steam to Hot Water Heat Exchangers (HX) located in the mechanical room. VA design requires 100% redundancy for Heat Exchangers (HX) Hot Water supply pumps will circulate heating water throughout the building to new convectors and hot water coils associated with each Fan Coil Unit (FCU). The estimated heating load is approximately 500 MBH.

A new Chiller is going to be located on the north side of the building, on grade. Chilled water pumps will be in the mechanical room and distribute chilled water throughout the building to the cooling coils associated with each Fan Coil Unit (FCU). The total estimated cooling load is approximately 55 tons.

The Fan Coil Units (FCU) will be installed above the ceiling and supply ventilation to individual rooms or offices through slot diffusers on the exterior and 2’x2’ lay-in diffusers on the interior.

Return air is ducted back to the FCU and Outside Air (OA) is introduced to the return plenum of the FCU. Fan Coil Units (FCU) will also be used to serve the Auditorium and Stage areas.

FCU’s serving the stage area will be exposed above the stage. The Auditorium and Balcony area FCU’s will be located in the attic and supplied through the ceiling.

The existing Kitchen exhaust hood will remain. A secondary exhaust is required to maintain a negative pressure to adjoining spaces at all times. It appears some type existing exhaust grille is located in the ceiling, but that will be replaced.

Ventilation

The 100% Outside Air (OA) Air Handling Unit provides ventilation to the Fan Coil Units (FCU) located throughout the building. Preconditioned air is supplied through the AHU and distributed to each Fan Coil Unit providing Outside Air Ventilation to the entire building. Building pressure is maintained through general exhaust (Kitchens and Toilets) and relief hoods.

Design Notes:

The existing building has limited interior space for mechanical equipment, both dedicated space and above the ceilings. The Fan Coil Unit System is a singular system all around. It has an 100% OA AHU, a Chiller, a heating system and a distribution system. The room air is circulated through the FCU and tempered to meet space design load. The OA is supplied directly to the FCU’s and is relieved from the building. No return ductwork, return fan or relief hood/louver is required.

Humidifying and Dehumidification Systems

No humidifying or dehumidification systems are planned for this facility.

Controls

A microprocessor based direct digital control (DDC) system will be specified for the facility. The control system will be performance specified by the engineer per the specifications. Each FCU, VAV or convector will feature its own wall-mounted thermostat and locking cover. The main central controller will be located in the VA Building Automation System (BAS) for full control over all indoor and outdoor units, featuring override functions of temperature, fan settings, unit status and monitoring.

Design Parameters

• VA HVAC Design Manual 2017

• ASHRAE/IES Standard 62.1

• International Mechanical Code

• International Fuel Gas Code

• International Plumbing Code

• International Building Code

• NFPA 13

• SMACNA

• National Electrical Code

ELECTRICAL

Electrical Distribution

ALL existing electrical panels will be replaced, with exception of Panel P. This means the following panels are to be replaced: A,B,C,D,E,F,G.

Panel E will be relocated entirely.

The 800A main switchboard will be replaced. Any available electrical load info that can be provided would be very helpful to establish a Baseline. Additional mechanical equipment electrical load may be much larger than the mechanical equipment to be removed.

Feeder circuits from the main switchboard to the sub panels will be replaced unless it is necessary to upsize the feed.

Power will be provided to HVAC equipment as required.

Direction will be given to demo existing feeds to HVAC equipment that is being removed.

Site Electrical No 12.5kV electrical work (transformers & switchgear) is part of this project.

The main service shall be verified to be 800A rated, but not replaced unless it is necessary to upsize the service. If this is required, the main service feed would no longer be below slab, and may require an external main disconnect switch.

Lighting

T8 fluorescent Fixtures in suspended ceilings will be replaced with LED fixtures. The majority are 2X4 fixtures, with fewer than 10 2X2 fluorescent lay in grid fixtures.

Wireless dimming from wall switch to fixtures will be specified, except in mechanical / electrical rooms.

Occupancy sensor will be specified for individual offices & restrooms where lighting/ceiling grid placement occurring.

Older period chandeliers are incandescent lamps and will be relamped with LED, as possible.

Exact model number/part number needs to be determined to consider feasibility of a relamp.

Most cost-effective option may be to replace with LED fixture that fits the style of the space (3500K color to mimic incandescent, high CRI of 90+). LED fixture can also possibly incorporate dimming.

Wall mounted sconces (six total) will be replaces with LED equivalent.

Other fixtures not on a suspended grid ceiling, exit signs, emergency egress lights, theatrical stage lights/controls, exterior lighting will not be replaced.

Fire Alarm

Smoke detectors will be added at the fire alarm control panel, fire alarm NAC Panel at (if present), and at electrical panels.

Follow up necessary to determine if the existing fire alarm notification devices a voice evac function, and if the fire alarm control panel has voice evac function.

Telecommunications/Special Systems

Two stairwell areas (second and third floors) will be considered an area of refuge and receive an emergency phone or ‘call button’ to a continuously manned location.

Further coordination with the VA is requested to determine exactly which areas have IT/DATA conduit fill beyond 40%, and need additional firestopping at fire rated walls.

Feasible solutions for the conduit fill are a combination of more conduits and/or bigger conduits (including spares for future capacity) and transfer cabling to lower fill ratio

JUSTIN MOULTON

FAYETTEVILLE, ARKANSAS

VETERANS ADMINISTRATION

MEP ASSOCIATES

FAN COIL UNIT SYSTEM (OPTION A)Comments

Company

Program user

Building owner

Location

APPENDIX A – MECHANICAL LOAD CALCULATIONS (OPTION A)

FAYETTEVILLE AUDITORIUM - LOAD CALCS

Fort Smith, ArkansasLocation

Latitude

Longitude

35.0 deg

94.0 deg

29.4 ft

in. Hg

Time Zone

Elevation

Barometric pressure

Air density

Air specific heat

Density-specific heat product

Latent heat factor

Enthalpy factor lb/cu ft 0.0747

0.2444

1.0962

4,825.2

4.4844

Btu/lb·°F

Btu/h·cfm·°F

Btu·min/h·cu ft lb·min/hr·cu ft

Summer design dry bulb

Summer design wet bulb

Winter design dry bulb

Summer clearness number

Winter clearness number

Summer ground reflectance

Winter ground reflectance

100.3

75.5

16.0

°F

°F

°F

0.95

0.95

0.20

0.20

TETD-TA1

UATD

Design simulation period

Cooling load methodology

Heating load methodology

January - December

By MEP Associates

C:\TRACE FILES\P14.18.02 VA FAYETTEVILLE A FAN

COIL\VA_FAY_AR.TRC

Dataset name

08:52 PM on 04/12/2018Calculation time

TRACE® 700 version

400Carbon Dioxide Level ppm

6.3.3

SYSTEM SUMMARY

DESIGN COOLING CAPACITIES

By MEP Associates

Alternative 1

Building Airside Systems and Plant Capacities tontontontontontontontontontontontontontonPlant ton tonSystem mo/hr

Peak TotalTotalCoil Coil Load Cond Cond Utility Coil Coil Coil Load Cond Cond UtilityCoil

Of BlockPeakMain Desic Desic Main Desic DesicAux Opt Vent Misc Base Aux Opt Vent Misc Base

TimeStg 1 Stg 2 Stg 1 Stg 2

Peak Plant Loads Block Plant Loads

Unassigned Cooling Loads 52.7 0.0 0.0 0.0 0.0 0.0 0.0 52.7 51.5 0.0 0.0 0.0 0.0 0.0 0.0 51.57/16

52.7 0.0 0.0 0.0 0.0 0.0 0.0 52.7 51.5 0.0 0.0 0.0 0.0 0.0 0.0 51.5System - AHU-1 7/16

Building totals 52.7 0.0 0.0 0.0 0.0 0.0 0.0 52.7 51.5 0.0 0.0 0.0 0.0 0.0 0.0 51.5

Building maximum block load of 51.5 tons occurs in July at hour 16 based on system simulation.

Building peak load is 52.7 tons.

Project Name: TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018FAYETTEVILLE AUDITORIUM - LOAD CALCS Dataset Name: VA_FAY_AR.TRC Design Capacity Quantities report Page 1 of 1

System Checksums By MEP Associates

Fan CoilSystem - AHU-1

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:Sum ofMo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:98 / 76 / 102OADB/WB/HR:Outside Air: 55.0 77.6

Ra Plenum 76.5 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.5 69.5 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 57.1 81.5

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 18,156Roof Cond 4.93-18,767-13,968 4 16,820 4 24,349 6,194

0.00 66,846Glass Solar 0 0 29 109,062 11 66,846 0 10,244Glass/Door Cond -29,298 7.69-29,298 3 9,971 2 10,244 0

AIRFLOWS

HeatingCooling 13,056Wall Cond 10.09-38,439-32,946 4 13,590 3 16,601 3,545

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 16.39 50,044Infiltration -62,431-62,431 7 25,099 8 50,044

0 0MinStop/Rh

39.11 158,345Sub Total ==> -148,935-138,643 47 174,543 27 168,083 9,739

18,101Return 18,124

Internal Loads

4,990 4,966Exhaust

49,608Lights 0.00 0 0 13 49,608 9 56,577 6,969

21 21Rm Exh

157,000People 0.00 0 21 79,250 25

0 0Auxiliary

58,362Misc 0.00 0 0 16 58,362 9 58,362 0

264,970Sub Total ==> 0.00 0 0 50 187,220 43 271,940 6,969

4,105Ceiling Load 0.000-2,899 1 4,010 0 0-4,105 0Ventilation Load 61.48-234,132 0 0 0 30 191,305 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 23.1 23.1

Duct Heat Pkup 0 0 0 1.31 1.31cfm/ft²

8,897Ov/Undr Sizing

0.00 0 0

2 8,897 1 8,897

324.47cfm/ton

Exhaust Heat

-0.58 2,225 -1-8,181

247.46ft²/ton

-29.36 48.49Btu/hr·ft²

311No. People 436,317Grand Total ==> 100.00-380,842-141,542100.00 374,669100.00 632,044 4,422

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 13,034 Main Htg -382.6 17,090 57.1 77.6 52.7 632.0 438.7 17,090 81.5 66.0 72.6 55.0 53.9 61.2Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 5,822 0 0 Wall 7,462 1,218 16

Humidif 0.0 0 0.0 0.0 52.7 632.0Total Opt Vent 0.0 0.0 0.0 0

-382.6Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

0.00 0.00 0.00

-8,181

Supply Air Leakage

Peaks

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

1,055 1,031Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0

0 0.00

0 0.00

17,090

17,090 17,090

3,955

3,955

17,090

17,090 17,090

3,955

3,955

0 157,000 0

Int Door 0

Ext Door 126 0 0

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 1 of 2VA_FAY_AR.TRC

System Checksums

Radiation (Heating Only)System - Heating Only

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:0 / 0Mo/Hr:0 / 0Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:0 / 0 / 0OADB/WB/HR:Outside Air: 0.0 70.0

Ra Plenum 0.0 70.0

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 0.0 70.0 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 70.0 0.0

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 1.16-386-386 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond -5,078 15.23-5,078 0 0 0 0 0

AIRFLOWS

HeatingCooling 0Wall Cond 10.38-3,460-3,460 0 0 0 0 0 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 73.24 0Infiltration -24,417-24,417 0 0 0 0

0 0MinStop/Rh

100.00 0Sub Total ==> -33,340-33,340 0 0 0 0 0

0Return 413

Internal Loads

413 0Exhaust

0Lights 0.00 0 0 0 0 0 0 0

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

0Sub Total ==> 0.00 0 0 0 0 0 0 0

0Ceiling Load 0.000 0 0 0 0 0 0 0Ventilation Load 0.00 0 0 0 0 0 0 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 0.0 0.0

Duct Heat Pkup 0 0 0 0.00 0.00cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

0.00cfm/ton

Exhaust Heat

0.00 0 0 0

0.00ft²/ton

-99.82 0.00Btu/hr·ft²

0No. People 0Grand Total ==> 100.00-33,340-33,340100.00 0100.00 0 0

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 334 Main Htg -33.3 0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 119 0 0 Wall 755 195 26

Humidif 0.0 0 0.0 0.0 0.0 0.0Total Opt Vent 0.0 0.0 0.0 0

-33.3Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

0.00 0.00 0.00

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

413 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0

0 0.00

0 0.00

0 0 0

Int Door 0

Ext Door 70 0 0

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 2 of 2VA_FAY_AR.TRC

Room Checksums

100S - STAIR

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:0 / 0Mo/Hr:0 / 0Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:0 / 0 / 0OADB/WB/HR:Outside Air: 0.0 70.0

Ra Plenum 0.0 70.0

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 0.0 70.0 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 70.0 0.0

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 1.90-386-386 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond -3,242 15.95-3,242 0 0 0 0 0

AIRFLOWS

HeatingCooling 0Wall Cond 10.06-2,043-2,043 0 0 0 0 0 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 72.10 0Infiltration -14,650-14,650 0 0 0 0

0 0MinStop/Rh

100.00 0Sub Total ==> -20,321-20,321 0 0 0 0 0

0Return 248

Internal Loads

248 0Exhaust

0Lights 0.00 0 0 0 0 0 0 0

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

0Sub Total ==> 0.00 0 0 0 0 0 0 0

0Ceiling Load 0.000 0 0 0 0 0 0 0Ventilation Load 0.00 0 0 0 0 0 0 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 0.0 0.0

Duct Heat Pkup 0 0 0 0.00 0.00cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

0.00cfm/ton

Exhaust Heat

0.00 0 0 0

0.00ft²/ton

-170.76 0.00Btu/hr·ft²

0.0No. People 0Grand Total ==> 100.00-20,321-20,321100.00 0100.00 0 0

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 119 Main Htg -20.3 0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 119 0 0 Wall 460 129 28

Humidif 0.0 0 0.0 0.0 0.0 0.0Total Opt Vent 0.0 0.0 0.0 0

-20.3Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

0.00

0.00

0.00 0.00

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

248 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 0 0

Int Door 0

Ext Door 35 0 0

0.0/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 1 of 52VA_FAY_AR.TRC

101 - ITS SECRETARY

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:8 / 16Mo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:98 / 76 / 102OADB/WB/HR:Outside Air: 55.0 86.4

Ra Plenum 76.5 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.5 68.9 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 57.0 81.4

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 554Glass Solar 0 0 15 476 11 554 0 952Glass/Door Cond -2,569 54.87-2,569 34 1,076 19 952 0

AIRFLOWS

HeatingCooling 0Wall Cond 1.47-69 0 0 0 0 19 19 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

56.33 1,506Sub Total ==> -2,638-2,569 49 1,552 30 1,525 19

145Return 145

Internal Loads

33 33Exhaust

470Lights 0.00 0 0 15 470 11 588 118

0 0Rm Exh

450People 0.00 0 8 250 9

0 0Auxiliary

853Misc 0.00 0 0 27 853 17 853 0

1,773Sub Total ==> 0.00 0 0 49 1,573 37 1,891 118

59Ceiling Load 0.000-41 2 59 0 0-59 0Ventilation Load 41.46-1,942 0 0 0 35 1,780 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 22.6 22.6

Duct Heat Pkup 0 0 0 1.18 1.18cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

339.02cfm/ton

Exhaust Heat

-0.81 38 -1-54

287.02ft²/ton

-38.07 41.81Btu/hr·ft²

1.0No. People 3,338Grand Total ==> 100.00-4,683-2,611100.00 3,185100.00 5,142 24

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 123 Main Htg -4.7 145 57.0 86.4 0.4 5.1 4.0 145 81.4 65.3 69.6 55.0 53.6 60.2Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 65 53 82

Humidif 0.0 0 0.0 0.0 0.4 5.1Total Opt Vent 0.0 0.0 0.0 0

-4.7Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-142

0.00

3.03

0.00 0.00

-54

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 450 0

Int Door 0

Ext Door 42 0 0

8.1/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 2 of 52VA_FAY_AR.TRC

102C - CORRIDOR

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:7 / 17Mo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:98 / 76 / 102OADB/WB/HR:Outside Air: 55.0 70.6

Ra Plenum 76.5 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.5 68.9 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 42.5 87.3

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond 0 0.00 0 0 0 0 0 0

AIRFLOWS

HeatingCooling 0Wall Cond 0.00 0 0 0 0 0 0 0 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

0.00 0Sub Total ==> 0 0 0 0 0 0 0

45Return 45

Internal Loads

22 22Exhaust

229Lights 0.00 0 0 23 229 13 287 57

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

229Sub Total ==> 0.00 0 0 23 229 13 287 57

40Ceiling Load 0.000-28 4 43 0 0-40 0Ventilation Load 96.07-1,326 0 0 0 56 1,209 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 50.0 50.0

Duct Heat Pkup 0 0 0 0.53 0.53cfm/ft²

710Ov/Undr Sizing

0.00 0 0

72 710 33 710

247.88cfm/ton

Exhaust Heat

-1.89 26 -2-37

464.77ft²/ton

-16.43 25.82Btu/hr·ft²

0.0No. People 980Grand Total ==> 100.00-1,380-28100.00 982100.00 2,169-20

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 84 Main Htg -1.4 45 42.5 70.6 0.2 2.2 1.5 45 87.3 69.4 81.3 55.0 54.2 62.7Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 -0.6Preheat 42.5 55.0 45 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 0 0 0

Humidif 0.0 0 0.0 0.0 0.2 2.2Total Opt Vent 0.0 0.0 0.0 0

-1.4Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-80

0.00

5.82

0.00 0.00

-37

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 0 0

Int Door 0

Ext Door 0 0 0

0.0/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 3 of 52VA_FAY_AR.TRC

102S - STAIR

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:0 / 0Mo/Hr:0 / 0Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:0 / 0 / 0OADB/WB/HR:Outside Air: 0.0 70.0

Ra Plenum 0.0 70.0

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 0.0 70.0 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 70.0 0.0

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond -1,837 14.11-1,837 0 0 0 0 0

AIRFLOWS

HeatingCooling 0Wall Cond 10.88-1,416-1,416 0 0 0 0 0 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 75.02 0Infiltration -9,767-9,767 0 0 0 0

0 0MinStop/Rh

100.00 0Sub Total ==> -13,020-13,020 0 0 0 0 0

0Return 165

Internal Loads

165 0Exhaust

0Lights 0.00 0 0 0 0 0 0 0

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

0Sub Total ==> 0.00 0 0 0 0 0 0 0

0Ceiling Load 0.000 0 0 0 0 0 0 0Ventilation Load 0.00 0 0 0 0 0 0 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 0.0 0.0

Duct Heat Pkup 0 0 0 0.00 0.00cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

0.00cfm/ton

Exhaust Heat

0.00 0 0 0

0.00ft²/ton

-60.56 0.00Btu/hr·ft²

0.0No. People 0Grand Total ==> 100.00-13,020-13,020100.00 0100.00 0 0

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 215 Main Htg -13.0 0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 295 66 22

Humidif 0.0 0 0.0 0.0 0.0 0.0Total Opt Vent 0.0 0.0 0.0 0

-13.0Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

0.00

0.00

0.00 0.00

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

165 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 0 0

Int Door 0

Ext Door 35 0 0

0.0/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 4 of 52VA_FAY_AR.TRC

103 - ITS BREAK

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:7 / 18Mo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:98 / 76 / 102OADB/WB/HR:Outside Air: 55.0 83.7

Ra Plenum 76.5 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.5 68.9 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 48.4 84.9

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 675Glass Solar 0 0 19 678 9 675 0 166Glass/Door Cond -502 7.81-502 5 175 2 166 0

AIRFLOWS

HeatingCooling 474Wall Cond 26.36-1,695-1,333 15 532 8 595 121

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 8.91 492Infiltration -573-573 5 196 6 492

0 0MinStop/Rh

43.08 1,807Sub Total ==> -2,769-2,408 43 1,581 25 1,928 121

176Return 176

Internal Loads

74 74Exhaust

925Lights 0.00 0 0 25 925 15 1,156 231

0 0Rm Exh

1,000People 0.00 0 14 500 13

0 0Auxiliary

512Misc 0.00 0 0 14 512 7 512 0

2,437Sub Total ==> 0.00 0 0 53 1,937 34 2,668 231

115Ceiling Load 0.000-81 3 120 0 0-115 0Ventilation Load 59.43-3,820 0 0 0 42 3,279 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 38.9 38.9

Duct Heat Pkup 0 0 0 0.69 0.69cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

256.85cfm/ton

Exhaust Heat

-1.34 86 -2-122

374.58ft²/ton

-26.56 32.04Btu/hr·ft²

2.0No. People 4,359Grand Total ==> 100.00-6,427-2,490100.00 3,638100.00 7,753 115

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 242 Main Htg -6.4 166 48.4 83.7 0.7 7.8 5.4 166 84.9 68.4 79.5 55.0 53.4 59.5Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 -1.2Preheat 48.4 55.0 166 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 298 23 8

Humidif 0.0 0 0.0 0.0 0.7 7.8Total Opt Vent 0.0 0.0 0.0 0

-6.4Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

0.00

-1.17

0.00 0.00

-122

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

10 10Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 1,000 0

Int Door 0

Ext Door 0 0 0

8.3/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 5 of 52VA_FAY_AR.TRC

103A - ITS ASST CHIEF

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:6 / 18Mo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:98 / 76 / 102OADB/WB/HR:Outside Air: 55.0 76.8

Ra Plenum 76.5 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.5 68.9 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 51.4 83.6

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 341Glass Solar 0 0 16 363 8 341 0 87Glass/Door Cond -251 8.75-251 4 82 2 87 0

AIRFLOWS

HeatingCooling 142Wall Cond 21.15-607-473 7 153 4 180 37

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

29.90 570Sub Total ==> -857-724 27 598 14 607 37

103Return 103

Internal Loads

34 34Exhaust

489Lights 0.00 0 0 22 489 14 612 122

0 0Rm Exh

450People 0.00 0 11 250 10

0 0Auxiliary

853Misc 0.00 0 0 38 853 20 853 0

1,793Sub Total ==> 0.00 0 0 71 1,593 45 1,915 122

61Ceiling Load 0.000-43 3 63 0 0-61 0Ventilation Load 70.46-2,020 0 0 0 43 1,833 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 33.2 33.2

Duct Heat Pkup 0 0 0 0.80 0.80cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

286.97cfm/ton

Exhaust Heat

-1.38 40 -1-56

357.32ft²/ton

-22.40 33.58Btu/hr·ft²

1.0No. People 2,423Grand Total ==> 100.00-2,868-767100.00 2,254100.00 4,299 42

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 128 Main Htg -2.9 103 51.4 76.8 0.4 4.3 3.1 103 83.6 67.1 74.6 55.0 53.5 59.7Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 -0.4Preheat 51.4 55.0 103 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 110 11 10

Humidif 0.0 0 0.0 0.0 0.4 4.3Total Opt Vent 0.0 0.0 0.0 0

-2.9Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-30

0.00

1.03

0.00 0.00

-56

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 450 0

Int Door 0

Ext Door 0 0 0

7.8/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 6 of 52VA_FAY_AR.TRC

103C - VESTIBULE

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:8 / 16Mo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:98 / 76 / 102OADB/WB/HR:Outside Air: 55.0 89.6

Ra Plenum 76.5 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.5 68.9 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 68.9 76.5

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 176Glass/Door Cond -459 30.93-459 14 199 10 176 0

AIRFLOWS

HeatingCooling 89Wall Cond 22.91-340-222 6 86 7 134 45

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 42.88 584Infiltration -637-637 20 290 33 584

0 0MinStop/Rh

96.71 849Sub Total ==> -1,437-1,319 40 575 50 894 45

76Return 76

Internal Loads

11 11Exhaust

734Lights 0.00 0 0 51 734 51 918 184

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

734Sub Total ==> 0.00 0 0 51 734 51 918 184

128Ceiling Load 0.000-90 9 130 0 0-128 0Ventilation Load 0.00 0 0 0 0 0 0 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 0.0 0.0

Duct Heat Pkup 0 0 0 0.24 0.24cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

439.12cfm/ton

Exhaust Heat

-0.84 13 -1-18

1,798.56ft²/ton

-5.52 6.67Btu/hr·ft²

0.0No. People 1,712Grand Total ==> 100.00-1,485-1,409100.00 1,440100.00 1,795 83

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 269 Main Htg -1.5 66 68.9 89.6 0.2 1.8 1.5 66 76.5 61.7 60.0 55.0 52.2 54.6Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 56 0 0

Humidif 0.0 0 0.0 0.0 0.2 1.8Total Opt Vent 0.0 0.0 0.0 0

-1.5Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-61

0.00

4.13

0.00 0.00

-18

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

11 11Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 0 0

Int Door 0

Ext Door 42 0 0

0.0/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 7 of 52VA_FAY_AR.TRC

104 - CLOSET

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:7 / 17Mo/Hr:7 / 15Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:98 / 76 / 102OADB/WB/HR:Outside Air: 55.0 70.6

Ra Plenum 76.5 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.5 68.9 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 68.9 76.5

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 0Glass Solar 0 0 0 0 0 0 0 0Glass/Door Cond 0 0.00 0 0 0 0 0 0

AIRFLOWS

HeatingCooling 0Wall Cond 0.00 0 0 0 0 0 0 0 0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

0.00 0Sub Total ==> 0 0 0 0 0 0 0

27Return 27

Internal Loads

0 0Exhaust

137Lights 0.00 0 0 23 137 29 171 34

0 0Rm Exh

0People 0.00 0 0 0 0

0 0Auxiliary

0Misc 0.00 0 0 0 0 0 0 0

137Sub Total ==> 0.00 0 0 23 137 29 171 34

24Ceiling Load 0.000-17 4 25 0 0-24 0Ventilation Load 0.00 0 0 0 0 0 0 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 0.0 0.0

Duct Heat Pkup 0 0 0 0.53 0.53cfm/ft²

423Ov/Undr Sizing

0.00 0 0

72 423 71 423

539.26cfm/ton

Exhaust Heat

0.00 0 0 0

1,011.12ft²/ton

-0.96 11.87Btu/hr·ft²

0.0No. People 583Grand Total ==> 100.00-48-17100.00 585100.00 593 10

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 50 Main Htg -0.1 27 68.9 70.6 0.1 0.6 0.6 27 76.5 57.4 41.2 55.0 48.5 41.2Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 0.0Preheat 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 0 0 0

Humidif 0.0 0 0.0 0.0 0.1 0.6Total Opt Vent 0.0 0.0 0.0 0

-0.1Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-48

0.00

100.00

0.00 0.00

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 0 0

Int Door 0

Ext Door 0 0 0

0.0/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 8 of 52VA_FAY_AR.TRC

105 - ITS STAFF

HEATING COIL PEAKCLG SPACE PEAKCOOLING COIL PEAK TEMPERATURES

Heating DesignMo/Hr:7 / 19Mo/Hr:7 / 16Mo/Hr:Peaked at Time: Cooling Heating

SADBOADB: 16OADB:97 / 75 / 100OADB/WB/HR:Outside Air: 55.0 72.1

Ra Plenum 76.6 68.9

ReturnPercentCoil PeakSpace PeakSpace PercentPercentNetPlenumSpace 76.6 68.9 Ret/OASens. + Lat. Of TotalTot SensSpace SensOf TotalSensibleOf TotalTotalSens. + Lat 47.5 85.0

0.0 0.0Fn MtrTDBtu/h (%)Btu/hBtu/h(%)Btu/h(%)Btu/hBtu/h

0.0 0.0Fn BldTDEnvelope Loads

0.0 0.0Fn Frict 0Skylite Solar 0.00 0 0 0 0 0 0 0

0Skylite Cond 0.00 0 0 0 0 0 0 0 0Roof Cond 0.00 0 0 0 0 0 0 0

0.00 1,889Glass Solar 0 0 24 3,097 8 1,889 0 190Glass/Door Cond -488 3.08-488 1 161 1 190 0

AIRFLOWS

HeatingCooling 219Wall Cond 4.38-694-531 2 272 1 283 64

0Partition/Door 0.00 0 0 0 0 0 0 0Floor 0.00 0 0 0 0 0

Sec Fan 0.00 0Infiltration 0 0 0 0 0 0

0 0MinStop/Rh

7.45 2,298Sub Total ==> -1,182-1,018 27 3,529 9 2,362 64

588Return 588

Internal Loads

239 239Exhaust

3,421Lights 0.00 0 0 27 3,421 17 4,276 855

0 0Rm Exh

2,250People 0.00 0 10 1,250 9

0 0Auxiliary

4,266Misc 0.00 0 0 33 4,266 17 4,266 0

9,937Sub Total ==> 0.00 0 0 69 8,937 43 10,793 855

448Ceiling Load 0.000-301 3 423 0 0-448 0Ventilation Load 89.11-14,127 0 0 0 49 12,250 0

Sup. Fan Heat 0 0

ENGINEERING CKS

HeatingCooling

Ret. Fan Heat 0 0 0 % OA 40.6 40.6

Duct Heat Pkup 0 0 0 0.66 0.66cfm/ft²

0Ov/Undr Sizing

0.00 0 0

0 0 0 0

282.30cfm/ton

Exhaust Heat

-1.75 278 -2-413

429.75ft²/ton

-17.71 27.92Btu/hr·ft²

5.0No. People 12,684Grand Total ==> 100.00-15,853-1,319100.00 12,889100.00 24,991 58

AREAS HEATING COIL SELECTIONCOOLING COIL SELECTION

Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB/HR Gross Total Glass Coil Airflow Ent LvgCapacity ton MBh MBh cfm °F °F gr/lb °F °F gr/lb ft² (%) °F°FcfmMBh

Floor 895 Main Htg -15.9 588 47.5 72.1 2.1 25.0 17.6 588 85.0 68.0 77.0 55.0 54.4 63.3Main Clg Part 0 Aux Htg 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Aux Clg

ExFlr 0 -4.9Preheat 47.5 55.0 588 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0Opt Vent

Roof 0 0 0 Wall 135 22 16

Humidif 0.0 0 0.0 0.0 2.1 25.0Total Opt Vent 0.0 0.0 0.0 0

-15.9Total

Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor

Infiltration Sub Total ==>

Lights People Misc

Sub Total ==>

Ceiling Load Ventilation Load

System Plenum Heat Additional Reheat

OA Preheat Diff.

Ov/Undr Sizing Exhaust Heat

RA Preheat Diff.

Grand Total ==>

Internal Loads

-822

0.00

5.18

0.00 0.00

-413

Supply Air Leakage

Dehumid. Ov Sizing 0 0

Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Leakage Ups

Leakage Dwn

0 0Infil

AHU Vent

Nom Vent

Main Fan Terminal

Adjacent Floor

Diffuser

Supply Air Leakage

Underflr Sup Ht Pkup Underflr Sup Ht Pkup

Adjacent Floor 0 0 0 0

0 0

0 0 0

0 0 0 0.00

0 0.00

0 0.00

0 2,250 0

Int Door 0

Ext Door 0 0 0

5.6/1000 ft²

TRACE® 700 v6.3.3 calculated at 08:52 PM on 04/12/2018Project Name: FAYETTEVILLE AUDITORIUM - LOAD CALCS

Dataset Name: Alternative - 1 System Checksums Report Page 9 of 52VA_FAY_AR.TRC

106 - ITS CHIEF

HEATING COIL PEAKCLG…