About this file

36C25619R0040 0001 Pricing Schedule.docx

View the file

Other files

File Type Posted
36C25619C0148-000.docx DOCX document
36C25619R0040-0002003.pdf PDF
36C25619R0040-0002000.docx DOCX document
36C25619R0040-0002001.docx DOCX document
36C25619R0040-0002002.pdf PDF
36C25619R0040-0001014.pdf PDF
36C25619R0040-0001012.pdf PDF
36C25619R0040-0001008.pdf PDF
36C25619R0040-0001011.pdf PDF
36C25619R0040-0001009.pdf PDF
36C25619R0040-0001007.docx DOCX document
36C25619R0040-0001010.pdf PDF
36C25619R0040-015.docx DOCX document
36C25619R0040-010.docx DOCX document
36C25619R0040-011.pdf PDF
36C25619R0040-012.pdf PDF
36C25619R0040-014.pdf PDF
36C25619R0040-013.pdf PDF
36C25619R0040-000.docx DOCX document
36C25619R0040-000.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Schedule

Description: Contractor shall provide all work required for the completion of the attached statement work.

0001 –Base: Includes all work listed in in the statement of work to be completed.

Unit Price: ____________________________

0001 –Deduct: Includes all work listed in in the statement of work to be completed except replacing flooring on ground level of building 3 based on specs and drawings provided.

0001 –Deduct: Includes all work listed in in the statement of work to be completed except provide vinyl clad wood windows and doors in lieu of aluminum

THE PERIOD OF PERFORMANCE FOR THIS PROJECT IS 400 DAYS.