36C25619Q1491-012.docx
DOCX document Posted
- Attached to
- GALLEY HOOD DEGREASING SERVICES Federal contract opportunity
- Solicitation number
- 36C25619Q1491
About this file
36C25619Q1491 ATTH E QASP.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -18487.docx | DOCX document | |
| 36C25619Q1491-A0002000.docx | DOCX document | |
| 36C25619Q1491-A0002000.docx | DOCX document | |
| 36C25619Q1491-A0001000.docx | DOCX document | |
| 36C25619Q1491-A0001000.docx | DOCX document | |
| 36C25619Q1491-009.pdf | ||
| 36C25619Q1491-011.docx | DOCX document | |
| 36C25619Q1491-010.docx | DOCX document | |
| 36C25619Q1491-008.pdf | ||
| 36C25619Q1491-007.docx | DOCX document | |
| 36C25619Q1491-006.docx | DOCX document | |
| 36C25619Q1491-007.docx | DOCX document | |
| 36C25619Q1491-006.docx | DOCX document | |
| 36C25619Q1491-009.pdf | ||
| 36C25619Q1491-010.docx | DOCX document | |
| 36C25619Q1491-011.docx | DOCX document | |
| 36C25619Q1491-008.pdf | ||
| 36C25619Q1491-012.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D – QUALITY ASSURANCE SURVEILLANCE PLAN
36C25619Q1491
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Engineering Service
Contract Number: (The Government will enter contract number upon award.)
Contract Description: Canteen Galley Hood Inspection, Testing and Degreasing Services
Contractor’s name: (hereafter referred to as the Contractor)
Period of Performance: November 1, 2019 through September 30, 2024 (base plus four option periods)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Danette Rene’ Impey Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO) 16 Gulf Coast Veterans Health Care System, Biloxi, MS 39531
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Darrel Maples
c. Other Key Government Personnel: N/A
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager: (Contractor please provide name here)
b. Other Contractor Personnel: (Contractor please enter name(s) or delete these lines if not applicable.)
Title: (Contractor please enter title(s) or delete these lines if not applicable.)
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
Performance Requirements Summary Matrix:
The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| Task |
| ID |
| Indicator |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Incentive |
Rating
| General |
| 1 |
| Perform Inspection, Cleaning and Degreasing Services (Para. 1) |
| Contractor shall provide annual and semi-annual inspection, testing, and degreasing services, as per the SOW. |
| 100% |
| Periodic Inspection |
Positive Past Performance & Exercise of Option Period
| General |
| 2 |
| NFPA 101 and NFPA Standard 96 Requirements (Para. 1) |
| Contractor shall comply with all NFPA 101 and Standard 96 requirements. |
| 100% |
| 100% Compliant |
| General |
| 3 |
| Contractor Employees & Personnel Qualifications (Para. 2) |
| Contractor shall furnish qualified personnel. |
| 100% |
| 100% Inspection |
| General |
| 4 |
| Perform quarterly degreasing maintenance (Para. 3) |
| Contractor shall provide quarterly degreasing services, as per the SOW. |
| 100% |
| Periodic Inspection |
| General |
| 5 |
| Additional System Maintenance (Tasks) to be maintained (Para. 4) |
| Contractor shall provide additional systems maintenance (tasks) as per the SOW. |
| 100% |
| Periodic Testing |
5. INCENTIVES
The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
Performance Standard(s) ID: N/A
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
Performance Standard (s) ID: 1, 4
c. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)
Performance Standard(s) ID: N/A
d. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)
Performance Standard(s) ID: N/A
e. 100% INSPECTION. (Evaluates all outcomes.)
Performance Standard(s) ID: 1, 3, & 4
f. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)
Performance Standard(s) ID: N/A
g. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.
Performance Standard(s) ID: N/A
h. Progress or status meetings.
Performance Standard(s) ID: N/A
i. Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)
Performance Standard(s) ID: 1, 2, 3, 4, & 5
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Excellent (“E”) = Exceeds Standards Satisfactory (“S”) = Meets Standards Unsatisfactory (“U”) = Fails To Meet Standards
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
(After award, both the contractor’s Program Manager and the COR shall sign this document.)
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
Contract Discrepancy Report
| Contract No. |
| Report No. for this Discrepancy: |
Contractor/Manager’s Name:
From: (Name of Project Officer)
Dates
Prepared:
Returned by Contractor:
Action Complete:
Discrepancy or Problem:
Signature of Contracting Officer:
To: (Contracting Officer)
From: (Contractor)
Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)
Signature of Contractor Representative:
Date:
Government Evaluation:
Government Actions: