36C25618U0323-001.docx
DOCX document 171 KB Posted
- Attached to
- Services Commissioning for HVAC Digital Controls Federal contract opportunity
- Solicitation number
- 36C25618U0323
About this file
36C25618U0323 36C25618U0323.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -15380.docx | DOCX document | |
| 36C25618U0323-0002007.pdf | ||
| 36C25618U0323-0002005.pdf | ||
| 36C25618U0323-0002011.pdf | ||
| 36C25618U0323-0002009.pdf | ||
| 36C25618U0323-0002014.pdf | ||
| 36C25618U0323-0002001.docx | DOCX document | |
| 36C25618U0323-0002004.pdf | ||
| 36C25618U0323-0002006.pdf | ||
| 36C25618U0323-0002012.pdf | ||
| 36C25618U0323-0002000.docx | DOCX document | |
| 36C25618U0323-0002013.pdf | ||
| 36C25618U0323-0002010.pdf | ||
| 36C25618U0323-0002002.pdf | ||
| 36C25618U0323-0002003.pdf | ||
| 36C25618U0323-0002008.pdf | ||
| 36C25618U0323-0001000.docx | DOCX document | |
| 36C25618U0323-002.pdf | ||
| 36C25618U0323-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25618U0323
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
502-18-4-5040-0066 36C25618U0323 08-24 -2018 Joseph Warren 479-444-5011 09-07-2018
3PM CST
Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 X X 238220 $15M X N/A X Department of Veterans Affairs Veterans Healthcare System of the Ozarks Purchasing & Contracting (90C) 1100 N. College Ave.
Fayetteville AR 72703 Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703
Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-8972 See CONTINUATION Page Contractor to provide all equipment, supplies, and labor to accomplish Commissioning Services for HVAC Digital Controls in accordance with attached Statement of Work.
Location: Alexandria VA Health Care System, Pineville, LA.
100% SDVOSB set aside See CONTINUATION Page X X Table of Contents
| SECTION A | 1 | |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 | |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 | |
| B.1 CONTRACT ADMINISTRATION DATA | 3 | |
| B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 4 | |
| B.3 STATEMENT OF WORK | 5 | |
| 1.1 | SCOPE OF WORK | 5 |
| 2.1 | GENERAL | 6 |
| 3.1 | REFERENCES | 28 |
| B.4 | 29 | |
| PRICE/COST SCHEDULE | 29 | |
| ITEM INFORMATION | 29 | |
| SECTION C - CONTRACT CLAUSES | 30 | |
| C.1 52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES (APR 2012) | 30 | |
| C.2 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 30 | |
| C.3 VAAR 852.211-70 SERVICE DATA MANUALS (NOV 1984) | 31 | |
| C.4 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 32 | |
| C.5 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 33 | |
| C.6 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 34 | |
| C.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 35 | |
| C.8 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018) | 35 | |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 43 | |
| SECTION E - SOLICITATION PROVISIONS | 44 | |
| E.1 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (JAN 2008) | 44 | |
| E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 44 | |
| E.3 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 45 | |
| E.4 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017) | 45 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C256 Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [x] After completion and acceptance of work |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Financial Services Center P.O. Box 149971
Austin TX 78714-8972 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes VAAR 852.219-10 VA Notice of Total Service- Disabled Veteran-Owned Small Business Set-Aside. Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.
36C25618U0323
Page 1 of Page 1 of
B.3 STATEMENT OF WORK
1.1 SCOPE OF WORK
1. The Commissioning Agent (CxA) shall perform all Construction Phase, Acceptance Phase and Warranty Phase commissioning services as an independent Commissioning Agent of the Veterans Affairs, “Replace Obsolete HVAC Controls” at the Main Campus of the Alexandria VA Health Care System, Pineville, Louisiana.
2. The CxA shall perform these services in FULL ACCORDANCE WITH the Department of Veterans Affairs “Whole Building Commissioning Process Manual” and TIL - Master Construction Specifications (PG-18-1), Section 01 91 00 – General Commissioning Requirements. Commissioning Services may include, (but may not be limited to) the services outlined below. Refer to the “Whole Building Commissioning Process Manual” for a complete description of the Commissioning Services to be provided. The manual is available at: http://www.cfm.va.gov/til/Cx-RCx/CxManual.PDF
3. The major scope items for this service includes:
Systems To Be Commissioned
| System |
| Description |
HVAC
| Direct Digital Control System** |
| Operator Interface Computer, Operator Work Station (including graphics, point mapping, trends, alarms), Network Communications Modules and Wiring, Integration Panels. [DDC Control panels will be commissioned with the systems controlled by the panel] |
| Chilled Water System** |
| VFDs associated with chilled water system components, DDC Control Panels (including integration with Building Control System) |
| Condenser Water System** |
| VFDs associated with condenser water system components, DDC control panels. |
| Steam/Heating Hot Water System** |
| Controls, interface with facility DDC system. |
| HVAC Air Handling Systems** |
| Air Handling Units, packaged rooftop AHU, Outdoor Air Conditioning units, humidifiers, DDC control panels |
| HVAC Ventilation/Exhaust Systems |
| General Exhaust, toilet exhaust, laboratory exhaust, isolation exhaust, room pressurization control systems |
| HVAC Energy Recovery Systems** |
| Heat Wheels, Heat Recovery Loops, AHU Integrated Heat Recovery |
| HVAC Terminal Unit Systems** |
| VAV Terminal Units, CAV terminal units, fan coil units, fin-tube radiation, unit heaters |
| Decentralized Unitary HVAC Systems* |
| Split-system HVAC systems, controls, interface with facility DDC |
| Unitary Heat Pump Systems** |
| Water-source heat pumps, controls, interface with facility DDC |
| Humidity Control Systems |
| Humidifiers, de-humidifiers, controls, interface with facility DDC |
Hydronic Distribution Systems
Pumps, DDC control panels, heat exchangers, ** Denotes systems that LEED requires to be commissioned to comply with the Fundamental Commissioning pre-requisite.
2.1 GENERAL
1. Commissioning is a systematic process of verifying that the building systems perform interactively according to the construction documents and the VA’s operational needs. The commissioning process shall encompass and coordinate the system documentation, equipment startup, control system calibration, testing and balancing, performance testing and training. Commissioning during the acceptance and post-warranty phases is intended to achieve the following specific objectives according to the contract documents:
a. Verify that the applicable equipment and systems are installed in accordance with the contract documents and according to the manufacturer's recommendations.
b. Verify and document proper integrated performance of equipment and systems.
c. Verify that Operations & Maintenance documentation is complete.
d. Verify that all components requiring servicing can be accessed, serviced and removed without disturbing nearby components including ducts, piping, cabling or wiring.
e. Verify that the VA’s operating personnel are adequately trained to enable them to operate, monitor, adjust, maintain, and repair building systems in an effective and energy-efficient manner.
f. Document the successful achievement of the commissioning objectives listed above.
2. The commissioning process does not take away from or reduce the responsibility of the Design A/E, or construction Contractor(s) to provide a finished and fully functioning product.
3. COMMISSIONING AGENT’S RESPONSIBILITIES
Commissioning Team Task/Deliverables Description Construction Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
Commissioning Kick Off Meeting
[The kickoff meeting should occur within 60 days of Notice to Proceed.] Conduct a “Commissioning Kickoff Meeting” with the Construction Team Establish the purpose and process for commissioning the project.
Establish the individual roles of each participating commissioning team member.
Review the Commissioning Plan and Commissioning Specifications.
Review the Commissioning Documents Review the Project Schedule and discuss how commissioning activities will be incorporated into the master schedule.
Review Draft Pre Functional Checklist (PFC) and Functional Performance Test (FPT); identify pre- requisites for functional testing.
ATTENDEES:
Commissioning Agent, A/E Design Team Representatives, Contractor’s Commissioning Representative, Subcontractor’s Commissioning Representatives, VA Contracting Officer Representative (COR).
Meeting Minutes
Revised Project Commissioning Plan (Include Names/Contact Information for selected Commissioning Team Members)
| Duration Schedule for Commissioning Activities |
| Based on the Commissioning Plan, prepare a duration schedule for the commissioning activities required by the commissioning plan. This duration schedule should be incorporated into the contractor’s project schedule to track all commissioning activities of the commissioning team. |
| Commissioning Duration Schedule |
(Schedule shall be periodically updated to reflect changes in the project schedule and/or scope.)
Commissioning Team Task/Deliverables Description Construction Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Submittal & Shop Drawing Review |
| Review all pertinent project shop drawings necessary to support the Commissioning Process. Review of the shop drawings is for the purpose of developing appropriate Pre Functional Checklists and Systems Functional Performance Test Procedures. Submittals & Shop drawings shall be reviewed for commissionability, maintainability and for compliance to the Construction Documents. |
Note any issues identified in the Shop Drawing Review that might compromise the final commissioned system on the ‘Commissioning Review Log’ and submit comment to the Design Team and the COR contemporaneously with the A/E review for resolution.
Comments shall be submitted in accordance with the contractual submittal review time.
Comments shall be provided to the Design Team no less than 7 days prior to the Submittal Review Due Date provided that the Cx Agent has no less than 7 days to review the submittals.
ANY ISSUES IDENTIFIED IN THE SUBMITTAL REVIEW THAT MIGHT REQUIRE A CONTRACT CHANGE BUT IS NECESSARY TO MEET DESIGN INTENT SHOULD BE SPECIFICALLY REFERRED TO THE COR.
Shop Drawing Cx Review List
Shop Drawing Review Comments
Commissioning Team Task/Deliverables Description Construction Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Commissioning Observations |
| The Commissioning Agent will visit the site to observe the progress of construction with respect to the systems being commissioned. The focus of the observations is to verify that systems installed comply with the Construction Documents and can be successfully configured, operated and maintained. |
In addition, site observations visits will be scheduled to include
· Witnessing and/or verification of factory testing and/or contractor equipment/system start up activities;
· Verification of Completed Pre Functional Checklists
· Verification that the Contractor and his subcontractors completed and documented Pre-Test procedures required by the specifications.
· Clarification and technical support for understanding and resolving Commissioning Issues.
Site Observation Reports
Updated Commissioning Issues Log
| Commissioning Team Meetings |
| The Commissioning Agent will hold regular commissioning team meetings to review progress of the commissioning effort and reinforce individual responsibilities. The team will review schedule, construction sequence, and completed work (PFC, Pre-Functional Test, PFT, and FPT’s) and outstanding issues on the Commissioning Issues Log. |
Commissioning Team Meetings may be held at the jobsite or by teleconference depending upon the status of construction.
Scheduling and location of meetings shall occur by consultation between the Commissioning Agent and the VA-COR.
The Prime Contractor should attend every Commissioning Team Meeting to review the master schedule and any changes that will affect commissioning activities.
Commissioning Meeting Agenda and Minutes Updated Commissioning Issues Log
Commissioning Team Task/Deliverables Description Construction Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Develop Final Pre- Functional Checklists (PFC’s) |
| The Commissioning Agent will prepare Pre- Final Pre Functional Checklists (PFC) for the project and distribute to all Cx Team members for review and comment. The Commissioning Agent will incorporate review comments and prepare Final PFCs. |
An executed PFC submitted by the Prime Contractor indicates the system and its related equipment is ready for Systems Functional Performance Testing.
The requirements for Pre Functional Checklists shall be coordinated with the startup requirements specified for each commissioned system. The PFC’s shall be constructed to leverage the specified contractor and vendor start activities to avoid unnecessary duplication.
Pre Functional Checklists (PFC’s)
| Final Systems |
| Based on construction documents and |
| Pre-Final and Final |
| Functional Performance |
| approved submittals, the Commissioning Agent |
| Systems Functional |
| Test (FPT’s) |
| will prepare Pre-Final Systems Functional |
| Performance Test |
| Procedures |
| Performance Test Procedures (FPT’s) for |
| Procedures (FPT’s) |
systems to be commissioned.
Completed Final FPT’s will be distributed to all appropriate members of the Commissioning
Team for review and comment.
Final FPT’s will be issued once comments are reviewed and incorporated into final documents as appropriate.
| Review Operations & Maintenance Manuals |
| The Commissioning Agent shall review Operations and Maintenance Manuals submitted by contractors for general conformance with specifications and VA’s requirements, including: |
If provided with the manuals, Review Preventive Maintenance Schedules provided as part of the O&M Manuals for completeness. Verify that data is provided in a manner consistent with VA process for managing Preventive Maintenance tasks.
Review of O&M Manuals will include a review of system and component warranties to confirm conformance with contract requirements and adequate documentation of warranty contract information and VA obligations.
Review of O&M Manuals shall be completed in accordance with the Submittal Review schedule requirements.
Updated Commissioning Issues Log
Commissioning Team Task/Deliverables Description Construction Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Review Contractor Equipment Startup Checklists, TAB Reports and PFC’s |
| The Commissioning Agent will review all contractor prepared Equipment Startup Checklists, TAB Reports (including “pencil” daily test results) and PFC’s to confirm that the systems were subjected to appropriate Quality Control and Start Up procedures prior to initiation of Functional Performance Testing. |
Incomplete work, inadequate preparation and deficiencies will be noted and tracked on the Commissioning Issues Log.
Commissioning Issues Log
Commissioning Team Task/Deliverables Description Construction Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| TAB Verification |
| The Commissioning Agent shall work with the TAB Contractor to verify that all Testing and Balancing work is conducted in strict accordance with the specified Procedural Standards for Testing, Adjusting and Balancing by either NEBB or AABC. The Commissioning Agent shall execute the following tasks: |
· Review the TAB Agenda provided by the TAB Contractor to verify that it is complete, thorough and in compliance with the specification and Procedural Standards requirements.
· On the project site, the CxA shall review the calibration certificates for the instrumentation being used by the TAB Contractor during the execution of TAB activities to confirm that the instrumentation meets the requirements of the specification and the appropriate Procedural Standard.
· The CxA shall periodically visit the project site and review the TAB documentation for method, reasonable values, and compliance with the specification, Procedural Standard and TAB Agenda.
· Upon completion of the TAB activities, the CxA shall visit the project site with the TAB Contractor and the COR. The TAB Contractor shall demonstrate readings selected by the CxA that demonstrate that the system performance is consistent with the submitted values on the TAB report. Readings shall include Air Handling Unit total flows, static pressure control values, select outlet flows, building and space pressures selected by the CxA as critical system operating values.
TAB Agenda Review Comments TAB Agenda Review Meeting Minutes Field Observation Reports of TAB Inspections Summary Report of TAB Verification Readings
Commissioning Team Task/Deliverables Description Acceptance and Testing Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Systems Functional Performance Testing |
| The Commissioning Agent will oversee, facilitate, and document all FPT testing. Execution of FPT’s shall be executed in accordance with the Functional Testing Procedures published by the Commissioning Agent. All systems tested in accordance with the FPT’s shall be operated by the contractors in accordance with the approved FPT. Contractors shall retain responsibility for the installed systems during and after functional testing until substantial completion or final acceptance as determined by the VA. |
The Commissioning Agent, in collaboration with the control contractor shall include long term trends (greater than 7 days) of integrated system performance once all systems have been commissioned. The Commissioning Agent shall provide analysis of these trends to confirm that the installed systems are stable and reliable Executed Functional Performance Tests and support documentation.
Long Term Trend Data and Analysis
| Prepare Systems Manuals |
| The Commissioning Agent shall work with the design team, contractor and VA to develop Systems Manuals. Manuals will contain system design, operations and sequence information that describes the design intent, operational features and appropriate operational practices necessary to sustain the system operation in accordance with the Design Narrative and the VA’s overall objectives for the facility. |
Systems Manual will include sections for each major system included in the commissioning process.
Project Systems Manual
Commissioning Team Task/Deliverables Description Acceptance and Testing Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Training Plan Review |
| The Commissioning Agent shall collaborate with the Prime Contractor and installing subcontractors to develop effective contractor and manufacturer training plans and agendas for general conformance with specifications and VA’s requirements. Observe training for quality of training and for general conformance with the training plan and agenda. |
The CxA shall observe contractor and vendor training for critical systems. The Contractor shall provide and the CxA shall maintain all attendance records and associated agendas and presentations for all training sessions.
Attendance records shall be written original sign in sheets for each training session.
Compiled Training Plan
Individual Training Agendas Training Attendance Sign In Sheets
| Systems Training |
| The Commissioning Agent will conduct training sessions to provide systems‐level training for O&M personnel. Training will include: |
· Review of system design, capacity, and equipment selection
· Review of system operating sequences
· Review of interconnection with other systems
· Review of Emergency operating procedures
· Review of the Project Systems Manual and its Use
· Student Evaluation forms
The number, duration and scope of the Systems Training sessions shall be determined by the specific requirements of the project.
The training provided by the CxA does not in any way relieve the Contractor from any specified training obligations.
Systems Training Presentations (electronic)
Commissioning Team Task/Deliverables Description Acceptance and Testing Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Final Commissioning Report |
| The Commissioning Agent shall compile a comprehensive commissioning report documenting all commissioning activities, including but not limited to the following: |
· Executive Summary
· Commissioning Scope of Work
· Test methods and results
· Outstanding commissioning issues
· Comprehensive Commissioning Issues Log, including resolved items and a description of their resolution,
· Commissioning plan,
· Field Observation Reports, Status reports and other field activity documentation,
· Submittal and O&M manual reviews
· Training record
· Completed Pre Functional Checklists
· Completed Functional Performance Test protocols and support documentation
· Other support documentation developed as part of the execution of the project Construction Phase Commissioning Process Final Commissioning Report
Commissioning Team Task/Deliverables Description Warranty Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Deferred and/or Seasonal Testing |
| The Commissioning Agent shall witness and document Systems Functional Performance Testing that was deferred to allow systems to be tested in appropriate seasonal conditions. |
Testing will be conducted in accordance with Systems Functional Performance Test Procedures. Testing support will be required from the installing contractors, Energy Management Control System (EMCS) Vendor and VA. Requirement for seasonal testing will be incorporated into the project specifications.
As part of the Seasonal Testing Effort, the Commissioning Agent shall review systems operations with the onsite operations team and reinforce training and best operating practices of the operations team.
Executed Functional Performance Test and Support Documents
Commissioning Issues Log
| Warranty Period Site Visits |
| The Commissioning Agent shall make quarterly visits to the project site to reinforce training, evaluate performance of the installed systems and provide technical support to the operating team to sustain commissioned performance of the systems. |
| Warranty Site Visit Reports |
Commissioning Team Task/Deliverables Description Warranty Phase
| Project Phase/ Cx Task |
| Commissioning Task Description |
| Commissioning Deliverables |
| Post-Occupancy Inspection |
| Return to the project approximately 10 months after substantial completion to review the building operation with the facility occupants and O&M staff, and to discuss outstanding issues related to commissioning. Provide suggestions for improvements to systems operation including, |
· Measurement & Verification Issues,
· Re-Commissioning Tasks, and
· Improvements in Preventive Maintenance or Operational Strategies Assist facility staff in developing warranty issues, documents and requests for service to remedy outstanding problems.
As part of the Post Occupancy Inspection, the Commissioning Agent shall analyze the energy consumption records from the project site (both utility and system generated reports) and provide the team with an analysis of actual system energy performance versus predicted performance. To the extent possible, deficiencies in performance shall be analyzed to provide an understanding of the systems, components or operating strategies that may be operating outside predicted parameters.
Post Occupancy Field Visit Report
Commissioning Issues Log
Warranty Issues Report Systems Energy Review Report
| Final Commissioning Report Amendment |
| Amend Final Commissioning Report to document the Warranty Phase commissioning activities. |
| Final Report Amendment |
4. COMMISSIONING AGENT QUALIFICATIONS
a. The CxA shall either be certified by the NEBB or the TABB, or be a member of ACG, or shall provide and utilize the services of a Commissioning Authority that meets the above qualifications as a sub-consultant to the CxA for performance of all commissioning services for the VA under this project. The certification shall be maintained for the entire duration of duties specified herein. If, for any reason, the firm loses subject certification during this period, immediately notify the Contracting Officer and submit another Commissioning Firm for approval. Any firm that has been the subject of disciplinary action by the ACG, the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform any duties related to the HVAC systems, including Commissioning. All work specified in Scope of Work to be performed by the CxA shall be considered invalid if the CxA or sub-consulting Firm loses its certification prior to Contract completion and must be performed by an approved successor. These Commissioning services are to assist the VA in performing the quality oversight for which it is responsible. The Commissioning or sub-consulting Firm shall be an agent acting of and for the VA and shall be financially and corporately independent of all other sub-contractors.
b. The CxA shall be working through, and reporting to the VA COR. The CxA will be paid by the VA.
5. TRADE ASSOCIATION DEFINITIONS
a. AABC: Associated Air Balance Council
b. ACG: Associated Air Balance Council Commissioning Group
c. NEBB: National Environmental Balancing Bureau
d. SMACNA: Sheet Metal and Air-Conditioning Contractors’ National Association
e. TABB: Testing, Adjusting, and Balancing Bureau f.
6. COMMISSIONING TEAM
Commissioning Team Roles and Responsibilities Construction Phase
Project Phase/ Cx Task Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Commissioning Kick Off Meeting |
| Prepare and disseminate Agenda |
Lead Kick Off Meeting Produce Meeting Minutes and Incorporate Comments Identify Cx Team Members
Review Meeting Minutes & Comment Identify Cx Team Members
Review Meeting Minutes & Comment Identify Cx Team Members
Review Meeting Minutes & Comment
| Duration Schedule for Commissioning Activities |
| Refine Commissioning Duration Schedule provided with the specification to include Commissioning Activities, Estimated Duration for each Activity and Conditions Required for Activity Execution |
| Review Commissioning Agent Duration Schedule and Comment as Appropriate |
Schedule VAMC Personnel to support Commissioning Process as appropriate
| Review Commissioning Agent Duration Schedule and Comment as Appropriate |
| Review Commissioning Agent Duration Schedule and Comment as Appropriate |
Incorporate Commissioning Activities into Project Critical Path Method (CPM) Schedule.
Confirm with Commissioning Agent
| Submittal & Shop Drawing Review |
| Provide a list of Required Shop Drawings to CM/GC |
Review required Shop Drawings in parallel with A/E Team.
Deliver Comments to A/E Team as part of Submittal Review Process
| None |
| Review Commissioning Agent Comments |
Incorporate into A/E Comments as Appropriate Communicate with Commissioning Agent where Cx comments are deemed inappropriate.
Deliver appropriate Shop Drawings to Commissioning Agent when provided to A/E Team.
Commissioning Team Roles and Responsibilities Construction Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Review RFI’s ASI’s and other Contract Documents |
| Review documents to identify impacts on Commissioning Process. Review to identify any conflicts with the project OPR. |
| None |
| In addition to other contract responsibilities, review and respond to CxA comments. |
| In addition to other contract responsibilities, review and respond to CxA comments. |
| Project Commissioning Plan |
| Update Project Commissioning Plan to include specific individuals and team members. |
Update as required for changes in project schedule or work scope as appropriate.
| Review Cx Plan & Comment |
| Review Cx Plan & Comment |
| Review Cx Plan & Comment |
Support Construction Team adherence to Cx Plan
| Site Observations |
| Visit the Project Site on a regular scheduled basis as agreed upon with the VA COR. |
Submit Site Visit Report to COR.
Update and deliver Commissioning Issues Log Review Site Visit Report & Comment as Appropriate Review Site Visit Report & Comment as Appropriate
Assist the Commissioning Agent in resolving all Design related Commissioning Issues.
Forward Site Visit Report to all Subcontractors, Commissioning Representatives and other appropriate construction team personnel.
Review Site Visit Report & Comment as Appropriate Assist the Commissioning Agent in resolving all commissioning Issues.
Commissioning Team Roles and Responsibilities Construction Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Commissioning Team Meetings |
| Prepare and disseminate Agenda for regular periodic Cx Team Meetings |
Lead Cx Team Meetings Produce Meeting Minutes and Incorporate Comments VAMC Cx Team Members Attend
Review Meeting Minutes & Comment A/E Cx Team Members Attend
Review Meeting Minutes & Comment Cx Team Members Attend
Review Meeting Minutes & Comment
| Develop Pre |
| Develop Pre Functional |
| Review & Comment as |
| Review & Comment as |
| Review & Comment – All |
| Functional |
| Checklists. (PFC’s) |
| appropriate |
| appropriate |
| Cx Team Members. |
| Checklists (PFC’s) |
| Provide to Contractor for comment. |
Incorporate PFC
Disseminate final PFC’s requirements into start up for use by Construction schedules and processes.
Team.
Develop Functional Performance Test (FPT’s) Procedures Develop Functional Performance Tests (FPT’s).
Provide to Contractor team for comment.
Disseminate final FPT’s for use by Construction Team.
| Review & Comment as appropriate |
| Review & Comment as appropriate |
| Review & Comment – All Cx Team Members. |
Incorporate FPT requirements into project and personnel schedules.
Commissioning Team Roles and Responsibilities Construction Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Review Contractor Equipment Startup Checklists, TAB Reports and PFC’s |
| Review & Comment on results of Start Up testing, TAB results and PFC documentation. |
Field Verify a sampling of PFC’s to confirm compliance with PFC requirements. Evaluate readiness for Functional Performance Testing
| Review & Comment as appropriate |
| Review & Comment as appropriate |
| Provide Factory and Contractor Start Up documentation in accordance with Specifications and PFC’s to VA COR, Commissioning Agent and A/E Team for review & comment. |
Correct any deficiencies or deviations noted on the Commissioning Issues Log and report corrective action.
| Review Operations & Maintenance Manuals |
| Review & Comment on Operations and Maintenance Manuals. |
Incorporate into Systems Training as appropriate.
| Review & Comment on Operations and Maintenance Manuals. |
| Review & Comment on Operations and Maintenance Manuals. |
| Complete & Submit Operations and Maintenance Manuals prior to equipment start up and execution of Pre Functional Checklists. |
Correct issues identified with O&M Manuals identified on the Commissioning Issues Log.
Commissioning Team Roles and Responsibilities Acceptance and Testing Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
Systems Functional Performance Testing
In collaboration with the Contractor Commissioning Team, direct the execution of the Functional Performance Testing.
Identify issues and deficiencies in system operation and performance on the Commissioning Issues Log.
Retest systems as appropriate to demonstrate compliance with the Contract Documents and the Commissioning Plan.
Participate with the Commissioning Agent as agreed upon to support the commissioning process and facilitate training of the Operations Team.
Review & Comment on Commissioning Issues Log as appropriate.
| Review & Comment on the Commissioning Issues Log as appropriate. |
| Provide Qualified Technicians and Professionals to operate the installed systems and components as required by the Functional Performance Testing and any retesting required by the Commissioning Agent. |
Provide documentation of test results from installed systems as required by the FPT’s.
Correct issues and deficiencies identified on the Commissioning Issues Log and report methods and results of corrective actions to the Commissioning Agent.
Commissioning Team Roles and Responsibilities Acceptance and Testing Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Prepare Systems Manuals |
| Utilizing the accumulated information and data, prepare a Systems Manual for the Operations Team. |
Review submitted data and note any issues or deficiencies on the Commissioning Issues Log.
Deliver Systems Manual to the Cx Team for Review and Comment.
Review Systems Manual & Comment Provide systems diagrams and other appropriate data to the Commissioning Agent in electronic format for development of Systems Manual.
Review Systems Manual & Comment Provide data, including record drawings and submittal data for all commissioned systems.
Correct any deficiencies and issues identified with the submitted data.
Review Systems Manual & Comment
| Training Plan Review |
| Facilitate development of Training Agendas. |
Collaborate with CM/GC and VAMC teams to schedule training activities.
Review and Approve all CM/GC training agendas. Note any issues or deficiencies in Agendas on the Commissioning Issues Log.
Review Training Plan & Comment
Schedule Appropriate Operations Personnel in accordance with the training schedule.
| Review Training Plan & Comment |
| Develop training agendas in accordance with Project Specifications and submit to Commissioning Agent for review. |
Coordinate training schedule with Commissioning Agent and other Cx Team members.
Schedule and execute training in accordance with training schedule and agendas.
Commissioning Team Roles and Responsibilities Acceptance and Testing Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Systems Training |
| Develop Systems Training Sessions in accordance with the Commissioning Plan. Sessions shall include the use of the Operations and Maintenance Manual and a ‘Systems Manual’ developed for the VAMC operations Team. |
Deliver Systems Training in accordance with the approved Systems Training Agenda.
| Schedule key O&M Personnel to attend Systems Training Sessions. |
| Review & Comment on Systems Training Agenda. |
| Review & Comment on Systems Training Agenda. |
| Final Commissioning Report |
| Create and submit Final Commissioning Report in accordance with the Commissioning Plan and other contract requirements. |
| Review & Comment on Final Commissioning Plan |
| Review & Comment on Final Commissioning Report |
| None |
| Lessons Learned Review Meeting |
| Distribute the Agenda for the Lessons Learned Meeting. |
Lead the Lessons Learned Meeting.
Complete and distribute Meeting Minutes.
Incorporate comments as appropriate.
Attend & Contribute to Meeting.
Review & Comment on Meeting Minutes Attend & Contribute to Meeting.
Review & Comment on Meeting Minutes Attend & Contribute to Meeting.
Review & Comment on Meeting Minutes
Commissioning Team Roles and Responsibilities Warranty Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Deferred and/or Seasonal Testing |
| Schedule & Execute Seasonal Testing in Accordance with Functional Performance Testing Protocols. |
Maintain & Distribute Warranty Phase Commissioning Issues Logs.
Facilitate and record resolution to identified Issues and Deficiencies recorded on Commissioning Issues Log.
Provide O&M Personnel to support seasonal testing in accordance with the Commissioning Plan.
Review Commissioning Agent Issues Log & Comment Operations Team will operate systems under the deferred season testing protocols.
Review & Comment on Seasonal Testing.
Provide and report resolution of any issue identified as a Design Issue.
Contractor will be invited to participate in the execution of seasonal testing and assist in resolution of issues and deficiencies identified.
Record resolution for each issues based on A/E Response
Commissioning Team Roles and Responsibilities Warranty Phase
Commissioning Team Member Responsibilities
| Commissioning Agent |
| VAMC |
| A/E Team |
| Contractor |
| Post-Occupancy Warranty Checkup |
| Meet with the VAMC Operations Team. |
Interview team members to evaluate system performance and identify any issues with operation of the commissioned systems.
Evaluate system performance through a review of operating performance data and warranty phase (re- commissioning) tests as identified in the Commissioning Plan and Systems Manual.
Develop a Warranty Report identifying any outstanding warranty issues for VAMC use in resolving warranty issues on the project.
Provide O&M personnel to participate with the Commissioning Agent in the Post Occupancy Warranty Checkup.
Identify any outstanding or persistent warranty issues to the Commissioning Agent.
Review and approve Final Commissioning Report Amendment.
A/E Team will be invited to participate at their discretion.
Review & Comment on Seasonal Testing.
Provide and report resolution of any issue identified as a Design Issue.
Facilitate Post Occupancy Warranty Check Up Meetings.
Contractor will be invited to participate at his discretion. Assist in resolution of issues and deficiencies identified.
Assist in facilitating execution of all warranty obligations identified.
| Final Commissioning Report Amendment |
| Create and submit Final Commissioning Report Amendment in accordance with the Commissioning Plan and other contract requirements. |
| Review & Approve Final Commissioning Report Amendment. |
| Review & Comment on Final Commissioning Report |
| None |
3.1 REFERENCES
1. Department of Veterans Affairs, Whole Building Commissioning Process Manual. This document can be found at http://www.cfm.va.gov/til/spclRqmts.asp#Cx
2. TIL - Master Construction Specifications (PG-18-1), Section 01 91 00 – General Commissioning Requirements. This document can be found at http://www.cfm.va.gov/til/spec.asp#01
3. Construction Project Specifications: To be developed in the design phase.
4. Construction Project Drawings: To be developed in the design phase.
- - - END OF SCOPE - - -
B.4
PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1.00
JB
Site visits for commissioning.
1.00
JB
Surveys, testing, material study, and site analysis study for Commissioning of HVAC Controls.
GRAND TOTAL
SECTION C - CONTRACT CLAUSES
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES (APR 2012)
(a) This Government Property listed in paragraph (e) of this clause is furnished to the Contractor in an "as-is, where is" condition. The Government makes no warranty regarding the suitability for use of the Government property specified in this contract. The Contractor shall be afforded the opportunity to inspect the Government property as specified in the solicitation.
(b) The Government bears no responsibility for repair or replacement of any lost Government property. If any or all of the Government property is lost or becomes no longer usable, the Contractor shall be responsible for replacement of the property at Contractor expense. The Contractor shall have title to all replacement property and shall continue to be responsible for contract performance.
(c) Unless the Contracting Officer determines otherwise, the Government abandons all rights and title to unserviceable and scrap property resulting from contract performance. Upon notification to the Contracting Officer, the Contractor shall remove such property from the Government premises and dispose of it at Contractor expense.
(d) Except as provided in this clause, Government property furnished under this contract shall be governed by the Government Property clause of this contract.
(e) Government property provided under this clause:
(End of Clause)
C.2 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
The Contractor shall not make reference in its commercial advertising to Department of Veterans Affairs contracts in a manner that states or implies the Department of Veterans Affairs approves or endorses the Contractor’s products or services or considers the Contractor’s products or services superior to other products or services.
(End of Clause)
C.3 VAAR 852.211-70 SERVICE DATA MANUALS (NOV 1984)
(a) The successful bidder will supply operation/maintenance (service data) manuals with each piece of equipment in the quantity specified in the solicitation and resulting purchase order. As a minimum, the manual(s) shall be bound and equivalent to the manual(s) provided the manufacturer's designated field service representative as well as comply with all the requirements in paragraphs (b) through (i) of this clause. Sections, headings and section sequence identified in (b) through (i) of this clause are typical and may vary between manufacturers. Variances in the sections, headings and section sequence, however, do not relieve the manufacturer of his/her responsibility in supplying the technical data called for therein.
(b) Title Page and Front Matter. The title page shall include the equipment nomenclature, model number, effective date of the manual and the manufacturer's name and address. If the manual applies to a particular version of the equipment only, the title page shall also list that equipment's serial number. Front matter shall consist of the Table of Contents, List of Tables, List of Illustrations and a frontispiece (photograph or line drawing) depicting the equipment.
(c) Section I, General Description. This section shall provide a generalized description of the equipment or devices and shall describe its purpose or intended use. Included in this section will be a table listing all pertinent equipment specifications, power requirements, environmental limitations and physical dimensions.
(d) Section II, Installation. Section II shall provide pertinent installation information. It shall list all input and output connectors using applicable reference designators and functional names as they appear on the equipment. Included in this listing will be a brief description of the function of each connector along with the connector type. Instructions shall be provided as to the recommended method of repacking the equipment for shipment (packing material, labeling, etc.).
(e) Section III, Operation. Section III will fully describe the operation of the equipment and shall include a listing of each control with a brief description of its function and step-by-step procedures for each operating mode. Procedures will use the control(s) nomenclature as it appears on the equipment and will be keyed to one or more illustrations of the equipment. Operating procedures will include any preoperational checks, calibration adjustments and operation tests. Notes, cautions and warnings shall be set off from the text body so they may easily be recognizable and will draw the attention of the reader. Illustrations should be used wherever possible depicting equipment connections for test, calibration, patient monitoring and measurements. For large, complex and/or highly versatile equipment capable of many operating modes and in other instances where the Operation Section is quite large, operational information may be bound separately in the form of an Operators Manual. The providing of a separate Operators manual does not relieve the supplier of his responsibility for providing the minimum acceptable maintenance data specified herein. When applicable, flow charts and narrative descriptions of software shall be provided. If programming is either built-in and/or user modifiable, a complete software listing shall be supplied. Equipment items with software packages shall also include diagnostic routines and sample outputs. Submission information shall be given in the Maintenance Section to identify equipment malfunctions that are software related.
(f) Section IV, Principles of Operation. This section shall describe in narrative form the principles of operation of the equipment. Circuitry shall be discussed in sufficient detail to be understood by technicians and engineers who possess a working knowledge of electronics and a general familiarity with the overall application of the devices. The circuit descriptions should start at the overall equipment level and proceed to more detailed circuit descriptions. The overall description shall be keyed to a functional block diagram of the equipment. Circuit descriptions shall be keyed to schematic diagrams discussed in paragraph (i) below. It is recommended that for complex or special circuits, simplified schematics should be included in this section.
(g) Section V, Maintenance. The maintenance section shall contain a list of recommended test equipment, special tools, preventive maintenance instructions and corrective information. The list of test equipment shall be that recommended by the manufacturer and shall be designated by manufacturer and model number. Special tools are those items not commercially available or those that are designed specifically for the equipment being supplied. Sufficient data will be provided to enable their purchase by the Department of Veterans Affairs. Preventive maintenance instructions shall consist of those recommended by the manufacturer to preclude unnecessary failures. Procedures and the recommended frequency of performance shall be included for visual inspection, cleaning, lubricating, mechanical adjustments and circuit calibration.