36C25618U0323-0002001.docx
DOCX document 14 KB Posted
- Attached to
- Services Commissioning for HVAC Digital Controls Federal contract opportunity
- Solicitation number
- 36C25618U0323
About this file
36C25618U0323 0002 question and answers.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -15380.docx | DOCX document | |
| 36C25618U0323-0002007.pdf | ||
| 36C25618U0323-0002005.pdf | ||
| 36C25618U0323-0002004.pdf | ||
| 36C25618U0323-0002006.pdf | ||
| 36C25618U0323-0002012.pdf | ||
| 36C25618U0323-0002000.docx | DOCX document | |
| 36C25618U0323-0002013.pdf | ||
| 36C25618U0323-0002010.pdf | ||
| 36C25618U0323-0002002.pdf | ||
| 36C25618U0323-0002003.pdf | ||
| 36C25618U0323-0002008.pdf | ||
| 36C25618U0323-0002011.pdf | ||
| 36C25618U0323-0002009.pdf | ||
| 36C25618U0323-0002014.pdf | ||
| 36C25618U0323-0001000.docx | DOCX document | |
| 36C25618U0323-002.pdf | ||
| 36C25618U0323-001.docx | DOCX document | |
| 36C25618U0323-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Answers to question received
1. Is a commissioning agent certified through AHRAE acceptable? This is not acceptable
2. Project Budget is just under $6 million.
3. Square-Footage affected is approximately 503,000 sf.
4. Project estimated duration Start/End Schedule targets: Construction began in February 2017 and we expect they will be complete by 10/30/18, would expect Start upon award and finish in approximately 60-90 days. and/or specific buildings affected by this project were 2,4,6,7,8,9,16,45,46,49 and 147. and equipment. The HVAC Controls Project affected approximately 30 air handlers, chiller plant, boiler plant, and solar panel system. There are approximately 4900 points in the control system.
5. Systems to be Commissioned (Pg5) lists the types of equipment included. There are approximately 30 air handlers, a chiller plant, a boiler plant, and a solar panel system. A fiber optic loop, actuators, valves, meters and a myriad of other components were installed as part of this project – see attached Drawings (sent in separate emails) and Specs (attached).
6. A rough estimate is needed of equipment counts to appropriately estimate field labor to support that verification. There are approximately 4,800 points in the control system.
7. Is the price cost schedule requesting the total fee to fully commission the project, or to develop the full scope of work? The fee to fully commission the HVAC Controls project.
8. Project equipment estimates for HVAC controls impact. Material costs associated with this project were approximately $2.1 million.
9. The pricing breakdown in ‘36C25618U0323-001’ Section B4 (Pg29) requests the following:
0001 Site visits for commissioning. # of site visits and travel costs associated with them.
10. 0002 Surveys, testing, material study, and site analysis study for Commissioning of HVAC Controls. Costs for any special studies/surveys and cost for actual commissioning