36C25618U0323-0002011.pdf

PDF 2 MB Posted

Attached to
Services Commissioning for HVAC Digital Controls Federal contract opportunity
Solicitation number
36C25618U0323
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

36C25618U0323 0002 Drawings - Symbols _ General Notes.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Services Commissioning for HVAC Digital Controls, newest first.
File Type Posted
-15380.docx DOCX document
36C25618U0323-0002007.pdf PDF
36C25618U0323-0002005.pdf PDF
36C25618U0323-0002003.pdf PDF
36C25618U0323-0002008.pdf PDF
36C25618U0323-0002004.pdf PDF
36C25618U0323-0002006.pdf PDF
36C25618U0323-0002012.pdf PDF
36C25618U0323-0002000.docx DOCX document
36C25618U0323-0002013.pdf PDF
36C25618U0323-0002010.pdf PDF
36C25618U0323-0002002.pdf PDF
36C25618U0323-0002009.pdf PDF
36C25618U0323-0002014.pdf PDF
36C25618U0323-0002001.docx DOCX document
36C25618U0323-0001000.docx DOCX document
36C25618U0323-002.pdf PDF
36C25618U0323-001.docx DOCX document
36C25618U0323-000.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

LOCAL TEMPERATURE CONTROL PANEL

HVAC CONTROL PANEL

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TEMPERATURE CONTROLLER. SEE SEQUENCE OF

OPERATION

VARIABLE FREQUENCY DRIVE

PRESSURE CONTROLLER. SEE SEQUENCE OF

OPERATION

SPEED CONTROLLER. SEE SEQUENCE OF OPERATION

FLOW CONTROLLER. SEE SEQUENCE OF OPERATION

PRESSURE SWITCH HIGH

MOTOR STARTER

FLOW SWITCH

LENGTH IN DUCT WHEN SPACE PERMITS.)

TEMPERATURE SENSING ELEMENT FOR

TRANSMITTING TEMPERATURE TO EMCS

(PROVIDE 12 INCHES [200mm] MINIMUM

SENSOR WITH AVERAGING ELEMENT TO TRANSMIT

TEMPERATURE TO EMCS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SQUARE 1-WAY CEILING DIFFUSERS

BACK DRAFT DAMPER

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

MANUAL SPLITTER DAMPER

POINT OF CHANGE IN DUCT CONSTRUCTION BY

STATIC PRESSURE CLASS. THE NUMBER ASSIGNS

PRESSURE CLASS (IN. OF WATER) WHICH WILL

ACCOMMODATE MAXIMUM OPERATING PRESSURE

COMBINATION FIRE/SMOKE DAMPER

IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES

THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR

ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.

STAINLESS STEEL DUCT

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION

UNIT HEATER (HORIZONTAL)

TERMINAL UNIT WITH REHEAT COIL

ROOM THERMOSTAT

TEMPERATURE TRANSMITTER

ROOM HUMIDISTAT

MOISTURE (HUMIDITY) TRANSMITTER

PRESSURE TRANSMITTER

TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

FLOW TRANSMITTER

CURRENT TRANSMITTER

CONDUCTIVITY TRANSMITTER

STATIC PRESSURE SENSOR

SMOKE DETECTOR

DIFFERENTIAL PRESSURE TRANSMITTER

TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE

TEMPERATURE SWITCH, LOW (FREEZESTAT)

HAND SWITCH (HAND-OFF-AUTO SWITCH)

ELECTRIC OPERATED CONTROL DAMPER/OR VALVE

VALVE OR DAMPER POSITION CONTROLLER

LEVEL TRANSMITTER

1. ALL CONDUIT, WIRING, PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE CEILING.

2. ACCESS PANELS SHALL BE FURNISHED FOR ALL CONCEALED CONTROL DEVICES AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.

3. DEMO ALL EXIST & NEWLY ABANDONED CONTROL PANELS. NO UNUSED CONTROL PANELS

ARE TO REMAIN.

4. DEMO ALL EXIST & NEWLY ABANDONED CONTROL CONDUIT IN MECHANICAL ROOMS.

5. DEMO EXIST & NEWLY ABANDONED CONTROL AIR LINES INSIDE ANY ROOM, MECHANICAL OR

OTHERWISE. ABANDONED CONTROL AIR MAINS IN CORRIDORS MAY REMAIN.

6. ALL CONTROLLERS (BUILDING CONTROLLERS, ADVANCED APPLICATION CONTROLLERS,

APPLICATION SPECIFIC CONTROLLERS, ETC.) ON CAMPUS SHALL BE SUPPLIED BY THE

CAMPUS SYSTEM MANUFACTURER AND SHALL BE THE LATEST VERSION. EXISTING CONTROL

ENCLOSURES AND CONDUIT MAY BE REUSED.

7. GATEWAYS TO INTERFACE WITH CONTROLLERS SHALL NOT BE PERMITTED.

8. EXIST DDC ACTUATORS, SENSORS, ETC. MAY BE REUSED IF FUNCTIONAL AND COMPATIBLE.

9. ALL EXIST PNEUMATIC CONTROL DEVICES SHALL BE REPLACED WITH DDC.

10. ALL EQUIPMENT SHOWN SHALL BE CONTROLLED BY DDC CONTROL SYSTEM UNLESS NOTED

OTHERWISE.

11. ALL SETPOINTS SHALL BE ADJUSTABLE.

12. TEST AND BALANCE ALL WATER FLOWS FOR AHU'S, FCU'S, VAV BOXES, ETC PRIOR TO

STARTING WORK. PROVIDE REPORT TO VA. BALANCE ALL WATER FLOWS TO VALUES SHOWN

IN DRAWINGS. IF VALUE IS NOT SHOWN RETURN TO PRE-CONSTRUCTION VALVE.

13. TEST AND BALANCE ALL TOTAL AIR FLOWS FOR AHU'S, VAV BOXES (MAX AND MIN) ETC PRIOR

TO STARTING WORK. PROVIDE REPORT TO VA. BALANCE ALL AIR FLOWS TO VALUES SHOWN IN

DRAWINGS. IF VALUE IS NOT SHOWN RETURN TO PRE-CONSTRUCTION VALUE.

14. TEST AND BALANCE ALL TOTAL AIR FLOW TO FAN COIL UNITS FROM AHU'S PRIOR TO STARTING

WORK. PROVIDE REPORT TO VA. BALANCE ALL AIR FLOWS TO VALUES SHOWN IN DRAWINGS.

IF VALUE IS NOT SHOWN RETURN TO PRE-CONSTRUCTION VALUE.

15. IF ANY PRE-CONSTRUCTION TESTING VALUE DIFFERS SIGNIFICANTLY FROM SCHEDULED

VALUE (±10%), REQUEST DIRECTION FROM VA FOR NEW VALUE PRIOR TO STARTING WORK.

16. PROVIDE CONTROL TRANSFORMERS FOR VAV BOXES, FCU'S, ETC. THAT ARE BEING

CONVERTED FROM PNEUMATIC TO DDC CONTROLS.

17. ALL EXIST THERMOSTATS (EVEN IF EXIST DDC) SHALL BE REPLACED IN LOCATION OF EXIST OR

WHERE SHOWN ON PLANS PER SPECIFICATIONS FOR UNIFORMITY ON CAMPUS. THE ONLY

EXCEPTION IS ROOM THERMOSTATS IN BUILDING 9 PATIENT ROOMS SHALL BE INSTALLED IN

RA PLENUM OF FCU'S OPPOSITE OA INTAKE WITH SHEILD TO LIMIT OA TEMPERATURE EFFECT

ON SENSOR.

18. PROVIDE CONTROL SYSTEM LOG-IN FOR BLDG 9 NURSES TO INDIVIDUALLY OVERRIDE BLDG 9

PATIENT ROOM SETPOINTS. THIS SPACE TEMPERATURE OVERRIDE SHALL BE THE ONLY

CAPABILITY FOR THIS LOG-IN.

19. LOW VOLTAGE CABLING ABOVE CEILING TO BE ROUTED IN EXISTING CABLE TRAYS WHERE

SPACE ALLOWS. INSTALL NEW CABLE TRAYS WHERE REQUIRED. CABLING IS NOT TO BE LAID

ON TOP OF CEILING.

20. ALL FIBER OPTIC NETWORK DEVICES THAT REQUIRE 120 VAC SHALL BE CONNECTED TO

EMERGENCY POWER. CONTRACTOR SHALL ROUTE TO NEAREST 120V EMERGENCY PANEL

WITH SPARE CAPACITY, INSTALL NEW 20 A-1 POLE BREAKER AND MAKE CONNECTION.

PROVIDE 20 A SNAP SWITCH AT DEVICE FOR DISCONNECT. CONTRACTOR TO VERIFY 120V

EMERGENCY PANEL LOCATION DURING PRE-BID WALKTHROUGH.

21. ANY CONTROLLER FOR EQUIPMENT THAT IS POWERED BY EMERGENCY POWER SHALL ALSO

BE CONNECTED TO EMERGENCY POWER.

22. CONTRACTOR TO INSTALL ONE ADDITIONAL WEATHER STATION. LOCATION TO BE SUGGESTED

BY VENDOR AND APPROVED BY THE VA.

23. ALL EXISTING SMOKE DAMPERS SHOWN ON PLANS ARE PNEUMATIC CONTROLLED AND ARE

TO BE CONVERTED TO ELECTRONIC CONTROL AND CONNECTED TO FIRE ALARM SYSTEM.

EXISTING ELECTRONIC SMOKE DAMPERS ARE NOT SHOWN.

24. NEW VARIABLE FREQUENCY DRIVES TO BE ABB OR APPROVED EQUAL. SIEMENS DRIVES ARE

NOT APPROVED.

25. CONTRACTOR TO FIELD VERIFY EXISTING RATED WALLS. ALL RATED WALL PENETRATIONS TO

BE SEALED TO MAINTAIN WALL RATING.

26. SEE SPEC SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS FOR CONTRACTORS

RESPONSIBILITIES DURING COMMISSIONING.

THIS PROJECT SHALL UPGRADE THE EXISTING VAMC CAMPUS WIDE SIEMENS APOGEE EMS SYSTEM AND

INFRASTRUCTURE TO FULLY INTEGRATE ALL BUILDINGS CONTAINED IN THE CONTRACT DOCUMENTS &

UTILITY MONITORING & METERING SYSTEMS. THE NEW SYSTEM INCLUDING INTERFACE TO EXISTING

SYSTEMS AND EQUIPMENT SHALL OPERATE AND FUNCTION AS ONE COMPLETE SYSTEM INCLUDING ONE

DATABASE OF CONTROL POINT OBJECTS AND GLOBAL CONTROL LOGIC CAPABILITIES (TRENDING, LOGGING, METERING, ETC.). FACILITY OPERATORS SHALL HAVE COMPLETE OPERATIONS AND CONTROL

CAPABILITY OVER ALL SYSTEMS, NEW AND EXISTING INCLUDING, MONITORING, TRENDING, GRAPHING, SCHEDULING, ALARM MANAGEMENT, GLOBAL POINT SHARING, GLOBAL STRATEGY DEPLOYMENT, GRAPHICAL OPERATIONS INTERFACE AND CUSTOM REPORTING AS SPECIFIED. UTILIZE OPEN PROTOCOL

DDC CONTROL FOR EQUIPMENT AND SOFTWARE, BACNET. THE UPGRADED SYSTEM SHALL HAVE BUILT-IN

CAPABILITY TO CONTROL FUTURE ENERGY GENERATING FACILITIES TO MINIMIZE UTILITY COST. FUTURE

ENERGY GENERATING TIE-IN SHALL BE "PLUG-N-PLAY".

PROJECT DESCRIPTION

F E

D C

B G

Alexandria, Louisiana

A&E Design - Upgrade Energy Management Control Systems

October 30, 2013

VA256-12-C-0253

VETERANS HEALTH CARE

SYSTEM

Alexandria, LA

A

U.S. Department of Veterans Affairs

SYMBOLS & GENERAL NOTES

--- WLP NMT

M001 10-30-13

D DAMPER - AUTOMATIC

DB DECIBELS

Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DP DEW POINT TEMPERATURE

DPS DIFFERENTIAL PRESSURE SENSOR

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE

DRAIN

CD CEILING DIFFUSER

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CG CEILING GRILLE

CHP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CO CLEAN OUT

CO2 CARBON DIOXODE

CP CONDENSATE PUMP

CR CEILING REGISTER

CSG CLEAN STEAM GENERATOR

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BIW BACKWARD INCLIND WHEEL (FAN)

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

A/E ARCHITECT / ENGINEER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACD AUTOMATIC CONTROL

DAMPER,MODULATING

ACD-TP AUTOMATIC CONTROL

DAMPER,TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AHU AIR-HANDLING UNIT

AP ACCESS PANEL

APD AIR PRESSURE DROP

AS AIR SEPARATOR

EA EXHAUST AIR

EAG EXHAUST AIR GRILLE

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXIST EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE

DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FV FACE VELOCITY

GA GAUGE

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HEX HEAT EXCHANGER

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY

(STEAM)

HSTAT HUMIDISTAT

HW HOT WATER

HWC HOT WATER COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

M METER

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQF SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSR SOLID SEPARATOR

SV STEAM PRESSURE REDUCING VALVE

RA RETURN AIR

RAHU ROFF AIR HANDLING UNIT

RAT RETURN AIR TEMPERATURE

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RV RELIEF VALVE

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSIG POUNDS PER SQUARE INCH – GAGE

PSV PRESSURE SAFETY VALVE

YR YEAR

Wb WET-BULB (TEMPERATURE)

WEF WALL EXHAUST FAN

WF WATER FILTER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WM WATER METER

WPD WATER PRESSURE DROP

V VALVE

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VI VIBRATION ISOLATOR

UH UNIT HEATER

PIPING SYMBOLS

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HOT WATER HEATING SUPPLY

CONDENSATE PUMP DISCHARGE

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

VENT LINE

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

MAKE-UP WATER

HOT WATER HEATING RETURN

LOW PRESSURE GRAVITY CONDENSATE RETURN

MEDIUM PRESSURE GRAVITY CONDENSATE RETURN

HIGH PRESSURE GRAVITY CONDENSATE RETURN

NATURAL GAS MAIN FUEL

VALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

HOSE CONNECTOR

STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

FLOW METER

L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LB/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

KG KILOGRAM

KPA KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ID INSIDE DIAMETER

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

GENERAL SYMBOLS

LIMIT OF DEMOLITION

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

AND EXISTING WORK

POINT OF CONNECTION BETWEEN NEW

PRESSURE GAGE

THERMOMETER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

MANUAL AIR VENT

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES

THERMOSTAT

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

PRIMARY ELEMENT FOR FLOW METERING

THERMOSTATIC STEAM TRAP (T)

CLOSED-FLOAT-THERMOSTATIC STEAM TRAP ASSEMBLY (T)

INVERTED BUCKET STEAM TRAP ASSEMBLY (T)

QUICK-COUPLE HOSE CONNECTOR

PRESSURE GAGE (WITH SIPHON ON STEAM SERVICE)

F E

D C

B G

Alexandria, Louisiana

A&E Design - Upgrade Energy Management Control Systems

October 30, 2013

VA256-12-C-0253

VETERANS HEALTH CARE

SYSTEM

Alexandria, LA

A

U.S. Department of Veterans Affairs

SYMBOLS & ABBREVIATIONS

--- WLP NMT

M002

FIBER NETWORK SPECIFICATIONS (CONTINUED):

CONSTRUCTION:

1. FIBER IS TO BE ROUTED IN EXISTING ARC NET CABLE BANK. PROVIDE NEW DUCT BANK WHERE

SPACE REQUIRES.

2.1” EMT CONDUIT SHALL BE INSTALLED FROM DUCT BANK UP TO A JUNCTION BOX OR

FIBER-RATED LB AT THE BUILDING ENTRY POINT TO PROTECT THE FIBER WHERE IT IS

EXPOSED ABOVE GROUND.

TESTING

1. ALL STRANDS OF TERMINATED FIBER SHALL BE TESTED WITH A LIGHT SOURCE AND POWER

METER IN BOTH DIRECTIONS AT BOTH 850NM AND 1300NM WAVELENGTHS.

2. ALL STRANDS OF TERMINATED FIBER SHALL BE TESTED WITH AN OTDR IN BOTH DIRECTIONS

AT BOTH 850NM AND 1300NM WAVELENGTHS.

3. ALL STRANDS MUST HAVE DB LOSS RESULTS THAT ARE IN COMPLIANCE WITH EIA/TIA

STANDARDS BASED ON LENGTH, CONNECTOR AND SPLICE LOSS FOR MULTIMODE FIBER AT

EACH WAVELENGTH.

4. ALL FIBER RESULTS SHALL BE PROVIDED IN BOTH PRINTED AND ELECTRONIC FORMAT UPON

COMPLETION OF THE PROJECT.

MANAGED NETWORK SWITCHES.

1. SWITCHES ARE TO BE SCHNEIDER CONNEXIUM SWITCHES. CONTRACTOR TO SUPPLY AND

INSTALL A TCSESM083F2CUO (8 PORT), TCSESM163F2CUO (16 PORT), OR TCSESM243F2CUO (24

PORT) NEAR EACH WALL MOUNTED PATCH PANEL COMPLETE WITH LOCKABLE ENCLOSURE

AND POWER SUPPLY. CONTRACTOR TO SELECT A SWITCH FOR EACH LOCATION SUCH THAT

THERE WILL BE A MINIMUM OF 4 SPARE WIRED ETHERNET PORTS AVAILABLE FOR USE BY THE

OWNER. CONTRACTOR SHALL PROVIDE 24 VDC POWER SUPPLY.

INTERNET CONNECTION

1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A VA APPROVED INTERNET CONNECTION

DEVICE THAT WILL CONNECT NETWORK TO INTERNET. PROVIDE ADEQUATE FIREWALL TO

PREVENT UNAUTHORIZED ACCESS TO INTERNET.

FIBER NETWORK SPECIFICATIONS:

FIBER OPTIC CABLE IS REQUIRED TO BE INSTALLED IN A RING TOPOLOGY BETWEEN THE SIXTEEN

(16) BUILDINGS LISTED ON THE FIBER OPTIC NETWORK ROUTING SCHEDULE.

CONTRACTOR REQUIREMENTS:

1. CONTRACTOR SHALL HAVE A BICSI CERTIFIED RCDD ON STAFF TO APPROVE THE FINAL

DESIGN AND TO OVERSEE THE INSTALLATION.

2. CONTRACTOR SHALL FURNISH REFERENCES OF SIMILAR SIZED FIBER OPTIC INSTALLATIONS.

3. CONTRACTOR SHALL FURNISH INDUSTRY CERTIFICATIONS FOR REVIEW THAT DEMONSTRATE

KNOWLEDGE AND EXPERIENCE.

FIBER OPTICAL CABLE REQUIREMENTS:

1. THE FIBER OPTICAL CABLE MUST BE 900 MICRON MULTIMODE TIGHT-BUFFERED

CONSTRUCTION DESIGNED FOR INTRA-BUILDING ENVIRONMENTS.

2. THE SHEATH SHALL BE UL LISTED OFCP OR OFCR IN ACCORDANCE WITH NEC ARTICLE 770.

3. THE OPTICAL FIBER SHALL MEET THE REQUIREMENTS OF FDDI, ANSI X3T9.5 PMD FOR 62.5/125

MICRON FOR USE IN 10/100 MB FIBER OPTIC NETWORKS.

4. FIBER OPTIC CABLE SHALL HAVE 24-STRANDS.

5. FIBER OPTIC CABLE SHALL BE ARMORED AND BE RATED FOR DIRECT BURIED INSTALLATION, AS WELL AS FOR USE INDOOR.

6. THE ARMORED SHEATH MUST BE PROPERLY GROUNDED ON EACH END.

7. USE PLENUM CABLE WHERE REQUIRED. IF NON-PLENUM CABLE IS ACCEPTABLE IN THE

BUILDINGS, NON-PLENUM CABLE MAY BE USED. IF PLENUM CABLE IS REQUIRED IN THE

BUILDINGS, THEN USE PLENUM CABLE BETWEEN THE BUILDINGS IN ORDER TO MINIMIZE THE

TRANSITION SPLICES.

8. USE CORNING FREEDM FIBER PART NUMBER 024K8P-31130-A3 (PLENUM) OR APPROVED

EQUAL.

CONNECTOR AND CONNECTOR HOUSING REQUIREMENTS:

1. CONNECTORS SHALL BE CORNING LC-STYLE PART # 95-000-99 OR APPROVED EQUAL.

2. 12 STRANDS OF EVERY FIBER OPTIC CABLE SHALL BE TERMINATED ON BOTH ENDS. THE

REMAINING 12 STRANDS SHALL BE COILED IN THE FIBER HOUSING FOR FUTURE USE.

3. USE CORNING WALL-MOUNT HOUSINGS PART # WCH-04P OR APPROVED EQUAL.

4. USE CORNING 12-PORT LC COUPLER PANELS PART # CCH-CP12-A7 OR APPROVED EQUAL.

ROUTE FIBER OPTIC CABLE ACROSS SITE TO BUILDINGS SHOWN OR LISTED BELOW IN

EXISTING ARC NET CABLE BANK. PROVIDE NEW DUCT BANK WHERE SPACE REQUIRES.

ROUTING SHOWN IS APPROXIMATE. COORDINATE EXACT ROUTE WITH VA, OTHER

UTILITIES, AND SITE CONDITIONS. COORDINATE SCHEDULING OF WORK WITH VA.

RETURN DISTURBED EARTH, PAVING, ETC. TO EXISTING CONDITIONS. PROVIDE

AS-BUILTS IN CAD DEPICTING EXACT ROUTING TO VA FOR THEIR USE.

KEYNOTES (FIBER):

BASEMENT STORAGE ROOM NEAR CHW PUMPS.

ATTIC MECHANICAL ROOM.

BASEMENT NEAR EXISTING CONTROL PANELS & EQUIPMENT.

BASEMENT MECHANICAL ROOM 116.

GROUND FLOOR ROOM 106.

BASEMENT MECHANICAL ROOM 003.

2ND FLOOR MECHANICAL ROOM 2M5.

1ST FLOOR MECHANICAL ROOM.

1ST FLOOR MECHANICAL ROOM 115C.

1ST FLOOR WORK ROOM 109.

ATTIC MECHANICAL ROOM.

ATTIC MECHANICAL ROOM.

1ST FLOOR MECHANICAL ROOM 142.

ON FRONT WALL OF CHILLER ROOM.

LOCATE IN BOILER ROOM ADJACENT TO CONTROL ROOM.

LOCATE IN SWITCHGEAR/SUBSTATION.

NOT USED.

APPROXIMATE LOCATION OF FIBER

NETWORK SWITCH. SEE KEYNOTES

FOR LOCATION DESCRIPTION.

SITE PLAN - MECHANICAL

--- WLP NMT

M100

N

KEYNOTES (METERING):

INSTALL BLDG 5 CHW METER IN CHW MAIN ROUTED THRU CONNECTER FROM BLDG 6. METER

PANEL TO BE LOCATED IN PUMP ROOM ADJACENT TO CONNECTER.

INSTALL STEAM AND DOMESTIC WATER METERS AND PANELS IN ROOM EQUIPMENT ROOM

G07 PRIOR TO ANY BUILDING TAKEOFFS.

FIBER OPTIC NETWORK ROUTING

FROM: TO:

BUILDING: To Building:

1 2 2 3 3 9 9 49

49 4 4 5 5 6 6 8 8 147

147 7 7 41

41 14 14 16 16 45 45 46 46 1

F E

D C

B G

Alexandria, Louisiana

A&E Design - Upgrade Energy Management Control Systems

October 30, 2013

VA256-12-C-0253

VETERANS HEALTH CARE

SYSTEM

Alexandria, LA

A

U.S. Department of Veterans Affairs

DUCT BANK NOTES:

1. CONCRETE SHALL BE 2000 P.S.I. @ 28 DAYS, OR AS SPECIFIED.

2. CONCRETE SHALL BE DYED RED.

3. PROVIDE REINFORCING RODS ON TOP AND BOTTOM OF DUCTS WHEN CROSSING

OR PLACED IN ROADWAYS.

4. MINIMUM COVER TO TOP OF ENVELOPE SHALL BE 24" [610mm].

5. PROVIDE MINIMUM 6" [152mm] SPACE BETWEEN POWER AND

TELECOMMUNICATION DUCTS. INCREASE SIZE AS REQUIRED.

3"

2-WAY DUCT LINE, UNPAVED

3" [76mm]

[7 m m

[7 m m

(T Y

P

[76mm]

3" [76mm]

SELECT EARTH

BACKFILL FROM

TRENCH EXCAVATION

COMPACTED TO 95%

STANDARD PROCTOR.

EXISTING SUBGRADE

COMPACTED TO 95%

STANDARD PROCTOR.

ORIGINAL

UNDISTURBED

GRADE

2-WAY DUCT LINE, ASPHALTIC CONCRETE

3"

3" [76mm]

[7 m m

[7 m m

(T Y

P

[76mm]

3" [76mm]

EXISTING SUBGRADE

COMPACTED TO 95%

STANDARD PROCTOR.

[2 m m

[5 m m

EDGES TO BE TRIMMED TO

STRAIGHT VERTICAL LINE.

ANY LOOSE OR DISTURBED

PAVEMENT MUST BE

REMOVED OR REPLACED.

ORIGINAL UNDISTURBED STREET GRADE

6" MIN.

[152mm]

FLOAT FINISH

CONCRETE TO BE

CLASS "A"

F E

D C

B G

Alexandria, Louisiana

A&E Design - Upgrade Energy Management Control Systems

October 30, 2013

VA256-12-C-0253

VETERANS HEALTH CARE

SYSTEM

Alexandria, LA

A

U.S. Department of Veterans Affairs

METERING LISTS

--- WLP NMT

M101

NOTES:

1. CONNECT ALL EXISTING METERING TO NEW DDC CONTROL SYSTEM. PROVIDE

REAL-TIME GRAPHIC FOR EACH BUILDING. TREND ALL VALUES.

2. WHERE MULTIPLE METERS MEASURE SAME UTILITY IN ONE BUILDING SHOW

INDIVIDUAL METER VALUES AND TOTAL VALUE FOR BUILDING.

3. TEST ALL EXISTING METERS TO INSURE THEY ARE CALABRATED AND FUNCTIONING

PROPERLY. REPAIR/REPLACE ANY NON-FUNCTIONING METERS.

FLOW DIRECTION

2 DIA

MINIMUM STRAIGHT

UPSTREAM PIPE RUN

3 DIA

MINIMUM STRAIGHT

DOWNSTREAM

PIPE RUN

NOTES;

1. INSTALL ONICON F-3200 ELECTROMAGNETIC FLOW

METER OR EQUAL IN DOMESTIC WATER LINE WHERE

INDICATED.

2. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE

REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND

ALL VALUES.

3. MINIMUM POINTS: 4-20mA ANALOG FLOW RATE OUTPUT,

(2) ISOLATED PROGRAMMABLE DIGITAL/PULSE OUTPUTS

(CONFIGURABLE FOR FREQUENCY, PULSE, ALAR, OR

DIRECTION).

4. SIZE AND INSTALL PER MFR'S RECOMMENDATIONS.

5 DIA

REFER TO THE TABLE

BELOW

FOR UPSTREAM DISTANCE

Upstream obstruction Without Flow Conditioner With Flow Conditioner

Single bend preceded by > 9 diameters of straight pipe

10 Diameters 3 Diameters

Pipe size reduction in straight pipe run 10 Diameters 3 Diameters

Multiple bends in plane with < 9 diameters of straight pipe between them 20 Diameters 5 Diameters

Pipe size expansion in straight pipe run 20 Diameters 5 Diameters

Tees 30 Diameters 5 Diameters

Multiple bends out of plane 30 Diameters 5 Diameters

Modulating or regulating valve 40 Diameters 10 Diameters

Minimum Upstream Straight Pipe Run Required

REQUIRED

OVERHEAD

CLEARANCE

30" - 36" Depending on pipe size

NOTES;

1. INSTALL ONICON F-5100 THERMAL MASS FLOW METER

OR EQUAL IN NATURAL GAS LINE WHERE INDICATED.

2. PROVIDE HOT-TAP INSTALLATION KIT.

3. PROVIDE FLOW CONDITIONER WHERE REQUIRED TO

MEET MINIMUM UPSTREAM STRAIGHT PIPE RUN.

4. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE

REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND

ALL VALUES.

5. MINIMUM POINTS: 4-20mA ANALOG MASS FLOW RATE

OUTPUT AND SCALABLE PULSE OUTPUT.

6. SIZE AND INSTALL PER MFR'S RECOMMENDATIONS.

REFER TO THE TABLE FOR

UPSTREAM DISTANCE

30 DIA

30 DIA

30 DIA

20 DIA

15 DIA

10 DIA

10 DIA

OBSTRUCTION

PIPE SIZE REDUCTION / EXPANSION IN STRAIGHT RUN

UPSTREAM

MINIMUM UPSTREAM STRAIGHT RUN REQUIRED

SINGLE BEND PRECEDED BY < 9 DIAMETERS OF

STRAIGHT PIPE RUN

OUTFLOWING TEE / PUMP OUTFLOW

SINGLE BEND PRECEDED BY > 9 DIAMETERS OF

STRAIGHT PIPE RUN

MULTIPLE BENDS OUT OF PLANE

INFLOWING TEE

CONTROL / MODULATING VALVE

RETURN

FLOW DIRECTION

SUPPLY

FLOW METER

5 DIA

NOTES;

1. INSTALL ONICON F-3500 INSERTION ELECTROMAGNETIC

FLOW METER WITH SYSTEM 10 MOD BTU METER OR

EQUAL IN CHILLED OR HEATING HOT WATER PIPING

WHERE INDICATED.

2. PROVIDE INSTALLATION KIT. HOT TAP WHERE REQUIRED

TO PREVENT SHUT-DOWN.

3. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE

REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND

ALL VALUES.

4. MINIMUM POINTS: TOTAL ENERGY, ENERGY RATE, TOTAL

FLOW, FLOW RATE, AND SUPPLY & RETURN

TEMPERATURES.

5. SIZE AND INSTALL PER MFR'S RECOMMENDATIONS.

Upstream Obstruction

*Minimum upstream pipe run required

Without flow straightener

With flow straightener

Minimum downstream run required

Single 90

Tee

RDCR/EXPNDR

Two 90's same plane

Ball/gate valve fully open

Two 90's out of plane

Control valve

P.R.V.

20 Dia

20 Dia

20 Dia

30 Dia

30 Dia

40 Dia

50 Dia

50 Dia

12 Dia

12 Dia

12 Dia

17 Dia

17 Dia

22 Dia

27 Dia

27 Dia

5 Diameters

Eccentric Reducer, Note 2

Pipe Run Optional Flow Straightener

ANSI Flanges, Note 4

ONICON F-2000 Series Vortex Flow Meter, Note 1

Eccentric Expansion Downstream

Pipe Run

2 Diameters

Upstream Meter Run, Note 3 5 Diameters

Flow Direction

NOTES;

1. INSTALL ONICON F-2600 INLINE VORTEX FLOW METER OR

EQUAL IN STEAM PIPING WHERE INDICATED.

2. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE

REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND

ALL VALUES.

3. MINIMUM POINTS: FLOW RATE AND TOTALIZATION.

4. CONSULT MANUFACTURER FOR METER SIZE AND

APPLICABLE METER PIPE RUN FOR EACH APPLICATION.

INSTALL ACCORDING TO MANUFACTURER'S

RECOMMENDATIONS.

5. PROVIDE ECCENTRIC REDUCER AND EXPANDER WHEN

REQUIRED.

6. PROVIDE FLOW STRAIGHTENER WHEN REQUIRED TO

MEET RECOMMENDED MINIMUM UPSTREAM STRAIGHT

RUN REQUIREMENTS.

7. PROVIDE ANSI CLASS 150, 300, OR 600 FLANGES AS

REQUIRED.

NOTES:

1. ELECTRIC METERS TO BE EQUAL TO SQUARE D PM870

POWER METER. INSTALL PER MFR'S RECOMMENDATIONS.

ELECTRICAL EQUIPMENT SHALL BE INSTALLED, OPERATED,

SERVICED, AND MAINTAINED ONLY BY QUALIFIED

PERSONNEL.

2. WHERE MULTIPLE METERS MEASURE SAME UTILITY IN ONE

BUILDING SHOW INDIVIDUAL METER VALUES AND TOTAL

VALUE FOR BUILDING.

3. CONNECT ALL METERING TO NEW DDC CONTROL SYSTEM.

PROVIDE REAL-TIME GRAPHIC FOR EACH BUILDING. TREND

ALL VALUES.

EXIST METER

PANEL

NEW METER PANEL.

CONNECT TO 120V

ELEC. SERVICE FOR

ADJACENT METER

PANEL.

CONTROL

ROOM

BOILER BOILER BOILER

MAIN STEAM

HEADER

REPLACE ORIFICE PLATE STEAM METER &

CONNECT TO NEW CAMPUS CONTROLS.

METER SHALL MEASURE TOTAL CAMPUS

USE EXCEPT AUTOCLAVE. METER SHALL

HAVE HIGH TURN-DOWN RATIO.

REPLACE ORIFICE PLATE STEAM

METER WITH NEW VORTEX FLOW

METER & CONNECT TO NEW

CAMPUS CONTROLS. METER SHALL

MEASURE LAUNDRY USE.

METERING TO-BE-ADDED

BLDG. NO. ROOM NAME METERING NEEDED

2 PIPE BASEMENT CHW

4 BLDG 4 ELEC 115 ELEC

5 PUMP ROOM CHW

5 G07 DOMESTIC WATER

5 D07 STEAM

5 BLDG 4 ELEC 115 ELEC

6 MECH 003 ELEC

6 BLDG 4 ELEC 115 ELEC

8 MECH BASEMENT CHW

8 MECH BASEMENT STEAM

8 MECH BASEMENT DOMESTIC WATER

8 ELEC RM BASEMENT ELEC

14 STEAM PLANT STEAM (CAMPUS)

14 STEAM PLANT STEAM (LAUNDRY)

46 ATTIC MECH CHW

46 ATTIC MECH STEAM

46 ATTIC MECH ELEC

EXISTING METERING LIST

BLDG. NO. METER PANEL LOCATION METER ID. METER TYPE DESCRIPTION

2 ELEC 117H 16-ALE-2-E3A ELECTRICAL -

4 ROOM 116 16-502-4-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE

4 ROOM 118 16-502-4-ST-2 STEAM ACCELEBAR FLOW/TEMP/PRESSURE

4 ROOM 116 16-502-4-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC

4 ROOM 116 16-502-4-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC

4 CORRIDOR 1CC-4 16-502-4-PW-2 DOMESTIC WATER TRANSIT TIME ULTRASONIC

6 MECH RM 003 - CHILLED WATER -

6 MECH RM 003 - HOT WATER -

7 ELECTRICAL SWITCHGEAR 16-502-7-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE

7 ELECTRICAL SWITCHGEAR 16-502-7-NG-1 NATURAL GAS FOX THERMAL MASS FLOW

7 ELECTRICAL SWITCHGEAR 16-502-7-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC

7 ELECTRICAL SWITCHGEAR 16-502-7-CHW-2 CHILLED WATER TRANSIT TIME ULTRASONIC

7 ELECTRICAL SWITCHGEAR 16-502-7-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC

7 ELECTRICAL RM 28 16-ALE-7-E3A ELECTRICAL -

7 ELECTRICAL RM 28 16-ALE-7-E3B ELECTRICAL -

9 ROOM 115C 16-502-9-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE

9 ROOM 115C 16-502-9-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC

9 ROOM 115C 16-502-9-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC

9 ROOM 115C 16-ALE-9-E3A ELECTRICAL -

14 CENTRAL PLANT 16-502-14-NG-1 NATURAL GAS FOX THERMAL MASS FLOW

14 CENTRAL PLANT 16-502-14-BW-1 BOILER MAKE-UP TRANSIT TIME ULTRASONIC

16 ROOM 101 - NATURAL GAS -

16 106 - DOMESTIC WATER -

16 101 - DOMESTIC WATER -

16 BASEMENT MECH. RM. - STEAM -

16 ROOM 101 - ELECTRICAL -

16 ROOM 101 - ELECTRICAL -

16 OUTSIDE, EAST OF

CHILLER#16-1 - ELECTRICAL -

16 OUTSIDE, NEAR

TRANSFORMER - ELECTRICAL -

45 MECH RM 153 16-502-45-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE

45 MECH RM 153 16-502-45-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC

45 MECH RM 153 16-502-45-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC

45 S. ATTIC MECH. RM. 16-502-45-PW-2 DOMESTIC WATER TRANSIT TIME ULTRASONIC

45 ELEC RM 154 16-ALE-45-E3A ELECTRICAL -

49 ROOM 142 49-WFMD-1 CHILLED WATER FLOW/BAL.

49 ROOM 142 49-WFMD-2 DOMESTIC WATER FLOW/BAL.

49 ROOM 142 - STEAM -

49 OUTSIDE 142 - ELECTRICAL -

147 CHILLER PLANT 16-502-147-CW-1 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CW-2 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CW-3 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CW-4 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-2 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-3 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-4 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-5 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-6 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-7 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-8 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-9 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-10 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-502-147-CHW-11 CHILLED WATER TRANSIT TIME ULTRASONIC

147 CHILLER PLANT 16-ALE-147-E3A ELECTRICAL -

SUPPLY

TEMPERATURE

SENSOR

RETURN

TEMPERATURE

SENSOR

24VAC INPUT AND

SIGNAL

CONNECTIONS TO

CONTROL SYSTEM

File details come from the government source that posted it.