36C25618U0323-0002011.pdf
PDF 2 MB Posted
- Attached to
- Services Commissioning for HVAC Digital Controls Federal contract opportunity
- Solicitation number
- 36C25618U0323
About this file
36C25618U0323 0002 Drawings - Symbols _ General Notes.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -15380.docx | DOCX document | |
| 36C25618U0323-0002007.pdf | ||
| 36C25618U0323-0002005.pdf | ||
| 36C25618U0323-0002003.pdf | ||
| 36C25618U0323-0002008.pdf | ||
| 36C25618U0323-0002004.pdf | ||
| 36C25618U0323-0002006.pdf | ||
| 36C25618U0323-0002012.pdf | ||
| 36C25618U0323-0002000.docx | DOCX document | |
| 36C25618U0323-0002013.pdf | ||
| 36C25618U0323-0002010.pdf | ||
| 36C25618U0323-0002002.pdf | ||
| 36C25618U0323-0002009.pdf | ||
| 36C25618U0323-0002014.pdf | ||
| 36C25618U0323-0002001.docx | DOCX document | |
| 36C25618U0323-0001000.docx | DOCX document | |
| 36C25618U0323-002.pdf | ||
| 36C25618U0323-001.docx | DOCX document | |
| 36C25618U0323-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
VARIABLE FREQUENCY DRIVE
PRESSURE CONTROLLER. SEE SEQUENCE OF
OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF OPERATION
FLOW CONTROLLER. SEE SEQUENCE OF OPERATION
PRESSURE SWITCH HIGH
MOTOR STARTER
FLOW SWITCH
LENGTH IN DUCT WHEN SPACE PERMITS.)
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
LIMIT OF DEMOLITION
(WALL TYPE)
(WALL TYPE)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
RETURN DUCT (UP & DOWN)
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SQUARE 1-WAY CEILING DIFFUSERS
BACK DRAFT DAMPER
FLEXIBLE CONNECTION, EQUIPMENT,
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL
DUCT WITH SOUND LINING
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
VIBRATION, OR SEISMIC
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
MANUAL SPLITTER DAMPER
POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
COMBINATION FIRE/SMOKE DAMPER
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
STAINLESS STEEL DUCT
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
UNIT HEATER (HORIZONTAL)
TERMINAL UNIT WITH REHEAT COIL
ROOM THERMOSTAT
TEMPERATURE TRANSMITTER
ROOM HUMIDISTAT
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FLOW TRANSMITTER
CURRENT TRANSMITTER
CONDUCTIVITY TRANSMITTER
STATIC PRESSURE SENSOR
SMOKE DETECTOR
DIFFERENTIAL PRESSURE TRANSMITTER
TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
TEMPERATURE SWITCH, LOW (FREEZESTAT)
HAND SWITCH (HAND-OFF-AUTO SWITCH)
ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
VALVE OR DAMPER POSITION CONTROLLER
LEVEL TRANSMITTER
1. ALL CONDUIT, WIRING, PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE CEILING.
2. ACCESS PANELS SHALL BE FURNISHED FOR ALL CONCEALED CONTROL DEVICES AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.
3. DEMO ALL EXIST & NEWLY ABANDONED CONTROL PANELS. NO UNUSED CONTROL PANELS
ARE TO REMAIN.
4. DEMO ALL EXIST & NEWLY ABANDONED CONTROL CONDUIT IN MECHANICAL ROOMS.
5. DEMO EXIST & NEWLY ABANDONED CONTROL AIR LINES INSIDE ANY ROOM, MECHANICAL OR
OTHERWISE. ABANDONED CONTROL AIR MAINS IN CORRIDORS MAY REMAIN.
6. ALL CONTROLLERS (BUILDING CONTROLLERS, ADVANCED APPLICATION CONTROLLERS,
APPLICATION SPECIFIC CONTROLLERS, ETC.) ON CAMPUS SHALL BE SUPPLIED BY THE
CAMPUS SYSTEM MANUFACTURER AND SHALL BE THE LATEST VERSION. EXISTING CONTROL
ENCLOSURES AND CONDUIT MAY BE REUSED.
7. GATEWAYS TO INTERFACE WITH CONTROLLERS SHALL NOT BE PERMITTED.
8. EXIST DDC ACTUATORS, SENSORS, ETC. MAY BE REUSED IF FUNCTIONAL AND COMPATIBLE.
9. ALL EXIST PNEUMATIC CONTROL DEVICES SHALL BE REPLACED WITH DDC.
10. ALL EQUIPMENT SHOWN SHALL BE CONTROLLED BY DDC CONTROL SYSTEM UNLESS NOTED
OTHERWISE.
11. ALL SETPOINTS SHALL BE ADJUSTABLE.
12. TEST AND BALANCE ALL WATER FLOWS FOR AHU'S, FCU'S, VAV BOXES, ETC PRIOR TO
STARTING WORK. PROVIDE REPORT TO VA. BALANCE ALL WATER FLOWS TO VALUES SHOWN
IN DRAWINGS. IF VALUE IS NOT SHOWN RETURN TO PRE-CONSTRUCTION VALVE.
13. TEST AND BALANCE ALL TOTAL AIR FLOWS FOR AHU'S, VAV BOXES (MAX AND MIN) ETC PRIOR
TO STARTING WORK. PROVIDE REPORT TO VA. BALANCE ALL AIR FLOWS TO VALUES SHOWN IN
DRAWINGS. IF VALUE IS NOT SHOWN RETURN TO PRE-CONSTRUCTION VALUE.
14. TEST AND BALANCE ALL TOTAL AIR FLOW TO FAN COIL UNITS FROM AHU'S PRIOR TO STARTING
WORK. PROVIDE REPORT TO VA. BALANCE ALL AIR FLOWS TO VALUES SHOWN IN DRAWINGS.
IF VALUE IS NOT SHOWN RETURN TO PRE-CONSTRUCTION VALUE.
15. IF ANY PRE-CONSTRUCTION TESTING VALUE DIFFERS SIGNIFICANTLY FROM SCHEDULED
VALUE (±10%), REQUEST DIRECTION FROM VA FOR NEW VALUE PRIOR TO STARTING WORK.
16. PROVIDE CONTROL TRANSFORMERS FOR VAV BOXES, FCU'S, ETC. THAT ARE BEING
CONVERTED FROM PNEUMATIC TO DDC CONTROLS.
17. ALL EXIST THERMOSTATS (EVEN IF EXIST DDC) SHALL BE REPLACED IN LOCATION OF EXIST OR
WHERE SHOWN ON PLANS PER SPECIFICATIONS FOR UNIFORMITY ON CAMPUS. THE ONLY
EXCEPTION IS ROOM THERMOSTATS IN BUILDING 9 PATIENT ROOMS SHALL BE INSTALLED IN
RA PLENUM OF FCU'S OPPOSITE OA INTAKE WITH SHEILD TO LIMIT OA TEMPERATURE EFFECT
ON SENSOR.
18. PROVIDE CONTROL SYSTEM LOG-IN FOR BLDG 9 NURSES TO INDIVIDUALLY OVERRIDE BLDG 9
PATIENT ROOM SETPOINTS. THIS SPACE TEMPERATURE OVERRIDE SHALL BE THE ONLY
CAPABILITY FOR THIS LOG-IN.
19. LOW VOLTAGE CABLING ABOVE CEILING TO BE ROUTED IN EXISTING CABLE TRAYS WHERE
SPACE ALLOWS. INSTALL NEW CABLE TRAYS WHERE REQUIRED. CABLING IS NOT TO BE LAID
ON TOP OF CEILING.
20. ALL FIBER OPTIC NETWORK DEVICES THAT REQUIRE 120 VAC SHALL BE CONNECTED TO
EMERGENCY POWER. CONTRACTOR SHALL ROUTE TO NEAREST 120V EMERGENCY PANEL
WITH SPARE CAPACITY, INSTALL NEW 20 A-1 POLE BREAKER AND MAKE CONNECTION.
PROVIDE 20 A SNAP SWITCH AT DEVICE FOR DISCONNECT. CONTRACTOR TO VERIFY 120V
EMERGENCY PANEL LOCATION DURING PRE-BID WALKTHROUGH.
21. ANY CONTROLLER FOR EQUIPMENT THAT IS POWERED BY EMERGENCY POWER SHALL ALSO
BE CONNECTED TO EMERGENCY POWER.
22. CONTRACTOR TO INSTALL ONE ADDITIONAL WEATHER STATION. LOCATION TO BE SUGGESTED
BY VENDOR AND APPROVED BY THE VA.
23. ALL EXISTING SMOKE DAMPERS SHOWN ON PLANS ARE PNEUMATIC CONTROLLED AND ARE
TO BE CONVERTED TO ELECTRONIC CONTROL AND CONNECTED TO FIRE ALARM SYSTEM.
EXISTING ELECTRONIC SMOKE DAMPERS ARE NOT SHOWN.
24. NEW VARIABLE FREQUENCY DRIVES TO BE ABB OR APPROVED EQUAL. SIEMENS DRIVES ARE
NOT APPROVED.
25. CONTRACTOR TO FIELD VERIFY EXISTING RATED WALLS. ALL RATED WALL PENETRATIONS TO
BE SEALED TO MAINTAIN WALL RATING.
26. SEE SPEC SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS FOR CONTRACTORS
RESPONSIBILITIES DURING COMMISSIONING.
THIS PROJECT SHALL UPGRADE THE EXISTING VAMC CAMPUS WIDE SIEMENS APOGEE EMS SYSTEM AND
INFRASTRUCTURE TO FULLY INTEGRATE ALL BUILDINGS CONTAINED IN THE CONTRACT DOCUMENTS &
UTILITY MONITORING & METERING SYSTEMS. THE NEW SYSTEM INCLUDING INTERFACE TO EXISTING
SYSTEMS AND EQUIPMENT SHALL OPERATE AND FUNCTION AS ONE COMPLETE SYSTEM INCLUDING ONE
DATABASE OF CONTROL POINT OBJECTS AND GLOBAL CONTROL LOGIC CAPABILITIES (TRENDING, LOGGING, METERING, ETC.). FACILITY OPERATORS SHALL HAVE COMPLETE OPERATIONS AND CONTROL
CAPABILITY OVER ALL SYSTEMS, NEW AND EXISTING INCLUDING, MONITORING, TRENDING, GRAPHING, SCHEDULING, ALARM MANAGEMENT, GLOBAL POINT SHARING, GLOBAL STRATEGY DEPLOYMENT, GRAPHICAL OPERATIONS INTERFACE AND CUSTOM REPORTING AS SPECIFIED. UTILIZE OPEN PROTOCOL
DDC CONTROL FOR EQUIPMENT AND SOFTWARE, BACNET. THE UPGRADED SYSTEM SHALL HAVE BUILT-IN
CAPABILITY TO CONTROL FUTURE ENERGY GENERATING FACILITIES TO MINIMIZE UTILITY COST. FUTURE
ENERGY GENERATING TIE-IN SHALL BE "PLUG-N-PLAY".
PROJECT DESCRIPTION
F E
D C
B G
Alexandria, Louisiana
A&E Design - Upgrade Energy Management Control Systems
October 30, 2013
VA256-12-C-0253
VETERANS HEALTH CARE
SYSTEM
Alexandria, LA
A
U.S. Department of Veterans Affairs
SYMBOLS & GENERAL NOTES
--- WLP NMT
M001 10-30-13
D DAMPER - AUTOMATIC
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPS DIFFERENTIAL PRESSURE SENSOR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CHP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CO CLEAN OUT
CO2 CARBON DIOXODE
CP CONDENSATE PUMP
CR CEILING REGISTER
CSG CLEAN STEAM GENERATOR
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BIW BACKWARD INCLIND WHEEL (FAN)
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACD AUTOMATIC CONTROL
DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL
DAMPER,TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AHU AIR-HANDLING UNIT
AP ACCESS PANEL
APD AIR PRESSURE DROP
AS AIR SEPARATOR
EA EXHAUST AIR
EAG EXHAUST AIR GRILLE
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE
DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HEX HEAT EXCHANGER
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY
(STEAM)
HSTAT HUMIDISTAT
HW HOT WATER
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
M METER
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQF SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
SV STEAM PRESSURE REDUCING VALVE
RA RETURN AIR
RAHU ROFF AIR HANDLING UNIT
RAT RETURN AIR TEMPERATURE
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RV RELIEF VALVE
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSIG POUNDS PER SQUARE INCH – GAGE
PSV PRESSURE SAFETY VALVE
YR YEAR
Wb WET-BULB (TEMPERATURE)
WEF WALL EXHAUST FAN
WF WATER FILTER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WM WATER METER
WPD WATER PRESSURE DROP
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
UH UNIT HEATER
PIPING SYMBOLS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
VENT LINE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
MAKE-UP WATER
HOT WATER HEATING RETURN
LOW PRESSURE GRAVITY CONDENSATE RETURN
MEDIUM PRESSURE GRAVITY CONDENSATE RETURN
HIGH PRESSURE GRAVITY CONDENSATE RETURN
NATURAL GAS MAIN FUEL
VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
HOSE CONNECTOR
STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
FLOW METER
L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LB/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
KG KILOGRAM
KPA KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ID INSIDE DIAMETER
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
GENERAL SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
THERMOSTAT
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
PRIMARY ELEMENT FOR FLOW METERING
THERMOSTATIC STEAM TRAP (T)
CLOSED-FLOAT-THERMOSTATIC STEAM TRAP ASSEMBLY (T)
INVERTED BUCKET STEAM TRAP ASSEMBLY (T)
QUICK-COUPLE HOSE CONNECTOR
PRESSURE GAGE (WITH SIPHON ON STEAM SERVICE)
F E
D C
B G
Alexandria, Louisiana
A&E Design - Upgrade Energy Management Control Systems
October 30, 2013
VA256-12-C-0253
VETERANS HEALTH CARE
SYSTEM
Alexandria, LA
A
U.S. Department of Veterans Affairs
SYMBOLS & ABBREVIATIONS
--- WLP NMT
M002
FIBER NETWORK SPECIFICATIONS (CONTINUED):
CONSTRUCTION:
1. FIBER IS TO BE ROUTED IN EXISTING ARC NET CABLE BANK. PROVIDE NEW DUCT BANK WHERE
SPACE REQUIRES.
2.1” EMT CONDUIT SHALL BE INSTALLED FROM DUCT BANK UP TO A JUNCTION BOX OR
FIBER-RATED LB AT THE BUILDING ENTRY POINT TO PROTECT THE FIBER WHERE IT IS
EXPOSED ABOVE GROUND.
TESTING
1. ALL STRANDS OF TERMINATED FIBER SHALL BE TESTED WITH A LIGHT SOURCE AND POWER
METER IN BOTH DIRECTIONS AT BOTH 850NM AND 1300NM WAVELENGTHS.
2. ALL STRANDS OF TERMINATED FIBER SHALL BE TESTED WITH AN OTDR IN BOTH DIRECTIONS
AT BOTH 850NM AND 1300NM WAVELENGTHS.
3. ALL STRANDS MUST HAVE DB LOSS RESULTS THAT ARE IN COMPLIANCE WITH EIA/TIA
STANDARDS BASED ON LENGTH, CONNECTOR AND SPLICE LOSS FOR MULTIMODE FIBER AT
EACH WAVELENGTH.
4. ALL FIBER RESULTS SHALL BE PROVIDED IN BOTH PRINTED AND ELECTRONIC FORMAT UPON
COMPLETION OF THE PROJECT.
MANAGED NETWORK SWITCHES.
1. SWITCHES ARE TO BE SCHNEIDER CONNEXIUM SWITCHES. CONTRACTOR TO SUPPLY AND
INSTALL A TCSESM083F2CUO (8 PORT), TCSESM163F2CUO (16 PORT), OR TCSESM243F2CUO (24
PORT) NEAR EACH WALL MOUNTED PATCH PANEL COMPLETE WITH LOCKABLE ENCLOSURE
AND POWER SUPPLY. CONTRACTOR TO SELECT A SWITCH FOR EACH LOCATION SUCH THAT
THERE WILL BE A MINIMUM OF 4 SPARE WIRED ETHERNET PORTS AVAILABLE FOR USE BY THE
OWNER. CONTRACTOR SHALL PROVIDE 24 VDC POWER SUPPLY.
INTERNET CONNECTION
1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A VA APPROVED INTERNET CONNECTION
DEVICE THAT WILL CONNECT NETWORK TO INTERNET. PROVIDE ADEQUATE FIREWALL TO
PREVENT UNAUTHORIZED ACCESS TO INTERNET.
FIBER NETWORK SPECIFICATIONS:
FIBER OPTIC CABLE IS REQUIRED TO BE INSTALLED IN A RING TOPOLOGY BETWEEN THE SIXTEEN
(16) BUILDINGS LISTED ON THE FIBER OPTIC NETWORK ROUTING SCHEDULE.
CONTRACTOR REQUIREMENTS:
1. CONTRACTOR SHALL HAVE A BICSI CERTIFIED RCDD ON STAFF TO APPROVE THE FINAL
DESIGN AND TO OVERSEE THE INSTALLATION.
2. CONTRACTOR SHALL FURNISH REFERENCES OF SIMILAR SIZED FIBER OPTIC INSTALLATIONS.
3. CONTRACTOR SHALL FURNISH INDUSTRY CERTIFICATIONS FOR REVIEW THAT DEMONSTRATE
KNOWLEDGE AND EXPERIENCE.
FIBER OPTICAL CABLE REQUIREMENTS:
1. THE FIBER OPTICAL CABLE MUST BE 900 MICRON MULTIMODE TIGHT-BUFFERED
CONSTRUCTION DESIGNED FOR INTRA-BUILDING ENVIRONMENTS.
2. THE SHEATH SHALL BE UL LISTED OFCP OR OFCR IN ACCORDANCE WITH NEC ARTICLE 770.
3. THE OPTICAL FIBER SHALL MEET THE REQUIREMENTS OF FDDI, ANSI X3T9.5 PMD FOR 62.5/125
MICRON FOR USE IN 10/100 MB FIBER OPTIC NETWORKS.
4. FIBER OPTIC CABLE SHALL HAVE 24-STRANDS.
5. FIBER OPTIC CABLE SHALL BE ARMORED AND BE RATED FOR DIRECT BURIED INSTALLATION, AS WELL AS FOR USE INDOOR.
6. THE ARMORED SHEATH MUST BE PROPERLY GROUNDED ON EACH END.
7. USE PLENUM CABLE WHERE REQUIRED. IF NON-PLENUM CABLE IS ACCEPTABLE IN THE
BUILDINGS, NON-PLENUM CABLE MAY BE USED. IF PLENUM CABLE IS REQUIRED IN THE
BUILDINGS, THEN USE PLENUM CABLE BETWEEN THE BUILDINGS IN ORDER TO MINIMIZE THE
TRANSITION SPLICES.
8. USE CORNING FREEDM FIBER PART NUMBER 024K8P-31130-A3 (PLENUM) OR APPROVED
EQUAL.
CONNECTOR AND CONNECTOR HOUSING REQUIREMENTS:
1. CONNECTORS SHALL BE CORNING LC-STYLE PART # 95-000-99 OR APPROVED EQUAL.
2. 12 STRANDS OF EVERY FIBER OPTIC CABLE SHALL BE TERMINATED ON BOTH ENDS. THE
REMAINING 12 STRANDS SHALL BE COILED IN THE FIBER HOUSING FOR FUTURE USE.
3. USE CORNING WALL-MOUNT HOUSINGS PART # WCH-04P OR APPROVED EQUAL.
4. USE CORNING 12-PORT LC COUPLER PANELS PART # CCH-CP12-A7 OR APPROVED EQUAL.
ROUTE FIBER OPTIC CABLE ACROSS SITE TO BUILDINGS SHOWN OR LISTED BELOW IN
EXISTING ARC NET CABLE BANK. PROVIDE NEW DUCT BANK WHERE SPACE REQUIRES.
ROUTING SHOWN IS APPROXIMATE. COORDINATE EXACT ROUTE WITH VA, OTHER
UTILITIES, AND SITE CONDITIONS. COORDINATE SCHEDULING OF WORK WITH VA.
RETURN DISTURBED EARTH, PAVING, ETC. TO EXISTING CONDITIONS. PROVIDE
AS-BUILTS IN CAD DEPICTING EXACT ROUTING TO VA FOR THEIR USE.
KEYNOTES (FIBER):
BASEMENT STORAGE ROOM NEAR CHW PUMPS.
ATTIC MECHANICAL ROOM.
BASEMENT NEAR EXISTING CONTROL PANELS & EQUIPMENT.
BASEMENT MECHANICAL ROOM 116.
GROUND FLOOR ROOM 106.
BASEMENT MECHANICAL ROOM 003.
2ND FLOOR MECHANICAL ROOM 2M5.
1ST FLOOR MECHANICAL ROOM.
1ST FLOOR MECHANICAL ROOM 115C.
1ST FLOOR WORK ROOM 109.
ATTIC MECHANICAL ROOM.
ATTIC MECHANICAL ROOM.
1ST FLOOR MECHANICAL ROOM 142.
ON FRONT WALL OF CHILLER ROOM.
LOCATE IN BOILER ROOM ADJACENT TO CONTROL ROOM.
LOCATE IN SWITCHGEAR/SUBSTATION.
NOT USED.
APPROXIMATE LOCATION OF FIBER
NETWORK SWITCH. SEE KEYNOTES
FOR LOCATION DESCRIPTION.
SITE PLAN - MECHANICAL
--- WLP NMT
M100
N
KEYNOTES (METERING):
INSTALL BLDG 5 CHW METER IN CHW MAIN ROUTED THRU CONNECTER FROM BLDG 6. METER
PANEL TO BE LOCATED IN PUMP ROOM ADJACENT TO CONNECTER.
INSTALL STEAM AND DOMESTIC WATER METERS AND PANELS IN ROOM EQUIPMENT ROOM
G07 PRIOR TO ANY BUILDING TAKEOFFS.
FIBER OPTIC NETWORK ROUTING
FROM: TO:
BUILDING: To Building:
1 2 2 3 3 9 9 49
49 4 4 5 5 6 6 8 8 147
147 7 7 41
41 14 14 16 16 45 45 46 46 1
F E
D C
B G
Alexandria, Louisiana
A&E Design - Upgrade Energy Management Control Systems
October 30, 2013
VA256-12-C-0253
VETERANS HEALTH CARE
SYSTEM
Alexandria, LA
A
U.S. Department of Veterans Affairs
DUCT BANK NOTES:
1. CONCRETE SHALL BE 2000 P.S.I. @ 28 DAYS, OR AS SPECIFIED.
2. CONCRETE SHALL BE DYED RED.
3. PROVIDE REINFORCING RODS ON TOP AND BOTTOM OF DUCTS WHEN CROSSING
OR PLACED IN ROADWAYS.
4. MINIMUM COVER TO TOP OF ENVELOPE SHALL BE 24" [610mm].
5. PROVIDE MINIMUM 6" [152mm] SPACE BETWEEN POWER AND
TELECOMMUNICATION DUCTS. INCREASE SIZE AS REQUIRED.
3"
2-WAY DUCT LINE, UNPAVED
3" [76mm]
[7 m m
[7 m m
(T Y
P
[76mm]
3" [76mm]
SELECT EARTH
BACKFILL FROM
TRENCH EXCAVATION
COMPACTED TO 95%
STANDARD PROCTOR.
EXISTING SUBGRADE
COMPACTED TO 95%
STANDARD PROCTOR.
ORIGINAL
UNDISTURBED
GRADE
2-WAY DUCT LINE, ASPHALTIC CONCRETE
3"
3" [76mm]
[7 m m
[7 m m
(T Y
P
[76mm]
3" [76mm]
EXISTING SUBGRADE
COMPACTED TO 95%
STANDARD PROCTOR.
[2 m m
[5 m m
EDGES TO BE TRIMMED TO
STRAIGHT VERTICAL LINE.
ANY LOOSE OR DISTURBED
PAVEMENT MUST BE
REMOVED OR REPLACED.
ORIGINAL UNDISTURBED STREET GRADE
6" MIN.
[152mm]
FLOAT FINISH
CONCRETE TO BE
CLASS "A"
F E
D C
B G
Alexandria, Louisiana
A&E Design - Upgrade Energy Management Control Systems
October 30, 2013
VA256-12-C-0253
VETERANS HEALTH CARE
SYSTEM
Alexandria, LA
A
U.S. Department of Veterans Affairs
METERING LISTS
--- WLP NMT
M101
NOTES:
1. CONNECT ALL EXISTING METERING TO NEW DDC CONTROL SYSTEM. PROVIDE
REAL-TIME GRAPHIC FOR EACH BUILDING. TREND ALL VALUES.
2. WHERE MULTIPLE METERS MEASURE SAME UTILITY IN ONE BUILDING SHOW
INDIVIDUAL METER VALUES AND TOTAL VALUE FOR BUILDING.
3. TEST ALL EXISTING METERS TO INSURE THEY ARE CALABRATED AND FUNCTIONING
PROPERLY. REPAIR/REPLACE ANY NON-FUNCTIONING METERS.
FLOW DIRECTION
2 DIA
MINIMUM STRAIGHT
UPSTREAM PIPE RUN
3 DIA
MINIMUM STRAIGHT
DOWNSTREAM
PIPE RUN
NOTES;
1. INSTALL ONICON F-3200 ELECTROMAGNETIC FLOW
METER OR EQUAL IN DOMESTIC WATER LINE WHERE
INDICATED.
2. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE
REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND
ALL VALUES.
3. MINIMUM POINTS: 4-20mA ANALOG FLOW RATE OUTPUT,
(2) ISOLATED PROGRAMMABLE DIGITAL/PULSE OUTPUTS
(CONFIGURABLE FOR FREQUENCY, PULSE, ALAR, OR
DIRECTION).
4. SIZE AND INSTALL PER MFR'S RECOMMENDATIONS.
5 DIA
REFER TO THE TABLE
BELOW
FOR UPSTREAM DISTANCE
Upstream obstruction Without Flow Conditioner With Flow Conditioner
Single bend preceded by > 9 diameters of straight pipe
10 Diameters 3 Diameters
Pipe size reduction in straight pipe run 10 Diameters 3 Diameters
Multiple bends in plane with < 9 diameters of straight pipe between them 20 Diameters 5 Diameters
Pipe size expansion in straight pipe run 20 Diameters 5 Diameters
Tees 30 Diameters 5 Diameters
Multiple bends out of plane 30 Diameters 5 Diameters
Modulating or regulating valve 40 Diameters 10 Diameters
Minimum Upstream Straight Pipe Run Required
REQUIRED
OVERHEAD
CLEARANCE
30" - 36" Depending on pipe size
NOTES;
1. INSTALL ONICON F-5100 THERMAL MASS FLOW METER
OR EQUAL IN NATURAL GAS LINE WHERE INDICATED.
2. PROVIDE HOT-TAP INSTALLATION KIT.
3. PROVIDE FLOW CONDITIONER WHERE REQUIRED TO
MEET MINIMUM UPSTREAM STRAIGHT PIPE RUN.
4. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE
REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND
ALL VALUES.
5. MINIMUM POINTS: 4-20mA ANALOG MASS FLOW RATE
OUTPUT AND SCALABLE PULSE OUTPUT.
6. SIZE AND INSTALL PER MFR'S RECOMMENDATIONS.
REFER TO THE TABLE FOR
UPSTREAM DISTANCE
30 DIA
30 DIA
30 DIA
20 DIA
15 DIA
10 DIA
10 DIA
OBSTRUCTION
PIPE SIZE REDUCTION / EXPANSION IN STRAIGHT RUN
UPSTREAM
MINIMUM UPSTREAM STRAIGHT RUN REQUIRED
SINGLE BEND PRECEDED BY < 9 DIAMETERS OF
STRAIGHT PIPE RUN
OUTFLOWING TEE / PUMP OUTFLOW
SINGLE BEND PRECEDED BY > 9 DIAMETERS OF
STRAIGHT PIPE RUN
MULTIPLE BENDS OUT OF PLANE
INFLOWING TEE
CONTROL / MODULATING VALVE
RETURN
FLOW DIRECTION
SUPPLY
FLOW METER
5 DIA
NOTES;
1. INSTALL ONICON F-3500 INSERTION ELECTROMAGNETIC
FLOW METER WITH SYSTEM 10 MOD BTU METER OR
EQUAL IN CHILLED OR HEATING HOT WATER PIPING
WHERE INDICATED.
2. PROVIDE INSTALLATION KIT. HOT TAP WHERE REQUIRED
TO PREVENT SHUT-DOWN.
3. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE
REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND
ALL VALUES.
4. MINIMUM POINTS: TOTAL ENERGY, ENERGY RATE, TOTAL
FLOW, FLOW RATE, AND SUPPLY & RETURN
TEMPERATURES.
5. SIZE AND INSTALL PER MFR'S RECOMMENDATIONS.
Upstream Obstruction
*Minimum upstream pipe run required
Without flow straightener
With flow straightener
Minimum downstream run required
Single 90
Tee
RDCR/EXPNDR
Two 90's same plane
Ball/gate valve fully open
Two 90's out of plane
Control valve
P.R.V.
20 Dia
20 Dia
20 Dia
30 Dia
30 Dia
40 Dia
50 Dia
50 Dia
12 Dia
12 Dia
12 Dia
17 Dia
17 Dia
22 Dia
27 Dia
27 Dia
5 Diameters
Eccentric Reducer, Note 2
Pipe Run Optional Flow Straightener
ANSI Flanges, Note 4
ONICON F-2000 Series Vortex Flow Meter, Note 1
Eccentric Expansion Downstream
Pipe Run
2 Diameters
Upstream Meter Run, Note 3 5 Diameters
Flow Direction
NOTES;
1. INSTALL ONICON F-2600 INLINE VORTEX FLOW METER OR
EQUAL IN STEAM PIPING WHERE INDICATED.
2. CONNECT TO CAMPUS DDC CONTROL SYSTEM, PROVIDE
REAL-TIME GRAPHIC FOR EACH BUILDING, AND TREND
ALL VALUES.
3. MINIMUM POINTS: FLOW RATE AND TOTALIZATION.
4. CONSULT MANUFACTURER FOR METER SIZE AND
APPLICABLE METER PIPE RUN FOR EACH APPLICATION.
INSTALL ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
5. PROVIDE ECCENTRIC REDUCER AND EXPANDER WHEN
REQUIRED.
6. PROVIDE FLOW STRAIGHTENER WHEN REQUIRED TO
MEET RECOMMENDED MINIMUM UPSTREAM STRAIGHT
RUN REQUIREMENTS.
7. PROVIDE ANSI CLASS 150, 300, OR 600 FLANGES AS
REQUIRED.
NOTES:
1. ELECTRIC METERS TO BE EQUAL TO SQUARE D PM870
POWER METER. INSTALL PER MFR'S RECOMMENDATIONS.
ELECTRICAL EQUIPMENT SHALL BE INSTALLED, OPERATED,
SERVICED, AND MAINTAINED ONLY BY QUALIFIED
PERSONNEL.
2. WHERE MULTIPLE METERS MEASURE SAME UTILITY IN ONE
BUILDING SHOW INDIVIDUAL METER VALUES AND TOTAL
VALUE FOR BUILDING.
3. CONNECT ALL METERING TO NEW DDC CONTROL SYSTEM.
PROVIDE REAL-TIME GRAPHIC FOR EACH BUILDING. TREND
ALL VALUES.
EXIST METER
PANEL
NEW METER PANEL.
CONNECT TO 120V
ELEC. SERVICE FOR
ADJACENT METER
PANEL.
CONTROL
ROOM
BOILER BOILER BOILER
MAIN STEAM
HEADER
REPLACE ORIFICE PLATE STEAM METER &
CONNECT TO NEW CAMPUS CONTROLS.
METER SHALL MEASURE TOTAL CAMPUS
USE EXCEPT AUTOCLAVE. METER SHALL
HAVE HIGH TURN-DOWN RATIO.
REPLACE ORIFICE PLATE STEAM
METER WITH NEW VORTEX FLOW
METER & CONNECT TO NEW
CAMPUS CONTROLS. METER SHALL
MEASURE LAUNDRY USE.
METERING TO-BE-ADDED
BLDG. NO. ROOM NAME METERING NEEDED
2 PIPE BASEMENT CHW
4 BLDG 4 ELEC 115 ELEC
5 PUMP ROOM CHW
5 G07 DOMESTIC WATER
5 D07 STEAM
5 BLDG 4 ELEC 115 ELEC
6 MECH 003 ELEC
6 BLDG 4 ELEC 115 ELEC
8 MECH BASEMENT CHW
8 MECH BASEMENT STEAM
8 MECH BASEMENT DOMESTIC WATER
8 ELEC RM BASEMENT ELEC
14 STEAM PLANT STEAM (CAMPUS)
14 STEAM PLANT STEAM (LAUNDRY)
46 ATTIC MECH CHW
46 ATTIC MECH STEAM
46 ATTIC MECH ELEC
EXISTING METERING LIST
BLDG. NO. METER PANEL LOCATION METER ID. METER TYPE DESCRIPTION
2 ELEC 117H 16-ALE-2-E3A ELECTRICAL -
4 ROOM 116 16-502-4-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE
4 ROOM 118 16-502-4-ST-2 STEAM ACCELEBAR FLOW/TEMP/PRESSURE
4 ROOM 116 16-502-4-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC
4 ROOM 116 16-502-4-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC
4 CORRIDOR 1CC-4 16-502-4-PW-2 DOMESTIC WATER TRANSIT TIME ULTRASONIC
6 MECH RM 003 - CHILLED WATER -
6 MECH RM 003 - HOT WATER -
7 ELECTRICAL SWITCHGEAR 16-502-7-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE
7 ELECTRICAL SWITCHGEAR 16-502-7-NG-1 NATURAL GAS FOX THERMAL MASS FLOW
7 ELECTRICAL SWITCHGEAR 16-502-7-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC
7 ELECTRICAL SWITCHGEAR 16-502-7-CHW-2 CHILLED WATER TRANSIT TIME ULTRASONIC
7 ELECTRICAL SWITCHGEAR 16-502-7-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC
7 ELECTRICAL RM 28 16-ALE-7-E3A ELECTRICAL -
7 ELECTRICAL RM 28 16-ALE-7-E3B ELECTRICAL -
9 ROOM 115C 16-502-9-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE
9 ROOM 115C 16-502-9-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC
9 ROOM 115C 16-502-9-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC
9 ROOM 115C 16-ALE-9-E3A ELECTRICAL -
14 CENTRAL PLANT 16-502-14-NG-1 NATURAL GAS FOX THERMAL MASS FLOW
14 CENTRAL PLANT 16-502-14-BW-1 BOILER MAKE-UP TRANSIT TIME ULTRASONIC
16 ROOM 101 - NATURAL GAS -
16 106 - DOMESTIC WATER -
16 101 - DOMESTIC WATER -
16 BASEMENT MECH. RM. - STEAM -
16 ROOM 101 - ELECTRICAL -
16 ROOM 101 - ELECTRICAL -
16 OUTSIDE, EAST OF
CHILLER#16-1 - ELECTRICAL -
16 OUTSIDE, NEAR
TRANSFORMER - ELECTRICAL -
45 MECH RM 153 16-502-45-ST-1 STEAM ACCELEBAR FLOW/TEMP/PRESSURE
45 MECH RM 153 16-502-45-PW-1 DOMESTIC WATER TRANSIT TIME ULTRASONIC
45 MECH RM 153 16-502-45-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC
45 S. ATTIC MECH. RM. 16-502-45-PW-2 DOMESTIC WATER TRANSIT TIME ULTRASONIC
45 ELEC RM 154 16-ALE-45-E3A ELECTRICAL -
49 ROOM 142 49-WFMD-1 CHILLED WATER FLOW/BAL.
49 ROOM 142 49-WFMD-2 DOMESTIC WATER FLOW/BAL.
49 ROOM 142 - STEAM -
49 OUTSIDE 142 - ELECTRICAL -
147 CHILLER PLANT 16-502-147-CW-1 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CW-2 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CW-3 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CW-4 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-1 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-2 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-3 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-4 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-5 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-6 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-7 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-8 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-9 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-10 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-502-147-CHW-11 CHILLED WATER TRANSIT TIME ULTRASONIC
147 CHILLER PLANT 16-ALE-147-E3A ELECTRICAL -
SUPPLY
TEMPERATURE
SENSOR
RETURN
TEMPERATURE
SENSOR
24VAC INPUT AND
SIGNAL
CONNECTIONS TO
CONTROL SYSTEM
File details come from the government source that posted it.