About this file

36C25618U0279 Attachment_4_Technical_Verification_Sheet.xlsx

View the file

Other files

File Type Posted
36C25618U0279-0005000.docx DOCX document
36C25618U0279-0004000.docx DOCX document
36C25618U0279-0003000.docx DOCX document
36C25618U0279-0002000.docx DOCX document
36C25618U0279-0001000.docx DOCX document
36C25618U0279-000.docx DOCX document
36C25618U0279-003.docx DOCX document
36C25618U0279-002.docx DOCX document
36C25618U0279-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

36C25618U279 Generator and ATS Maintenance Technical Responses must include evidence of meeting the criteria and the purpose of this requirement as specified in the Performance Work Statement (PWS). Lack of evidence may result in a technically unacceptable rating.Contractor: ComplyCOMPLYNOT COMPLYTECHNICAL EVALUATION EXPLANATION HOW IT COMPLIES OR DOES NOT COMPLY WITH THE REQUIRMENT
YesNoSpec NotesPicture, link or other explanation how your specification meets the requirment
Contractor experience is relevant and is related to the current requirement and demonstrates the capability to successfully perform the duties and successfully execute PWS deliverables. See PWS and 52.212-1 Instruction to Offerors Volume 1 -Technical Volume
Key Personnel experience is/was relevant/related to the current requirement (See PWS and 52.212-1 Instruction to Offerors Volume 1 -Technical Volume.
Credentials/documents etc. were provided that verifies the experience, knowledge, and qualifications of Key & Non-Key Personnel See PWS and 52.212-1 Instruction to Offerors Volume 1 -Technical Volume.
Key Personnel meet the necessary qualifications as identified in the PWS based on the credentials/documents etc. that were provided in contractor's offer (i.e. Credentialing documents acurately define/verify the necessary qualifications of these key personnel). See PWS and 52.212-1 Instruction to Offerors Volume 1 -Technical Volume.
Schedule-Contractor's proposed/anticipated/projected schedule (or timeline) addresses all deliverables and the completion of those deliverables during the expected performance period (12 months). See Price/Cost Schedule, PWS, and 52.212-1 Instructions to Offerors Volume 1-Technical Volume.
Reporting-Contractor has a plan that will meet the necessary reporting requirements for the service areas identified for the duration of the performance period See PWS and 52.212-1 Instruction to Offerors Volume 1 -Technical Volume.
36C25618U0279Technical Verification Sheet
Generator and ATS MaintenanceAttachment 3

Sheet2

Sheet3