36C25527R0013_2.docx
DOCX document 20 KB Posted
- Attached to
- C222--657A5-24-108, FCA Replace Medium Voltage Feeder 3 and Transformers l MC FY27 NRM VISN Base DE
- Solicitation number
- 36C25527R0013
About this file
This is Modification 2 to a Pre-Solicitation Notice for Architectural and Engineering (A-E) Services. The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15 is seeking qualified Service-Disabled Veteran Owned Small Business (SDVOSB) firms to design and provide construction oversight for the replacement of Medium Voltage Feeder 3 and Transformers at the Marion VA Medical Center in Marion, Illinois (Project No. 657A5-24-108). The solicitation (36C25527R0013) requires submission of completed SF 330 forms by November 17, 2026 at 12:00 PM Central Time. The contracting office is located in Leavenworth, Kansas, with Maria Hoover serving as the Contracting Officer (maria.hoover@va.gov, 913-946-1130). This is a restricted procurement limited to SDVOSB firms, and the anticipated contract award date is no later than December 30, 2026, contingent upon fund availability.
This modification addresses three Requests for Information (RFIs) and revises the evaluation criteria accordingly. The VA clarified that past performance projects must demonstrate both completed design and construction work; studies or assessments without construction will not be considered. Laboratory requirements have been removed from Factor 2 (Specialized Experience and Technical Competence) as they are not applicable to the medium-voltage electrical infrastructure work. The SF 330 submission deadline was extended one week from November 10, 2026 to November 17, 2026. Evaluation will be based on seven factors: Professional Qualifications, Specialized Experience and Technical Competence, Capacity to Accomplish the Work, Past Performance (projects completed within the past five years rated more favorably), Reputation in A/E Community, Claims and Terminations, and Experience in Construction Period Services. The selected firm must conduct a mandatory site visit before submitting a price proposal, and all response costs are at the firm's expense with no government reimbursement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25527R0013_1.docx | DOCX document | |
| 36C25527R0013.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modification to a Previous Notice Modification to a Previous Notice
| SUBJECT* |
| 657A5-24-108, FCA Replace Medium Voltage Feeder 3 and Transformers l MC FY27 NRM VISN Base DE |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 66048 |
| SOLICITATION NUMBER* |
| 36C25527R0013 |
BASE NOTICE TYPE
| RESPONSE DATE/TIME/ZONE |
| 11-17-2026 12:00 PM CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 90 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| C222 |
| NAICS CODE* |
| 541330 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
POINT OF CONTACT*
Contracting Officer Maria Hoover maria.hoover@va.gov 913-946-1130
PLACE OF PERFORMANCE
| ADDRESS |
| Marion VA Medical Center |
2401 West Main Street
Marion Illinois
| POSTAL CODE |
| 62959-1188 |
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
| AGENCY CONTACT’S EMAIL ADDRESS |
| Maria.hoover@va.gov |
| EMAIL DESCRIPTION |
| office email |
DESCRIPTION
Modification 2 to Presolicitation Notice 36C25527R0013 This modification provides answers to RFIs received and revised the evaluation criteria to be used for this project.
RFIs Received for Project # 657A5-24-108, Replace Medium Voltage Feeder 3 and Transformers
1. Factor 4 – Past Performance / Section F Project Eligibility The solicitation states that projects submitted for past performance consideration must have completed both design and construction, and that projects not constructed will not be considered. Would the VA consider accepting relevant electrical infrastructure studies or assessments in Section F, particularly those involving medium-voltage distribution systems and feeder evaluations, that demonstrate directly applicable technical expertise but did not result in construction?
We prefer to keep it as projects that were designed AND constructed. Since this is a construction project and not a study, we want projects that have been finished to be used for past performance criteria.
2. Factor 2 – Specialized Experience and Technical Competence / Laboratory Requirements Factor 2 references the firm's technical capabilities in design quality management procedures, CADD/BIM, equipment resources, and laboratory requirements. Given that the project scope primarily involves medium-voltage electrical feeder and transformer replacements, could the VA clarify the applicability of laboratory requirements to this project? We respectfully request that this criterion be removed from the evaluation requirements, as it does not appear directly relevant to the stated scope of work.
Laboratory requirements were deleted. Please see revised evaluation criteria below.
3. Request for Submission Deadline Extension Given the technical scope of the project and the level of detail required to address the evaluation criteria, we respectfully request a one-week extension of the SF330 submission deadline, from November 10, 2026, to November 17, 2026. This additional time would allow interested firms to prepare comprehensive qualifications packages that fully address the solicitation requirements.
SF330 submission due date extended from 11/10/2026 to 11/172026.
End of RFIs.
A.1 REVISED EVALUATION CRITERIA
Evaluation Criteria:
1. Professional Qualifications: the qualifications of the individuals will be examined for experience and education and their record of working together as a team that are necessary for satisfactory performance of the services required. The architectural firm capable of preparing all design and construction documentation including, but not limited to advance planning, design, and construction oversite (including final as-built drawings) at the VA Medical Center in Marion, Illinois. The Engineering on staff representing the project or signing drawings in each discipline must be licensed to practice in one of the US States. Provide Professional License numbers and/or proof of licensure. The team shall have demonstrable expertise in their respective fields: Electrical Engineer, Mechanical Engineer, Structural Engineer, Fire Protection Engineer, Certified Professional Industrial Hygienist, Plumbing Engineer, Life Safety Engineer, and Cost Estimator with experience on projects of similar size and complexity.
2. Specialized Experience and Technical Competence: specific experience and technical skill in the type of work required for this project, including medical renovations to existing medical facilities, VA safety and physical security design, and experience in abatement of hazardous construction materials. Experience and qualification of personnel proposed for assignment and their record of working together as a team. The effectiveness of proposed project team (including management structure, coordination of disciplines, subcontractors, and prior working relationships) will be examined. The qualifications for Engineers shall include a summary of at least five similar projects that demonstrate technical capabilities and how well the proposal addresses technical capabilities in design quality management procedures, Computer-Aided Design and Drafting/Building Information Modeling, and equipment resources requirements.
3. Capacity to Accomplish the Work: The prime contractor will be evaluated to determine if it has the general workload and staffing capacity within its design office which will be responsible for the design to accomplish the work in the required time. In accordance with VAAR 852.219-75 : In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. Prime contractor must include its certification of compliance with the limitations on subcontracting specified in 852.219-75 with its SF330 submissions.
4. Past Performance: The past performance of projects that are complete (design and construction) that the firm has designed relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performances that are older than 5 years will receive a lesser rating than those references for projects accomplished within the past 5 years. Projects that are submitted and not constructed will not be considered.
5. Reputation in A/E Community: Reputation and standing of the firm and its principal officers within the design community with respect to professional performance, general management and cooperativeness, including awards, merits and recommendations.
6. Claims and Terminations: Record of significant claims against the firm because of improper or incomplete architectural and engineering services.
7. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services.
End of Evaluation Criteria