This is an addendum to contract documents for the Replace Air Handlers (AHU-3) in Building 1 project at Marion VA Medical Center. Issued on March 13, 2026, as Addendum No. 1, this document modifies the original contract documents by adding Drawing Sheet AE401 – PLAN DETAILS to the bid documents. The addendum is issued in accordance with VA requirements and must be incorporated into the contractor's bid documents as a fully binding part of the contract documents.

Drawing AE401 contains three plan details at a scale of 3" = 1'-0" depicting construction assemblies for the air handler replacement project: a plan detail cut at mid-beam, a corner plan detail cut at mid-beam, and a corner plan detail cut 24" above grating. The details show structural and architectural components including metal wall panels, rigid insulation, metal studs, steel beams, columns, gypsum sheathing, sealants, and backrod installations. The drawing is prepared by the Architect/Engineer of Record and is part of the fully sprinklered bid documents for VAMC Marion, IL under project number 675A5-22-103.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Air Handlers (AHU-3) in Building 1

Marion VA Medical Center

ADDENDUM NO. 1

March 13, 2026

The following changes, corrections, deletions, and/or additions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein.

A. DRAWINGS

Drawing AE401 – PLAN DETAILS

1. ADD DRAWING SHEET AE401.

This addendum is issued in accordance with VA requirements and shall be incorporated into the Contractor’s Bid Documents.

END OF DOCUMENT

I.3

5/8" WEATHER RESISTANCE

GYP. SHEATHING

3" METAL STUDS

METAL WALL PANELS

1 1/2" RIGID INSULATION, R-7.5

BACKROD

SEALANT

WEB OF STEEL BEAM -

SEE STRUCTURAL

FLANGE OF STEEL BEAM -

SEE STRUCTURAL

WEB OF STEEL BEAM

FLANGE OF STEEL BEAM

3 1/4"FACE OF STUD

I.3

5/8" FRT PLYWOOD5/8" WEATHER RESISTANCE

GYP. SHEATHING

(2) 3" METAL BOXED STUDS

METAL WALL PANELS

1 1/2" RIGID INSULATION, R-7.5

STEEL TUBE COLUMN -

SEE STRUCTURAL

6" COLD FORMED METAL FRAMING -

SEE STRUCTURAL

3 1/4"FACE OF STUD

I.3

5/8" WEATHER RESISTANCE

GYP. SHEATHING

3" METAL STUDS

METAL WALL PANELS

1 1/2" RIGID INSULATION, R-7.5

BACKROD

SEALANT

WEB OF STEEL BEAM -

SEE STRUCTURAL

FLANGE OF STEEL BEAM -

SEE STRUCTURAL

WEB OF STEEL BEAM -

SEE STRUCTURAL

FLANGE OF STEEL BEAM -

SEE STRUCTURAL

(2) 3" METAL BOXED STUDS

3 1/4"FACE OF STUD

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

PA SJ/KB

REPLACE AIR HANDLERS IN BUILDING 1 675A5-22-103

VAMC MARION, IL

03-07-2025REVISIONS:

03-13-2026ADDENDUM NO. 1

PLAN DETAILS

AE401

3" = 1'-0"AE401

1 PLAN DETAIL (CUT @ MID-BEAM)

3" = 1'-0"AE401

3 CORNER PLAN DETAIL (CUT 24" ABOVE GRATING)

3" = 1'-0"AE401

2 CORNER PLAN DETAIL (CUT @ MID-BEAM)

SCALE:

0' 2" 4" 8" 1'

3" = 1' - 0" sjeffries Snapshot