Master Panel vol-1.pdf

PDF 18 MB Posted

Attached to
Y1DA--657-26-109JB, Upgrade Master Boiler Program Logic Controls l STL
Solicitation number
36C25526R0051_1
Issued by

About this file

This file is a comprehensive operations and maintenance documentation package for boiler master panel and field instrument systems installed at the VA Medical Center Jefferson Barracks in St. Louis, Missouri. The documentation, submitted May 13, 2015, under Solicitation #VA-101-11-RP-0149 and Contract #VA101F-12-C-0039, covers equipment supplied by Protherm Corporation and includes detailed brief operating instructions and functional safety manuals for Endress & Hauser pressure transmitters (Cerabar M and S models), level transmitters (Deltabar S), and flowmeters (Prowirl models).

The documentation provides installation, wiring, commissioning, and operational guidance for multiple instrument types including pressure measurement devices (PMC51, PMP51, PMP55, PMC71, PMP71, PMP75), differential pressure and level transmitters (PMD55, PMD70, PMD75, FMD76, FMD77, FMD78), and associated control components. Functional safety manuals detail Safety Integrity Level (SIL) 2 and SIL 3 certifications per IEC 61508 standards, with specific performance parameters, proof-test intervals, and configuration procedures for safety-related applications. The materials include device configuration forms, parameter tables, alarm response settings, and maintenance protocols, with emphasis on proper installation positioning, wiring specifications, commissioning procedures for pressure and level measurement modes, and fail-safe operation requirements for process safety systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .