This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs Network Contracting Office (NCO) 15 in Leavenworth, Kansas. The amendment modifies solicitation 36C25526R0006 by adding additional Contract Line Item Numbers (CLINs) 00002-0005 as Alternate Deducts and updating key procurement details. The project involves replacing the MDP Panel in Building 89, with a base bid (CLIN 0001) and four alternate deduct options: removing refrigeration equipment (CLIN 0002), eliminating busway interconnections (CLIN 0003), skipping emergency switchboard replacement (CLIN 0004), and potentially excluding electrical room security upgrades (CLIN 0005). Each CLIN has a 310-day performance period and requires general construction, demolition, and electrical distribution equipment work across Buildings 88, 89, 90, and 91.

The amendment schedules an additional site visit for 04 December 2025 at 1:00 pm Central time at Building 88/89 loading dock and updates the proposal submission deadline to 19 December 2025 at 2:00 pm Central, to be delivered to the NCO15 Contracting office in Leavenworth, Kansas. Potential bidders must acknowledge receipt of this amendment through specified methods, and failure to do so may result in offer rejection. The amendment provides contractors with flexibility to bid on the base construction project or select from various deduct alternates that could potentially reduce the overall project scope and cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0005 12-03-2025

589A6-24-410

36C255

Department of Veterans Affairs

Network Contracting Office (NCO) 15

3450 S 4th Street Trafficway

Leavenworth KS 66048

36C255

Department of Veterans Affairs

Network Contracting Office (NCO) 15

3450 S 4th Street Trafficway

Leavenworth KS 66048

To all Offerors/Bidders

36C25526R0006

10-20-2025

X

X X x

THIS AMENDMENT IS TO PROMULGATE THE FOLLOWING CHANGES.

1. Add additional CLINS 00002-0005 Alternate Deducts to the Solicitation (See Attached).

2. Schedule additional site visit for 04 December 2025 at 1:00 pm Central time at BLDG 88/89 Loading dock.

3. Proposal due date is 19 December 2025 at 2:00pm central, at the NCO15 Contracting office 3450 So. 4th St Trafficway

Leavenworth, Kansas 66048.

3. All other terms and conditions remain the same.

Timothy Parison

Contracting Officer

CLIN 0001, General Construction: (BASE Proposal): Base bid work includes general construction, alterations, removal of existing equipment, construction and certain other items required for the demolition of the electrical distribution equipment noted in the contract document drawings. This includes the distribution switchboards serving Buildings 88, 89, 90, and 91 located within Building 89. As a part of the base bid, the contractor shall complete all elements listed within the contract document drawings and specifications. Refer to the bid deductions listed below for deduct options.

Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Replace MDP Panel Bld 89 as required by drawings and specifications.

Total: _____________________________________________

Period of Performance – 310 days

CLIN 0002 ALTERNATE 1 (Deduct Alternate I) –All items in CLIN 0001 except:

Demolition of the existing refrigerator and freezer located in room B137A and B137B.

Total: ______________________________________________

Period of Performance – 310-days

CLIN 0003 ALTERNATE 2 (Deduct Alternate 2) –All items in CLIN 0001 except: Busway interconnecting the replacement switchboards and associated PLC.

CLIN 0004 ALTERNATE 3 (Deduct Alternate 3) - All items in CLIN 0001 except:

Replacement of emergency distribution switchboard 89-EDPG1 and associated connections.

CLIN 0005 ALTERNATE 4 (Deduct Alternate 4) - All items in CLIN 0001 except: Security upgrades to associated electrical room under project scope – (This shall be a deduct if these upgrades are completed under a separate project prior to the completion of the project to Replace

MDP Panel Bldg 89.