Drawings Set 1_2 657A4-22-309 62 pages.pdf

PDF 22 MB Posted

Attached to
Z1NE--657A4-22-309, Fire Main and Water Storage
Solicitation number
36C25525R0099
Issued by

About this file

These engineering drawings detail a comprehensive water infrastructure replacement project for the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The 62-page drawing set (Drawings Set 1_2 657A4-22-309) includes detailed civil, structural, architectural, and utility plans for replacing the facility's fire main and water storage systems across multiple bid packages. Key components include constructing two 140,000-gallon water storage tanks (one for domestic water, one for fire/industrial water), a new pump station building, emergency generator, underground fuel tank, and comprehensive water distribution infrastructure improvements.

The project involves three primary construction phases, with extensive demolition and replacement of existing water lines, fire hydrants, valves, and underground utilities. The drawings specify detailed site grading, utility routing, erosion control measures, and technical specifications for water tank foundations, piping, and associated infrastructure. The project is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated cost between $10-20 million and a 520-calendar day performance period. The solicitation is expected to be released around June 20, 2025, with the goal of addressing the facility's degraded water infrastructure and ensuring a 96-hour standby water supply.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

NOT FOR

CONSTRUCTION750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SGL ADB

GI001

N/A

COVER SHEET

JOHN J. PERSHING VA MEDICAL CENTER

1500 N. WESTWOOD BLVD., POPLAR BLUFF, MO 63901

PROJECT #: 657A4-22-309

REPLACE FIRE MAIN AND WATER STORAGE

ACCEPTANCE SHEET - PROJECT 657A4-22-309

AREA OF WORK

SO WOO V

W S

W

OO

V

W Y 67)

N or th

SHEET

NUMBER SHEET NAME

GENERAL

GI001 COVER SHEET

GI002 PHASING PLAN 1

GI003 PHASING PLAN 2

GI004 PHASING PLAN 3

SURVEY / MAPPING

VF101 EXISTING CONDITIONS SURVEY

CIVIL

C-001 GENERAL NOTES, ABBREVIATIONS, AND LEGENDS

CD100 CIVIL OVERALL DEMOLITION PLAN

CD101 CIVIL DEMOLITION PLAN 1

CD102 CIVIL DEMOLITION PLAN 2

CD103 CIVIL DEMOLITION PLAN 3

CG100 CIVIL OVERALL GRADING PLAN

CG101 CIVIL GRADING PLAN 1

CG102 CIVIL GRADING PLAN 2

CG103 CIVIL GRADING PLAN 3

CG114 EROSION CONTROL PLAN 3 - INITIAL BMPS

CG115 EROSION CONTROL PLAN 3 - INTERIM BMPS

CG116 EROSION CONTROL PLAN 3 - FINAL STABILIZATION

CG404 CIVIL GRADING PLAN - BUILDING 24 PUMP HOUSE

CG405 CIVIL DRAINAGE PLAN - BUILDING 24 PUMP HOUSE

CG501 CIVIL GRADING DETAILS

CG502 CIVIL GRADING DETAILS 2

CJ601 DOMESTIC WATER SCHEMATIC

CJ602 FIRE AND INDUSTRIAL WATER SCHEMATIC

CS100 CIVIL OVERALL SITE PLAN

CS101 CIVIL SITE PLAN 1

CS102 CIVIL SITE PLAN 2

CS103 CIVIL SITE PLAN 3

SHEET

NUMBER SHEET NAME

CS404 CIVIL SITE PLAN - BUILDING 24 PUMP HOUSE

CS501 CIVIL SITE PLAN DETAILS

CU100 CIVIL OVERALL UTILITY PLAN

CU101 CIVIL UTILITY PLAN 1

CU102 CIVIL UTILITY PLAN 2

CU103 CIVIL UTILITY PLAN 3

CU301 CIVIL WATER SUPPLY PLAN & PROFILE 1

CU302 CIVIL WATER SUPPLY PLAN & PROFILE 2

CU303 CIVIL WATER SUPPLY PLAN & PROFILE 3

CU304 CIVIL FIRE AND INDUSTRIAL WATER PLAN & PROFILE 4

CU305 CIVIL FIRE AND INDUSTRIAL WATER PLAN & PROFILE 5

CU306 CIVIL FIRE AND INDUSTRIAL WATER PLAN & PROFILE 6

CU308 CIVIL FIRE AND INDUSTRIAL WATER PLAN & PROFILE 8

CU309 CIVIL FIRE AND INDUSTRIAL WATER PLAN & PROFILE 9

CU311 CIVIL DOMESTIC WATER PLAN & PROFILE 11

CU312 CIVIL DOMESTIC WATER PLAN & PROFILE 12

CU313 CIVIL DOMESTIC WATER PLAN & PROFILE 13

CU315 CIVIL DOMESTIC WATER PLAN & PROFILE 15

CU318 CIVIL DOMESTIC WATER PLAN & PROFILE 18

CU319 CIVIL DOMESTIC WATER PLAN & PROFILE 19

CU320 CIVIL SANITARY SEWER PLAN AND PROFILE - BUILDING 24

CU321 CIVIL STORM SEWER PLAN AND PROFILE - BUILDING 24

CU322 CIVIL STORM SEWER PLAN AND PROFILE NORTH CAMPUS

CU404 CIVIL UTILITY PLAN BUILDING 24 - PUMP HOUSE

CU501 CIVIL UTILITY DETAILS - WATER DISTRIBUTION

CU502 CIVIL UTILITY DETAILS - WATER DISTRIBUTION

CU503 CIVIL UTILITY DETAILS - WATER DISTRIBUTION

CU504 CIVIL UTILITY DETAILS - WATER DISTRIBUTION

CU505 CIVIL UTILITY DETAILS

CU506 STORAGE TANK PLAN & PROFILE

CU507 STORAGE TANK ROOF DETAILS

CU508 STORAGE TANK FOUNDATION DETAILS

CU509 ALTITUDE CONTROL VALVE DETAILS

SHEET

NUMBER SHEET NAME

LANDSCAPE

L-001 LANDSCAPE ABBREVIATIONS & NOTES

LD100 LANDSCAPE OVERALL DEMOLITION PLAN

LD101 LANDSCAPE DEMOLITION PLAN 1

LD102 LANDSCAPE DEMOLITION PLAN 2

LD103 LANDSCAPE DEMOLITION PLAN 3

LP100 OVERALL PLANTING PLAN

LP101 PLANTING PLAN 1

LP102 PLANTING PLAN 2

LP103 PLANTING PLAN 3

LP404 PLANTING PLAN - BUILDING 24 PUMP HOUSE

STRUCTURAL

S-001 STRUCTURAL NOTES

S-002 STRUCTURAL ABBREVIATIONS, NOTES, & SYMBOLS

S-601 STRUCTURAL SPECIAL INSPECTIONS SCHEDULE

SB101 FOUNDATION PLAN

SB111 SLAB ON GRADE PLAN

SB501 FOUNDATION DETAILS

SB502 FOUNDATION DETAILS

SF112 TOP OF BEAM PLAN

SF113 ROOF FRAMING PLAN

SF411 ENLARGED FRAMING SECTIONS

SF501 CMU WALL DETAILS

SF511 CONNECTION DETAILS

SF512 CONNECTION DETAILS

SF601 COLUMN AND BEAM SCHEDULES

ARCHITECTURE

A-001 ARCHITECTURAL ABBREVIATIONS, NOTES, CODE DATA &

SYMBOLS

AE111 FLOOR PLAN, RCP & ROOF PLAN

SHEET

NUMBER SHEET NAME

AE201 ELEVATIONS - EXTERIOR

AE301 SECTIONS - BUILDINGS

AE511 DETAILS

AE601 SCHEDULES - FINISH SCHEDULE, WALL & ROOF TYPES

AE611 SCHEDULES - DOORS

FIRE PROTECTION

FP001 FIRE PROTECTION - GENERAL

PLUMBING

P-001 PLUMBING ABBREVIATIONS

PQ601 EQUIPMENT & FIXTURE SCHEDULES

PW111 DRAIN-WASTE-VENT PLAN

PW112 DRAIN-WASTE-VENT AXONOMETRIC VIEW

PI601 CONTROL DIAGRAMS

PK501 TYPICAL DETAILS

PK502 PROJECT PHOTOS

MECHANICAL

M-001 MECHANICAL ABBREVIATIONS & NOTES

M-002 MECHANICAL SYMBOLS

MQ601 EQUIPMENT SCHEDULES

MH110 HVAC PLAN

MP111 MECHANICAL PIPING PLAN

MI601 CONTROL DIAGRAMS

MK501 TYPICAL DETAILS

ELECTRICAL

SHEET

NUMBER SHEET NAME

E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES

E-002 ELECTRICAL SYMBOLS

EL121 LIGHTING RCP - LEVEL 1

EL601 LIGHTING SCHEDULES

EP111 PUMP HOUSE - ELECTRICAL PLAN

EP112 PUMP HOUSE - ELECTRICAL GROUNDING PLAN

EP601 ELECTRICAL SCHEDULES

ET111 TELCOM PLAN - LEVEL 1

EK501 TYPICAL DETAILS

EK502 TYPICAL DETAILS

EK503 ELECTRICAL SEISMIC DETAILS

EK504 ELECTRICAL SEISMIC DETAILS

KEY MAP

AERIAL MAP

SHEET INDEX

DIRECTOR

ASSOCIATE DIRRECTOR

CHIEF OF STAFF

AD FOR PATIENT CARE

AD FOR OPERATIONS

QUALITY MANAGEMENT

MENTAL HEALTH CHIEF

PROJECT ENGINEER / COR

CHIEF OF EOC

CHIEF OF HOUSEKEEPING

ENGINEER REVIEW 1

ENERGY ENGINEER

ADDITIONAL REVIEW 1

ADDITIONAL REVIEW 2

POLICE CHIEF

CHIEF FMS

FACILITY PLANNER

EMPLOYEE HEALTH

SAFETY MANAGER

INFECTION CONTROL

PATIENT SAFETY

INTERIOR DESIGNER

e Date

SEE REVISION

SCHEDULE

100% CONSTRUCTION

DOCUMENTS IFB

S 89°38' E 1339.9'

N

°3 4'

E

0.

6'

N 32°56' W 1054.5'

N 89°11' W 763.9'

S

°3 2'

W

8.

1'

N 32°56' W 174.5'

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

OHW

O H

W

OHW

TRAN

TRAN

TRAN

TRAN

C

D D

D

D

DD

D

FUTURE

TEMPORARY

BUILDING

C

C

C C C C

C

C

C

C C

C

C C

C

C

CC

C

C

C

C

C

C

C

PIV

FDC

FDC

FDC

FUEL OIL TANKS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

EQUIPMENT

SHED

EQUIPMENT

SHEDS

PC

R

PC

R

PC

R

LP

S

LP

S

PCR

LPS

LPS

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

WATER VAULT

M

W

M

MEMORIAL

DRIVE

SOUTHWOOD DRIVE (UNDEVELOPED)

W

ESTW

OOD BLVD. (HW

Y 67)

AL

LE

Y

WV

CONSTRUCTION

PHASE 1,

BID PACKAGE 1

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W W W W

FDC

W

W

W

W

FH

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FH

FDC

FH

D

D

D

D

D

D

FH

FH

FH

FDC

TRAN

D

X X

X X

X

X

X X

X X

X X

X X

X X

FW

FW

FW

FW

W W

W

P

P

FP

FP

P

P

W

W

W

W

W

W

W W

W

W

FH

FH

W

W

W

W

W

W

W

W

W

W

W

W

W

W

FH

W

FO

FO

FO

FO FO

FO

FO

FH

D

FO

FO

FO

FO

FO

FO

C

C

C

5.40'

4.49'

6.90'

5.6 3'

5.51'

4.99'

C

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

NOT FOR

CONSTRUCTION750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025

SCALE:SCALE: 1" = 60'

0 30' 60' 120' 180' 240'15

PHASING PLAN 1

N or th

SGL ADB

GI002

N/A

PHASING PLAN 1

SO WOO V

W S

W

OO

V

W Y 67)

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

1. PHASE 1 CONSTRUCTION STAGING AREA.

2. 140,000 GAL. DOMESTIC WATER STORAGE TANK.

3. 140,000 GAL. FIRE AND INDUSTRIAL WATER STORAGE TANK.

4. PUMP STATION BUILDING

5. PROVIDE TEMPORARY 8" DIA. PLUG AND DEAD END THRUST COLLAR WITH 2"

DIA. BLOWOFF AT END OF WATER AND FIRE MAIN EXTENSIONS.

6. EMERGENCY GENERATOR & FUEL TANK.

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SECTION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE IN

ACCORDANCE WITH 31 20 00 EARTHWORK.

3. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SECTION 02 83 33.

4. PROVIDE TEMPORARY PLUGS WITH 2" BLOW-OFFS FOR CHLORINATION AND

PRESSURE TESTING PURPOSES

5. PHASE 1 CONSTRUCTION SHALL INCLUDE WATER AND FIRE STORAGE TANKS,

PUMP STATION BUILDING, EMERGENCY GENERATOR, AND UNDERGROUND

FUEL TANK. PHASE 1 IMPROVEMENTS SHALL BE INSTALLED, TESTED,

OPERATIONAL, AND APPROVED BY VHA COR BEFORE PROCEEDING TO PHASE 2

INFRASTRUCTURE IMPROVEMENTS.

6. CONTRACTOR MUST MAINTAIN EGRESS TO ALL AREAS OF FACILITY DURING

OPERATIONS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: LOADING

DOCKS, FACILITY ENTRANCES, CLINICAL SERVICE ENTRANCES, PARKING

AREAS, LIFE SAFETY EGRESS. BRIEF UTILITY INTERRUPTIONS MIST BE

COORDINATED A MINIMUM OF TWO (2) WEEKS NOTICE TO THE COR. UTILITY

INTERRUPTIONS SHALL BE AFTER BUSINESS HOURS (MON - FRI 8AM TO 4:30 PM)

OR ON WEEKENDS AT THE DISCRETION OF THE COR.

e Date

SEE REVISION

SCHEDULE

PIV

FDC

FDC

FDC

S 89°38' E 1339.9'

N

°3 4'

E

0.

6'

N 32°56' W 1054.5'

N 89°11' W 763.9'

S

°3 2'

W

8.

1'

N 32°56' W 174.5'

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

OHW

O H

W

OHW

TRAN

TRAN

TRAN

TRAN

C

D D

D

D

DD

D

FUTURE

TEMPORARY

BUILDING

C

C

C C C C

C

C

C

C C

C

C C

C

C

CC

C

C

C

C

C

C

C

FUEL OIL TANKS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

PC

R

PC

R

PC

R

LP

S

LP

S

PCR

LPS

LPS

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

WATER MH 41

ELEC. W METER

W

W

W

M

W

W

W

W

EXISTING

WATER

STORAGE

TANK

M

W

ESTW

OOD BLVD. (HW

Y 67)

AL

LE

Y

SOUTHWOOD DRIVE (UNDEVELOPED)

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W W W W

FDC

W

W

W

W

FH

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FH

FDC

FH

D

D

D

D

D

D

FH

FH

FH

FDC

TRAN

D

X X

X X

X

X

X X

X X

X X

X X

X X

FW

FW

FW

FW

W W

W

P

P

FP

FP

P

P

W

W

W

W

W

W

W W

W

W

FH

FH

W

W

W

W

W

W

W

W

W

W

W

W

W

W

FH

W

FO

FO

FO

FO FO

FO

FO

FH

D

FO

FO

FO

FO

FO

FO

C

C

C

5.40'

4.49'

6.90'

5.6 3'

5.51'

4.99'

C

CONSTRUCTION

PHASE 2,

BID PACKAGE 1

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

NOT FOR

CONSTRUCTION750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025

SCALE:SCALE: 1" = 60'

0 30' 60' 120' 180' 240'15

PHASING PLAN 2

N or th

SGL ADB

GI003

N/A

PHASING PLAN 2

SO WOO V

W S

W

OO

V

W Y 67)

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

1. PROVIDE TEMPORARY 8" DIA. PLUG AND DEAD END THRUST COLLAR WITH 2"

DIA. BLOWOFF AT END OF WATER FIRE AND SUPPLY MAIN EXTENSIONS.

2. REMOVE PHASE 1 TEMPORARY PLUG AND BLOWOFF AND CONNECT TO

PHASE 1 DISTRIBUTION PIPELINE.

3. PROVIDE FIBER OPTIC PROTECTIVE CASING AND MANHOLE. DO NOT PROVIDE

FIBER OPTIC WIRING, IT WILL BE RAN THROUGH THE CASING IN BIDDING

PACKAGE 2.

4. CAP PIPE AT VALVE FOR PHASE 2 CONNECTION

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE IN

ACCORDANCE WITH 31 20 11 EARTHWORK .

3. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

4. PROVIDE TEMPORARY PLUGS WITH 2" BLOWOFFS FOR CHLORINATION AND

PRESSURE TESTING PURPOSES.

5. PHASE 2 CONSTRUCTION SHALL INCLUDE REPLACEMENT OF WATER AND FIRE

DISTRIBUTION MAINS. NEW PHASE 2 IMPROVEMENTS SHALL BE INSTALLED,

TESTED, OPERATIONAL, AND APPROVED BY VHA COR BEFORE PROCEEDING

TO PHASE 3 INFRASTRUCTURE IMPROVEMENTS AND SERVICE CONNECTIONS

TO EXISTING BUILDINGS.

6. CONTRACTOR MUST MAINTAIN EGRESS TO ALL AREAS OF FACILITY DURING

OPERATIONS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: LOADING

DOCKS, FACILITY ENTRANCES, CLINICAL SERVICE ENTRANCES, PARKING

AREAS, LIFE SAFETY EGRESS. BRIEF UTILITY INTERRUPTIONS MIST BE

COORDINATED A MINIMUM OF TWO (2) WEEKS NOTICE TO THE COR. UTILITY

INTERRUPTIONS SHALL BE AFTER BUSINESS HOURS (MON - FRI 8AM TO 4:30 PM)

OR ON WEEKENDS AT THE DISCRETION OF THE COR.

e Date

SEE REVISION

SCHEDULE

°3 4'

E

0.

6'

N 32°56' W 1054.5'

N 89°11' W 763.9'

S

°3 2'

W

8.

1'

N 32°56' W 174.5'

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

OHW

O H

W

OHW

TRAN

TRAN

TRAN

TRAN

C

D D

D

D

DD

D

FUTURE

TEMPORARY

BUILDING

C

C

C C C C

C

C

C

C C

C

C C

C

C

CC

C

C

C

C

C

C

C

PIV

FDC

FDC

FDC

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

EQUIPMENT

SHED

EQUIPMENT

SHEDS

PC

R

PC

R

PC

R

LP

S

LP

S

PCR

LPS

LPS

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

WATER VAULT

M

W

M

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W W W W

FDC

W

W

W

W

FH

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FH

FDC

FH

D

D

D

D

D

D

FH

FH

FH

FDC

TRAN

D

X X

X X

X

X

X X

X X

X X

X X

X X

FW

FW

FW

FW

W W

W

P

P

FP

FP

P

P

W

W

W

W

W

W

W W

W

W

FH

FH

W

W

W

W

W

W

W

W

W

W

W

W

W

W

FH

W

FO

FO

FO

FO FO

FO

FO

FH

D

FO

FO

FO

FO

FO

FO

C

C

C

5.40'

4.49'

6.90'

5.6 3'

5.51'

4.99'

C

W

ESTW

OOD BLVD. (HW

Y 67)

AL

LE

Y

SOUTHWOOD DRIVE (UNDEVELOPED)

'1

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

NOT FOR

CONSTRUCTION750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025

SCALE:SCALE: 1" = 60'

0 30' 60' 120' 180' 240'15

PHASING PLAN 3

N or th

SGL ADB

GI004

N/A

PHASING PLAN 3

SO WOO V

W S

W

OO

V

W Y 67)

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

1. PROVIDE TEMPORARY 8" DIA PLUG AND THRUST BLOCK WITH 2" DIA BLOWOFF AT END OF

WATER AND FIRE MAIN EXTENSIONS.

2. COORDINATE WITH NATURAL GAS UTILITY FOR CROSSING AND UTILITY RELOCATION.

3. CONNECTION TO EXISTING WATER UTILITY MAINS, COORDINATE WITH MODOT FOR BORING

UNDER HWY 67 (WESTWOOD BLVD.).

4. 8" X 6" TEE AND KB WITH 6" GATE VALVE & BOX. 6" D.I. WATER MAIN, AND 6" DIA MANHOLE WITH

6" CHECK VALVE.

5. DISCONNECT EXISTING 6" X 6" TEE FOR EXISTING 6" D.I. MAIN TO NORTH. PLUG AND THRUST BLOCK TEE. INSTALL 8" X 6" TEE AND THRUST BLOCK AT 8" FIRE MAIN AND EXTEND 6" D.I. FIRE MAIN SOUTHWESTERLY TO EXISTING FIRE MAIN. INSTALL 6" X 6" TEE, TWO (2) 6" RESTRAINED

COUPLINGS, CONCRETE THRUST BLOCK, AND APPURTENANCES AS REQUIRED FOR

CONNECTION TO EXISTING 6" D.I. FIRE MAIN.

6. AFTER WATER DISTRIBUTION MAIN TO BE INSTALLED, TESTED AND ACCEPTABLE BY VHA COR, INSTALL 8" X 1.5" SERVICE SADDLE, 1.5" CORP STOP, 1.5" CURB STOP AND 1.5" TYPE K COPPER SERVICE LINE FROM 8" D.I. WATER MAIN TO EXISTING 1.5" COPPER SERVICE LINE SUPPLYING

DOMESTIC WATER BUILDING 2.

7. CAP FIRE AND WATER MAINS AFTER VALVE TO PREPARE FOR BID PACKAGE 2.

8. CONNECT 8" D.I. WATER AND 8" D.I. FIRE MAINS TO NEW 8" WATER & 8" FIRE MAINS FROM

PHASE 2.

9. CONNECT 8" D.I. SERVICE LINE TO PHASE 2 LINE.

10. PROVIDE SIGNAGE FOR PARKING LOT CLOSURE DURING PHASES.

CONSTRUCTION

PHASE 3,

BID PACKAGE 1

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE IN

ACCORDANCE WITH 31 20 11 EARTHWORK.

3. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

4. PROVIDE TEMPORARY PLUGS WITH 2" BLOWOFFS FOR CHLORINATION AND

PRESSURE TESTING PURPOSES.

5. PHASE 3 CONSTRUCTION SHALL INCLUDE REPLACEMENT OF WATER AND FIRE

DISTRIBUTION MAINS. NEW PHASE 2 IMPROVEMENTS SHALL BE INSTALLED,

TESTED, OPERATIONAL, AND APPROVED BY VHA COR BEFORE PROCEEDING

WITH SERVICE CONNECTIONS TO EXISTING BUILDINGS.

6. CONTRACTOR MUST MAINTAIN EGRESS TO ALL AREAS OF FACILITY DURING

OPERATIONS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: LOADING

DOCKS, FACILITY ENTRANCES, CLINICAL SERVICE ENTRANCES, PARKING

AREAS, LIFE SAFETY EGRESS. BRIEF UTILITY INTERRUPTIONS MIST BE

COORDINATED A MINIMUM OF TWO (2) WEEKS NOTICE TO THE COR. UTILITY

INTERRUPTIONS SHALL BE AFTER BUSINESS HOURS (MON - FRI 8AM TO 4:30 PM)

OR ON WEEKENDS AT THE DISCRETION OF THE COR.

e Date

SEE REVISION

SCHEDULE

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

NOT FOR

CONSTRUCTION750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025 SGL ADB

C-001

N/A

GENERAL NOTES, ABBREVIATIONS,

AND LEGENDS

ABBREVIATIONS

(A) TO BE REMOVED

AHJ AUTHORITY HAVING JURISDICTION

(ATG) ADJUST TO GRADE

BMP BEST MANAGEMENT PRACTICES

BOC BACK OF CURB

BW BOTTOM OF WALL

BOW BACK OF WALK

C.I. CAST IRON

CLF CHAIN LINK FENCE

CLR CLEARANCE

CO CLEANOUT

COR CONTRACTING OFFICER'S REPRESENTATIVE

CONC CONCRETE

DEMO DEMOLISH / DEMOLITION

DC BFP DOUBLE CHECK VALVE

BACKFLOW PREVENTER

DIP OR D.I. DUCTILE IRON PIPE

E EAST, EASTERLY

EL / ELEV ELEVATION

ELEC ELECTRIC

EOP EDGE OF PAVEMENT

EPB ELECTRIC PULL BOX

EW EACH WAY

EX EXISTING

FCCCHR FOUNDATION FOR CROSS-CONNECTION

AND HYDRAULIC RESEARCH

FFE FINISHED FLOOR EXISTING

FL FLOWLINE

FND FOUND

FT FEET

G GAS

GAL GALLON

H HEIGHT

HDPE HIGH DENSITY POLYETHYLENE

HP HIGH POINT

I.E. INVERT ELEVATION

L LENGTH

LP LOW POINT, LIGHT POLE

LPS LOW PRESSURE STEAM

LT LIGHT

MAX. MAXIMUM

MH MANHOLE

MIN. MINIMUM

N NORTH, NORTHING

NTS NOT TO SCALE

OHW OVERHEAD WIRE

PCR PRESSURE CONDENSATE RETURN

PVC POLYVINYL CHLORIDE PIPE

R RADIUS

(R) RECORD INFORMATION

RCP REINFORCED CONCRETE PIPE

RP BFP REDUCED PRESSURE PRINCIPAL BACKFLOW PREVENTER

RSMO REVISED STATUES OF MISSOURI

SQ SQUARE

SS SANITARY SEWER

SST STAINLESS STEEL

STEM STEAM

STM STORM

T TELEPHONE CABLE

TBC TOP BACK OF CURB

(TBR&R) TO BE REMOVED AND REPLACED

TC TOP OF CURB

TF TOP OF FOUNDATION

T.O.P. TOP OF PIPE

TRANS ELECTRIC TRANSFORMER

TW TOP OF WALL

UDE UNDERGROUND ELECTRIC

UDG UNDERGROUND GAS

UDRN UNDERDRAIN

UGC UNDERGROUND COMMUNICATION

UGE UNDERGROUND ELECTRIC

UGFO UNDERGROUND FIBER OPTIC

UGRD UNDERGROUND

UGT UNDERGROUND TELEPHONE

USC UNIVERSITY OF SOUTHERN CALIFORNIA

VA DEPARTMENT OF VETERANS AFFAIRS

VCP VITRIFIED CLAY PIPE

VHA VETERANS HEALTH ADMINISTRATION

WTR WATER

W WIDTH, WATER

DEMOLITION NOTES

EROSION NOTES

1. EROSION AND SILTATION CONTROL SHALL BE INSTALLED AND MUST BE MAINTAINED THROUGHOUT THE

PROJECT UNTIL ACCEPTANCE OF THE WORK BY THE OWNER AND ADEQUATE VEGETATIVE GROWTH ENSURES

NO FURTHER EROSION OF THE SOIL.

2. AT LEAST ONCE EVERY WEEK AND AFTER EVERY RAINFALL EVENT OF 0.25 INCHES OR MORE, EROSION AND SILTATION CONTROL DEVICES SHALL BE INSPECTED BY THE CONTRACTOR FOR DAMAGE AND AMOUNT OF

SEDIMENTATION ACCUMULATED AND CORRECTIVE ACTIONS TAKEN.

3. TEMPORARY SILTATION CONTROL MEASURES (STRUCTURAL) SHALL BE MAINTAINED UNTIL VEGETATIVE COVER

IS ESTABLISHED AT A SUFFICIENT DENSITY TO PROVIDE EROSION CONTROL ON THE SITE.

4. WHERE NATURAL VEGETATION IS REMOVED DURING GRADING, VEGETATION SHALL BE REESTABLISHED IN SUCH

A DENSITY AS TO PREVENT EROSION.

5. WHEN GRADING OPERATIONS ARE COMPLETED OR SUSPENDED FOR MORE THAT 5 DAYS IN ANY AREA, THE DISTURBED AREA SHALL BE SEEDED OR OTHERWISE STABILIZED TO SIGNIFICANTLY REDUCE THE ERODIBILITY OF THE SOIL. PROTECTIVE MEASURES MAY INCLUDE A COMBINATION OF SEEDING, SODDING, MULCHING OR

OTHER SUITABLE MEANS TO PROTECT THE GROUND SURFACE FROM EROSION.

6. IF CUT AND FILL OPERATIONS OCCUR DURING A SEASON NOT FAVORABLE FOR IMMEDIATE ESTABLISHMENT OF PERMANENT GROUND COVER, A FAST GERMINATING GRASS SEED SUCH AS RYE GRASSES SHALL BE UTILIZED

TO RETARD EROSION IF EROSION CONTROL DEVICES HAVE NOT BEEN ESTABLISHED.

7. ALL FINISHED GRADES (AREAS NOT TO BE DISTURBED BY FUTURE IMPROVEMENT) IN EXCESS OF 20% SLOPES (5:1) SHALL BE COVERED WITH EROSION CONTROL FABRIC OR MULCHED AND TACKED AT THE RATE OF 100

POUNDS PER 1,000 SQUARE FEET WHEN SEEDED.

8. STORM WATER PIPES, OUTLETS AND CHANNELS SHALL BE PROTECTED BY SILT BARRIERS AND KEPT FREE OF

WASTE AND SILT AT ALL TIMES PRIOR TO FINAL SURFACE STABILIZATION AND/OR PAVING.

9. SEDIMENT BUILD-UP REMOVED DURING ROUTINE BMP MAINTENANCE SHALL REMAIN ON-SITE. SEDIMENT SHALL BE RELOCATED TO WITHIN THE STOCKPILE AREA OR TO A LEVEL AREA (1% MAX) ABSENT OF CONCENTRATED

FLOWS. LEVEL OUT SEDIMENT AND ALLOW TO DRY.

SILTATION IMPLEMENTATION SCHEDULE:

GRADING NOTES:

1. INSTALL PERIMETER SILTATION CONTROL AND CONSTRUCTION ENTRANCE.

2. DEMO EXISTING PARKING LOT AND BEGIN PLACING AGGREGATE BASE IN PAVEMENT AREAS ONCE AREA HAS

REACHED FINAL GRADE TO PREVENT EROSION.

3. PLACE SILT FENCE AROUND EACH STORM SEWER INLET AS IT IS CONSTRUCTED.

4. IMMEDIATELY SEED GRADED AREAS UPON REACHING FINAL GRADE THAT ARE TO BE PERMANENTLY SEEDED.

1. ON-SITE GRADING WILL UTILIZE STANDARD GRADING EQUIPMENT TO ACHIEVE THE PROPOSED GRADES

SHOWN ON THIS PLAN.

2. GRADING OPERATIONS SUBJECT TO THE CONDITIONS AND RECOMMENDATIONS OF THE GEOTECHNICAL

ENGINEER(S).

3. PROPOSED CONTOURS AND SPOT ELEVATIONS ARE TO FINISHED GRADE.

1. VALHALLA ENGINEERING GROUP, LLC. HAS NO RESPONSIBILITY FOR SERVICES PROVIDED BY OTHERS TO IMPLEMENT THE IMPROVEMENTS SHOWN ON THIS PLAN. THE CONSTRUCTION MEANS AND METHODS ARE THE SOLE RESPONSIBILITY TO THE VHA CONTRACTOR. VALHALLA ENGINEERING GROUP, LLC. HAS NO RESPONSIBILITY TO VERIFY FINAL IMPROVEMENTS AS SHOWN ON THIS PLAN UNLESS SPECIFICALLY ENGAGED

AND AUTHORIZED TO DO SO BY THE VHA OR CONTRACTOR.

2. UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND INFORMATION PROVIDED BY THE VHA, AND THEREFORE DO NOT NECESSARILY REFLECT THE ACTUAL EXISTENCE, NONEXISTENCE, SIZE, TYPE, NUMBER OR LOCATION OF THESE FACILITIES, STRUCTURES, AND UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION OF ALL UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES, EITHER SHOWN OR NOT SHOWN ON THESE PLANS.

THE UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES SHALL BE LOCATED IN THE FIELD, PRIOR TO ANY GRADING, EXCAVATION OR CONSTRUCTION OF IMPROVEMENTS. THESE PROVISIONS SHALL IN NO WAY ABSOLVE ANY PARTY FROM COMPLYING WITH THE UNDERGROUND FACILITY AND DAMAGE PREVENTION ACT, CHAPTER 319 RSMO.

3. LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES AND OTHER EXISTING SUBSURFACE

CONDITIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. NEITHER THE GOVERNMENT NOR THE

ARCHITECT/ENGINEER IS RESPONSIBLE FOR CONFIRMING OR VERIFYING EXISTING

UNDERGROUND/SUBSURFACE CONDITIONS. CONTRACTOR'S PROPOSED PRICE FOR WORK SHALL INCLUDE THE COSTS TO PHYSICALLY CONFIRM AND VERIFY EXISTING UNDERGROUND/SUBSURFACE CONDITIONS AS TO LOCATION, SIZE, ELEVATION OR AS OTHERWISE REQUIRED FOR THE CONTRACTOR'S PERFORMANCE OF THE WORK AND TO ENSURE THE CONTRACTOR'S PERFORMANCE OF THE WORK SO AS TO MAINTAIN MEDICAL CENTER OPERATIONS WITHOUT DISRUPTION OF SERVICES. FOR EXISTING UTILITIES PARALLEL TO AREAS OF EXCAVATION, CONTRACTOR'S PROPOSAL SHALL INCLUDE COST TO PROPERLY LOCATE, PROTECT, RELOCATE OR RE-ROUTE SUCH UTILITIES WHICH ARE SUBJECT TO DAMAGE OR SERVICE DISRUPTION AS A RESULT OF PERFORMANCE OF THE WORK. FOR EXISTING UTILITIES PERPENDICULAR TO AREAS OF EXCAVATION THAT CANNOT BE PROPERLY PROTECTED, SUPPORTED OR OTHERWISE MAINTAINED IN OPERATION, CONTRACTOR'S PROPOSAL SHALL INCLUDE COSTS TO REPLACE THE SECTION OF THE UTILITY SPANNING THE AREA OF EXCAVATION PLUS AN ADDITIONAL TEN (10) FEET OF LENGTH ON EITHER SIDE OF THE AREA OF EXCAVATION.

RELOCATION OR REPLACEMENT OF EXISTING UTILITIES SHALL INCLUDE TEMPORARY PROVISIONS TO MAINTAIN MEDICAL CENTER OPERATIONS. CONTRACTOR'S FAILURE TO CONFIRM AND/OR VERIFY THE NATURE OF EXISTING UNDERGROUND/SUBSURFACE CONDITIONS PRIOR TO PERFORMANCE OF THE WORK OF THE PROJECT SHALL NOT ENTITLE THE CONTRACTOR TO ADDITIONAL COMPENSATION OR AN EXTENSION OF CONTRACT TIME. EXISTING UTILITIES DAMAGED AS A RESULT OF THE WORK OF THE PROJECT SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE IMMEDIATELY WHETHER OR NOT SUCH DAMAGE IS SUFFICIENT TO DISRUPT MEDICAL CENTER OPERATIONS. THE CONTRACTOR'S AS-BUILT/RECORD DOCUMENTS SHALL INCLUDE THE RECORDING OF EXISTING CONDITIONS INVESTIGATED BY THE CONTRACTOR AND THE AFFECT OF THE WORK OF THE PROJECT ON EXISTING CONDITIONS INCLUDING, BUT NOT LIMITED TO, THEIR

RELOCATION, RE-ROUTING AND REPLACEMENT IN WHOLE OR IN PART.

4. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR COSTS INCURRED DUE TO REMOVAL OF UNSUITABLE

MATERIAL WHICH MUST BE REMOVED FROM THE SITE.

5. IT IS THE RESPONSIBILITY OF THE GRADING CONTRACTOR TO PERFORM AN INDEPENDENT EARTHWORK ANALYSIS PRIOR TO SUBMISSION OF BID. IN THE EVENT DISCREPANCIES EXIST, THE GRADING CONTRACTOR

SHALL NOTIFY ENGINEER PRIOR TO SUBMISSION OF BID.

6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMPORT AND/OR EXPORT ANY AND ALL MATERIALS NEEDED TO

COMPLETE THE FINISHED GRADES AND ELEVATIONS AS SHOWN ON DETAILED GRADING PLANS.

7. RE-USE OF EXISTING STOCKPILE MATERIALS AND EXCAVATION SPOILS ON-SITE SHALL BE VERIFIED AND

COORDINATED WITH THE PROJECT GEOTECHNICAL ENGINEER.

8. CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ANY ROCK ENCOUNTERED. CONTRACTOR SHOULD

FAMILIARIZE THEMSELVES WITH ALL GEOTECHNICAL REPORTS AVAILABLE AND REVIEW THE

RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER.

GENERAL CONSTRUCTION NOTES

EXISTING PROPOSED

STM STM

D

STEM STEM

SS SS

510 510

1. ALL DEMOLITION WORK SHALL BE IN CONFORMANCE WITH VHA SPECIFICATIONS 01 00 00 GENERAL

REQUIREMENTS AND 02 41 00 DEMOLITION.

2. PROTECT EXISTING TREES AND VEGETATION INDICATED TO REMAIN. PROTECT AGAINST UNNECESSARY CUTTING OR SKINNING OF ROOTS, BRANCHES OR BARK. DO NOT SMOTHER TREES OR VEGETATION WITH STOCKPILE MATERIAL. DO NOT PARK VEHICLES WITHIN DRIP LINE OF TREES. PROTECT EXISTING TREES AND VEGETATION TO REMAIN WITH TEMPORARY CONSTRUCTION FENCING PRIOR TO SITE CLEARING OPERATIONS.

3. CONTRACTOR TO COORDINATE RELOCATIONS, ABANDONMENT OR REMOVAL OF EXISTING UTILITIES WITH UTILITY COMPANIES AND VHA TO AVOID INTERRUPTION OF SERVICE TO BUILDINGS OUTSIDE OF SPECIFIED

PHASE OF WORK.

4. SAW CUTTING, CURB AND PAVEMENT REMOVALS MUST BE COORDINATED WITH INSTALLATION OF PROPOSED UTILITY MAINS AND SERVICES. CONTRACTOR TO COORDINATE WITH VHA TO COORDINATE PAVEMENT REMOVAL

AND/OR REPLACEMENT BY UTILITY COMPANY WITH ON-SITE DEMOLITION BY CONTRACTOR.

5. EXISTING PAVEMENT SHOWN TO BE REMOVED SHALL REQUIRE BACKFILL AND PROPER COMPACTION WITH

GRADES TO BE REESTABLISHED TO AVOID CONDITIONS WHERE PONDING OF WATER OCCURS.

6. THE VHA & UTILITY COMPANIES SHALL BE CONTACTED FOR COORDINATION ON PROPER ABANDONMENT AND/OR REMOVAL OF EXISTING UTILITY SERVICES TO BE REMOVED. NO CRITICAL SYSTEMS ARE TO BE SHUT OFF

WITHOUT ADVANCE NOTICE AND COORDINATION WITH FACILITY OPERATIONS.

7. CONTRACTOR TO CONTACT THE VHA & UTILITY COMPANIES TO COORDINATE UTILITY AND SERVICE INSTALLATION, REMOVALS, RELOCATIONS & ABANDONMENTS WITH EXISTING AND PROPOSED IMPROVEMENTS.

CONTRACTOR TO AVOID CONDITIONS WHERE NEW PAVEMENT, CURBING OR SIDEWALKS WILL BE DISTURBED BY

UTILITY INSTALLATIONS.

8. PAVEMENT AREAS, CURBS, BUILDINGS, TREES, ETC. SHALL BE REMOVED IN COMPLIANCE WITH ALL GOVERNING

AUTHORITIES.

9. ANY STORM SEWER INLETS INDICATED TO REMAIN IN PLACE BUT ARE OBSTRUCTED SHALL BE CLEANED OUT AND POSITIVE FLOW SHALL BE VERIFIED. IF INLETS ARE UNABLE TO BE REPAIRED, ENGINEER IS TO BE NOTIFIED

IMMEDIATELY.

10. EXISTING WATER METERS, HYDRANTS AND VALVES INDICATED TO REMAIN SHALL HAVE CONNECTING PIPES FIELD LOCATED PRIOR TO SERVICE AND ANY CONFLICTS WITH PROPOSED IMPROVEMENTS SHALL BE

REPORTED TO THE VHA COR PRIOR TO CONSTRUCTION.

11. EXISTING SEWERS INDICATED TO BE REMOVED AND/OR ABANDONED SHALL BE SECURELY BLOCKED AT ANY POINTS OF INTAKE OR DISCHARGE WITH A BULKHEAD OR PREFORMED PLUG. IF THE SEWER IS ABANDONED, IT

SHALL BE COMPLETELY FILLED WITH GROUT.

12. WATER AND FIRE UTILITY LINES, FITTINGS, AND VALVES SHALL BE EXCAVATED EXPOSING LINE, FITTINGS, AND VALVES. UTILITY PIPING, FITTINGS AND VALVES ARE TO BE REMOVED AND DISPOSED OFFSITE IN AN APPROVED

DISPOSAL SITE.

UD UD

CHLR CHLR

CHLS CHLS

EPBEPB

AREA INLET

BOLLARD (FIXED, REMOVEABLE)

CURB INLET

ELECTRIC PULL BOX

FIRE HYDRANT

GATE VALVE (OPEN, CLOSED)

GRATE INLET

GUY WIRE

HANDICAPPED PARKING

LIGHT STANDARD (SINGLE)

LIGHT STANDARD (DOUBLE)

MANHOLE (SEWER, DRAINAGE)

NOTES PARKING SPACES

PARKING CURB STOP

SHRUB

SIGN

KEYNOTE DESIGNATION

TREE

DEMOLITION OR DEMOLISH

LINE TYPE

SYMBOL LEGEND

SYMBOL

UNDERDRAIN

6" VERTICAL CONCRETE CURB

CHILLED WATER SUPPLY

CHILLED WATER RETURN

COMMUNICATION

SANITARY SEWER PIPE

STEAM LINE

STORM SEWER PIPE

STORM SEWER OUTLET

C C

CONTOUR AND ELEVATION

DEMOLISH AND REMOVE UTILITY // //

EELECTRIC E

LIMITS OF CONSTRUCTION

FUELFUEL LINE FUEL

D

UGEEUNDERGROUND ELECTRIC

EXISTING PROPOSED

FOFIBER OPTIC FO

MANHOLE (COMMUNICATION, ELECTRIC)

LINE TYPE LEGEND

DOWDOW

WWDOMESTIC WATER MAIN

DOMESTIC WATER SERVICE LINE

FWFWFIRE / INDUSTRIAL WATER

LPSLOW PRESSURE STEAM LPS

PCRPRESSURE CONDENSATE RETURN PCR

SS

SURVEY CONTROL DATUM:

1. BASE MAPPING PROVIDED FROM FIELD SURVEY PERFORMED BY SMITH & CO ENGINEERING DATED JULY 29, 2022.

NORTH BASED ON MISSOURI COORDINATE SYSTEM OF 1983 EAST ZONE CONVERGENCE SHOWN AND GRID FACTOR OF 0.99991787 AT CONTROL POINT NO. 3, NORTH 341942.45 FEET, EAST 844345.71 FEET, GROUND

DISTANCES SHOWN.

MODOT CORS. RTN STA. MODP (U.S. SURVEY FEET) NORTH 295644.965 FEET, EAST 732787.439 FEET.

CONTROL POINT TABLE

POINT NO. DESCRIPTION ELEVATION NORTHING EASTING

1 VA-1 432.800 342201.626 844595.049

2 VA-2 454.000 342313.120 844244.893

3 VA-3 428.640 341942.450 844345.712

K4 BOLLARD (FIXED)

SLEEVE

XFENCE X

TANK DESIGN:

THE FOLLOWING ARE A DELEGATED DESIGN TO THE TANK MANUFACTURER AND MIST BE SEALED AND SIGNED BY A

PROFESSIONAL ENGINEER LICENSED IN THE STATE OF MISSOURI:

1. TANK DESIGN PLANS FOR STEEL BOLTED GLASS COATED TANK AND ALL APPURTENANCES, INCLUDING PIPE

SUPPORTS.

2. TANK FOUNDATION DESIGN PLANS. THE GEOTECHNICAL REPORT SHOULD BE FURNISHED TO THE TANK

MANUFACTURER.

3. DESIGN PLANS FOR GROUNDING AND CATHODIC PROTECTION SYSTEM.

4. SPECIFICATIONS FOR ALL APPURTENANCES.

5. ALL REQUIRED CALCULATIONS WHICH SUPPORT THE DESIGN.

FINAL TANK FOUNDATION DESIGN IS DELEGATED DESIGN TO THE TANK MANUFACTURER AND MIST BE SEALED AND

SIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF MISSOURI.

STORM SEWER SWALE

FH

ABANDON UTILITY // //SS

e Date

SEE REVISION

SCHEDULE

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS SS

SSE

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

JCT BOX

JCT BOX

JCT BOX

JCT BOX D

JCT BOX

JCT BOX

JCT BOX

JCT BOX

D

D

D

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

STM

STM

ST

M

STM STM

STM

STM

STM

ST

M

STM

STM

STM

STM

STM

STM

ST

M

W

W

W

W

W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

OHW

SS

GAS

GAS

GAS

GAS

GAS

GAS

G

AS

G

AS GAS

GAS

GAS

GAS

GAS

GA

S

GA

S

GAS

GAS

STM

STM

ST

M

ST

M

ST

M

STM

STM

STM

STM

STM

STM

STM

STM

D

D

D

D

D

STM ST

M

ST

M

STM

D

D

D

D

STM

STM

D

STM

STM

ST

M

D D

D

SS

SS

SS

SS

SS

SS

SS

D

D

D

D

D

GAS

GA

S

GAS

D

D

D

GAS

D

D D

D

STM

D

DW

W

W

W

W W

W

W

W

W

W

PCR

LPS

W

MH 1C-78

RIM: 390.44

INV: 381.99

MH 1C-78A

RIM: 400.06

INV: 394.48

MH 1C-78B

RIM: 410.96

INV: 404.40

MH 1C-80

RIM: 420.00

INV: 413.33

MH 1C-80A

RIM: 422.39

INV: 415.97

WATER MH 41

ELEC. W METER

DETENTION BASIN

OUTFLOW BOX

RIM: 396.37

INV.: 390.26

STW MH 40

STW MH 39

SS

MH

CHEMICAL HOLDING TANK

STW MH 49

STW CI 48

STW CI 47

SS MH 42

SS MH 21

STW CI 15

STW CI 16

STW MH 20

TELE. RISER

ELEC. MH

TELE MH

STW MH 19

STW MH 14

STW CI 17

STW CI 18

STW MH 44

SS MH 13

STW DI 12

STW DI 11

STW MH 9

SS MH 10

ELEC.

TRANS.

STW MH 5

ELEC MH

STW MH 6

STW MH 7

STW CI 23

STW CI 24

ELEC. MH

STW DI 4

STW MH 26

SS MH 27

STW CI 32

SS MH 31

STW MH 30

STW MH 29

ELEC MH

SS MH 35

STW MH 36

STW MH 37

STW MH 38

ELEC MH

STW CI 25

STW AI 46

STW AI 43

STW DI 3

SS MH 22

UNDERGROUND

FUEL TANK

UNDERGROUND

FUEL TANK

STW CI 28

STW DI 1

STW DI 2

SS MH 8

STW AI

STW AI

STW AI

STW AI

STW DI 33

STW DI 34

STW DI 45

STW AI

STW AI

STW AI

STW AI

STW MH

DEPTH: 3.1'

DRAINAGE STRUCTURE

FL ELEV: 420.38'

STW AI 50

WATER VAULT

O H

W

OHW

D

D

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

NOT FOR

CONSTRUCTION750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025

SCALE:SCALE: 1" = 60'

0 30' 60' 120' 180' 240'

OVERALL IMPROVEMENT AND

TOPOGRAPHIC SURVEY

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

SGL ADB

VF101

N/A

EXISTING CONDITIONS SURVEY

e Date

SEE REVISION

SCHEDULE

°3 4'

E

0.

6'

N 32°56' W 1054.5'

N 89°11' W 763.9'

S

°3 2'

W

8.

1'

N 32°56' W 174.5'

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

OHW

O H

W

OHW

C

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G G

G G

G

G

G

G

G

G

G

FUTURE

TEMPORARY

BUILDING

C

C

C C C C

C

C

C

C C

C

C C

C

C

CC

C

C

C

C

C

C

C

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

M

W

W

W

W

EXISTING

WATER

STORAGE

TANK

M

FH

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

PIV

FW

FW

FW

FW

FW

FDC

FDC

FW

FW

FW

FW

FW

FW

FW

FH

FH

FH

FH

FW

FDC

FW

SOUTHWOOD DRIVE (UNDEVELOPED)

W

ESTW

OOD BLVD. (HW

Y 67)

AL

LE

Y

MEMORIAL

DRIVE

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X

X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

STM

STM

STM

STM

ST

M

ST

M

STM

STM

ST

M

STM STM

STM

STM

STM

ST

M

STM

STM

STM

STM

STM

ST

M

STM

STM

STM

STM

STM

STM

STM

ST

M

STM

STM

STM

STM

STM

STM

STM

STM ST

M

ST

M

STM

STM

STM

STM

STM

ST

M

STM

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

STM

D D

D

D

D

D

D

D

D

D

DD

D

D

D

D

D

D

D

D

D

D

PLAN 3

PLAN 1BID PACKAGE 2

PLAN 2

EQUIPMENT

SHED

EQUIPMENT

SHEDS

GAS

SHED

PC

R

PC

R

PC

R

LP

S

LP

S

PCR

LPS

LPS

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SGL ADB

CD100

N/A

CIVIL OVERALL DEMOLITION PLAN

SCALE:SCALE: 1" = 60'

0 30' 60' 120' 180' 240'

CIVIL OVERALL DEMOLITION PLAN

SO WOO V

W S

W

OO

V

W Y 67)

N or th

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE

IN ACCORDANCE WITH 31 20 00 EARTHWORK.

3. COORDINATION OF EXISTING UTILITIES TO REMAIN IN SERVICE DURING

CONSTRUCTION TO BE COORDINATED WITH VHA COR.

4. TREES NOT INDICATED FOR DEMOLITION ARE TO BE PROTECTED IN PLACE.

5. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.13.

6. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION

SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.

FH

TR

FH

FH

PRESERVE TREES NOT INDICATED FOR

DEMOLITION AND AVOID DISTURBANCE

OF PICNIC AREA IMPROVEMENTS

DURING DEMOLITION OF PIPELINES

FH

TR

N or th

TR

TR

TR

TR

TR

TR

TR TR

TR

TRTR TR

TRTR

TR TRTR

TR

TRTR

TRTR TR

TR TR

TR

TR

TRTR

TR

TR

TR TR

TR

TR

TR

TR

TRTR

TR TRFH

TR

TR

DEMOLISH AND REMOVE FIRE HYDRANT

DEMOLISH AND REMOVE EXISTING TREE

UTILITY DISCONNECTION POINT

DEMOLITION SYMBOL LEGEND

UTILITY PIPELINES TO BE DEMOLISHED AND REMOVE

UTILITY PIPELINE TO BE ABANDONED IN PLACE

LEGEND

e Date

SEE REVISION

SCHEDULE

FDC

FDC

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

TRAN

TRAN

TRAN

BU

ILD

ING

BU

ILD

ING

BUILDING 7

EQUIPMENT

SHED

EQ

UI

PM

EN

T

SH

ED

S

FUEL OIL TANKS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

STM

STM

ST

M

ST

M

STM

STM

STM

STM

ST

M

ST

M

ST

M

ST

M

STM

STM

STM

STM

STM

STM

STM

ST

M

ST

M

ST

M

ST

M

STM

ST

M

ST

M

STM

STM

STM

STM

STM

STM

STM

STM

D

D

D

DD

D

D

D

T

T

T T T T T T T T T

T

T

T

T

T

T

T

T

T

T

T

T

EXISTING

UTILITY

TUNNEL

SOUTHWOOD DRIVE (UNDEVELOPED)

AL

LE

Y

PC

R

PC

R

PC

R

PC

R

PC

R

PC

R

LP

S

LP

S

LP

S

LP

S

LP

S

LPS

PCR

LPSPCR

PCR

PCR

PC

R

LPS

LPS

LPS LP

S

BUILDING 1

BUILDING 1

BUILDING 23

SGL ADB

CD101

N/A

CIVIL DEMOLITION PLAN 1

SCALE: 1" = 30'

0 15' 30' 60' 90' 120'

CIVIL DEMOLITION PLAN 2

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

MATCHLINE SEE SHEET CD103

M

AT

CH

LI

NE

S

EE

B

ID

P

AC

KA

GE

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025

BID PACKAGE 2 SHEET

CD101

SHEET

CD102

SHEET

CD103

1. DEMOLISH AND REMOVE EXISTING 10" C.I. WATER LINE .

2. DEMOLISH AND REMOVE EXISTING 8" C.I. FIRE LINE.

3. DEMOLISH AND REMOVE EXISTING 8" C.I. WATER LINE.

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE IN

ACCORDANCE WITH 31 20 00 EARTHWORK.

3. COORDINATION OF EXISTING UTILITIES TO REMAIN IN SERVICE DURING

CONSTRUCTION TO BE COORDINATED WITH VHA COR.

4. TREES NOT INDICATED FOR DEMOLITION ARE TO BE PROTECTED IN PLACE.

5. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

6. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION

SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.

DEMOLISH AND REMOVE FIRE HYDRANT

DEMOLISH AND REMOVE EXISTING TREE

UTILITY DISCONNECTION POINT

DEMOLITION SYMBOL LEGEND

UTILITY PIPELINES TO BE DEMOLISHED AND REMOVE

UTILITY PIPELINE TO BE ABANDONED IN PLACE

LEGEND

e Date

SEE REVISION

SCHEDULE

N 32°56' W 1054.5'

N 32°56' W 1054.5'

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

O H

W

D D

C

PIV

FDC

FH

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W//

TR

TR

TR

TR

TR

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

W

ESTW

OOD BLVD. (HW

Y 67)

BUILDING 2

GAS

SHED BUILDING 1

SGL ADB

CD102

N/A

CIVIL DEMOLITION PLAN 2

SCALE: 1" = 30'

0 15' 30' 60' 90' 120'

CIVIL DEMOLITION PLAN 2

N or th

MATCHLINE SEE SHEET BID PACKAGE 2, CD101

M

AT

CH

LI

NE

S

EE

S

HE

ET

C D1

SO WOO V

W S

W

OO

V

W Y 67)

N or th

BID PACKAGE 2 SHEET

CD101

SHEET

CD103

SHEET

CD102

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025

1. DEMOLISH AND REMOVE EXISTING 8" C.I. WATER LINE.

2. DEMOLISH AND REMOVE EXISTING 8" C.I. FIRE LINE.

3. DEMOLISH AND REMOVE EXISTING FIRE HYDRANT AND 8" C.I. FIRE LINE.

4. DEMOLISH AND REMOVE EXISTING 6" C.I. FIRE LINE.

5. ABANDON IN PLACE EXISTING 8" C.I. FIRE LINE. FILL WITH GROUT AND CAP

ENDS WITH CONCRETE.

6. ABANDON IN PLACE EXISTING 8" C.I. WATER LINE. FILL WITH GROUT AND CAP

ENDS WITH CONCRETE.

7. DEMOLISH AND REMOVE EXISTING 6" C.I. FIRE LINE, VERIFY THAT THE LINE WAS

NOT REMOVED IN CONCURRENT PROJECT.

DEMOLISH FIRE HYDRANT

DEMOLISH EXISTING TREE

UTILITY DISCONNECTION POINT

DEMOLITION SYMBOL LEGEND

UTILITY PIPELINES TO BE DEMOLISHED

UTILITY PIPELINE TO BE ABANDONED IN PLACE

LEGEND

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE

IN ACCORDANCE WITH 31 20 00 EARTHWORK.

3. COORDINATION OF EXISTING UTILITIES TO REMAIN IN SERVICE DURING

CONSTRUCTION TO BE COORDINATED WITH VHA COR.

4. TREES NOT INDICATED FOR DEMOLITION ARE TO BE PROTECTED IN PLACE.

5. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

6. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION

SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.

e Date

SEE REVISION

SCHEDULE

AL

LE

Y

MEMORIAL

DRIVE

W

W

W

W

W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

M

W//

W

M

FH

FH

S

°3 2'

W

8.

1'

E

E

E

E

E

E

E

E

E

E

DD

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR

TR TRTR

TR

TR

TR

TR

TR

TR

TR

TRTR

TRTR

TR

TR

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS SS SS

SS

SS

SS

SS

SS

SS

BUILDING 1

SO WOO V

W S

W

OO

V

W Y 67)

N or th

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025

SCALE: 1" = 30'

0 15' 30' 60' 90' 120'

CIVIL DEMOLITION PLAN 4

N or th

M

AT

CH

LI

NE

S

EE

S

HE

ET

C D1

MATCHLINE SEE SHEET CD101

BID

PACKAGE

SHEET

CD101

SHEET

CD102

SHEET

CD103

1. EXISTING WATER LINES AND FIRE LINES IN THE VICINITY OF THE HELICOPTER

LANDING PAD TO BE ABANDONED IN PLACE. HELICOPTER LANDING PAD MUST

REMAIN OPERATIONAL DURING CONSTRUCTION. PROTECT EXISTING LANDING

SURFACE, RETAINING WALLS AND STAIRS FROM DAMAGE.

2. DEMOLISH AND REMOVE EXISTING 10" C.I. WATER LINE.

3. DEMOLISH AND REMOVE EXISTING 8" C.I. WATER LINES.

4. DEMOLISH AND REMOVE EXISTING 8" C.I. FIRE WATER LINES.

5. REMOVE EXISTING TREES.

6. EXISTING 8" D.I. WATER MAIN.

7. EXISTING 8" D.I. FIRE WATER MAIN.

8. DEMOLISH AND REMOVE EXISTING GRAVEL DRIVEWAY.

9. EXISTING 8" C.I. WATER MAIN.

10. EXISTING GRAVEL SURFACE TO REMAIN.

11. EXISTING ASPHALT PARKING LOT TO REMAIN.

12. DEMOLISH AND REMOVE EXISTING MASTER METER AND VAULT AFTER WATER

TANKS AND PUMP STATION ARE MADE OPERATIONAL AND FINAL WATER AND

FIRE SERVICE CONNECTS ARE COMPLETED TO MEDICAL CENTER.

13. AVOID DISTURBANCE OF PICNIC AREA IMPROVEMENTS DURING DEMOLITION OF

PIPELINES.

DEMOLISH AND REMOVE FIRE HYDRANT

DEMOLISH AND REMOVE EXISTING TREE

UTILITY DISCONNECTION POINT

DEMOLITION SYMBOL LEGEND

UTILITY PIPELINES TO BE DEMOLISHED AND REMOVE

UTILITY PIPELINE TO BE ABANDONED IN PLACE

LEGEND

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE

IN ACCORDANCE WITH 31 20 00 EARTHWORK.

3. COORDINATION OF EXISTING UTILITIES TO REMAIN IN SERVICE DURING

CONSTRUCTION TO BE COORDINATED WITH VHA COR.

4. TREES NOT INDICATED FOR DEMOLITION ARE TO BE PROTECTED IN PLACE.

5. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

6. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION

SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.

SGL ADB

CD103

N/A

CIVIL DEMOLITION PLAN 3

e Date

SEE REVISION

SCHEDULE

FUTURE

TEMPORARY

BUILDING

OHW

O H

W

OHW

C

FH

FH

FUEL OIL TANKS

W

W

W

W

W W

W

W

M

EXISTING

WATER

STORAGE

TANK

M

FDC

8"

CI

WM

8"

CI

WM

W

FW

FW

FW

FW

FW

W

WW

W

W

W

W W W

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

W

W

FH

FH

FH

FH

TRAN

D

FH

X X

X X

X

X

X X

X X

X X

X X

X X

FW

FW

FW

FW

W W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

FW

W

W

W

W

W

FW

FW

FW

FH

W

FWW

D

W

W

W

FW

FO

FO

FO

FO

FO

C

C

C

FH

5.8 1'

5.40'

4.49'

6.90'

5.6 3'

4.47'

7.40'

4.4 6'

5.5 2'

4.44'

5.51'

4.99'

5.84'

4.96' C

S 89°38' E 1339.9'

N

°3 4'

E

0.

6'

N 32°56' W 1054.5'

N 89°11' W 763.9'

S

°3 2'

W

8.

1'

N 32°56' W 174.5'

GAS

SHED

EQUIPMENT

SHED

EQUIPMENT

SHEDS

SOUTHWOOD DRIVE (UNDEVELOPED)

W

ESTW

OOD BLVD. (HW

Y 67)

AL

LE

Y

MEMORIAL

DRIVE

NEW PUMP

STATION

SEE SHEET CG404

FOR PUMP STATION

ENLARGEMENT

PLAN 3

PLAN 1BID PACKAGE 2

PLAN 2

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025 SGL ADB

CG100

N/A

CIVIL OVERALL GRADING PLAN

SCALE:SCALE: 1" = 60'

0 30' 60' 120' 180' 240'

CIVIL OVERALL GRADING PLAN

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE

IN ACCORDANCE WITH 31 20 00 EARTHWORK.

3. COORDINATION OF EXISTING UTILITIES TO REMAIN IN SERVICE DURING

CONSTRUCTION TO BE COORDINATED WITH VHA COR.

4. TREES NOT INDICATED FOR DEMOLITION ARE TO BE PROTECTED IN PLACE.

5. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

e Date

SEE REVISION

SCHEDULE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

STW CI 23

STW CI 24

STW MH 26

STW CI 32

STW MH 30

STW MH 29

STW CI 25

STW CI 28

STW DI 33

STW DI 34

STW AI 50

FDC

FDC

W

W

W

W

WATER VAULT

W

W

W

W

FUEL OIL TANKS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

MH 1C-78A

RIM: 400.06

INV: 394.48

MH 1C-78B

RIM: 410.96

INV: 404.40

MH 1C-80

RIM: 420.00

INV: 413.33

MH 1C-80A

RIM: 422.39

INV: 415.97

SS MH 27

SS MH 31

SS MH 35

SS MH 22

BU

ILD

ING

BU

ILD

ING

BUILDING 7

EQUIPMENT

SHED

EQ

UI

PM

EN

T

SH

ED

S

BU

ILD

ING

BUILDING 1

SOUTHWOOD DRIVE (UNDEVELOPED)

A

LL

E Y

BU

ILD

ING

PC

R

PC

R

PC

R

PC

R

PC

R

PC

R

LP

S

LP

S

LP

S

LP

S

LP

S

LPS

PCR

LPSPCR

PCR

PCR

PC

R

LPS

LPS

LPS LP

S

EXISTING

UTILITY

TUNNEL

FW

FDC

W

W

W

W

3" W

FH

FW

FW

FH

FW

FW

W W

W

W

W

W

W

FH

W W

FO

FO

FO

C

5.51'

4.99'

C

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025 SGL ADB

CG101

N/A

CIVIL GRADING PLAN 1

SCALE: 1" = 30'

0 15' 30' 60' 90' 120'

CIVIL GRADING PLAN 1

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

MATCHLINE SEE SHEET CG103

M

AT

CH

LI

NE

S

EE

B

ID

P

AC

KA

GE

BID

PACKAGE

SHEET

CG101

SHEET

CG102

SHEET

CG103

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE

IN ACCORDANCE WITH 31 20 00 EARTHWORK.

3. COORDINATION OF EXISTING UTILITIES TO REMAIN IN SERVICE DURING

CONSTRUCTION TO BE COORDINATED WITH VHA COR.

4. TREES NOT INDICATED FOR DEMOLITION ARE TO BE PROTECTED IN PLACE.

5. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

e Date

SEE REVISION

SCHEDULE

W

ESTW

OOD BLVD. (HW

Y 67)

N 32°56' W 1054.5'

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS MH 21

SS MH 13

SS MH 10

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

ST

M

ST

M

ST

M

STM

STW CI 15

STW CI 16

STW MH 19

STW MH 14

STW CI 17

STW CI 18

STW MH 44

STW DI 12

STW AI

STW AI 43

STW AI

STW AI

STW AI

DRAINAGE STRUCTURE

FL ELEV: 420.38'

D

D

D

D

STM

STM

D D

D

D

D

D

D

D

PIV

FDC

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

O H

W

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

C

BUILDING 1

BUILDING 2

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

12" WM

W

W

DOW

W

W

W

W

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FH

FH

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

FO

FO

FO

FO

6.90'

5.6 3'

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025 SGL ADB

CG102

N/A

CIVIL GRADING PLAN 2

SCALE: 1" = 30'

0 15' 30' 60' 90' 120'

CIVIL GRADING PLAN 3

N or th

SO WOO V

W S

W

OO

V

W Y 67)

N or th

MATCHLINE SEE BID PACKAGE 2

M

AT

CH

LI

NE

S

EE

S

HE

ET

C G1

SHEET

CG101

SHEET

CG102

SHEET

CG104

SHEET

CG103

1. SEE GENERAL NOTES, ABBREVIATIONS AND LEGENDS ON SHEET C-001.

2. UTILITY DISRUPTION WILL BE IN ACCORDANCE WITH SPECIFICATION 01 00 00

GENERAL REQUIREMENTS AND THE VHA COR. DEMOLITION WILL BE IN

ACCORDANCE WITH SECTION 02 41 00. EXCAVATION AND BACKFILL WILL BE

IN ACCORDANCE WITH 31 20 00 EARTHWORK.

3. COORDINATION OF EXISTING UTILITIES TO REMAIN IN SERVICE DURING

CONSTRUCTION TO BE COORDINATED WITH VHA COR.

4. TREES NOT INDICATED FOR DEMOLITION ARE TO BE PROTECTED IN PLACE.

5. ASBESTOS ABATEMENT SHALL BE IN ACCORDANCE WITH SECTION 02 82 13.41,

AND LEAD-BASED PAINT REMOVAL AND DISPOSAL IN ACCORDANCE WITH

SPECIFICATION 02 83 33.

6. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION

SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.

e Date

SEE REVISION

SCHEDULE

S

°3 2'

W

8.

1'

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

JCT BOX

BUILDING 1

E

E

E

E

E

E

E

E

E

E

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS SS SS

SS

SS

SS

SS

SS

SS

STM

STM

STM

STM

ST

M

ST

M

ST

M

ST

M

ST

M

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

STM

ST

M

ST

M

ST

M

ST

M

ST

M

STM

STM

STM

STM

STM

STM

STM

STM

STM

D

D

D

D

D

D

D

D

D

DD

W W

W W

W

W

W

W

W

WM

W

M

W

8"

CI

WM

FH

W

W

W

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FDC

FH

FH

TRAN

STM

ST

M

D

X X

X X

X X

X X

X

X

X

X

X

X X

X

X

X X X

X X

X X

X X

X X

X X

X X

FW

FW

FW

FW

FW

FW

FW

W

W

W

W

W

P P

FP

FP

P

P

W

W

W

W

W

W

W

W

W

W

W

W

W

W

FH

FH

W

W

W

W

W

W

W

W

W

W

W

W

W

W

FW

W

E E

E

E

E

E

E

E

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FH

FW

FO

FO

FO

C

C

SS

SS

5.8 1'

5.40'

4.49'

395400405

SEE SHEET CG404

FOR PUMP STATION

ENLARGEMENT

MEMORIAL

DRIVE

A

LL

E Y

418.73 E

5FFE: 400.00

FFE: 400.00

FFE: 400.00

KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

1098754321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

REPLACE FIRE MAIN AND WATER

STORAGE, BID PACKAGE 1

1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901

657A4-22-309

VEG 22.09

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

100% CONSTRUCTION

DOCUMENTS

SEE REVISION

SCHEDULE

001 REV. IFB 04/10/2025 SGL ADB

CG103

N/A

CIVIL GRADING PLAN 3

SCALE: 1" = 30'

0 15' 30' 60' 90' 120'

CIVIL GRADING PLAN 4

N or th

SO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .