Drawings Set 2 of 2 657A4-22-309 59 pages.pdf
PDF 9 MB Posted
- Attached to
- Z1NE--657A4-22-309, Fire Main and Water Storage
- Solicitation number
- 36C25525R0099
About this file
This is a set of engineering and architectural drawings for a Veterans Affairs (VA) medical center project to replace fire main and water storage infrastructure at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. The comprehensive drawing set includes detailed plans for landscape demolition, mechanical systems, electrical infrastructure, plumbing, structural elements, and site layouts across multiple sheets, covering Building 24 and associated utility systems.
The project involves completely replacing the campus fire water lines, hydrants, valves, and water storage system to ensure a 96-hour standby water supply. Key components include installing a new water tower, removing existing below-grade storage tanks, and upgrading fire protection infrastructure. The project is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated cost between $10-20 million and a 520-calendar day performance period. The solicitation is expected to be available for download around June 20, 2025, with a single mandatory site visit to be scheduled, and the procurement will use a Best Value Lowest Price Technically Acceptable source selection process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. VERIFY ALL PLAN DIMENSIONS PRIOR TO THE START OF CONSTRUCTION.
CONTACT THE VHA COR TO ADDRESS QUESTIONS OR TO CLARIFY ANY
DISCREPANCIES.
B. CONTRACTOR MUST CONFIRM THAT SITE CONDITIONS ARE SIMILAR TO THE
PLANS, WITHIN TOLERANCES STATED IN THE CONTRACT DOCUMENTS, AND
SATISFACTORY TO THE CONTRACTOR PRIOR TO START OF WORK. SHOULD
SITE CONDITIONS BE DIFFERENT THAN REPRESENTED ON THE PLANS OR
UNSATISFACTORY TO THE CONTRACTOR, THE CONTRACTOR MUST
CONTACT THE VHA COR FOR CLARIFICATION AND FURTHER DIRECTION.
C. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL UTILITY
LOCATES PRIOR TO ANY EXCAVATION. REFER TO CIVIL DEMOLITION PLANS
FOR APPROXIMATE UTILITY LOCATIONS AND DETAILS. NOTIFY VHA COR IF
EXISTING OR PROPOSED UTILITIES INTERFERE WITH THE ABILITY TO
PERFORM WORK.
D. THE CONTRACTOR IS RESPONSIBLE FOR THE COST TO REPAIR UTILITIES,
ADJACENT OR EXISTING LANDSCAPE, ADJACENT OR EXISTING PAVING, OR
ANY PUBLIC AND PRIVATE PROPERTY THAT IS DAMAGED BY THE
CONTRACTOR OR THEIR SUBCONTRACTOR'S OPERATIONS DURING
INSTALLATION, ESTABLISHMENT OR DURING THE SPECIFIED MAINTENANCE
PERIOD. ALL DAMAGES MUST BE REPAIRED TO PRE-CONSTRUCTION
CONDITIONS AS DETERMINED BY THE VHA COR. CONTRACTOR IS
RESPONSIBLE FOR LOGGING ANY EXISTING DAMAGES PRIOR TO START OF
CONSTRUCTION AND DURING THE CONTRACT PERIOD.
E. ALL WORK MUST BE CONFINED TO THE AREA WITHIN THE CONSTRUCTION
LIMITS AS SHOWN ON THE PLANS. ANY AREAS OR IMPROVEMENTS
DISTURBED OUTSIDE THESE LIMITS MUST BE RETURNED TO THEIR
ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. IN THE EVENT THE
CONTRACTOR REQUIRES A MODIFICATION TO THE CONSTRUCTION LIMITS,
WRITTEN PERMISSION MUST BE OBTAINED FROM THE VHA COR PRIOR TO
ANY DISTURBANCE OUTSIDE OF THE LIMITS OF WORK.
F. COORDINATE SITE ACCESS, STAGING, STORAGE AND CLEAN-OUT AREAS
WITH CIVIL PLANS AND WITH VHA COR.
G. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY
FENCING AND BARRIERS AROUND ALL IMPROVEMENTS SUCH AS WALLS,
EXCAVATIONS, ETC. ASSOCIATED WITH THEIR WORK UNTIL SUCH
FACILITIES ARE COMPLETELY INSTALLED PER THE PLANS, SPECIFICATIONS
AND MANUFACTURER'S RECOMMENDATIONS.
H. THE CONTRACTOR MUST PREVENT SEDIMENT, DEBRIS, AND ALL OTHER
POLLUTANTS FROM EXITING THE SITE OR ENTERING THE STORM SEWER
SYSTEM DURING ALL DEMOLITION AND CONSTRUCTION OPERATIONS THAT
ARE PART OF THIS PROJECT.
I. KEEP THE PREMISES CLEAN AND ORDERLY DURING CONSTRUCTION.
DISPOSE OF ALL REMOVED MATERIALS AT AN APPROVED DUMP SITE
WITHIN 24 HOURS OF REMOVAL.
J. PROTECT EXISTING TREES AND VEGETATION INDICATED TO REMAIN.
PROTECT AGAINST UNNECESSARY CUTTING OR SKINNING OF ROOTS,
BRANCHES OR BARK. DO NOT SMOTHER TREES OR VEGETATION WITH
STOCKPILE MATERIAL. DO NOT PARK VEHICLES WITHIN DRIP LINE OF
TREES. PROTECT TREES AND VEGETATION TO REMAIN WITH TEMPORARY
CONSTRUCTION FENCING PRIOR TO SITE CLEARING OPERATIONS.
A
ABAN
ABBRV
ABC
AC
ACP
AD
ADA
AGGR
ALT
APPROX
ASB
ASCE
ASI
ASPH
ASSY
AVE
AWWA
B
BC
BCV
BDRY
BFP
BFV
BITUM
BL
BLDG
BLT
BLVD
BM
BN
BRG
BSTR
BV
C
CAP
CB
CD
CDW
CDWR
CDWS
CEM
CF
CFS
CHFR
CHK
CHKV
CI
CIP
CJ
CL
CLL
CLOS
CMP
CND
CNDS
CO
CONC
CONSTR
CONSULT
CONTR
COORD
COR
COTG
COV
COV PL
CPLG
CPP
CRP
CRT YD
CSB
CSI
CSP
CSTL
CU
CU FT
CU IN
CU YD
CV
CW
D
DA
DAT
D-B
DBA
DEG
DEL
DEMO
DEPT
DET
DEV
DHW
DI
DIA
DIFF
DIM
DIP
DOM
DR
DS
DSBL
DW
DWG
DWR
DWS
DRAINAGE AREA
DATUM
DESIGN-BUILD
UNIT OF SOUND LEVEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DEVELOPMENT
DOMESTIC HOT WATER
DROP INLET
DIAMETER
DIFFERENCE OR DIFFERENTIAL
DIMENSION
DUCTILE IRON PIPE
DOMESTIC
DRAIN OR DRIVE
DOWNSPOUT
DISABLE
DOMESTIC WATER
DRAWING
DOMESTIC WATER RETURN OR DRAWER
DOMESTIC WATER SUPPLY
CAPACITY
CATCH BASIN OR CEMENT BASE
CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CHILLED DRINKING WATER
CHILLED DRINKING WATER RETURN
CHILLED DRINKING WATER SUPPLY
CEMENT OR CEMETERY
CONTRACTOR FURNISHED
CUBIC FEET PER SECOND
CHAMFER
CHECK
CHECK VALVE
CAST IRON OR CURB INLET
CAST-IN-PLACE OR CAST IRON PIPE
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE, CLASS, OR CLOSE
CONTRACT LIMIT LINE
CLOSURE
CORRUGATED METAL PIPE
CONDUIT
CONDENSATE
CONCENTRIC OR CONCRETE
CONSTRUCTION
CONSULTANT
CONTRACT OR CONTRACTOR
COORDINATE
CONTRACTING OFFICER'S REPRESENTATIVE
CLEANOUT TO GRADE
COVER OR CUT OFF VALVE
COVER PLATE
COUPLING
CORRUGATED PLASTIC PIPE
CONDENSATE RETURN PUMP
COURTYARD
CONCRETE SPLASH BLOCK
CONSTRUCTION SPECIFICATIONS INSTITUTE
CONCRETE SEWER PIPE
CAST STEEL
COPPER OR CUBIC
CUBIC FEET
CUBIC INCH
CUBIC YARD
CONTROL VALVE
CLOCKWISE
BACK OF CURB
BUTTERFLY CHECK VALVE
BOUNDARY
BACKFLOW PREVENTER
BUTTERFLY VALVE
BITUMINOUS
BASE LINE
BUILDING
BUILT
BOULEVARD
BENCHMARK
BULLNOSE
BEARING
BOOSTER
BALL VALVE
ABANDON
ABBREVIATION
AGGREGATE BASE COURSE
ASPHALTIC CONCRETE
ASPHALTIC CONCRETE PAVING
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AGGREGATE
ALTERNATE OR ALTITUDE
APPROXIMATE / APPROXIMATELY
ASBESTOS
AMERICAN SOCIETY OF CIVIL ENGINEERS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASPHALT
ASSEMBLY
AVENUE
AMERICAN WATER WORKS ASSOCIATION
E
EC
EJ
EL
ENGR
EOS
EP
EPA
EPT
EQ
EQL SP
ERD
ESMT
EST
EXIST
EXP
EXST GR
EXT
F F
FD
FES
FFE
FG
FH
FLG
FLUOR
FN
FOC
FP
FPM
FPS
FPW
FSP
FSS
FT
FTG
FW
G G
G LN
GA
GAL
GC
GCO
GDR
GI
GIP
GL
GPH
GPM
GTV
GUT
H
H&CW
HAZ MAT
HB
HDPE
HNDRL
HP
HV
HYD
HYDR
I
ID
IMH
INCL
INCR
INSTL
INV
INV EL
IP
IPS
IPT
IW
L
LAT
LF
LIN
LNG
LOC
LONG
LOS
LP
LS
LT
LTG
M
MAINT
MAX
MED
MER
MFD
MFG
MGT
MH
MIN
MISC
ML
MN
MOD
MON
MULT
MUNIC
MAINTENANCE
MAXIMUM
MEDIUM
MERIDIAN
MANUFACTURED
MANUFACTURING
MANAGEMENT
MANHOLE
MINIMUM
MISCELLANEOUS
MATERIALS LIST
MAGNETIC NORTH
MODEL OR MODIFY
MONUMENT
MULTIPLE
MUNICIPAL
S
SAMP
SAN
SB
SCHED
SCP
SD
SDL
SDMH
SE
SECT
SEG
SEP TNK
SF
SJ
SLV
SAMPLE
SANITARY
SPLASH BLOCK
SCHEDULE
SCUPPER
STORM DRAIN
SADDLE
STORM DRAIN MANHOLE
SPOT ELEVATION
SECTION
SEGMENT
SEPTIC TANK
SQUARE FOOT (FEET)
SCORED JOINT
SLEEVE
LATITUDE
LINEAR FEET (FOOT)
LINEAR
LONGITUDE
LOCATION
LONGITUDINAL
LINE OF SIGHT
LOW POINT
LUMP SUM
LIGHT
LIGHTING
INSIDE DIAMETER OR INSIDE DIMENSION
INLET MANHOLE
INCLUDED
INCREMENT
INSTALL
INVERT
INVERT ELEVATION
IRON PIPE
IRON PIPE SIZE
IRON PIPE THREADED
IRRIGATION WATER
HOT AND COLD WATER
HAZARDOUS MATERIALS
HOSE BIBB
HIGH DENSITY POLYETHYLENE
HANDRAIL
HIGH POINT
HOSE VALVE
HYDRANT
HYDRAULIC
Q
QTR
QTY
QUAD
QUAL
R R
RAD
RC
RCB
RCCP
RCP
RD
RDC
REP
REPL
REQ
REQD
RESIL
RFI
RFP
ROW
RT
RW
RWL
RWR
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RANGE
RADIAN
REINFORCED CONCRETE
REINFORCED CONCRETE BOX
REINFORCED CONCRETE CULVERT PIPE
REINFORCED CONCRETE PIPE
ROAD OR ROOF DRAIN
REDUCER
REPAIR
REPLACE
REQUIRE
REQUIRED
RESILIENT
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
RIGHT OF WAY
RIGHT
ROADWAY
RAIN WATER LEADER
RECESSED WASTE RECEPTACLE
EDGE OF CURB
EXPANSION JOINT
EASEMENT LINE OR ELEVATION
ENGINEER
EDGE OF SLAB
EDGE OF PAVEMENT (PAVING)
ENVIRONMENTAL PROTECTION AGENCY
EXTERNAL PIPE THREAD
EQUAL
EQUALLY SPACED
EXISTING ROOF DRAIN
EASEMENT
ESTIMATE
EXISTING
EXPANSION
EXISTING GRADE
EXTERIOR
FAHRENHEIT, FEMALE, FIRE LINE
FLOOR DRAIN
FLARED END SECTION
FINISH FLOOR ELEVATION
FINISHED GRADE
FIRE HYDRANT
FLANGE
FLUORESCENT
FENCE
FACE OF CURB
FIRE PROTECTION OR FLAGPOLE
FEET PER MINUTE
FEET PER SECOND
FIRE PROTECTION WATER SUPPLY
FIRE STANDPIPE
FLOW SENSING SWITCH
FEET OR FOOT
FOOTING
FLOOD WALL
GROUND OR NATURAL GAS
GAS LINE
GAGE
GALLON
GENERAL CONTRACTOR
GRADE CLEANOUT
GUARD RAIL
GALVANIZED IRON
GALVANIZED IRON PIPE
GROUND LEVEL
GALLONS PER HOUR
GALLONS PER MINUTE
GATE VALVE
GUTTER
O
OC
OD
OFD
OPNG
OZ
P P
PA
PB
PC
PCA
PCC
PCCP
PCT
PED
PEN
PERF
PERIM
PERM
PERP
PG
PH
PI
PIV
PL
PLAS
PMPSCT
PN
POLY
PORT
POTW
POW LN
PP
PR
PRCST
PREFMD
PRELIM
PREP
PROP
PRV
PS CONC
PSI
PSL
PT
PT CONC
PV
PVC
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN
OPENING
OUNCE
PUMP
PIPE ANCHOR
PULL BOX
POINT OF CURVE
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PERCENT
PEDESTAL
PENETRATE
PERFORATED
PERIMETER
PERMANENT
PERPENDICULAR
PRESSURE GAGE OR PROFILE GRADE
PHASE
POINT OF INTERSECTION
POST INDICATOR VALVE
PROPERTY LINE
PLASTIC OR PLASTER
PUMP SUCTION
PART NUMBER
POLYETHYLENE (PLASTIC)
PORTABLE
POTABLE WATER
POWER LINE
POLYPROPYLENE (PLASTIC)
PUMPED RETURN
PRECAST
PREFORMED
PRELIMINARY
PREPARATION
PROPERTY
PRESSURE REGULATOR VALVE OR
PRESSURE RELIEF VALVE
PRESTRESSED CONCRETE
POUNDS PER SQUARE INCH
PIPE SLEEVE
POST TENSIONED
POST-TENSIONED CONCRETE
PAVED
POLYVINYL CHLORIDE (PLASTIC)
U
UFC
UGND
UNO
UP
UPS
UTIL
V
VAR
VB
VC
VCP
VERT
VIC
VIF
VOL
W W W/ W/O
WI
WL
WM
WM
WO
WP
WT
WT EL
WTR
WW
WWF
X, Y, Z, MISC
XFMR
YD
VARIES
VALVE BOX
VERTICAL CURVE
VITRIFIED CLAY PIPE
VERTICAL
VICINITY
VERIFY IN FIELD
VOLUME
WASTE, WEST, OR WIDE
WITH
WITHOUT
WROUGHT IRON
WATER LINE
WATER METER WIRE MESH
WIRE MESH WATER METER
WORK ORDER
WATER PUMP
WATER TABLE
WATER ELEVATION
WATER
WASTE WATER
WELDED WIRE FABRIC
TRANSFORMER
YARD
AND
AT
UNIFORM FIRE CODE
UNDERGROUND
UNLESS NOTED OTHERWISE
UTILITY POLE
UNINTERRUPTIBLE POWER SUPPLY
UTILITY
N N
NA
NAT
NATL
NBC
NE
NIC
NO
NTS
NOM
NORM
NRCP
NTP
NTS
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NATIONAL BUILDING CODE
NOT EXCEEDING
NOT IN CONTRACT
NUMBER
NOT TO SCALE
NOMINAL
NORMAL
NON-REINFORCED CONCRETE PIPE
NOTICE TO PROCEED
NOT TO SCALE
SMH
SMP
SOV
SP
SPEC
SPKLR
SPLY
SPR
SQ
SQ IN
SQ YD
SR
SS
SSP
SST
ST
STA
STD
STM
SURV
SUTK
SW
SWR
SYM
T T&M
TAN
TBM
TB-XX
TBC
TC
TCP
TD
TE
TEMP
TF
THK
THRU
TMH
TN
TNL
TO
TO FDN
TOB
TOC
TOPO
TOS
TR
TW
TYP
TIME AND MATERIALS
TANGENT
TEMPORARY BENCHMARK
TEST BORING-XX (E.G., TB-01)
TOP OF BACK CURB
TOP OF CURB
TRAFFIC CONTROL PLAN
TRENCH DRAIN
TOP ELEVATION
TEMPORARY
TOP OF FOOTING
THICKNESS
THROUGH
TOP OF MANHOLE
TRUE NORTH
TUNNEL
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF CONCRETE
TOPOGRAPHY
TOP OF SLAB
TOP OF RIM
TOP OF WALL
TYPICAL
STEAM MANHOLE
SUMP PUMP
SHUT OFF VALVE
STANDPIPE OR SUMP PIT
SPECIFICATION
SPRINKLER
SUPPLY
SPRINKLER LINE
SQUARE
SQUARE INCH
SQUARE YARD
STEAM RETURN
SANITARY SEWER
STAINLESS STEEL PIPE
STAINLESS STEEL
STREET OR STORM SEWER
STATION
STANDARD
STEAM
SURVEY
SUMP TANK
SIDEWALK
SEWER
SYMBOL
VHA VETERANS HEALTH ADMINISTRATION
CONTRACTING OFFICER OR CERTIFICATE
OF OCCUPANCY
MFR MANUFACTURER
LANDSCAPE ABBREVIATIONS
POC POINT OF CONNECTION
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025 DV MLH
L-001
NA
LANDSCAPE ABBREVIATIONS &
NOTES
e Date
SEE REVISION
SCHEDULE
100% CONSTRUCTION
DOCUMENTS IFB
S 89°38' E 1339.9'
N
°3 4'
E
0.
6'
N 32°56' W 1054.5'
N 89°11' W 763.9'
S
°3 2'
W
8.
1'
N 32°56' W 174.5'
FUTURE
TEMPORARY
BUILDING
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
PIV
FW
FW
FW
FW
FW
FDC
FDC
FW
FW
FW
FW
FW
FW
FW
FW
FDC
FW
FUEL OIL TANKS
SOUTHWOOD DRIVE (UNDEVELOPED)
W
ESTW
OOD BLVD. (HW
Y 67)
AL
LE
Y
MEMORIAL
DRIVE
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
M
W
W
W
W
EXISTING
WATER
STORAGE
TANK
M
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EQUIPMENT
SHED
EQUIPMENT
SHEDS
GAS
SHED
TRTR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TRTR
TR
TR
TR
TR
TR
TR
TR TRTR
TRTR
TR
TR
TR
TR
TR
TRTR
TRTR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D
D
D
D
D
D
DD
D
D
D
D
D
D
D
D
D
D
SHEET 1
SHEET 3SHEET 2
BID PACKAGE 2
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025 DV MLH
LD100
N/A
LANDSCAPE OVERALL DEMOLITION
PLAN
SCALE:SCALE: 1" = 60'
0 30' 60' 120' 180' 240'
LANDSCAPE OVERALL DEMOLITION PLAN
SO WOO V
W S
W
OO
V
W Y 67)
N or th
A. UTILITIES TO BE ABANDONED OR DEMOLISHED ARE SHOWN FOR
REFERENCE ONLY. SEE CIVIL SHEETS FOR UTILITY ABANDONMENT AND
DEMOLITION DETAILS.
B. DEMOLITION MUST BE IN ACCORDANCE WITH SECTION 02 41 00.
EXCAVATION AND BACKFILL MUST BE IN ACCORDANCE WITH 31 20 11
EARTHWORK (SHORT FORM).
C. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION
SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.
D. PROTECT EXISTING TREES TO REMAIN IN PLACE. NO DISTURBANCE WITHIN
DRIP LINE. PROTECT TREE'S CRITICAL ROOT ZONE.
E. SEE CIVIL SHEETS CG111 - CG114 FOR EROSION CONTROL MEASURES
DURING DEMOLITION AND CONSTRUCTION.
EXISTING TREE TO REMAIN
TR
PRESERVE TREES NOT INDICATED FOR
DEMOLITION AND AVOID DISTURBANCE
OF PICNIC AREA IMPROVEMENTS
DURING DEMOLITION OF PIPELINES
N or th
LEGEND
PROPERTY LINE
DEMOLISH EXISTING TREE
EXISTING STORM SWALE
EXISTING
STORM SWALE
X X X X X EXISTING CHAINLINK FENCE
UTILITY PIPELINES TO BE DEMOLISHED
(SEE CIVIL FOR DETAILS)
UTILITY PIPELINE TO BE ABANDONED IN PLACE
(SEE CIVIL FOR DETAILS)// //
e Date
SEE REVISION
SCHEDULE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W //
BU
ILD
ING
BU
ILD
ING
BUILDING 7
EQUIPMENT
SHED
EQ
UI
PM
EN
T
SH
ED
S
FUEL OIL TANKS
TR
TR
TR
TRAN
TRAN
TRAN
D
D
D
DD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FDC
FDC
TR
TR
TR
DV MLH
LD101
N/A
LANDSCAPE DEMOLITION PLAN 1
SCALE: 1" = 30'
0 15' 30' 60' 90' 120'
LANDSCAPE DEMOLITION PLAN 1
N or th
SO WOO V
W S
W
OO
V
W Y 67)
N or th
MATCHLINE SEE SHEET LD103
M
AT
CH
LI
NE
S
EE
B
ID
P
AC
KA
GE
BID
PACKAGE
SHEET
LD101
SHEET
LD102
SHEET
LD103
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025
1. REMOVE TREE.
2. EXISTING STORM SWALE.
LEGEND
DEMOLISH EXISTING TREE
UTILITY PIPELINES TO BE DEMOLISHED
(SEE CIVIL FOR DETAILS)
UTILITY PIPELINE TO BE ABANDONED IN PLACE
(SEE CIVIL FOR DETAILS)// //
EXISTING TREE TO REMAIN
PROPERTY LINE
EXISTING STORM SWALE
X X X X EXISTING CHAINLINK FENCE
TR
A. UTILITIES TO BE ABANDONED OR DEMOLISHED ARE SHOWN FOR
REFERENCE ONLY. SEE CIVIL SHEETS FOR UTILITY ABANDONMENT AND
DEMOLITION DETAILS.
B. DEMOLITION MUST BE IN ACCORDANCE WITH SECTION 02 41 00.
EXCAVATION AND BACKFILL MUST BE IN ACCORDANCE WITH 31 20 11
EARTHWORK (SHORT FORM).
C. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION
SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.
D. PROTECT EXISTING TREES TO REMAIN IN PLACE. NO DISTURBANCE WITHIN
DRIP LINE. PROTECT TREE'S CRITICAL ROOT ZONE.
E. SEE CIVIL SHEETS CG111 - CG114 FOR EROSION CONTROL MEASURES
DURING DEMOLITION AND CONSTRUCTION.
e Date
SEE REVISION
SCHEDULE
N 32°56' W 1054.5'
N 32°56' W 1054.5'
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
O H
W
D D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
TR
TR
TR
TR
TR
W
ESTW
OOD BLVD. (HW
Y 67)
BUILDING 2
GAS
SHED BUILDING 1
PIV
FDC
FH
DV MLH
LD102
N/A
LANDSCAPE DEMOLITION PLAN 2
SCALE: 1" = 30'
0 15' 30' 60' 90' 120'
LANDSCAPE DEMOLITION PLAN 2
N or th
MATCHLINE SEE SHEET LD101
M
AT
CH
LI
NE
S
EE
S
HE
ET
L D1
SO WOO V
W S
W
OO
V
W Y 67)
N or th
BID
PACKAGE
SHEET
LD101
SHEET
LD103
SHEET
LD102
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025
1. REMOVE TREE.
LEGEND
PRESERVE TREES NOT INDICATED FOR
DEMOLITION AND AVOID DISTURBANCE
OF PICNIC AREA IMPROVEMENTS
DURING DEMOLITION OF PIPELINES
DEMOLISH EXISTING TREE
UTILITY PIPELINES TO BE DEMOLISHED
(SEE CIVIL FOR DETAILS)
UTILITY PIPELINE TO BE ABANDONED IN PLACE
(SEE CIVIL FOR DETAILS)
EXISTING TREE TO REMAIN
PROPERTY LINE
EXISTING STORM SWALE
EXISTING CHAINLINK FENCE
A. UTILITIES TO BE ABANDONED OR DEMOLISHED ARE SHOWN FOR
REFERENCE ONLY. SEE CIVIL SHEETS FOR UTILITY ABANDONMENT AND
DEMOLITION DETAILS.
B. DEMOLITION MUST BE IN ACCORDANCE WITH SECTION 02 41 00.
EXCAVATION AND BACKFILL MUST BE IN ACCORDANCE WITH 31 20 11
EARTHWORK (SHORT FORM).
C. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION
SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.
D. PROTECT EXISTING TREES TO REMAIN IN PLACE. NO DISTURBANCE WITHIN
DRIP LINE. PROTECT TREE'S CRITICAL ROOT ZONE.
E. SEE CIVIL SHEETS CG111 - CG114 FOR EROSION CONTROL MEASURES
DURING DEMOLITION AND CONSTRUCTION.
e Date
SEE REVISION
SCHEDULE
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
M
W//
M
S
°3 2'
W
8.
1'
DD
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR TRTR
TR
TR
TR
TR
TR
TR
TR
TRTR
TRTR
TR
TR
AL
LE
Y
MEMORIAL
DRIVE
BUILDING 1
FH
FH
SO WOO V
W S
W
OO
V
W Y 67)
N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025 DV MLH
LD103
N/A
LANDSCAPE DEMOLITION PLAN 3
SCALE: 1" = 30'
0 15' 30' 60' 90' 120'
LANDSCAPE DEMOLITION PLAN 3
N or th
M
AT
CH
LI
NE
S
EE
S
HE
ET
L D1
MATCHLINE SEE SHEET LD101
BID
PACKAGE
SHEET
LD101
SHEET
LD102
SHEET
LD103
1. REMOVE TREE.
2. EXISTING GRAVEL DRIVEWAY TO BE DEMOLISHED. SEE CIVIL SHEETS FOR
DETAILS.
LEGEND
PRESERVE TREES NOT INDICATED FOR
DEMOLITION AND AVOID DISTURBANCE
OF PICNIC AREA IMPROVEMENTS
DURING DEMOLITION OF PIPELINES
DEMOLISH EXISTING TREE
UTILITY PIPELINES TO BE DEMOLISHED
(SEE CIVIL FOR DETAILS)
UTILITY PIPELINE TO BE ABANDONED IN PLACE
(SEE CIVIL FOR DETAILS)
EXISTING TREE TO REMAIN
PROPERTY LINE
EXISTING STORM SWALE
EXISTING CHAINLINK FENCE
A. UTILITIES TO BE ABANDONED OR DEMOLISHED ARE SHOWN FOR
REFERENCE ONLY. SEE CIVIL SHEETS FOR UTILITY ABANDONMENT AND
DEMOLITION DETAILS.
B. DEMOLITION MUST BE IN ACCORDANCE WITH SECTION 02 41 00.
EXCAVATION AND BACKFILL MUST BE IN ACCORDANCE WITH 31 20 11
EARTHWORK (SHORT FORM).
C. DEMOLITION SHALL INCLUDE DISCONNECTION OF THE EXISTING IRRIGATION
SYSTEM AND REMOVAL OF EXISTING IRRIGATION COMPONENTS.
D. PROTECT EXISTING TREES TO REMAIN IN PLACE. NO DISTURBANCE WITHIN
DRIP LINE. PROTECT TREE'S CRITICAL ROOT ZONE.
E. SEE CIVIL SHEETS CG111 - CG114 FOR EROSION CONTROL MEASURES
DURING DEMOLITION AND CONSTRUCTION.
e Date
SEE REVISION
SCHEDULE
FUTURE
TEMPORARY
BUILDING
OHW
O H
W
OHW
C
D
JCT BOX
JCT BOX
JCT BOXJCT BOX
FUEL OIL TANKS
FDC
W
W
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FH
TRAN
D
X X
X X
X
X
X X
X X
X X
X X
X X
FW
FW
FW
FW
W W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
FO
FO
FO
FO FO
FO
FO
D
FO
C
C
C
5.40'
4.49'
6.90'
5.6 3'
5.51'
4.99'
C
S 89°38' E 1339.9'
N
°3 4'
E
0.
6'
N 32°56' W 1054.5'
N 89°11' W 763.9'
S
°3 2'
W
8.
1'
N 32°56' W 174.5'
GAS
SHED
EQUIPMENT
SHED
EQUIPMENT
SHEDS
SOUTHWOOD DRIVE (UNDEVELOPED)
W
ESTW
OOD BLVD. (HW
Y 67)
AL
LE
Y
MEMORIAL
DRIVE
SHEET 3
SEE SHEET LP404 FOR
PUMP STATION
ENLARGEMENT
SHEET 2
BID PACKAGE 2 SHEET 1
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025 SGL MLH
LP100
N/A
OVERALL PLANTING PLAN
SCALE:SCALE: 1" = 60'
0 30' 60' 120' 180' 240'
OVERALL PLANTING PLAN
N or th
SO WOO V
W S
W
OO
V
W Y 67)
N or th
A. SEE LANDSCAPE ABBREVIATIONS & NOTES ON SHEET L-001.
B. EXCAVATION AND BACKFILL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTION 31 20 11 EARTHWORK (SHORT FORM).
C. EROSION CONTROL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTIONS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS AND 32 90 00
PLANTING.
1. REPLACE SOD WHERE REMOVED OR DAMAGED DURING CONSTRUCTION.
2. SEED AREAS OF DISTURBANCE.
3. REPAIR AREAS WHERE TREES WERE REMOVED.
LEGEND
PROPERTY LINE
6" DIA. BOLLARD
GRATE INLET
MANHOLE (DRAINAGE)
EXISTING TREE
K4 SECURITY BOLLARD - FIXED
K4 SECURITY BOLLARD - REMOVABLE
D
MANHOLE (SEWER)
NATIVE GRASS SEED
LANDSCAPE ROCK
REPLACE SOD
e Date
SEE REVISION
SCHEDULE
TRAN
TRAN
TRAN
BU
ILD
ING
BU
ILD
ING
BUILDING 7
EQUIPMENT
SHED
EQ
UI
PM
EN
T
SH
ED
S
FDC
FDC
W
W
W
W
FUEL OIL TANKS
FW
FDC
W
W
W
W
FH
FW
FW
FH
FW
FW
W W
W
W
W
W
W
FH
W W
FO
FO
FO
C
5.51'
4.99'
C
BUILDING 1
BUILDING 1
E (UNDEVELOPED)
BU
ILD
ING
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025 DV MLH
LP101
N/A
PLANTING PLAN 1
SCALE: 1" = 30'
0 15' 30' 60' 90' 120'
PLANTING PLAN 1
N or th
SO WOO V
W S
W
OO
V
W Y 67)
N or th
MATCHLINE SEE SHEET LP103
M
AT
CH
LI
NE
S
EE
B
ID
P
AC
KA
GE
BID
PACKAGE
SHEET
LP101
SHEET
LP102
SHEET
LP103
A. SEE LANDSCAPE ABBREVIATIONS & NOTES ON SHEET L-001.
B. EXCAVATION AND BACKFILL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTION 31 20 11 EARTHWORK (SHORT FORM).
C. EROSION CONTROL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTIONS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS AND 32 90 00
PLANTING.
LEGEND
CHAIN LINK FENCE, EXISTING
GRATE INLET
MANHOLE (STORM)
EXISTING TREE
MANHOLE (SEWER)
SOD REPLACEMENT/REPAIR
AT UTILITY WORK
FHFIRE HYDRANT
SOD REPLACEMENT/REPAIR
AT TREE REMOVAL
e Date
SEE REVISION
SCHEDULE
D
DO
H W
BUILDING 2
GAS
SHED
FDC
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
12" WM
W
W
W
W
W
W
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
D
D
D
D
D
D
FW
FH
FH
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
FO
FO
FO
FO
6.90'
5.6 3'
W
ESTW
OOD BLVD. (HW
Y 67)
BUILDING 1
DV MLH
LP102
N/A
PLANTING PLAN 2
SCALE: 1" = 30'
0 15' 30' 60' 90' 120'
PLANTING PLAN 2
N or th
SO WOO V
W S
W
OO
V
W Y 67)
N or th
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025
MATCHLINE SEE SHEET LP101
M
AT
CH
LI
NE
S
EE
S
HE
ET
L P1
BID
PACKAGE
SHEET
LP101
SHEET
LP103
SHEET
LP102
A. SEE LANDSCAPE ABBREVIATIONS & NOTES ON SHEET L-001.
B. EXCAVATION AND BACKFILL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTION 31 20 11 EARTHWORK (SHORT FORM).
C. EROSION CONTROL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTIONS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS AND 32 90 00
PLANTING.
LEGEND
CHAIN LINK FENCE, EXISTING
GRATE INLET
MANHOLE (STORM)
EXISTING TREE
MANHOLE (SEWER)
SOD REPLACEMENT/REPAIR
FHFIRE HYDRANT
e Date
SEE REVISION
SCHEDULE
S
°3 2'
W
8.
1'
JCT BOX
JCT BOX
JCT BOX
JCT BOX
JCT BOX
JCT BOX
JCT BOX
JCT BOX
BUILDING 1
E
E
E
E
E
E
E
E
E
E
D
D
D
D
D
D
D
D
D
D
W
W
W
W
W
M
M
8"
CI
WM
FH
W
W
W
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FDC
FH
FH
TRAN
D
X X
X X
X X
X X
X
X
X
X
X
X X
X
X
X X X
X X
X X
X X
X X
X X
X X
FW
FW
FW
FW
FW
FW
FW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
FH
FH
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E E
E
E
E
E
E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FH
FW
FO
FO
FO
C
C
5.8 1'
5.40'
4.49'
395400405
SEE SHEET LP404
FOR PUMP STATION
ENLARGEMENT
MEMORIAL
DRIVE
A
LL
E Y
418.73 E
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025 DV MLH
LP103
N/A
PLANTING PLAN 3
SCALE: 1" = 30'
0 15' 30' 60' 90' 120'
PLANTING PLAN 3
N or th
SO WOO V
W S
W
OO
V
W Y 67)
N or th
M
AT
CH
LI
NE
S
EE
S
HE
ET
L P1
MATCHLINE SEE SHEET LP101
BID
PACKAGE
SHEET
LP101
SHEET
LP102
SHEET
LP103
A. SEE LANDSCAPE ABBREVIATIONS & NOTES ON SHEET L-001.
B. EXCAVATION AND BACKFILL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTION 31 20 11 EARTHWORK (SHORT FORM).
C. EROSION CONTROL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTIONS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS AND 32 90 00
PLANTING.
LEGEND
CHAIN LINK FENCE
CONTOUR AND ELEVATION, EXISTING
X X
6" DIA. BOLLARD
GRATE INLET
MANHOLE (DRAINAGE)
EXISTING TREE
K4 SECURITY BOLLARD - FIXED
LIMITS OF GRADING
K4 SECURITY BOLLARD - REMOVABLE
D
MANHOLE (SEWER)
CONTOUR AND ELEVATION, PROPOSED
NATIVE GRASS SEED
e Date
SEE REVISION
SCHEDULE
W W W
W
W
W
W
W
W
W
W
W
FW
FW
FW
FW
FW
FW
FW
FW
TRAN
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X X X X X
X
X
X
X
X
X
X
X
X
X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
FW
FW
FW
FW
FW
FW
FW
FW
FW
W W
W W
W
W
W W W
W W W W
FW FW FW
FW
FW FW FW
FW
W W
W
W
FH
FH
W W W W W
W
W
FO
FO
FO
FO
FH
FW
FW
FW
FO
FO
FO
FO
C
C
5.8 1'
BUILDING 24
PUMP HOUSE
FFE: 400.00
FIRE WATER TANK
FFE: 400.00
MEMORIAL DRIVE
AL
LE
Y
DOMESTIC WATER TANK
FFE: 400.00
-4:1
-6:1 -4:1
391392393394
3982.00'
2.00'
8.00'
R24.00'
48.00'
CONCRETE MOW STRIP NOTES:
1. 6" x 8" REINFORCED CONCRETE MOW STRIP WITH 14" CHAMFERED CORNERS.
2. USE CRACK RESISTANT CONCRETE, 4000 PSI.
3. REINFORCE WITH #5 REBAR, MIN OF 3" BELOW TOP SURFACE OF MOW STRIP.
4. PLACE 2" MINIMUM OF FINE GRAVEL AT BASE OF TRENCH AFTER PLACING
FORMS AND BEFORE POURING MOW STRIP.
5. SET TOP OF MOW STRIP APPROX 1" ABOVE FINISH GRADE.
6. MAINTAIN MINIMUM OF 1" BETWEEN TOP OF MOW STRIP AND TOP OF ROCK.
7. SPACE TOOLED CONTROL JOINTS APPROX EVERY 5 FEET.
6"
8"
1 x #5
MIN 1"
4" DEPTH
WEED
CONTROL
FABRIC
2"
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
1098754321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
REPLACE FIRE MAIN AND WATER
STORAGE, BID PACKAGE 1
1500 N WESTWOOD BLVD., POPLAR BLUFF, MO 63901
657A4-22-309
VEG 22.09
NOT FOR
CONSTRUCTION750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
100% CONSTRUCTION
DOCUMENTS
SEE REVISION
SCHEDULE
001 REV. IFB 04/10/2025 07/25/2023 DV MLH
LP404
PLANTING PLAN - BUILDING 24
PUMP HOUSE
SO WOO V
W S
W
OO
V
W Y 67)
N or th
N or th
LEGEND
1. EXISTING ROADWAY.
2. CHAIN LINK SECURITY FENCE. SEE CIVIL FOR DETAILS.
3. ELECTRIC SLIDING ACCESS GATE. SEE CIVIL FOR DETAILS.
4. CONCRETE DRIVEWAY. SEE CIVIL FOR DETAILS.
5. 6" DIA. BOLLARD FILLED WITH CONCRETE. SEE CIVIL FOR DETAILS.
6. TYPE K4 SECURITY BOLLARD, FIXED. SEE CIVIL FOR DETAILS.
7. TYPE K4 SECURITY BOLLARD, REMOVABLE. SEE CIVIL FOR DETAILS.
8. ELECTRIC TRANSFORMER ON CONCRETE PAD.
9. MASONRY BLOCK RETAINING WALL. SEE CIVIL FOR DETAILS.
10. CONCRETE EDGING. SEE DETAIL 2/LP404.
11. SEED ENTIRE AREA OF DISTURBANCE WITH SPECIFIED EROSION CONTROL
NATIVE GRASS SEED MIX.
12. REPAIR AREAS WHERE TREES WERE REMOVED.
SHEET
PROPERTY LINE
CONTOUR AND ELEVATION, EXISTING
LIMITS OF CONSTRUCTION
KEYNOTES XX
6" DIA. BOLLARD
GRATE INLET
MANHOLE (DRAINAGE)
EXISTING TREE
K4 SECURITY BOLLARD - FIXED
LIMITS OF GRADING
K4 SECURITY BOLLARD - REMOVABLE
D
MANHOLE (SEWER)
CONTOUR AND ELEVATION, PROPOSED
NATIVE GRASS SEED
LANDSCAPE ROCK
SCALE: 1" = 5'
0 5' 10' 10' 20'
CONCRETE EDGING
2 SCALE:
1" = 10' 5' 10' 20' 30' 40'
PLANTING PLAN - BUILDING 24 PUMP HOUSE
A. SEE LANDSCAPE ABBREVIATIONS & NOTES ON SHEET L-001.
B. SEE SPECIFICATION SECTION 32 90 00 FOR EROSION CONTROL GRASS SEED
MIX. USE LOCALLY SOURCED NATIVE GRASS SEED MIX.
C. EXCAVATION AND BACKFILL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTION 31 20 11 EARTHWORK (SHORT FORM).
D. EROSION CONTROL WILL BE IN ACCORDANCE WITH SPECIFICATION
SECTIONS 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS AND 32 90 00
PLANTING.
e Date
SEE REVISION
SCHEDULE
A. UNLESS NOTED OTHERWISE, ALL WORK SHALL CONFORM WITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS. SPECIFICATIONS SHALL TAKE PRECEDENCE OVER GENERAL NOTES & TYPICAL
DETAILS.
B. PRIOR TO STARTING THE WORK, THE CONTRACTOR SHALL COMPARE THE INITIAL CONDITIONS SHOWN
ON THE DRAWINGS WITH THE EXISTING SITE CONDITIONS. ANY DISCREPANCIES BETWEEN THE
DRAWINGS AND SITE CONDITIONS SHALL BE REPORTED TO THE VHA COR AND RESOLVED BEFORE
PROCEEDING WITH THE WORK.
C. IN CASE OF CONFLICT BETWEEN REQUIREMENTS, FOLLOW THE MOST STRINGENT REQUIREMENT
INDICATED OR AS DIRECTED BY THE VHA CO WITHOUT ADDITIONAL COST TO THE OWNER.
D. THE CONTRACTOR SHALL COORDINATE & VERIFY ALL DIMENSIONS & ELEVATIONS SHOWN ON
STRUCTURAL DRAWINGS WITH THE DIMENSIONS AND ELEVATIONS SHOWN ON THE ARCHITECTURAL
DRAWINGS. DISCREPANCIES SHALL BE REPORTED TO THE VHA COR AND RESOLVED PRIOR TO
STARTING ANY RELATED WORK.
E. DETAILS, SECTIONS, & NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL & SHALL APPLY TO SIMILAR SITUATIONS WHERE APPROPRIATE UNLESS NOTED OR OTHERWISE INDICATED. DETAILS MAY NOT BE DRAWN TO SCALE OR DIMENSIONS INDICATED ON TYPICAL DETAILS AND SECTIONS MAY
REQUIRE ADJUSTMENT TO SUIT SPECIFIC CONDITIONS.
F. MEANS AND METHODS AS WELL AS MAINTAINING SITE SAFETY ARE THE RESPONSIBILITY OF THE
CONTRACTOR.
1. SHORING AND BRACING REQUIREMENTS: WALLS ABOVE GRADE SHALL BE BRACED AND/OR SHORED
UNTIL THE STRUCTURAL SYSTEM IS COMPLETE. WALLS ARE NOT SELF-SUPPORTING.
2. FLOOR AND ROOF STRUCTURES: THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE METHOD
AND SEQUENCE OF ALL STRUCTURAL ERECTION. PROVIDE TEMPORARY SHORING AND BRACING AS
REQUIRED TO PROVIDE ADEQUATE INTERIM VERTICAL & LATERAL SUPPORT. SHORING AND
BRACING SHALL REMAIN IN PLACE UNTIL ALL PERMANENT MEMBERS ARE IN PLACE AND ALL FINAL CONNECTIONS ARE COMPLETE. THIS INCLUDES, BUT IS NOT LIMITED TO, ALL ROOF AND FLOOR
CONNECTIONS. THE BUILDING SHALL BE ADEQUATELY SHORED AND BRACED UNTIL ALL
STRUCTURAL COMPONENTS ARE COMPLETE AND CONNECTED AS INDICATED ON THE DRAWINGS
AND IN THE SPECIFICATIONS.
G. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATE THE WORK WITH
ALL TRADES & ALL ITEMS TO BE INTEGRATED INTO STRUCTURAL SYSTEM. OPENINGS OR
PENETRATIONS THROUGH, OR ATTACHMENTS TO THE STRUCTURAL SYSTEM THAT ARE NOT INDICATED
ON DRAWINGS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR & SHALL BE
COORDINATED WITH THE CO. THE ORDER OF CONSTRUCTION IS THE RESPONSIBILITY OF THE GENERAL
CONTRACTOR. IT IS THE CONTRACTOR'S OBLIGATION TO PROVIDE ITEMS NECESSARY FOR THE
SELECTED CONSTRUCTION PROCEDURE.
H. OBSERVATION VISITS TO THE SITE BY ARCHITECT'S/ENGINEER'S REPRESENTATIVES SHALL NOT BE
CONSTRUED AS INSPECTIONS OR APPROVALS OF CONSTRUCTION.
I. ALL CONSTRUCTION AND INSPECTIONS SHALL BE IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED INSPECTIONS AND SHALL NOT PROCEED WITH THE WORK INVOLVED UNTIL THE INSPECTIONS HAVE BEEN COMPLETED AND THE WORK
APPROVED BY CO.
J. THE CONTRACTOR MUST SUBMIT A WRITTEN REQUEST AND OBTAIN THE CO'S PRIOR WRITTEN APPROVAL FOR ANY CHANGES, MODIFICATIONS, OMISSIONS, AND/OR SUBSTITUTIONS TO THE WORK
INDICATED HEREIN.
K. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY AND PROTECTIONS IN AND AROUND THE JOB
SITE AND/OR ADJACENT PROPERTIES THAT MAY BE AFFECTED BY THE WORK. ALL SUPPORT OF
CONSTRUCTION LOADS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. ALL SHORING AND BRACING REQUIRED FOR THE PROTECTION OF LIFE & PROPERTY DURING THE CONSTRUCTION PROCESS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. ALL PROCEDURES OF SOIL EXCAVATION, BACKFILL, & SUPPORT OF ADJACENT PROPERTY DURING EARTHWORK SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR.
L. ALL DIMENSIONS INDICATED ON PLANS SHALL BE TO FACE OF STUDS, FACE OF CONCRETE BLOCK, FACE OF ROUGH CONCRETE, CENTERLINE OF COLUMNS, TOP OF STEEL, OR TOP OF SLAB, UNLESS NOTED OR INDICATED OTHERWISE. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS NOT INDICATED
ON STRUCTURAL DRAWINGS.
PART I - GENERAL REQUIREMENTS
A. GENERAL BUILDING CODE
1. THE CONSTRUCTION DOCUMENTS ARE BASED ON THE REQUIREMENTS, CODES AND DESIGN GUIDES
SPECIFIC TO THE VETERAN'S HEALTH ADMINISTRATION AS FOLLOWS:
• VA CFM, 2014 STRUCTURAL DESIGN MANUAL
• VA CFM, 2020 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
• VA CFM, HANDBOOK H-18-8 "SEISMIC DESIGN REQUIREMENTS"
• INTERNATIONAL BUILDING CODE, IBC 2021
• ASCE/SEI 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
• AMERICAN CONCRETE INSTITUTE (ACI) 318-19, BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE
• AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) 360-16, NORTH AMERICAN SPECIFICATION
FOR STRUCTURAL STEEL BUILDINGS
• UNIFIED FACILITIES CRITERIA (UFC) 3-340-01, DESIGN AND ANALYSIS OF HARDENED STRUCTURES
TO CONVENTIONAL WEAPONS EFFECTS. SEPTEMBER 2014
• THE MASONRY SOCIETY (TMS) 402/602 BUILDING CODE REQUIREMENTS AND SPECIFICATIONS
FOR MASONRY STRUCTURES
B. FUTURE EXPANSION
1. NO PROVISIONS FOR ANY FUTURE EXPANSIONS HAVE BEEN MADE IN THE STRUCTURAL
DESIGN.
C. DEAD LOADS
1. SUPERIMPOSED DEAD LOAD: AN ALLOWANCE OF 20 PSF HAS BEEN MADE FOR NONLOAD BEARING
PARTITIONS, HANGING CEILING AND MECHANICAL EQUIPMENT LOADS SUCH AS DUCT WORK,
SPRINKLER PIPES, AND OTHER ELECTRICAL AND PLUMBING PIPES.
D. LIVE LOADS
1. DESIGN LIVE LOADS ARE BASED ON THE MORE RESTRICTIVE OF THE UNIFORM LOAD LISTED
BELOW OR THE CONCENTRATED LOAD LISTED ACTING OVER AN AREA 2.5.
2. MECHANICAL ROOMS:
• ELECTRICAL AND IT CLOSETS: 100 PSF.
• DESIGN CONCENTRATED LOAD IS THAT REQUIRED BY DESIGNATED EQUIPMENT WEIGHT.
3. ROOFS:
• ORDINARY FLAT, PITCHED AND CURVED ROOFS: 20 PSF
E. SNOW LOADS
1. SNOW CRITERIA:
• GROUND SNOW LOAD (Pg): 15 PSF
• FLAT-ROOF SNOW LOAD (Pf): 14 PSF
• SNOW EXPOSURE FACTOR (Ce): 1.0
• THERMAL FACTOR (Ct): 1.1
• ROOF SLOPE FACTOR (Cs) = 1.0
• BALANCED SNOW LOAD (Ps) = 14 PSF
PART II - DESIGN CRITERIA
A. SEISMIC LOADS
1. SEISMIC DESIGN CATEGORY: D
2. SOIL SITE CLASS: C - VERY DENSE SOIL AND SOFT ROCK
3. SEISMIC DESIGN CRITERIA:
• SS, 0.2 SEC. SPECTRAL ACCELERATION, (%g) = 1.003
• S1, 1 SEC. SPECTRAL ACCELERATION, (%g) = 0.334
• SDS, 0.2 SPECTRAL RESPONSE COEFFICIENT, (%g) = 0.802
• SD1, 1 SPECTRAL RESPONSE COEFFICIENT, (%g) = 0.334
• OCCUPANCY CATEGORY: IV
• Ie, OCCUPANCY IMPORTANCE FACTOR = 1.5
• ρ, "rho", SEISMIC REDUNDANCY FACTOR = 1.3
• CS, SEISMIC RESPONSE COEFFICIENT = 0.344
• W, TOTAL BUILDING WEIGHT (KIPS) = 173.8 K
• BASIC SEISMIC FORCE RESISTING SYSTEM: ORDINARY MOMENT FRAMES
• R, SEISMIC RESPONSE MODIFICATION FACTOR = 3.5
• Ωo, "omega naught", SYSTEM OVERSTRENGTH FACTOR = 3
• CD, DEFLECTION AMPLIFICATION FACTOR = 3
• V, DESIGN SEISMIC BASE SHEAR (KIPS) = 58.1
• ∆a, ALLOWABLE STORY DRIFT (INCHES) = 0.53 INCHES
• PLAN STRUCTURAL IRREGULARITY TYPE: NONE
• VERTICAL STRUCTURAL IRREGULARITY TYPE: NONE
• ANALYTICAL PROCEDURE: EQUIVALENT LATERAL FORCE ANALYSIS
4. SEISMIC DESIGN OF NONSTRUCTURAL COMPONENTS:
1. NONSTRUCTURAL COMPONENTS ENGINEERED AS PART OF DEFERRED SUBMITTALS, AND
CONNECTIONS OF THOSE COMPONENTS TO THE PRIMARY STRUCTURE SHALL BE DESIGNED IN
ACCORDANCE WITH THE AFOREMENTIONED BUILDING CODE, THE GENERAL SEISMIC CRITERIA
LISTED ABOVE, AND THE REQUIREMENTS OF ASCE 7-16 AS APPROPRIATE.
B. WIND LOADS
1. WIND DESIGN PRESSURE CRITERIA FOR THE MAIN FORCE RESISTING SYSTEM AND COMPONENTS
AND CLADDING ARE LISTED BELOW AND TABULATED ON THIS SHEET.
1. ULTIMATE DESIGN WIND SPEED: 118 MPH (3 SECOND GUST)
2. RISK CATEGORY: IV
3. BUILDING CATEGORY: ENCLOSED
4. WIND EXPOSURE CATEGORY: B
5. GCpi, INTERNAL PRESSURE COEFFICIENT = +/- 0.18
C. BLAST LOADS
1. BLAST DESIGN BASED ON THE FOLLOWING ENGINEERING REPORT:
"JOHN J. PERSHING VAMC - REPLACE FIRE MAIN AND WATER STORAGE BLAST DESIGN NARRATIVE -
100% CD SUBMISSION, PREPARED BY THORNTON TOMASETTI, INC." DATED JUNE 23, 2023.
2. THE BLAST ENGINEERING REPORT IS AVAILABLE TO THE GENERAL CONTRACTOR UPON REQUEST
TO THE OWNER. THE INFORMATION INCLUDED THEREIN MAY BE USED BY THE GENERAL
CONTRACTOR FOR HIS GENERAL INFORMATION ONLY. THE ARCHITECT AND ENGINEER WILL NOT BE
RESPONSIBLE FOR THE ACCURACY OF SUCH DATA THEREIN.
PART II - DESIGN CRITERIA (CONTINUED)
D. BUILDING MOVEMENT AND DEFLECTIONS
1. THE BUILDING MOVEMENT SPECIFIED HEREIN IS ANTICIPATED TO OCCUR AND SHOULD BE
CONSIDERED BY THE CONTRACTOR IN THE PERFORMANCE OF THE WORK.
2. THE FOLLOWING PROVISIONS SHOULD BE MADE FOR SUPERIMPOSED LOAD DEFLECTION OF
ONE FLOOR RELATIVE TO AN ADJACENT FLOOR IN THE DESIGN, FABRICATION, AND ERECTION
OF THE BUILDING CLADDING. TYPICAL SPANDREL BEAM DEFLECTIONS: 3/8". SUPERIMPOSED
LOAD DEFLECTION IS DEFINED AS ALL DEFLECTION ANTICIPATED TO OCCUR AFTER THE
CLADDING HAS BEEN ERECTED. THE RELATIVE DEFLECTION ABOVE DOES NOT INCLUDE THE
FLOOR DEFLECTION CAUSED BY THE WEIGHT OF THE CLADDING ITSELF OR THE DEAD LOAD
DEFLECTION OF THE FLOOR FRAMING ITSELF, NOR DOES IT INCLUDE ANY ALLOWANCE FOR
FABRICATION OR ERECTION TOLERANCES.
3. FLOOR DEFLECTIONS: THE FOLLOWING PROVISION FOR SUPERIMPOSED LOAD DEFLECTIONS
SHALL BE MADE IN THE DESIGN, FABRICATION, AND INSTALLATION OF ALL PARTITIONS, GLASS
WALLS, AND OTHER ELEMENTS SUPPORTED BY AND ATTACHED TO THE STRUCTURE:
• TYPICAL FLOOR MEMBERS: SPAN/360 BUT NOT LESS THAN 3/8”
• TYPICAL ROOF MEMBERS: SPAN/360 BUT NOT LESS THAN 3/8”
4. LATERAL FRAME WIND DEFLECTION (DRIFT): THE DEFLECTIONS LISTED BELOW ARE BASED ON
WIND LOADS WITH A 10-YEAR MEAN RECURRENCE INTERVAL. THE ”FOLLOWING PROVISION
FOR LATERAL FRAME DEFLECTION IN THE PLANE OF THE WALL OF ONE FLOOR RELATIVE TO
AN ADJACENT FLOOR SHALL BE MADE IN THE DESIGN, FABRICATION AND INSTALLATION OF
THE BUILDING CLADDING: (FLOOR HEIGHT)/400
5. LATERAL FRAME SEISMIC DEFLECTION: THE FOLLOWING PROVISION FOR INELASTIC LATERAL
FRAME DEFLECTION IN THE PLANE OF THE WALL ONE FLOOR RELATIVE TO AN ADJACENT
FLOOR SHALL BE MADE IN THE DESIGN, FABRICATION AND INSTALLATION OF BUILDING
CLADDING AS SPECIFIED IN THE BUILDING CODE: (FLOOR HEIGHT)/50
A. GEOTECHNICAL ENGINEERING REPORT
1. FOUNDATION DESIGN IS BASED ON THE GEOTECHNICAL ENGINEERING REPORT AS FOLLOWS:
"GEOTECHNICAL INVESTIGATION REPORT - JOHN J PERSHING VA MENTAL HEALTH BUILDING
1500 N WESTWOOD BLVD, POPLAR BLUFF, MO 63901" PREPARED BY SMITH & CO ENGINEERS,
DATED OCTOBER 18TH, 2022.
2. THE GEOTECHNICAL REPORT IS AVAILABLE TO THE GENERAL CONTRACTOR UPON REQUEST
TO THE OWNER. THE INFORMATION INCLUDED THEREIN MAY BE USED BY THE GENERAL
CONTRACTOR FOR HIS GENERAL INFORMATION ONLY. THE ARCHITECT AND ENGINEER WILL
NOT BE RESPONSIBLE FOR THE ACCURACY OF SUCH DATA THEREIN.
3. ALL FOUNDATION EXCAVATIONS, COMPACTION, FILL MATERIAL, TESTING AND INSPECTION OF
FOUNDATION BEARING STRATA SHALL BE PERFORMED ACCORDING TO THE REQUIREMENTS
SET FORTH IN THE GEOTECHNICAL ENGINEERING REPORT. THE CONTRACTOR SHALL
DETERMINE THE EXTENT OF CONSTRUCTION DEWATERING REQUIRED FOR THE EXCAVATION.
THE CONTRACTOR SHALL SUBMIT TO THE GEOTECHNICAL ENGINEER FOR REVIEW THE
PROPOSED PLAN FOR CONSTRUCTION DEWATERING, PRIOR TO BEGINNING THE EXCAVATION.
4. IF EXISTING SUBGRADE SOILS ARE SOFT OR PUMPING (PROOFROLLING PER GEOTECH
REPORT), THE PROJECT ENGINEER OR GEOTECHNICAL ENGINEER MAY APPROVE
CORRECTIVE ACTIONS PRIOR TO PROCEEDING WITH FOUNDATION WORK. THE CORRECTIVE
ACTIONS MAY INCLUDE OVER-EXCAVATION AND REPLACEMENT OF STRUCTURAL FILL LIFTS
OR INSTALLING GEOTEXTILES OR GEOTECHNICAL FABRICS TO IMPROVE THE STRENGTH OF
LOWER SOILS.
B. DESIGN CRITERIA PER FOUNDATION TYPE
1. SPREAD FOOTING
1. NOMINAL BEARING RESISTANCE = 3,000 PSF
2. MINIMUM ISOLATED FOOTING DIMENSION = 24 INCHES
3. MINIMUM CONTINUOUS FOOTING DIMENSION = 18 INCHES
4. MINIMUM FROST DEPTH BELOW GRADE = 24 INCHES
PART III - FOUNDATIONS
A. ALL CONCRETE MATERIALS SHALL COMPLY WITH THE STANDARDS SPECIFIED IN THE
SPECIFICATIONS. EACH MIX DESIGN SHALL BE REVIEWED BY AN APPROVED INDEPENDENT
LABORATORY & SHALL BE SUBMITTED TO THE ENGINEER OF RECORD AT LEAST 2 WEEKS PRIOR TO THE PLACEMENT OF CONCRETE. ANY CONCRETE THAT FAILS TO MEET SPECIFICATIONS SHALL BE
REMOVED & REPLACED AT THE EXPENSE OF THE CONTRACTOR.
B. PREPARE CONCRETE MIX DESIGNS FOR EACH TYPE AND STRENGTH OF CONCRETE. STRENGTH OF CONCRETE SHALL BE DETERMINED BY USING EITHER LABORATORY TRIAL BATCH OR FIELD EXPERIENCE METHODS AS SPECIFIED IN ACI 301. IF TRIAL BATCH METHOD IS USED, USE AN INDEPENDENT TESTING
FACILITY ACCEPTABLE TO ENGINEER FOR PREPARING AND REPORTING PROPOSED DESIGN MIX.
C. ALL CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF THE "CLASSES OF CONCRETE MATRIX".
THE NOTES BELOW ARE PROVIDED FOR EASY REFERENCE ONLY.
D. CONCRETE CRITERIA:
1. CONCRETE STRENGTH SHALL MEET THE FOLLOWING 28-DAY COMPRESSIVE STRENGTHS (f'c), UON:
• FOOTINGS: 4,000 PSI
• FOUNDATION WALLS: 4,000 PSI
• SLAB ON GRADE: 4,000 PSI
2. PROVIDE NORMAL-WEIGHT, MAX W/C RATIO OF 0.55, MIN 6% +/- 1.5% AIR-ENTRAINED CONCRETE.
3. NORMAL WEIGHT CONCRETE SHALL HAVE A UNIT WEIGHT OF 145 TO 155 PCF.
4. AGGREGATE FOR NORMAL WEIGHT CONCRETE SHALL CONFORM TO ASTM C33.
5. AGGREGATE TO BE 3/4" MINUS, UNLESS NOTED OTHERWISE.
6. CONCRETE MIXING OPERATIONS SHALL CONFORM TO ASTM C94 AND ACI 304.
7. NON SHRINK GROUT SHALL CONFORM TO ASTM C1107.
8. USE ACCELERATING ADMIXTURES IN COLD WEATHER ONLY WHEN APPROVED BY ENGINEER OF
RECORD.
9. USE SET RETARDING ADMIXTURES DURING HOT WEATHER ONLY WHEN APPROVED BY THE
ENGINEER OF RECORD.
10. USE OF ADMIXTURES WILL NOT RELAX COLD WEATHER PLACEMENT REQUIREMENTS.
11. DO NOT USE CALCIUM CHLORIDE.
12. WATER REDUCING ADMIXTURES SHALL CONFORM TO ASTM C494, AND USED IN ACCORDANCE WITH
THE MANUFACTURER'S RECOMMENDATIONS.
13. AIR ENTRAINMENT SHALL CONFORM TO ASTM A C260 AND SHALL BE USED IN ALL CONCRETE
MIXTURES EXPOSED TO WEATHER.
14. PORTLAND CEMENT SHALL CONFORM TO ASTM C150 TYPE I/II.
15. ALL CONCRETE SHALL BE CONSOLIDATED BY VIBRATION, SPADING, RODDING OR FORKING SO
THAT THE CONCRETE IS THOROUGHLY WORKED AROUND THE REINFORCEMENT, EMBEDDED
ITEMS, AND INTO THE CORNERS OF FORMS WITHOUT SEGREGATION OF MATERIALS.
16. CONCRETE TOLERANCES SHALL BE AS SPECIFIED IN ACI 301 AND AS FOLLOWS:
• TOPS OF WALLS AND COLUMNS: -3/4", +0"
• PLUMBNESS: 1/4" IN 10 FEET, 1" MAXIMUM TOTAL
• PLAN ALIGNMENT:1/2" IN 20 FEET, 1" MAXIMUM TOTAL
• CROSS-SECTIONAL DIMENSION.: -1/4", +1/2"
• SIZE AND LOCATION OF SLEEVES AND BLOCKOUTS: ±1/4"
• SLAB AND BEAM SOFFITS: 1/4" IN 10 FEET, 3/4" MAXIMUM TOTAL
17. CRACKING OF CONCRETE SLABS DUE TO SHRINKAGE IS EXPECTED. THE GENERAL CONTRACTOR SHALL ANTICIPATE REPAIRING CRACKS IN ALL SLABS. ROUT AND SEAL ALL CRACKS 0.01 INCH WIDE
AND GREATER.
E. FORMWORK AND SHORING CRITERIA:
1. FORM WORK SHALL COMPLY WITH THE SPECIFICATIONS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE DESIGN, DETAILING, CARE, PLACEMENT, AND REMOVAL OF THE FORM
WORK AND SHORES. DESIGN SHALL INCLUDE RATE AND METHOD OF PLACING CONCRETE AND
CONSTRUCTION LOADS, INCLUDING VERTICAL, HORIZONTAL, AND IMPACT LOADS. FORMS SHALL
BE SUBSTANTIAL AND SUFFICIENTLY TIGHT TO PREVENT LEAKAGE OF MORTAR AND PROPERLY
BRACED OR TIED TO MAINTAIN POSITION AND SHAPE.
2. FORMS SHALL BE REMOVED IN SUCH A MANNER AS NOT TO IMPAIR SAFETY AND SERVICEABILITY OF
THE STRUCTURE. ALL CONCRETE TO BE EXPOSED BY FORM REMOVAL SHALL HAVE SUFFICIENT
STRENGTH NOT TO BE DAMAGED THEREBY. RESHORE UNTIL 28 DAYS AFTER PLACEMENT, AND FOR
THE FULL DURATION WHERE CONSTRUCTION LOADS EXCEED SPECIFIED SERVICE LOADS.
RESHORING SHALL CONFORM TO ACI 347.
F. EMBEDDED CONDUITS, PIPES AND SLEEVES CRITERIA:
1. ANY AND ALL CONDUITS, PIPES, AND SLEEVES EMBEDDED IN STRUCTURAL CONCRETE SHALL BE
SHOWN IN PLAN OR THOROUGHLY DESCRIBED IN WRITING AND PROVIDED TO THE ENGINEER OF
RECORD FOR WRITTEN APPROVAL A MINIMUM OF FOUR WEEKS PRIOR TO INSTALLATION.
2. ALL EMBEDDED ITEMS SHALL BE LOCATED AS TO NOT IMPAIR THE STRENGTH OF THE
CONSTRUCTION OF THE CONCRETE MEMBER. CONDUITS OR DUCTS EXCEEDING ONE-THIRD THE
SLAB OR WALL THICKNESS SHALL NOT PLACED IN THE STRUCTURAL CONCRETE UNLESS
SPECIFICALLY DETAILED.
3. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL EMBEDDED ITEMS AND
PENETRATIONS. COST OF ADDITIONAL REINFORCEMENT OR WHERE CONDUIT IS TO BE PROVIDED
WITH SCHEDULE 40 UNCOATED OR GALVANIZED STEEL PIPE (ASTM 53)
SHALL BE BORNE BY THE CONTRACTOR.
4. ALL EMBEDDED ITEMS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE DIRECTED BY THE
ENGINEER OF RECORD OR SHOWN ON THE STRUCTURAL DRAWINGS:
1. PIPES MAY PASS THROUGH STRUCTURAL CONCRETE IN SLEEVES, BUT SHALL NOT BE
EMBEDDED THEREIN.
2. PROPOSED CONDUITS LESS THAN OR EQUAL TO 1 1/2" OUTSIDE DIAMETER SHALL CONFORM TO
THE FOLLOWING:
1. NO EMBEDMENT SHALL DISRUPT THE PLACEMENT OF THE REINFORCING STEEL.
2. THE CONDUIT SHALL BE PLACED BETWEEN VERTICAL REINFORCEMENT LAYERS.
3. THE CONDUIT SHALL BE PLACED IN THE MIDDLE THIRD OF THE WALL FOR SINGLE LAYER
VERTICAL REINFORCEMENT.
3. HORIZONTAL CONDUIT SHALL NOT BE EMBEDDED WITHIN A SLAB ON GRADE.
4. CONDUITS SHALL NOT BE EMBEDDED HORIZONTALLY IN ANY WALL, LENGTH WISE.
5. CONDUITS SHALL NOT BE EMBEDDED VERTICALLY IN ANY WALL LESS THAN 8" THICK.
6. THE PLACEMENT OF JUNCTION BOXES SHALL NOT DISRUPT THE LOCATION OF THE
REINFORCEMENT
7. PARALLEL RUNS OF CONDUIT MAY NOT BE CLOSER THAN 3" ON CENTER.
G. CONSTRUCTION JOINTS & CONTROL JOINTS:
1. ALL CONSTRUCTION JOINTS SHALL BE AS DETAILED OR AS APPROVED BY THE ENGINEER.
2. THERE SHALL BE NO HORIZONTAL CONSTRUCTION JOINTS IN ANY CONCRETE POURS UNLESS
SHOWN ON THE DRAWINGS. THE ARCHITECT/ENGINEER SHALL APPROVE ALL DEVIATIONS OR
ADDITIONAL JOINTS IN WRITING.
3. PROVIDE JOINT SEALANT FOR WALLS EXPOSED TO EARTH OR WEATHER.
4. CONTROL JOINTS SHALL BE PROVIDED IN ALL SLABS-ON-GRADE AT A MAXIMUM SPACING OF 10'-0"
OC, UNLESS NOTED OTHERWISE. CONTROL JOINTS FOR SLABS-ON-GRADE JOINTS SHALL BE 1/8"
WIDE X (THICKNESS/4)" DEEP CONTINUOUS SAWED JOINT.
5. CONTROL JOINTS SHALL BE PROVIDED AT 30'-0" OC MAXIMUM IN CONCRETE WALLS.
6. CONTROL JOINTS SHALL BE PROVIDED AT ALL COLUMN CENTERLINES, CORNERS AND ENDS OF
WALLS, RE-ENTRANT CORNERS AND ANY OTHER AREAS WITH HIGH CRACK POTENTIAL. PROPOSED JOINT LOCATIONS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO COMPLETION
OF WORK.
7. CONTROL JOINTS SHALL BE COMPLETED WITHIN 12 HOURS OF CONCRETE PLACEMENT.
8. REINFORCING SHALL BE CONTINUOUS THROUGH CONSTRUCTION JOINT AND CONTROL JOINTS, UNLESS NOTED OTHERWISE.
9. VERTICAL CONSTRUCTION JOINTS SHALL HAVE A CONTINUOUS 2"X4" KEY WAY ALONG THE JOINT, UNLESS NOTED OTHERWISE, SEE DETAILS. JOINTS IN WALLS REQUIRE WATER STOPS.
10. VERTICAL CONSTRUCTION JOINTS ON WALLS OR GRADE BEAMS SHALL BE LOCATED AT ONE
QUARTER TO ONE THIRD SPAN BETWEEN CAISSONS AND SHALL BE APPROVED BY ENGINEER.
11. PROVIDE REINFORCING DOWELS TO MATCH THE MEMBER REINFORCING AT THE JOINT, UNLESS
NOTED OTHERWISE.
PART IV - REINFORCED CONCRETE
A. REINFORING STEEL CRITERIA:
1. ALL REINFORCING, INCLUDING WWF, SHALL BE DETAILED, BOLSTERED, & SUPPORTED TO
COMPLY WITH ACI 315, "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCING
CONCRETE STRUCTURES" & CRSI RECOMMENDATIONS.
2. ALL REINFORCING BARS SHALL CONFORM TO ASTM A-615 GRADE 60, Fy = 60 KSI MIN, UNLESS
NOTED OTHERWISE.
3. ALL EPOXY COATED REINFORCING SHALL CONFORM TO ASTM A775 AND SHALL BE COATED PRIOR
TO FABRICATION.
4. ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185. LAP FABRIC 12 INCHES MINIMUM.
5. A706 BARS MAY BE SUBSTITUTED WITH A615 BARS IF MILL CERTIFICATIONS ARE SUBMITTED
SHOWING ACTUAL YIELD STRENGTH DOES NOT EXCEED SPECIFIED STRENGTH BY MORE THAN 18
KSI AND Ft ≥ 1.25Fy.
6. REINFORCING BARS SHALL NOT BE WELDED UNLESS SPECIFICALLY SHOWN ON DRAWINGS.
7. WELDING OF REINFORCING STEEL SHALL CONFORM TO AWS D1.4, USING PROPER LOW HYDROGEN
ELECTRODES.
8. ALL REINFORCING BAR BENDS SHALL BE MADE COLD WITH A BAR BENDER ACCORDING TO ACI 350
BAR BEND RADIUS.
B. REINFORCING STEEL PLACEMENT:
1. BARS SHALL BE TIED SECURE PRIOR TO PLACEMENT OF CONCRETE TO MAINTAIN PROPER
PLACEMENT AFTER CONCRETE IS IN PLACE. USE CHAIRS OR OTHER SUPPORT DEVICES
RECOMMENDED BY CRSI TO SUPPORT & TIE REINFORCEMENT BARS & WWF PRIOR TO PLACING
CONCRETE.
2. ALL BARS IN CONCRETE SHALL BE LAPPED (CLASS B) IN ACCORDANCE WITH THE SCHEDULE
PROVIDED IN THESE DRAWINGS UNLESS SPECIFICALLY NOTED OTHERWISE
3. REINFORCING STEEL COVERAGE SHOULD CONFORM TO THE REQUIREMENTS SPECIFIED IN DETAILS
LABELED “TYPICAL CONCRETE CLEAR COVER” UNLESS NOTED OTHERWISE ON THE DRAWINGS.
COVER SPECIFIED SHALL BE CONSIDERED MINIMUMS THAT MAY REQUIRE INCREASING WHERE
REINFORCING STEEL INTERSECTS FOR DIFFERENT MEMBER TYPES.
4. ALL EMBEDMENT & DOWELS SHALL BE SECURELY TIED TO FORM WORK OR TO ADJACENT
REINFORCING PRIOR TO THE PLACEMENT OF CONCRETE.
5. ALL VERTICAL REINFORCING SHALL BE DOWELED TO FOOTINGS OR THE STRUCTURE BELOW.
DOWELS SHALL BE THE SAME SIZE AND AT THE SAME SPACING AS THE VERTICAL WALL
REINFORCING SCHEDULED FOR THE WALL ABOVE. DOWELS SHALL EXTEND INTO FOOTINGS WITH
A 90 DEGREE STANDARD ACI HOOK & TO WITHIN 4" OF THE BOTTOM OF THE FOOTING.
6. UNLESS NOTED OTHERWISE, PLACE (2) - #4 BARS AROUND ALL OPENINGS 8" OR LARGER IN ANY
DIRECTION, & EXTEND REINFORCING BARS A MINIMUM OF 24" BEYOND THE CORNER OF THE
OPENINGS. WHERE 24" IS NOT AVAILABLE, EXTEND BARS AS FAR BEYOND THE OPENING AS
POSSIBLE, & TERMINATE THEM WITH A 90 DEGREE STANDARD ACI HOOK. PROVIDE 2 - #4 X 4'-0"
DIAGONAL AT THE CORNERS OF EACH OPENING.
7. CONTRACTOR SHALL COORDINATE PLACEMENT OF ALL CURBS, DOWELS, SLEEVES, CONDUITS, BOLTS, & INSERTS PRIOR TO CONCRETE PLACEMENT.
PART V - REINFORCING STEEL
A. SEE SPECIFICATIONS. ACCEPTABLE MANUFACTURERS (EPOXY TYPE) LISTED FOR REFERENCE ONLY:
1. HILTI.....................HIT-HY 200
2. SIMPSON............. SET-XP
B. ANCHOR INSTALLATION:
1. DRILL HOLE TO THE EMBEDMENT DEPTH NOTED ON PLANS, MINIMUM 9x ANCHOR/BAR DIAMETER.
DRILL BIT DIAMETER TO BE DETERMINED PER ANCHOR DIAMETER IN ACCORDANCE WITH
MANUFACTURER'S SPECIFICATIONS.
2. INSTALL ANCHORS PER MANUFACTURER'S REQUIREMENTS. THESE REQUIREMENTS INCLUDE, BUT
ARE NOT LIMITED TO, HOLE PREPARATION, EPOXY PROPORTIONS AND QUANTITIES,
INSTALLATION TEMPERATURE, AND CURE TIMES.
3. CLEAR OUT ALL DUST AND FRAGMENTS FROM THE HOLE PRIOR TO INJECTION OF EPOXY USING A BRUSH AND COMPRESSED AIR. COMPRESSED AIR TO BE INJECTED INTO THE HOLE USING A WAND
TO BLOW THE DUST FROM THE BACK OF THE HOLE FORWARD THROUGH THE OPENING. ENSURE
ALL DUST HAS BEEN REMOVED PRIOR TO INJECTING EPOXY.
4. INJECT EPOXY INTO HOLE. AMOUNT OF EPOXY TO BE DETERMINED BY MANUFACTURER'S
REQUIREMENTS FOR ANCHOR DIAMETER AND EMBEDMENT DEPTH.
5. INSERT ANCHOR AND TWIST 1/2 ROTATION UNLESS NOTED OTHERWISE IN INSTALLATION
INSTRUCTIONS.
6. REMOVE EXCESS EPOXY FROM SURFACE.
7. ALLOW EPOXY TO CURE PER MANUFACTURER'S SPECIFICATIONS.
8. INSPECTIONS AS PER MANUFACTURER'S REQUIREMENTS.
PART VI - POST INSTALLED ANCHORAGE
A. MASONRY WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE…
This is the start of the file's text. The full file is on GovTribe.