This document is an Amendment to Solicitation/Modification of Contract for the Department of Veterans Affairs Network Contracting Office. The solicitation (36C25525R0045) involves replacing steam traps at a VA facility, with a project value between $25,000 and $100,000. Key details include extending the proposal due date to April 15, 2025 at 2:00 PM CDT, clarifying technical specifications for steam trap replacements, and addressing pre-bid site visit questions.

The amendment provides critical technical clarifications, including: trap quantities (25 1" and 4 2" steam bucket traps), confirmation of like-for-like replacements, specification that cast iron traps are prohibited, and verification that the project area contains no asbestos-containing materials. Bidding requirements include submitting a bid bond, providing an abridged safety plan, and meeting technical proposal requirements such as 25% self-performance and specific experience criteria. VA maintenance staff will assist with steam line shutdown and startup during the project.

View the file

Other files for this federal contract opportunity

Other files attached to 589A5-25-192 REPLACE B1 STEAM TRAPS, newest first.
File Type Posted
9-4082_1-P2.pdf PDF
Pre-bid Sign-in 589A5-25-192.pdf PDF
36C25525R0045.docx DOCX document
P09 Drawings 02.pdf PDF
P09- Specs Building 1 Steam Traps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-07-2025 589A5-25-192 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25525R0045 09-17-2024

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-15-2025 2:00pm CDT

THIS AMENDMENT IS TO PROMULGATE THE FOLLOWING CHANGES.

1. Promulgate the publishing of the Pre-Bid Site Visit attendance (See attached).

2. Provide answers to submitted RFI's with attached images.

3. Extend Proposal Due Date to 15 April 2025 at 2:00pm CST.

Timothy Fitzgerald Contracting Officer

1. We are unable to locate a drawing for Unit B where some of the work is to be performed. Please provide a copy of this drawing, if available. Drawings attached

1. The specifications provided appear to require flanged connections on all steam traps. This varies from the current VA TIL which requires flanged connections on traps greater than 1.5” in size. Please clarify the requirements for this project. There is no flange connections on the traps needing to be replaced

1. The specifications provided appear to allow cast iron bodied steam traps. The current VA TIL does not permit the use of cast iron steam traps and specifies either cast steel or stainless bodies. Please clarify the requirements for this project. Cast Iron is Prohibited. Please provide other options in the submittals.

1. The specification includes a section for asbestos abatement. Is the contract expected to provide abatement on this project? All areas have been determined to not contain any ACM, however is there is suspected materials a mod will be considered however this specs is required for all projects regardless of reports of no ACM in the event that some is found during the demo phase.

1. The drawings provided only appear to reference F&T traps. Is the facilities preference to receive all new F&T traps? All traps are currently F&T and will be like for like replacement for functionality.

1. If the contractor is required to perform abatement, please provide details on the location and quantity so that this can be correctly estimated. All areas have been determined to not contain any ACM, however is there is suspected materials a mod will be considered

1. Are any traps located in permit required confined spaces? All space is considered non-permitted confined space

1. Solicitation documents page 23 of 46 is requesting hard copy submissions of proposals. Will emailed PDF submissions be accepted in lieu of printed or CD copies? Please submit proposals as directed in the solicitation. Please contact the CO directly if these requests cannot be met.

1. Given the magnitude of this project ($25K - $100K) , a bid bond or project bond is typically not required. However, the solicitation documents are requesting bid bonds be submitted . Please confirm that no bid bond is required for this submission. Please submit bid bond with proposal.

1. Factor 2 proposal requirements item 2a, asks for projects that involved “construction of replace various fan coil units”. Please confirm the relevancy here is steam traps or similar. This project is steam traps only. That was a misprint.

1. Factor 2 item 2b is requesting experience on self-performance of 15%. Based on the naics of 238220, was this criteria intended to be 25%? Yes, 25% is the standard

1. Factor 2 item 2.C.5, references NAICS 236220, please confirm this should be 238220. Correct. NAICS is 238220

1. For a project under $100K in magnitude, we typically do not see requirements for a full time Quality Control Manager, Safety Officer and Superintendent. Given this project size, please confirm that the Prime Contractors Superintendent may satisfy these roles independently. The PM may assume the role of QCM or SSHO and the Super may assume the other, no need to have a dedicated individual

1. If the Superintendent may satisfy these three roles above in question #6, please confirm that only the one resume will be required for QCM, Safety and Superintendent to satisfy the technical proposal requirements on solicitation page 27 of 46. Confirmed.

1. For Factor 4 submissions of Safety plan, is contracting requesting a copy of our full safety plans? Or an abridged version for proposal purposes? For proposal, an abridged version is acceptable, for the NTP a full is required

1. During the site visit it was uncovered that the steam trap size and counts maybe in accurate. Please clarify the size and quantities. 25 – ½” Steam bucket traps, 4 – ¾” Steam bucket traps

1. Please identify which size, and quantities tie into 2” lines. Please clarify? Is this related to the flange question?

1. During the site visit it was discovered that the current traps are not insulated. Nor were the attached piping between the steam line. Through the trap to the condensate return line. Please provide an insulation schedule and spec. the traps do not need to be insulated

1. What type of steam trap is being requested to replace the existing steam traps? Like for like in functionality

1. Can the quantities be confirmed? During the site visit it seems as if the quantities and sizes are not accurate. See quantities provided in previous question

1. Are there better drawings as to the locations of the existing traps. No see answers above and attached existing plans

1. Can the location of traps be provided on the drawing. No see answers above and attached existing plans

1. Can the quantity of traps on the 2” line be provided as this is a deduct. See quantities provided in previous question

1. Who will be responsible for shut down, draining, and start up of stem lines daily. VA maintenance staff will assist with shutdown and startup of the steam lines

1. Please confirm that the crawlspace is not a confined space. See answer in previous question

See attached document: Pre-bid Sign-in 589A5-25-192.

See attached document: 9-4082_1-P2.