This document is an amendment to a solicitation for the Kansas City Job Order Contract (JOC) from the Department of Veterans Affairs, Veterans Integrated Service Network 15. The amendment provides additional information and clarifies requirements, including:

  • Posting of questions and answers from a site visit. Key clarifications include that contractors are no longer eligible for tax-exempt status, contractors may submit past performance questionnaires, and the page limit for the proposal will not be increased from 50 pages.
  • The previous JOC contract had a total value of $63,375,180.64 across 262 task orders.
  • The requirement to provide 2 CDs and 2 hard copies of the RS Means Cost Books has been removed, as the online version is now the only requirement.
  • The amendment also extends the proposal due date to November 19, 2024 at 2pm CST.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0002 11-12-2024

PER TASK ORDER

36C255

Department of Veterans Affairs

Network Contracting Office (NCO) 15

3450 S 4th Street Trafficway

Leavenworth KS 66048

36C255

Department of Veterans Affairs

Network Contracting Office (NCO) 15

3450 S 4th Street Trafficway

Leavenworth KS 66048

To all Offerors/Bidders

36C25524R0109

10-10-2024

X

X X

See CONTINUATION Page

N/A

KANSAS CITY JOB ORDER CONTRACT (JOC), KANSAS CITY, MO. The above solicitation is hereby amended as follows:

a. Post Questions and Answers.

b. Please acknowledge the amendment with your proposal on November 19, 2024 at 2pm CST.

c. All other terms and conditions remain unchanged.

KANSAS CITY JOC ORDER CONTRACT – SITE VISIT QUESTIONS AND ANSWERS:

1. Will the task orders issued under the JOC be eligible for tax exempt status?

You are no longer eligible for tax exempt status.

2. Factor 4 (a) states, “Contractors may submit completed Past Performance

Questionnaires in support of this evaluation factor.” Can you clarify if PPQs are either not required as the contractors “may” submit is specified as opposed to “shall” submit OR is the criteria that PPQs are required, but the contractors “may” submit past PPQs not specific to this solicitation for evaluation?

Contractor may submit PPQs.

3. Can additional pages be added to the Volume 2 above the 50 pages? Some required documents such as Reps and Certs make the page limit difficult to comply with. Can the limit move to 75 pages?

The Contract documents and Price proposal shall not exceed the limits stated in the solicitation. If the page limits are exceeded, the proposal may be determined as non-responsive and cannot be considered for award.

4. What was the total contract value awarded under the previous JOC requirement?

$63,375,180.64.

5. What was the total number of task orders awarded under the previous JOC requirement? 262.

6. Can you please clarify the requirement for coefficient supporting documentation?

There is conflicting direction on whether supporting documentation is required and, if so, what information and format is requested. Sections in question below as follows:

Paragraph b Section 2 below is deleted.

a. Section (3) Notes, item (a) states, “A coefficient breakdown sheet is provided for

Prime Contractor use. This form is not required for the proposal and is only provided as a guide for contractors use when calculating their coefficient.

b. Section 2 states, “Section 2 shall contain the supporting documentation for coefficient factors submitted in Schedule A. The schedule consists of two

Coefficients for: (1) Normal Working Hours; (2) Other Than Normal Working Hours.

7. Section (3) Notes, item (e) states, ‘Contractor shall use the RS Means Facilities

Repair Cost Data Software located at www.rsmeans.com. This Software contains pricing information for the work to be accomplished and for the units of measure specified. The contractor must furnish pricing (proposals) for each individual Task

Order on a LINE-ITEM BASIS per RS Means Cost Works (www.rsmeans.com).” Is the Rs Means database the only requirement for the estimating software as there are numerous platforms (WinEst, 4 Clicks, etc. ) that all use the Rs Means Database specified.

Contractor determines which platform to use if you use RS Mean Database.

8. The solicitation states that the contractor shall provide 2 CD’s and 2 Hard copies of the

RS Means Cost books. I understand this requirement and we follow this on current JOC contracts. However, since RS means is now online and they update the online version each qtr, the books and CD’s are out dated by the first qtr of each year. Could this be amended to not require the CD’s and Hard Copy books to reduce waste?

2 CD’s and 2 Hard copies of the RS Means Cost Books are not required.

https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.rsmeans.com%2F&data=05%7C02%7C%7Ca1744996150d4a3161e308dcf9d1180d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638659923660668417%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=gZeN1aa%2BQlUdsWKd4O0RZj8AarUrCXucOhJvKjV5g5w%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.rsmeans.com%2F&data=05%7C02%7C%7Ca1744996150d4a3161e308dcf9d1180d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638659923660699025%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=dk2r6E8URRgklXfCznFumu6iShLgHudq6MKxHt1t5Ik%3D&reserved=0

File details come from the government source that posted it. Updated .