Questions and Answers.docx
DOCX document 16 KB Posted
- Attached to
- N041--250-Ton Chiller Replacement St. Louis VA Medical Center John Cochran Division (Cancelled)
- Solicitation number
- 36C25524Q0320_1
About this file
This document contains Questions and Answers related to a federal contract opportunity for the replacement of a 250-ton chiller at the St. Louis VA Medical Center John Cochran Division. Key details include:
The contract requires the removal of an existing chiller and installation of a new 250-ton air-cooled chiller. There will be a site visit as stated in Amendment 0001, but no engineer's estimate is provided. The new chiller must be integrated into the existing building automation system by the VA's contractor, and no additional glycol is required as it is a backup unit connected to the chiller plant. The VA is seeking the replacement to be completed as soon as possible, with the new chiller having the same efficiency as the existing unit. The chilled water temperature requirements are 42°F leaving temperature, and the contractor can drain the existing unit's refrigerant off-site if preferred. No glycol is used, as the unit is protected from freezing via heat trace and sensors connected to the building automation system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25524Q0320 Amendment 0003.pdf | ||
| 36C25524Q0320 Amendment 0002.pdf | ||
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| 36C25524Q0320 Amendment 0001.pdf | ||
| 36C25524Q0320_1 250-Ton Chiller Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1. Is there going to be a scheduled site visit for this project? Yes, See Amendment 0001
2. Do you know what the engineer's estimate is for this project? Not applicable to the solicitation.
3. Can you please confirm if this is for an air-cooled or water-cooled chiller? Air Cooled
4. Will the EMS control contractor work for integration of the new chiller need to be included in the contractor’s price?
The VA will have our contractor who services our BAS integrate the unit into our system
5. Will additional glycol need to be included in the bid and if so what quantity should be added in gallons and concentration?
There is no glycol. This is a back up chiller that switches over from the chiller plant which doesn’t run glycol.
6. Is there an estimated time of completion that you are looking at? The reason that I am asking is that manufactures have extensive build times for ordered equipment but it is sometimes possible to secure a machine that is scheduled for production but not yet sold.(Will an earlier lead time help to secure the bid) I cannot say whether that will help secure the bid. We would like to have the unit replaced as soon as possible.
7. Is there a target efficiency minimum required?
The same as the one being removed.
8. Is it required to drain the existing unit on site or can it be done off site?
Draining the residual chilled water can be done on site. Because it is a self-contained unit the refrigerant can be removed IAW regulations off site if that is easier.
9. Water conditions – Entering and Leaving water temperature requirements (54F / 44F?)
Our chiller plant provides 42F water so the Leaving water temp must be 42F or lower.
10. This is an air-cooled chiller that I assume will be required to run year-round (In the winter) and therefore will/probably requires Glycol in the water to prevent freezing during ambient conditions below 32F, What type (I would assume Propylene Glycol) and what concentration ( I would suggest 35-40% PG) is currently being used or will be used. I would not recommend using fresh water as it will freeze if you experience loss of power for an extended amount of time during freezing ambient conditions (Murphy’s Law).
Because this is a back up chiller that cross connects with our Chiller Plant there is no glycol. We will use a heat trace and sensor connected to our BAS in order to prevent freezing, as well as draining the unit in the winter when it will not be needed.
11. Is the chiller being replaced a Nominal 250-ton machine or are you looking for 250 actual tons of capacity based on the design operating conditions? High percentage Glycol solution will derate the chiller performance.
There is no glycol in the system. The unit being replaced is a back up to the chiller plant and is cross connected making the use of glycol impossible. Manufacturers calculate the nominal tonnage differently. 250 tons of capacity is what we are looking for.