This document outlines requirements for a cost-per-test agreement for point-of-care prothrombin time and INR testing across three Department of Veterans Affairs medical centers in Veterans Integrated Service Network 15. The selected contractor must provide instruments, reagents, supplies, maintenance, and technical support to perform approximately 5,000 tests annually at the St. Louis, Wichita, and Kansas City VAMCs. The contractor will also interface the instruments with the VA's laboratory information system. Bids are due by February 8, 2024. The agreement will have a base year and four optional annual extensions. The contractor must handle all waste disposal and meet interfacing, training, service, and records management obligations. Attachments A and B specify the required instruments, estimated test volumes, and other details by location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25524Q0139.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) None 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 To all Offerors/Bidders
36C25524Q0139 02-05-2024
X X X Extended to 02/08/2024 11:00 a.m. CST X POC Prothrombin and INR Testing
The purpose of this amendment is to:
1) Respond to questions - See Questions & Answers.
2) Update SOW – Changes have been highlighted.
3) Extend the Response Due Date from 02/05/2024 - 02/08/2024 11:
00 a.m. CST.
Betty Flores Contracting Officer
STATEMENT OF REQUIREMENT
FOR
VISN 15 - Prothrombin Time Point of Care Testing- Cost Per Testing
SCOPE OF PROCUREMENT:
· It is the intent of the Department of Veterans Affairs, (herein afterwards referred to as VISN 15) to establish a Cost per Test (CPT) agreement for POC INR Instrumentation, supplies and middleware connectivity. The Government will award a Cost per Kit to a single contractor for POC INR testing.
· The desired instrument shall have capability to perform testing as described below and meet the performance characteristics for accuracy and precision as defined by the 1988 Clinical Laboratory Improvement Act (CLIA) and the Clinical and Laboratory Standards Institute (CLSI).
· Equipment shall be acquired for each of the clinical laboratories located at the VISN 15 facilities that have been identified in Attachment A.
· Facilities within VISN 15 may be added or deleted by supplemental agreement of the Government and the Contractor.
· The Contractor is required to provide a continuously stocked inventory of; reagents, standards, controls, supplies, disposables, and any other materials required to properly perform tests on the equipment such that equipment operations are not interrupted.
· These items shall be of the highest quality, sensitivity, specificity and tested to assure precision and accuracy.
· Expiration date must be clearly marked on reagent, standards, and control containers.
· Unexpected changes in methodology/technology shall be at the expense of the Contractor.
· Alert/Notification of any delays in shipment as well as any or all technical advisory/recalls/alerts, prior to or simultaneously with field alerts should be forwarded to the designated individuals determined at contract award.
· Estimated volumes of reagents can be found in Attachment B.
· Special handling for emergency orders of supplies: If the supplies are found to be defective and unsuitable for use with the Contractor’s equipment, or the Contractor has failed to comply with the requirements for routine supply delivery, the Contractor is required to deliver the supplies within 24 hours of receipt of a verbal order for emergency delivery. If either circumstance has occurred, the Contractor shall deliver to the Government site in the most expeditious manner possible without additional cost to the Government, the necessary consumables in sufficient quantity as required to allow operation of the Contractor’s equipment for one week (under normal Government test load volume). If additional requests for emergency supply delivery are required by the Government, they shall be honored by the Contractor until the arrival at the laboratory of the monthly standing order/routine supplies delivery.
DEFINITIONS:
· Cost per Test (CPT)- as defined in the Federal Supply Schedule FSC Group 66, Part III, Cost-Per-Test Clinical Laboratory Analyzers – Contractors are required to provide a price for each test that can be performed on its equipment. The per test price shall include costs covering (1) 4 year equipment use, (2) all reagents, standards, quality controls, supplies, consumable/disposable items, parts, accessories and any other item required for the proper operation of the Contractor’s equipment and necessary for the generation and reporting of a test result, (3) all necessary maintenance to keep the equipment in good operating condition (This element includes both preventive maintenance and emergency repairs) and (4) training for Government personnel. Contractors are required to provide delivery, installation, and removal of equipment at no additional charge.
· Business Associate Agreement (BAA)‐ A business associate is an entity, including an individual, company, or organization that, on behalf of VHA, performs or assists in the performance of functions or activities involving the use or disclosure of PHI, or that provides certain services involving the disclosure of protected health information (PHI). VHA is a covered entity under the HIPAA Privacy Rule (Privacy Rule). HIPAA regulations require VHA to execute HIPAA‐compliant BAAs with certain entities that receives, uses, or discloses VHA PHI to perform some activity for VHA. These BAAs obligate VHA business associates to provide the same protections and safeguards to PHI that is required of VHA under the Privacy Rule.
· MOU ‐ The VA utilizes a Memorandum of Understanding (MOU) to document the terms and conditions for sharing data and information resources in a secure manner. The following supporting information within the MOU will define the purpose of the interconnection, identify relative authorities, specify the responsibilities of both organizations, and define the terms of the agreement. Additionally, the MOU provides details pertaining to apportionment of cost and timeline for terminating or reauthorizing the interconnection.
· ISA ‐Technical details on how the interconnection is established or maintained are included within the Interconnection Security Agreement (ISA). A system interconnection is a direct connection between two or more information technology (IT) systems for the purpose of sharing data and other information resources. The VA uses the ISA to formally document the reasons, methodology, and approvals for interconnecting IT systems; to identify the basic components of an interconnection; to identify methods and levels of interconnectivity; and to discuss potential security risks associated with the interconnections.
· Parameter definitions‐
· PT – Prothrombin Time
· INR – International Normalized Ratio
GENERAL REQUIREMENTS:
· Operational Features – The instrumentation offered shall have the capability to perform:
· Prothrombin Times and INR testing as a CLIA waived analyte
· Prothrombin Time assay at locations that are remote from the laboratory, such as Community Based Outpatient Clinics (CBOC)
· Bi-directional computer interface compatible with the current VA laboratory information system. The fully operational interface (both hardware and software) shall be immediately available for implementation to the VA computerized hospital information system.
· Technical Features – The instrumentation must be approved by the Food and Drug Administration (FDA) and shall have the following:
· CLIA Waived Complexity status
· Operator and patient identification tracking
· Expired operator, failed quality control and invalid lot number instrument lock out
· Ability to detect poor reagent or strip integrity
· Ability to process whole blood samples
· No requirement for micropipette (sample transfer tubes) for application of blood for capillary test option
· Test process time of less than 120 seconds
· Capability to add user configurable comments
· Strip technology that is insensitive to Heparin
· System that has the same strip technology approved for both clinical and home-based testing
· Ability to correlate INR values of 3.5 or less with main laboratory coagulation instrumentation within +/- 0.5
· Ability to correlate INR values of greater than 3.5 with main laboratory coagulation instrumentation within +/- 20%
· Measurement range should span range of INR values 0.8 – 8.0
· Hardware Features – The instrumentation shall have the following:
· Rechargeable batteries
· Meter weight of less than 16 ounces Method Performance/Validation Requirements:
· Method performance/comparison shall be at the expense of the Contractor, shall include linearity material and reagents, and be consistent with current CLSI guidelines and related documents, The Joint Commission (TJC) standards and Federal regulations.
· Correlation studies for each analyte. A minimum of 20 samples spanning the reportable range shall be run by the present and the proposed method. In systems where multiple sampling modes exist, mode to mode correlation studies must also be performed. Contractor shall provide technical support specialist to assist with studies and to analyze results and provide statistical data to support acceptance of the new method for above studies. Statistics shall consist of at least mean, bias, slope, y-intercept, correlation coefficient, and meet current standards defined by CLSI.
· Vendor should provide correlation studies between POC device and main laboratory analyzers to show correlation results.
· Analytical Measurement Range (AMR) Validation shall be performed on proposed instrument(s) for each analyte to validate the reportable range. The material must have values, which are near the low, mid, and high values of the AMR and be of appropriate matrix for the clinical specimens assayed by that method.
· Precision study using normal and abnormal control material. This shall consist of a within run precision study of 10 normal and 10 abnormal controls and a day-to-day precision study of normal controls and abnormal controls for 10 days (may be run twice a day) for a total of 20 values per level of control. Intra-VISN facility variations should be kept at an absolute minimum.
· Sensitivity. Sensitivity may be validated concurrently with correlation studies. Mathematical calculations to determine efficiency, sensitivity, false positive rate, and false negative rate are applied.
· Specificity Studies. A review of product literature and assay inserts to determine any adverse effects for increased bilirubin, hemolysis, lipemia, or other interfering substances.
· Testing will not be implemented at the individual facilities for the selected system if the validation fails statistical studies.
· Reference Range. A reference range must be determined for each test following CLSI guidelines. Samples used for the reference range study must be representative of the patient population being tested. Reference range assessment must be performed for each lab. One of the following protocols shall be used:
· A verification of the manufacturer’s suggested reference range may be performed if the suggested range is based on a comparable population of test subjects. The manufacturer shall provide specific information defining how the suggested range was determined. A minimum of 20 reference individuals shall be used to verify the manufacturer’s range. Any apparent outliers should be discarded, and new specimens obtained to provide a statistically valid verification.
· If the suggested manufacturer’s range is not appropriate for the patient population, a reference range shall be established. Establishing a reference must follow CLSI guidelines. This requires a minimum of 120 reference individuals to be used to establish a reference range. The reference interval should be determined using the nonparametric method.
· If a laboratory is currently using the proposed instrument/reagent system, the “in-use” reference range can be transferred to the “new” system if a method comparison study between the two systems proves to be acceptable. If comparison studies are not acceptable, one of the two above items must be performed.
Support Features:
The equipment models being offered shall be in current production as of the date this offer is submitted. “Current productions” shall mean that the clinical laboratory analyzer model is being offered as new equipment. Discontinued models that are only being made available as remanufactured equipment are not acceptable.
· Start-Up Reagents. The Contractor shall provide all reagents, calibrators, controls, consumable/disposable items, parts, accessories, and any other item included on the list of supplies defined in the Federal Supply Schedule contract and required to establish instruments for operation for performance of acceptance testing. The Contractor shall perform, to the satisfaction of the Government, all validation studies including precision, method comparison with current analyzer, accuracy (recovery), calibration verification, verification of reference interval, and determination of sensitivity and specificity at no cost to the Government. The Contractor shall perform all the statistical analysis as stated in the Method Performance/Validation section above and report data in an organized, clearly comprehensible format.
· Training. Upon Installation: The Contractor shall provide an instrument training program for at least two operators per facility at no charge to the Government that is coordinated with and timely with the equipment installation, sufficient to the size and scope of the facility’s services. This shall include training on the operation of the system, data manipulation, and basic trouble shooting and repair.
Service Requirements:
Equipment Preventative Maintenance/Repair Service. The Contractor shall be able to provide emergency equipment repair and preventative maintenance on all primary and buck-up instrumentation and any incremental support equipment, e.g., water system, offered according to the following terms:
· A technical assistance center shall be available by telephone 24 hours per day, 7 days per week with maximum call back response time of 1 hour.
· The contractor shall provide the necessary information to replace an inoperable device.
· This replacement shall include meters, charging bases, and rechargeable batteries at no additional cost.
· A minimum acceptable service shall also include replacement delivery of items to be replaced with overnight service, but no longer than one (1) business day from the time of service ticket confirmation.
Upgrades:
The Contractor shall provide upgrades to the equipment hardware, bidirectional interface, and software to maintain the integrity of the system and the state-of- the art technology, at no additional charge to the Government (for sites that are interested). These shall be provided as they become commercially available and at the same time as they are being provided to commercial customers. This requirement only applies to “system upgrades” that enhance the model of equipment being offered, i.e., new version of software, correction of hardware defect, upgrade offered to commercial customers at no additional charge, upgrade to replace model of equipment no longer Contractor supported, etc. This does not refer to replacing the original piece of equipment provided under the BPA; however, it does refer to significant changes in the hardware operational capability.
Ancillary Support Equipment:
The Contractor shall provide, install, and maintain through the life of the BPA, as indicated, all ancillary support equipment to fully operate the analyzer as defined in these specifications, e.g., universal interface equipment. In addition, the Contractor shall include all ancillary components that are customarily sold or provided with the model of equipment proposed, e.g., starter kits, etc.
Interface Requirements:
· The contractor shall be responsible for providing middleware connectivity for the meters using RALS. Cost for middleware must be included in reagents’ price.
· The Contractor shall be responsible for providing all hardware required for the connection, implementation, and operation of the interface to the universal interface being utilized at VISN 15 VA Medical Centers.
· The Contractor shall provide all necessary software support for ensuring that successful interfacing has been established. Specific requirements for the communication of the data streams will be unique to the instrument system involved and dictated by the manufacturer itself. Information necessary to make the determination for type and amount of interfacing equipment is supplied in Attachment B.
· If a site already has a universal interface box, the Contractor is responsible for everything leading up to the box including any incremental fee required to add additional equipment (e.g., licenses, ports/cards, cables, software, etc.) to the universal interfacing system.
· If a site does not have a universal interface and one is needed to optimally interface the instrument, then the Contractor is responsible for the acquisition of the universal interface box and everything else needed to connect with VA computerized hospital information system.
· If there are any software upgrades in the instrument during its life, the Contractor is responsible for seeing that the interface can accommodate any changes in the data stream going to the VA computerized hospital information system.
· Contractor shall provide copies of current ISA/MOU and BAA that are applicable for remote connection to the interface system used to manage to testing system.
Cerner Compatibility Statement:
· The contractor shall be responsible for providing middleware connectivity for the meters using RALS. Cost for middleware must be included in reagents’ price.
· The Contractor shall be responsible for providing all hardware required for the connection, implementation, and operation of the interface to the universal interface being utilized at VISN 15 VA Medical Centers.
· The Contractor shall provide all necessary software support for ensuring that successful interfacing has been established. Specific requirements for the communication of the data streams will be unique to the instrument system involved and dictated by the manufacturer itself. Information necessary to make the determination for type and amount of interfacing equipment is supplied in Attachment B.
· If a site already has a universal interface box, the Contractor is responsible for everything leading up to the box including any incremental fee required to add additional equipment (e.g., licenses, ports/cards, cables, software, etc.) to the universal interfacing system.
· If a site does not have a universal interface and one is needed to optimally interface the instrument, then the Contractor is responsible for the acquisition of the universal interface box and everything else needed to connect with VA computerized hospital information system.
· If there are any software upgrades in the instrument during its life, the Contractor is responsible for seeing that the interface can accommodate any changes in the data stream going to the VA computerized hospital information system.
· Contractor shall provide copies of current ISA/MOU and BAA that are applicable for remote connection to the interface system used to manage to testing system.
· Vendor bids that do not include a CCS directly from the OEM will be disqualified.
· All devices running windows must be Windows 10 OS at the time of award.
Characterization of Waste:
The Contractor shall provide documentation that it has characterized the hazardous nature of all wastes produced by all equipment, devices, reagents, and discharges in accordance with the requirements of the Code of Federal Regulations Title 40 “Protection of the Environment” Part 261 et seq. and applicable state and local requirements. Documentation shall include a description of the characteristics of the hazardous waste produced as a byproduct of the instrument operations, Safety Data Sheets (SDS) meeting the requirements of the Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA), the analytical process used to determine the hazardous nature and characteristics of the waste, and the analytical test results. Testing of hazardous waste is to be done in accordance with testing protocol specified for each individual waste as described in the Code of Federal Regulations Title 40 to make a determination if the waste is a hazardous waste or otherwise regulated.
· The determination and description shall address the following:
· Waste toxicity (Reference 40 CFR §261.11 and 40 CFR §261.24)
· Waste ignitability (Reference 40 CFR §261.21)
· Waste corrosivity (Reference 40 CFR §261.22)
· Waste reactivity (Reference 40 CFR §261.23)
· Hazardous waste from non-specific sources (F-listed) (Reference 40 CFR §261.31)
· Discarded commercial products (acutely toxic or P-listed and toxic or U-listed) (Reference 40 CFR §261.33)
· Solid Waste (Reference 40 CFR §261.2)
· Exclusions (Reference 40 CFR §261.4)
· The contractor will provide written instructions and training material to ensure VHA laboratory staff are trained as needed to properly operate devices with special emphasis to managing and disposing of hazardous waste in accordance with EPA and state requirements. Additionally, the training provided by the contractor must fulfill Resource Conservation and Recovery Act (RCRA) requirements for training as applicable to devices.
· Contractor shall provide a description of all wastes the process or equipment may discharge so that the facility can determine whether the discharge meets Local Publicly Owned Treatment Works (POTW), State and Federal discharge requirements. At a minimum, the characteristics of ignitability, corrosivity, reactivity and toxicity as defined in 40 CFR §261 must be determined and documented. Any mercury containing reagents must be identified in any concentrations. All test results shall be provided. All listed chemicals (F, U, K and P) found in 40 CFR §261 shall be provided in product information and their concentrations documented. For those materials with a positive hazardous waste determination, a mechanism for the laboratory to meet local discharge requirements (i.e., mercury, thimerosol and formaldehyde) must be developed and SDS sheets must be provided in advance for review. At a minimum, documentation shall include, but not be limited to the concentration/measures of the elements and parameters listed below and must be included with vendor response:
| Barium | (Total) | ||
| Cadmium | (Total) | ||
| Chromium | (Total) | ||
| Copper | (Total) | ||
| Cyanide | (Total) | ||
| Lead | (Total) | ||
| Mercury | (Total) | ||
| Nickel | (Total) | ||
| Silver | (Total) | ||
| Zinc | (Total) | ||
| Arsenic | (Total) | ||
| Selenium | (Total) | ||
| Tin | (Total) | ||
| pH Flash point | (to higher than 200°F) |
BOD; biochemical oxygen demand
· The documentation the contractor provides will be used to work with the VAMC and the public and/or private organization (e.g., POTW) to determine whether the waste from each device can legally be disposed of via the sewerage system.
Records Management:
| 1. | Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. |
| 2. | In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. |
chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
| 3. | In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. |
| 4. | [FACILITY] and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [FACILITY] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 |
U.S.C. 2701.
In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [FACILITY]. The agency must report promptly to NARA in accordance with 36 CFR 1230.
| 5. | The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [FACILITY] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). |
| 6. | The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [FACILITY] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. |
| 7. | The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [FACILITY] policy. |
| 8. | The Contractor shall not create or maintain any records containing any non-public [FACILITY] information that are not specifically tied to or authorized by the contract. |
QUESTIONS & ANSWERS
1. Please confirm vendors should propose new equipment and that no additional instruments outside of those noted here are required.
See Attachment A & B for updated information in yellow and no additional equipment or instruments will be required.
Totals have been adjusted to reflect the needs of the VISN 15 facilities.
ATTACHMENT A
VISN 15 Participating Facilities And Estimated Volume
| Facility |
| Annual Volume PT/INR's (estimated) |
| Number of Meters Required |
| Number of Downloaders/Chargers Required |
| Number of Download Stations |
| Number of Rechargeable Battery Packs |
| Number of Control Sets |
St. Louis VAMC 915 N. Grand Blvd.
St. Louis, MO
| 3600 |
| 11 |
| 11 |
| 11 |
| 11 |
| 60 |
Robert J. Dole VAMC 5500 E. Kellogg Drive Wichita, KS
| 1000 |
| 22 |
| 22 |
| 22 |
| 22 |
| 55 |
Kansas City VAMC 4801 East Linwood Boulevard Kansas City, MO
| 384 |
| 5 |
| 5 |
| 5 |
| 5 |
| 15 |
ATTACHMENT B
VISN 15 – POC INR USAGE
| CLIN # |
| Item |
| Catalog Number |
| Facility |
| Est. Annual Usage/Tests |
| Unit |
| Unit Price |
| Aggregate Yearly Cost |
| St. Louis, MO |
| Estimated Number of tests |
| 3600 |
| Tests/year |
| 001 |
| Meters |
| 5021537001 |
| St. Louis, MO |
| 11 |
| Each |
| Included |
| $0.00 |
| 002 |
| Downloader/Recharger |
| St. Louis, MO |
| 11 |
| Each |
| Included |
| $0.00 |
| 003 |
| RALS Web3 Download Locations |
| N/A |
| St. Louis, MO |
| 11 |
| Each |
| Included |
| No Charge |
| 004 |
| CoaguChek XS 2x24 tests USA |
| 4625315160 |
| St. Louis, MO |
| 75 |
| Box |
$0.00
| 005 |
| Control Sets |
| St. Louis, MO |
| 60 |
| Box |
$0.00
| Subtotal |
| $0.00 |
| Wichita, KS |
| Estimated Number of tests |
| 1000 |
| Tests/year |
| 001 |
| Meters |
| 5021537001 |
| Wichita, KS |
| 22 |
| Each |
| Included |
| $0.00 |
| 002 |
| Downloader/Recharger |
| Wichita, KS |
| 22 |
| Each |
| Included |
| $0.00 |
| 003 |
| RALS Web3 Download Locations |
| N/A |
| Wichita, KS |
| 22 |
| Each |
| Included |
| No Charge |
| 004 |
| CoaguChek XS 2x24 tests USA |
| 4625315160 |
| Wichita, KS |
| 21 |
| Box |
$0.00
| 005 |
| Control Sets |
| Wichita, KS |
| 55 |
| Box |
$0.00
| Subtotal |
| $0.00 |
| Kansas City, MO |
| Estimated Number of tests |
| 384 |
| Tests/year |
| 001 |
| Meters |
| 5021537001 |
| Kansas City, MO |
| 5 |
| Each |
| Included |
| $0.00 |
| 002 |
| Downloader/Recharger |
| Kansas City, MO |
| 5 |
| Each |
| Included |
| $0.00 |
| 003 |
| RALS Web3 Download Locations |
| N/A |
| Kansas City, MO |
| 5 |
| Each |
| Included |
| No Charge |
| 004 |
| CoaguChek XS 2x24 tests USA |
| 4625315160 |
| Kansas City, MO |
| 8 |
| Box |
$0.00
| 005 |
| Control Sets |
| Kansas City, MO |
| 15 |
| Box |
$0.00
| Subtotal |
| $0.00 |
| Total Cost Base Year |
| $0.00 |
| TOTAL Meters |
| 38 |
| Total Tests |
| 104 |
| Total Controls |
| 130 |
File details come from the government source that posted it. Updated .