About this file
This document summarizes a federal contract opportunity to prepare a site for a new CT room at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is soliciting bids under solicitation number 36C25523R0130 to prepare site A256 for a new CT room at an unspecified VA medical center. Bids are due by the response date of June 15, 2022. The contract will be awarded by August 1, 2022. The solicitation seeks general contracting services to prepare the site for the new CT room, including any necessary demolition, modifications to existing infrastructure, and related construction work. Relevant documentation is provided in the 35-page PDF file attached, including final drawings and specifications for the project scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S05 36C25523R0130 0003.docx | DOCX document | |
| S05 36C25523R0130 0002.docx | DOCX document | |
| S05 36C25523R0130 0001.docx | DOCX document | |
| TS02 36C25523R0130.docx | DOCX document | |
| TP09 FINAL DRAWINGS (38 PAGES) 657-22-102JC_100 Bid Documents.pdf | ||
| TP09 FINAL SPECS (618 PAGES) 657-22-102JC_100 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F H
F H
EXTENT OF SECURED
PICK ZONE
CRANE AREA, PROVIDE
ROAD PROTECT AS
REQUIRED TO PREVENT
DAMAGE TO DRIVE LANES
CRANE AREA. COORDINATE
EXACT LOCATION WITH COR
AREA AVAILABLE FOR STAGING DURING THE PICK
WHILE CRANE IS ON SITE. MATERIAL, TOOLS, ETC,
LEFT NO LONGER THAN 3 DAYS. WORK CAN BEGIN
AFTER 5:00 PM FRIDAY AND WORK MUST BE
COMPLETED, MATERIALS REMOVED, AREA SWEPT
AND CLEANED BEFORE 6:00 AM MONDAY. ANY
DAMAGE TO LANDSCAPE TO BE REPAIRED BY GC.
SEE NOTES ON THIS SHEET FOR MORE INFORMATION
HATCHED AREA
DENOTES EXTENT OF
THE CRANE AREA TO
REMAIN SHUT DOWN
WHEN CRANE IS IN USE
G R
A N
D A
V E
EXTENT OF SECURED
PICK ZONE
01-AE-102
01-AE-102
AREA OF SHUTDOWN OF 1ST
AND 2ND FLOOR OF BUILDING
WHILE CRANE IS IN USE
AREA AVAILABLE FOR STAGING DURING THE PICK
WHILE CRANE IS ON SITE. MATERIAL, TOOLS, ETC,
LEFT NO LONGER THAN 3 DAYS. WORK CAN BEGIN
AFTER 5:00 PM FRIDAY AND WORK MUST BE
COMPLETED, MATERIALS REMOVED, AREA SWEPT
AND CLEANED BEFORE 6:00 AM MONDAY. ANY
DAMAGE TO LANDSCAPE TO BE REPAIRED BY GC.
SEE NOTES ON THIS SHEET FOR MORE INFORMATION
PATH OF EQUIPMENT
DELIVERY AND REMOVAL
PATH OF EGRESS
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR NEW COMPUTED
TOMOGRAPHY - ROOM A256
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
KEYPLAN
N.T.S.
N
Drawing # of
FULLY SPRINKLERED
100 % BID DOCUMENTS
Revision
10/31/23 BD NB
01-AE-101
SITE PLAN
1/32" = 1'-0"
SITE PLAN PICK AREA IMPACT
REFERENCE SPEC SECTION 013526 SAFETY REQUIREMENTS, PARAGRAPH 1.19 CRANES FOR MORE
INFORMATION:
A. THE GC IS TO COORDINATE WITH THE COR AND PROVIDE A DETAILED LIFT PLAN PER SPEC
GIVING THE VAMC A MINIMUM OF 14 DAYS NOTICE AFTER PLAN APPROVAL FROM THE COR.
B. THE GC IS TO PROVIDE PERSONNEL MEETING THE SAFETY REQUIREMENTS, STAGE ALL
ENTRY/EXITS WITHIN THE CRANE PICK AREA NOTED ON THE PLAN FOR THE ENTIRE TIME
THE CRANE AREA IS IN USE.
C. THE CRANE AREA NOTED ON THE PLAN WITH A DOUBLE-HATCHED PATTERN DENOTES AN
AREA TO BE SHUT DOWN WHILE THE CRANE IS NOT IN USE. THE CRANE CAN SIT ON-SITE
FOR A MAXIMUM OF THREE DAYS AND TWO NIGHTS WHILE REMOVING THE EXISTING
STOREFRONT AND REMOVING THE EXISTING CT SCAN EQUIPMENT. THE EXACT LENGTH OF
TIME AND SPECIFIC DAYS TO BE SUBMITTED IN THE PICK PLAN FOR APPROVAL.
D. THE GC MUST COORDINATE WITH THE COR AND OTHER TRADES AND PROJECTS IN THE
AREA TO ENSURE THAT NO TWO MEANS OF EGRESS ARE CLOSED OFF DURING THE PICK.
MORE THAN TWO MEANS OF EGRESS AND ENTRY MAY HAVE A STAGE WITH A SAFETY
PERSON BUT NO TWO EXITS CAN BE CLOSED OFF AT THE SAME TIME, UNLESS THE AREA
SERVING THE STAIR IS VACATED.
E. THE EXISTING SKYLIGHT CAN BE STAGED WITHIN THE CRANE SHUT-DOWN AREA FOR A
MAXIMUM OF THREE DAYS AND TWO NIGHTS.
F. THE GC IS TO REMOVE THE EXISTING SKYLIGHT AND REINSTALL THE EXISTING SKYLIGHT IN
BETWEEN THE REMOVAL OF THE EXISTING MRI AND INSTALLATION OF THE NEW MRI. THERE
WILL BE A MINIMUM OF TWO SEPARATE WEEKEND LIFTS PER THE REQUIREMENTS NOTED
ABOVE AND IN THE SPECS. THE GC CAN ELECT TO PROPERLY SECURE THE SKYLIGHT AND
PROTECT THE GLASS FOR A CRANE LIFT (REMOVAL/REINSTALLATION) TWICE, OR THE GC
CAN ELECT TO REMOVE THE EXISTING GLASS AND STORE IT OFF-SITE AT THEIR COST AND
RE-USE THE SKYLIGHT FRAMING TO PROVIDE A WATERTIGHT AND INSULATED ENCLOSURE
OF R-19 OR GREATER DURING SITE PREP FOR THE NEW MRI OR ELECT TO REMOVE AND
STORE THE ENTIRE EXISTING SKYLIGHT OFF-SITE AT THEIR COST AND TO PROVIDE A
WATERTIGHT AND INSULATED ENCLOSURE OF R-19 OR GREATER DURING SITE PREP FOR
THE NEW MRI.
1/16" = 1'-0"
AREA PLAN PICK AREA IMPACT
2/01-AE-101
PROTECTION AS
GLAZING
GLAZING GLAZING
CT CT
THE GC IS TO PROVIDE A UNIFORM
WEIGHT DISTRIBUTION TO
ACCOMMODATE THE NEW CT SCAN
AND RIGGING LOAD TO MINIMIZE
THE POINT LOAD ON EXISTING
CONCRETE. GC IS RESPONSIBLE
FOR THE FLOOR PROTECTION, SIM.
TO (2) STAGGED LAYERS OF 3/4“
PLYWOOD.
THE GC IS TO PROVIDE TEMP WALL
PROTECTION AS THE CT SCAN AND
RIGGING AS IT TRAVELS TO ITS
LOCATION.
THE GC IS TO REMOVE THE EXISTING CURTAIN WALL SYSTEM AND VERTICAL MESH
SUNSCREEN (TO BE NOTED AS GLAZING) AND REINSTALL THE EXISTING GLAZING BETWEEN
CLEARING THE EXISTING CT SCAN AND AGAIN WHEN DELIVERING THE NEW CT SCAN. THERE
WILL BE TWO SEPARATE WEEKEND LIFTS PER THE REQUIREMENTS NOTED ON THIS SHEET.
THE GC IS RESPONSIBLE FOR REMOVING, STORING, AND REINSTALLING ANY EXISTING
FURNITURE OR FREESTANDING DEVICES REQUIRED TO BE MOVED TO PROVIDE A CLEAR
4’-6” PATH FOR THE NEW CT SCAN INSTALLATION.
G.
Addendum No. 1 10 / 31 / 2023Added Sheet 01-AE-101
OFFICE
A285
VESTIBULE
A288
206203
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR NEW COMPUTED
TOMOGRAPHY - ROOM A256
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
KEYPLAN
N.T.S.
N
Drawing # of
FULLY SPRINKLERED
100 % BID DOCUMENTS
02/10/2023 BD NB
01-AE-102
PICK AREA PLANS, ELEVATIONS,
AND SECTIONS
1/4" = 1'-0"
ENLARGED PLAN - A285
1/4" = 1'-0"
ENLARGED PLAN - A288
4 71
657-CSI-332_AS8-1 SHEET A8.1 657-CSI-332_AS9-1 SHEET A9.1
657-CSI-332_AS6-1 SHEET A6.11 PARTIAL ELEVATION
1/4" = 1'-0" 1 1/8" = 1'-0"
ELEVATION3
AS6.1
SHEET AS6.1
SHEET AS8.1 SHEET AS9.1
1'-3" min 1'-3" min
3'-0" min
NEW PAIR OF UNEQUAL LEAF DOORS
DEMO EXISTING PARTITION AND DOOR
NEW PAIR OF UNEQUAL LEAF DOORS
DEMO EXISTING PARTITION AND DOOR
COORDINATE ACCESS CONTROL
DEMO EXISTING PARTITION AND DOOR
NEW PARTITION AND FRAME TO
MATCH EXISTING
NEW PARTITION AND FRAME TO
MATCH EXISTING
EXISTING PARTITIONS SHOWN SHADED
NEW PAIR OF UNEQUAL LEAF DOORS
DEMO EXISTING PARTITION
DEMO EXISTING DOOR AND INFILL OPENING
WITH NEW PARTITION TO MATCH EXISTING.
PATCH RESULTING IMPACTED MATERIALS TO
MATCH EXISTING: FLOORING, BASE, AND
PAINT.
NEW PARTITION AND FRAME TO
MATCH EXISTING
NEW PARTITION SHOWN SHADED BLACK
THE GC TO PROVIDE A STAGING
PLATFORM TO ACCOMMODATE THE
NEW CT SCAN AND TRANSPORT
RIGGING. GC IS RESPONSIBLE FOR
THE PLATFORM DESIGN.
EXISTING VERTICAL MESH SUNSCREEN
TO BE REMOVED/REINSTALLED
EXISTING GLAZING TO BE
REMOVED/REINSTALLED PER NOTES ON
SHEET 01-AE-101
THE EXISTING CORRIDOR CEILING,
EXIT LIGHTS, AND LIGHT FIXTURES
REMAIN U.O.N. NO RCP WAS
PROVIDED.
THE EXISTING CEILING LIGHT
FIXTURES REMAIN AS IS U.O.N. NO
RCP WAS PROVIDED. RELOCATE LIGHT
SWITCH AND PROVIDE NEW
POWER/COMM AT SOUTH PARTITION
THE GC TO PROVIDE A STAGING
PLATFORM TO ACCOMMODATE THE
NEW CT SCAN AND TRANSPORT
RIGGING. GC IS RESPONSIBLE FOR
THE PLATFORM DESIGN.
THE GC IS TO REMOVE AND REPLACE EXISTING DOORS 203, 206, AND 223 WITH A
NEW UNEQUAL PAIR OF DOORS TO PROVIDE A MINIMUM OF 4’-6” WIDE BY (EXISTING
7’-0” HIGH CLEAR OPENING. UNEQUAL LEAF TO BE AN INACTIVE DOOR WITH
CONCEALED FLUSH BOLTS TOP AND BOTTOM AND CONTINUOUS PIANO HINGE; SEE
HDWR GROUP FOR MORE INFORMATION. GC WILL COORDINATE REMOVAL AND
REINSTALL EXISTING ACCESS CONTROL TO MEET HOSPITAL STANDARDS.
THE GC IS TO REMOVE AND REPLACE EXISTING DOORS 203, 206, AND 223
WITH A NEW UNEQUAL PAIR OF DOORS TO PROVIDE A MINIMUM OF 4’-6”
WIDE BY (EXISTING 7’-0” HIGH) CLEAR OPENING. UNEQUAL LEAF TO BE AN
INACTIVE DOOR WITH CONCEALED FLUSH BOLTS TOP AND BOTTOM AND
CONTINUOUS PIANO HINGE; SEE HDWR GROUP FOR MORE INFORMATION.
GC WILL COORDINATE REMOVAL AND REINSTALL EXISTING ACCESS
CONTROL TO MEET HOSPITAL STANDARDS.
THE GC IS TO REMOVE AND REPLACE EXISTING DOORS 203, 206, AND 223 WITH
A NEW UNEQUAL PAIR OF DOORS TO PROVIDE A MINIMUM OF 4’-6” WIDE BY
(EXISTING 7’-0” HIGH CLEAR OPENING. UNEQUAL LEAF TO BE AN INACTIVE
DOOR WITH CONCEALED FLUSH BOLTS TOP AND BOTTOM AND CONTINUOUS
PIANO HINGE; SEE HDWR GROUP FOR MORE INFORMATION. GC WILL
COORDINATE REMOVAL AND REINSTALL EXISTING ACCESS CONTROL TO MEET
HOSPITAL STANDARDS.
DRAWING PROVIDED FOR REFERENCE ONLY.
Addendum No. 1 10 / 31 / 2023Added Sheet 01-AE-102
6 5 4
R
Q
P
O
HEMO
A164
TOILET
A164A
HEMO
A165
HAC
A166
TOILET
4173A
CLEAN
4154A
TOILET
4174A
24' - 8"
CORRIDOR
H108
TEMPORARY
PARTITIONS
1-HR FIRE RATED
CONSTRUCTION
TO UNDRSIDE OF
CEILING ONLY
PER SPEC AND
APPROVED ACRU
CLEAR REQ.
3' - 8"
LINE INDICATES AREA OF
CONSTRUCTION IMPACT
TOILET
A165A
6 5 4
R
Q
P
O
8' - 0"
8' - 0"
8' - 4"
8' - 2"
7' - 1"
24' - 8"
DEMOLISH ALL EXISTING
CEILINGS IN THESE TWO ROOMS.
SEE MEP SHEETS FOR MORE
INFORMATION ON REMOVAL OF
EXISTING ELECTRICAL AND
MECHANICAL DEVICES
HEMO DIAL
TREAT BAY
A162E
TOILET
A160
ELEC. CLOSET
A161
HEMO DIAL
TREAT BAY
A162E
NOUR.
A159
OFFICE
A158
MED. PREP.
A157
PATIENT ISO.
A164
TOILET
A164A
PATIENT ISO.
A164
PATIENT ISO.
A165
MECH. RM.
A155
SOILED UTILITY
A154
HEMO DIAL
TREAT BAY
A162E
HAC
A166
EQUIPMENT
REPAIR
A167
PERITONEAL
DIALYSIS
A168
EXAM
A169A EXAM
A169B
OFFICE
A170A
DIETITIAN
A170C
DIETITIAN
A170C
DIETITIAN
A170C
CLEAN
A154A TOILET
A174A
TOILET
A173A
CONFERENCE
RM.
A153
OFFICE
A170F
SUPPLY
A170E
CORRIDOR
H109C
CORRIDOR
H109C
CORRIDOR
H109C
COATS
A173B
STORAGE
A168A
LOCKER RM.
A172A
CORRIDOR
H109C
DECONTAMINATION
A171
OFFICE
A170G
LOUNGE
A172
WAITING RM.
A174
OFFICE
A186
OI&T
A170I
F.E. CLOSET
A258C
CHASE
CH-A-9
CHASE
CH-A-10
CHASE
CH-A-11
12"x12" Light Fixture
9"x48" Light Fixture
24"x48" Light Fixture
24"x24" Light Fixture
Supply
Return
Sprinkler
Recessed Light Fixture
Speaker
Fire Alarm Strobe
Smoke Detector
Exit Sign
Nurse Call
Piping
RCP LEGEND
6 5 4
R
Q
P
O
8' - 2"
24' - 8"
8' - 0"
8' - 4"
8' - 2"
7' - 1"
8' - 0"
PROVIDE ALL NEW ACT-1
CEILINGS IN THESE TWO ROOMS.
SEE MEP SHEETS FOR MORE
INFORMATION ON
REINSTALLATION OF EXISTING
ELECTRICAL AND MECHANICAL
DEVICES
1' - 0"
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR NEW COMPUTED
TOMOGRAPHY - ROOM A256
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
KEYPLAN
N.T.S.
N
Drawing # of
FULLY SPRINKLERED
100 % BID DOCUMENTS
Revision 1 Addendum 01 10/31/2310/19/2022 BD NB
01-AE-112
INFECTION CONTROL RISK
ASSESSMENT FLOOR PLAN 01 - A
1/4" = 1'-0"
FLOOR 01 PLAN - BELOW CT SCAN - PHASE A
1/4" = 1'-0"
FLOOR 01 DEMOLITION RCP - PHASE A
1/16" = 1'-0"
LIFE SAFETY FLOOR PLAN - BUILDING 01 - FLOOR 01
DEMOLITION:
A. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN
B. CONSTRUCT TEMPORARY PARTITIONS AND DOORS,
COORDINATE LOCATIONS WITH EXISTING CEILING
FIXTURES
C. SALVAGE EXISTING LIGHTS AND MECHANICAL
GRILLS, STORE FOR REINSTALLATION
D. DEMOLISH ALL GRID, HANGERS AND CEILING TILE IN
CT SCAN A256
E. DEMOLISH CT SCAN PIPING AND ELECTRICAL AS
REQUIRED
F. DEMOLISH EXISTING RF SHIELDING IN CEILING AS
REQUIRED TO ACCOMMODATE NEW WORK
RENOVATION:
A. PATCH AND REPAIR EXISTING FLOORING AS
REQUIRED AFTER REMOVAL OF EXISTING CT SCAN
MACHINE
B. INSTALL NEW GRID TO MATCH PREVIOUS NON-
FERROUS CONSTRUCTION REQUIREMENTS AND
NEW TILES.
C. REINSTALL ALL LIGHTING AND MECHANICAL
GRILLES
D. REPAIR RF SHIELDING AND TEST ENCLOSURE
E. PATCH AND REPAIR WALLS AS REQUIRED DUE TO
INSTALLATION OF NEW EQUIPMENT, CONTROLS OR
SYSTEMS
F. SEE SHEET 01-AE-122 FOR GENERAL CEILING
DETAILS
1/4" = 1'-0"
FLOOR 01 NEW CONSTRUCTION RCP - PHASE A
Addendum No. 1 10 / 31 / 2023
1'-0"
1'-0"EQ
EQ
EQ
EQ
REINSTALLATION OF NEW LIGHT
FIXTURES AND MECHANICAL
DEVISES TO MATCH EXTG FOR ACTALL PARTITIONS ARE EXTG
RATHER SHADED OR NOT
MATERIAL ABBREVIATIONS
Product: OC - 152 Color: Super White Finish: Ceilings, Scrub-able Eggshell Flat
Code Item Manufacturer Description
ACT-1
SVT-1
PT-1
PT-2
Acoustical Ceiling Tile
Sheet Vinyl Tile
Paint
Paint
Armstrong
Patcraft
Benjamin Moore
Benjamin Moore
Calla Health Zone Tegular Lay-in Smooth Texture 24 x 48 15/16 Clean Room Grid System
AdMix Color: White Coral 00100 Size: 36" x 36" Weld Rod Color: White 00902
Product: OC - 17 Color: White Dove Finish:
Remarks
Flooring and Integral Cove Base 4" High
All Walls and Door Frames
GWB Ceilings
Walls, Scrub-able Eggshell Door Frames,Scrub-able Semi-Gloss
MATERIAL SCHEDULE
ROOM FINISH TAG LEGEND
GENERAL FINISH NOTES
Q
P
O
8' - 0"
8' - 4"
8' - 0"
7' - 1"
8' - 2"
24' - 8"
DEMOLISH ALL EXISTING
CEILINGS IN THESE TWO ROOMS.
SEE MEP SHEETS FOR MORE
INFORMATION ON REMOVAL OF
EXISTING ELECTRICAL AND
MECHANICAL DEVICES
6 5 4
R
Q
P
O
8' - 0"
8' - 2"
24' - 8"
8' - 0"
8' - 4"
8' - 0"
7' - 1"
PROVIDE ALL NEW ACT-1 CEILINGS
IN THESE TWO ROOMS. SEE MEP
SHEETS FOR MORE INFORMATION
ON REINSTALLATION OF EXISTING
ELECTRICAL AND MECHANICAL
DEVICES
6 5 4
R
Q
P
O
HEMO
A164
TOILET
A164A
HEMO
A165
HAC
A166
TOILET
4173A
CLEAN
4154A
TOILET
4174A
24' - 8"
CORRIDOR
H108
TEMPORARY
PARTITIONS
1-HR FIRE RATED
CONSTRUCTION TO
UNDRSIDE OF CEILING
ONLY PER SPEC AND
APPROVED ACRU
CLEAR REQ.
3' - 8"
LINE INDICATES AREA OF
CONSTRUCTION IMPACT
TOILET
A165A
12"x12" Light Fixture
9"x48" Light Fixture
24"x48" Light Fixture
24"x24" Light Fixture
Supply
Return
Sprinkler
Recessed Light Fixture
Speaker
Fire Alarm Strobe
Smoke Detector
Exit Sign
Nurse Call
Piping
RCP LEGEND
HEMO DIAL
TREAT BAY
A162E
TOILET
A160
ELEC. CLOSET
A161
HEMO DIAL
TREAT BAY
A162E
NOUR.
A159
OFFICE
A158
MED. PREP.
A157
PATIENT ISO.
A164
TOILET
A164A
PATIENT ISO.
A164
PATIENT ISO.
A165
MECH. RM.
A155
SOILED UTILITY
A154
HEMO DIAL
TREAT BAY
A162E
HAC
A166
EQUIPMENT
REPAIR
A167
PERITONEAL
DIALYSIS
A168
EXAM
A169A EXAM
A169B
OFFICE
A170A
DIETITIAN
A170C
DIETITIAN
A170C
DIETITIAN
A170C
CLEAN
A154A TOILET
A174A
TOILET
A173A
CONFERENCE
RM.
A153
OFFICE
A170F
SUPPLY
A170E
CORRIDOR
H109C
CORRIDOR
H109C
CORRIDOR
H109C
COATS
A173B
STORAGE
A168A
LOCKER RM.
A172A
CORRIDOR
H109C
DECONTAMINATION
A171
OFFICE
A170G
LOUNGE
A172
WAITING RM.
A174
OFFICE
A186
OI&T
A170I
F.E. CLOSET
A258C
CHASE
CH-A-9
CHASE
CH-A-10
CHASE
CH-A-11
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR NEW COMPUTED
TOMOGRAPHY - ROOM A256
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
KEYPLAN
N.T.S.
N
Drawing # of
FULLY SPRINKLERED
100 % BID DOCUMENTS
Revision 1 Addendum 01 10/31/2310/19/2022 BD NB
01-AE-113
INFECTION CONTROL RISK
ASSESSMENT FLOOR PLAN 01 - B
1/4" = 1'-0"
FLOOR 01 DEMOLITION RCP - PHASE B
1/4" = 1'-0"
FLOOR 01 NEW CONSTRUCTION RCP - PHASE B
1/4" = 1'-0"
FLOOR 01 PLAN - BELOW CT SCAN - PHASE B
1/16" = 1'-0"
LlFE SAFETY FLOOR PLAN - BUILDING 01 - FLOOR 01
DEMOLITION:
A. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN
B. CONSTRUCT TEMPORARY PARTITIONS AND DOORS,
COORDINATE LOCATIONS WITH EXISTING CEILING
FIXTURES
C. SALVAGE EXISTING LIGHTS AND MECHANICAL
GRILLS, STORE FOR REINSTALLATION
D. DEMOLISH ALL GRID, HANGERS AND CEILING TILE IN
CT SCAN A256
E. DEMOLISH CT SCAN PIPING AND ELECTRICAL AS
REQUIRED
F. DEMOLISH EXISTING RF SHIELDING IN CEILING AS
REQUIRED TO ACCOMMODATE NEW WORK
RENOVATION:
A. PATCH AND REPAIR EXISTING FLOORING AS
REQUIRED AFTER REMOVAL OF EXISTING CT SCAN
MACHINE
B. INSTALL NEW GRID TO MATCH PREVIOUS NON-
FERROUS CONSTRUCTION REQUIREMENTS AND
NEW TILES.
C. REINSTALL ALL LIGHTING AND MECHANICAL
GRILLES
D. REPAIR RF SHIELDING AND TEST ENCLOSURE
E. PATCH AND REPAIR WALLS AS REQUIRED DUE TO
INSTALLATION OF NEW EQUIPMENT, CONTROLS OR
SYSTEMS
F. SEE SHEET 01-AE-122 FOR GENERAL CEILING
DETAILS
Addendum No. 1 10 / 31 / 2023
1'-0"
EQ
EQ
EQ
EQ
REINSTALLATION OF NEW LIGHT
FIXTURES AND MECHANICAL
DEVISES TO MATCH EXTG FOR ACT
ALL PARTITIONS ARE EXTG
RATHER SHADED OR NOT
EQ EQ
Q
P
O
24' - 8"
15' - 9 1/4"
/4
TEMPORARY
PARTITIONS
1-HR FIRE RATED
CONSTRUCTION TO
UNDRSIDE OF CEILING
ONLY PER SPEC AND
APPROVED ACRU
NEW PLASTIC LAMINATE
FREESTANDING TABLE
25" D X 54" W X 30" H
CT SCAN
A256
VIEW
A258
CHUTE
A258A
CHASE
CH-A-2
ELEC
A258B
CORRIDOR
H205
CORRIDOR
H208
CT SCAN
A259
OFFICE
A255A
CLEAR
3' - 8"
NEW CASEWORK TO MATCH
EXISTING U.O.N.
NEW PLASTIC LAMINATE
WALL CABINETS
MIN
2' - 6"
12" MAX
2' - 1"
NEW GROMMETS IN
CASEWORK
NO EXTERIOR WORK HERE,
NO NEW LOUVERS, EXISTING
FALSE LOUVERS TO REMAIN
AS IS
01-AE-121 5
COVER THE EXISTING PARTITION WITH A
LAYER 1/32" LEAD SHIELDING FROM
FLOOR TO CONCRETE DECK
COVER ADDITIONAL LEAD SHIELDING
WITH A LAYER 1/4" GWB TO 6" ABOVE
EXTG LAY-IN-CLG, TAPED AND FLOATED
TO LEVEL 4 FINISH
NEW DOORS AND FRAMES
1/32" LEAD SHIELDING TO
MATCH EXISTING
TYPICAL JAMB
(HEAD SIMILAR) ADJACENT JAMBS
3 3 3
4 4
5 5
JAMB TIGHT TO
PARTITION
KEYED NOTES:
1. SCHEDULED PARTITION TYPE - WHERE OCCURS.
2. 6" UNO.
3. SCHEDULED PARTITION TYPE.
4. SEALANT EACH SIDE OF FRAME.
5. FRAME (SEE DOOR SCHEDULE FOR MORE INFORMATION).
6. FRAME (SEE DOOR SCHEDULE FOR MORE INFORMATION)
INSTALLED TIGHT TO SCHEDULED PARTITION.
7. REMOVABLE STOP AND GLAZING (WHERE OCCURS). F
FLUSH
WIDTH
SEE SCHED
S E
E S
C H
E D
U L E
H E
IG
H
T
F1
H E
IG
H
T
"0' - 2" WIDTH 0' - 2"
F2
H E
IG
H
T
"0' - 2" WIDTH WIDTH0' - 4"
TGL TGL
F
FLUSH
WITH LITE
SR
STYLE & RAIL
FULL LITE
NURSE
WORKROOM
A242
TOILET
A243
OFFICE
A244
X-RAY READING
A245
CT SCAN
A256
CHUTE
A258A
ELEC
A258B
CT SCAN
A259
CONTROL
A260
INTERVENTIONAL
SUITE
A261
HAC
A263
CORRIDOR
H209
CONTROL
A259A
CORRIDOR
H208
OFFICE
A255A
STAIR 05
S205
CORRIDOR
H205
CORRIDOR
H206
ELEC. POWER
RM.
A241A
TOILET
A264
SCRUB
A261A
VIEW
A258
6 5 4
R
Q
P
O
24' - 8"
9' - 0 1/4"
/2
15' - 9 1/4"
15' - 9 1/4"
/4
TEMPORARY
PARTITIONS
1-HR FIRE RATED
CONSTRUCTION TO
UNDRSIDE OF CEILING
ONLY PER SPEC AND
APPROVED ACRU
/4
CT SCAN
A256
VIEW
A258
CHUTE
A258A
CHASE
CH-A-2
ELEC
A258B
CORRIDOR
H205
CORRIDOR
H208
CT SCAN
A259
OFFICE
A255A
CLEAR
3' - 8"
EXISTING CASEWORK TO
BE REMOVED
SEE MEP DRAWINGS AND SPEC
FOR SCOPE SEPARATION OF
EXISTING EQUIPMENT REMOVAL
AND INFRASTRUCTURE
DEMOLITION
NO DEMOLITION OF EXISTING
PARTITION, EXISTING FALSE
LOUVERS TO REMAIN AS IS
1/16" LEAD SHIELDING IN
EXISTING NORTH PARTITION
BETWEEN ROOM A256 AND
A255A
NO EXISTING OR NEW LEAD
SHIELDING REQUIRED IN
EAST EXTERIOR WALL
BOLD DASHED LINE DENOTES
EXISTING 1/16" LEAD
SHIELDING IN EAST PARTITION
BETWEEN ROOMS A256 AND
A259
1/32" LEAD SHIELDING IN
EXISTING PARTITIONS AND
DOORS U.N.O
B A
C K
S P
L A
S H
1/2" FILLER
EQ EQ EQ EQ
1/2" FILLER
A F
F
01-AE-121
TYP.
CONTINUOUS CLEAT
ALONG BACK WALL
SUPPORT PANEL
COUNTERTOP
APRON
4' - 6" 2' - 1"
0' - 6"
1 1/2" SIDE SUPPORT PANELS
/2
C O
U N
T E
R T
O P
SIDE SUPPORT PANELS
CENTER SUPPORT
BACK PANEL
CENTER SUPPORT
BACK PANEL
NEW
FREESTANDING
DESK
BACKING PLATE -
TYP TOP & BOTTOM
FINISH FLOOR
WALL CABINET
A F
F
U N
IT
H
E
IG
H T
DEPTH
UNIT
FIN MATL ON
3/4" SBSTR TOP
FIN MATL ON 3/4"
SBSTR SIDES & BACK
ADJUSTABLE SHELF AND
SUPPORT BRACKET
FIN MATL ON 3/4"
SBSTR DOOR
FACE OF WALL
B E
L O
W
C O
U N
T E
R T
O P
CLEAT AS NOTED
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR NEW COMPUTED
TOMOGRAPHY - ROOM A256
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
KEYPLAN
N.T.S.
N
Drawing # of
FULLY SPRINKLERED
100 % BID DOCUMENTS
Revision 1 Addendum 01 10/31/2310/19/2022 BD NB
01-AE-121
INFECTION CONTROL RISK
ASSESSMENT FLOOR PLAN 02
1/4" = 1'-0"
FLOOR 02 NEW CONSTRUCTION PLAN - CT SCAN
1 1/2" = 1'-0"
TYP. HM JAMB CONDITIONS AT GWB PARTITIONS
1/4" = 1'-0"
DOOR AND FRAME TYPE
Room Floor Finish
Base Finish
North Finish
East Finish
South Finish
West Finish
Ceiling FinishNumber Name
A258 VIEW SVT-1 SVT-1 P-1 P-1 P-1 P-1 AT-1
A258B ELEC
A259 CT SCAN SVT-1 SVT-1 P-1 P-1 P-1 P-1 AT-1
Grand total: 3
Mark Width Height Thickness HDW Group Material Rating Frame Type Remarks
270 3' - 0" 7' - 0" 0' - 1 3/4" EXISTING EXISTING EXISTING EXISTING
274 6' - 0" 7' - 0" 0' - 1 3/4" EXISTING EXISTING EXISTING EXISTING
55 3' - 0" 7' - 0" 0' - 1 3/4" MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING 1
56 4' - 6" 7' - 0" 0' - 1 3/4" MATCH EXISTING MATCH EXISTING MATCH EXISTING MATCH EXISTING 1, 2
223 6' - 0" 7' - 0" 0' - 1 3/4" 1 WD 45 MIN HM 4, 5
203 4' - 6" 7' - 0" 0' - 1 3/4" 1 WD HM 4, 5
206 4' - 6" 7' - 0" 0' - 1 3/4" 1 WD HM 4, 5
ROOM SCHEDULE
DOOR SCHEDULE
Remarks:
1 New door to match existing 2 New door with power door actuator.
3 New door frame type F1 4 New door frame type F2
1/16" = 1'-0"
LIFE SAFETY PLAN - BLDG 01 - FLOOR 02 - CT SCAN
PROJECT DESCRIPTION: REPLACEMENT OF CT
SCAN EQUIPMENT AND HARDWARE, SURFACES,
AND FINISHES AFFECTED IN REPLACEMENT OF
CT SCAN EQUIPMENT. NO CHANGE TO EXISTING
OCCUPANCY, WALL RATINGS OR EGRESS
PATHS AND ACCESS
1/4" = 1'-0"
FLOOR 02 DEMOLITION PLAN - CT SCAN
3/8" = 1'-0"
NEW DESK ELEVATIONS
3/4" = 1'-0"
WALL CABINET SECTION
DEMOLITION:
A. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN
B. CONSTRUCT TEMPORARY PARTITIONS AND DOORS,
COORDINATE LOCATIONS WITH EXISTING CEILING
FIXTURES
C. SALVAGE EXISTING LIGHTS AND MECHANICAL
GRILLS, STORE FOR REINSTALLATION
D. DEMOLISH ALL GRID, HANGERS AND CEILING TILE IN
CT SCAN A256
E. DEMOLISH CT SCAN PIPING AND ELECTRICAL AS
REQUIRED
F. DEMOLISH EXISTING RF SHIELDING IN CEILING AS
REQUIRED TO ACCOMMODATE NEW WORK
RENOVATION:
A. PATCH AND REPAIR EXISTING FLOORING AS
REQUIRED AFTER REMOVAL OF EXISTING CT SCAN
MACHINE
B. INSTALL NEW GRID TO MATCH PREVIOUS NON-
FERROUS CONSTRUCTION REQUIREMENTS AND
NEW TILES.
C. REINSTALL ALL LIGHTING AND MECHANICAL
GRILLES
D. REPAIR RF SHIELDING AND TEST ENCLOSURE
E. PATCH AND REPAIR WALLS AS REQUIRED DUE TO
INSTALLATION OF NEW EQUIPMENT, CONTROLS OR
SYSTEMS
F. SEE SHEET 01-AE-122 FOR GENERAL CEILING
DETAILS
5'
Addendum No. 1 10 / 31 / 2023
4"
2'
1"
4"
F F
5'
1'-6" min
6"
, 3 , 3
4 New door frame type F2, w/ door type F (half lite) for both leafs 5 New door frame type F2, w/ door type F (half lite) and in-active leaf a full lite
F B C R
SVT-1
SVT-1
ACT-1
N: PT-1
E: PT-1
S: PT-1
W: PT-1
W
AL
LS
F B C R
SVT-1
SVT-1
ACT-1
N: PT-1
E: PT-1
S: PT-1
W: PT-1
W
AL
LS
CT SCAN A256
VIEW A258
DEMO EXISTING VCT
FLOORING AND RUBBER
BASE AT ROOMS
SCHEDULED FOR NEW
FINISHES. PREPARE
RESULTING SURFACES TO
RECEIVE NEW FINISHES
PER MANUFACTURER'S
REQUIREMENTS,
INCLUDING RE-FINISHING
EXISTING GWB
PARTITIONS AT THE BASE.
bdunn Cloud bdunn Cloud
Q
P
O
24' - 8"
COVER THE UNDER SIDE OF THE
EXISTING CONCRETE DECK
ABOVE WITH A LAYER OF 1/16"
LEAD SHIELDING AS
DIMENSIONED ON SECTION
ELEVATION 5/01-AE-122 APPROX
HATCH AREA SHOWN
12"x12" Light Fixture
9"x48" Light Fixture
24"x48" Light Fixture
24"x24" Light Fixture
Supply
Return
Sprinkler
Recessed Light Fixture
Speaker
Fire Alarm Strobe
Smoke Detector
Exit Sign
Nurse Call
Piping
RCP LEGEND
6 5 4
R
Q
P
O
24' - 8"
45°
(2) 12 GA
HANGER
WIRES @ OPP
CORNERS TO
STRUCTURE
ACT & GRID
12 GA HANGER WIRE
ELECTRICAL
FIXTURE
MECHANICALLY
FASTEN
TO SUSPENSION
SYSTEM
ELECTRICAL/HVAC
FIXTURE
MECHANICALLY
FASTEN
TO SUSPENSION
SYSTEM
LFB
LATERAL
FORCE BRACE
EC
EXPANSION
CLIP
SJCG CLIP
MAIN GRID RUN
AT LAY-IN FIXTURE
AT RECESSED DOWNLIGHT
[(IBC 2003 C-I/II, CISCA-2)]
[(IBC 2006 C-II/III, CISCA-2)]
[(IBC 2009 C-II/III, CISCA-2)]
[(IBC 2012 C-II/III, CISCA-2)]
8" MAX
SEISMIC RETAINING CLIP -
FASTEN TO ADJOINING
CONSTRUCTION
EDGE MOLDING
MAIN BEAM OR
CROSS-TEE
PERIMETER HANGER
WIRE WHEN EDGE
MOLDING IS LESS
THAN 7/8" WIDE
1 MAX
GRID END TIGHT TO
ADJOINING CONSTRUCTION
UNATTACHED SIDETIGHT SIDE
REQUIREMENTS:
- ATTACHED ON (2) ADJACENT WALLS
WITH THE BERC2 CLIP TO THE WALL
SECURES THE GRID AND ELIMINATES
THE NEED FOR POP RIVITS THROUGH
THE VISIBLE PART OF THE WALL
MOULDING
- BERC2 CLIP WITH 1/2" TO 5/8"
CLEARANCE ON UNATTACHED ENDS
- BERC2 CLIP ON ALL 4 WALLS
- HEAVY-DUTY GRID
- LATERAL BRACING
- PERIMETER SUPPORT WIRE
16' - 0"
COVER THE UNDER SIDE OF THE
EXISTING CONCRETE DECK ABOVE
WITH A LAYER OF 1/16" LEAD
SHIELDING AS DIMENSIONED
LINE OF NEW ACT
CEILING
INSTALLED AT
EXISTING
ELEVATION
COVER THE EXISTING
PARTITION WITH A
LAYER OF 1/32" LEAD
SHIELDING FROM
FLOOR TO
CONCRETE DECK
ABOVE
COVER ADDITIONAL
LEAD SHIELDING WITH
A LAYER 1/4" GWB TO
6" ABOVE EXTG LAY-
IN-CLG TAPED AND
FLOATED TO LEVEL 4
FINISH
1 S. Memorial Dr.
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
PREPARE SITE FOR NEW COMPUTED
TOMOGRAPHY - ROOM A256
657-22-102JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
KEYPLAN
N.T.S.
N
Drawing # of
FULLY SPRINKLERED
100 % BID DOCUMENTS
Revision 1 Addendum 01 10/31/2310/19/2022 BD NB
01-AE-122
INFECTION CONTROL RISK
ASSESSMENT RCP 02
1/4" = 1'-0"
FLOOR 02 CEILING PLAN - CT SCAN
1/4" = 1'-0"
FLOOR 02 CEILING PLAN - CT SCAN DEMOLITION
1 1/2" = 1'-0"
SEISMIC LIGHT FIXTURE
3" = 1'-0"
SEISMIC RESTRAINTS AT SUSPENDED CEILINGS
NOTE: ALL CEILING ELEMENTS TO
BE DEMOLISHED. PERIMETER
CEILING WALL MOLD TO REMAIN
DEMOLITION:
A. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN
B. CONSTRUCT TEMPORARY PARTITIONS AND DOORS,
COORDINATE LOCATIONS WITH EXISTING CEILING
FIXTURES
C. SALVAGE EXISTING LIGHTS AND MECHANICAL
GRILLS, STORE FOR REINSTALLATION
D. DEMOLISH ALL GRID, HANGERS AND CEILING TILE IN
CT SCAN A256
E. DEMOLISH CT SCAN PIPING AND ELECTRICAL AS
REQUIRED
F. DEMOLISH EXISTING RF SHIELDING IN CEILING AS
REQUIRED TO ACCOMMODATE NEW WORK
RENOVATION:
A. PATCH AND REPAIR EXISTING FLOORING AS
REQUIRED AFTER REMOVAL OF EXISTING CT SCAN
MACHINE
B. INSTALL NEW GRID TO MATCH PREVIOUS NON-
FERROUS CONSTRUCTION REQUIREMENTS AND
NEW TILES.
C. REINSTALL ALL LIGHTING AND MECHANICAL
GRILLES
D. REPAIR RF SHIELDING AND TEST ENCLOSURE
E. PATCH AND REPAIR WALLS AS REQUIRED DUE TO
INSTALLATION OF NEW EQUIPMENT, CONTROLS OR
SYSTEMS
3/8" = 1'-0"
SECTION ELEVATION - CT SCAN
Addendum No. 1 10 / 31 / 2023
SOMATOM FORCE
13045
A-101ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
O T
C
N
S T
R U
C T
I O
N https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj https://a360.co/2ODwMdj
A-102ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
N
S-101ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
S-102ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
S-501ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
E-101ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
E-102ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
M-101ATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
M-101-AATTENTION:
R E
F E
R E
N C
E
D
O C
U M
E N
T
N
N
S T
R U
C T
I
Comments
A
B
C
C
Control Door
West Wall
Southwest Wall
Room Door
D North Wall Office
E Northeast Wall
1/16" Lead 1/32" Lead
Exterior (2nd Fl.) 114 mm Conc. None
Hallway
1/32" Lead
1/32" Lead None
1/32" Lead None
1/32" Lead None
Control None
Chute
Hallway
SHIELDING DESIGN SUMMARY
Facility Shielding Type
Room(s)
VA St. Louis Healthcare Computed Tomography
A256
Date July 13, 2023
915 N. Grand Blvd., St. Louis, MO 63116
Eric Hooper, MS, CHP, DABSNMPhysicist
Address
Barrier Description Adjacent Space
The following Shielding Design(s) were performed in accordance with NCRP 147, Structural Shielding Design for Medical X-Ray Imaging Facilities and applicable State regulations.
A
Minimum Shielding To Be Installed
Control Wall Control None1/32" Lead
Existing Shielding
1/16" Lead None
H Ceiling Office 114 mm Conc. 1/16" Lead G Floor Patient Rooms 114 mm Conc. None
Southeast Wall CTF
Please review the Methods & Assumptions as well as the Design & Building Requirements to ensure adequate barrier installation.
eric@olympichp.com 253.432.2806
Eric Hooper, MS, CHP, DABSNM
Medical Physicist mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com mailto:eric@olympichp.com
V.A. St. Louis Healthcare CT Room A256
Radiation Shielding Design July 2023
Uncontrolled Areas
Design Goals Controlled Areas
Scatter Fraction
0.1 mGy/week
Appropriate fitting parameters were used to determine the required shielding for secondary barriers.
Methods & Assumptions
NCRP Report No. 147, Structural Shielding Design for Medical X-Ray Imaging Facilities
Primary Barriers
Secondary Barriers
Unit Make & Model Siemens Somatom Force 64
References
Primary air kerma was not considered as the image receptor contains a primary barrier
Leakage and scatter were considered for all barriers.
0.02 mGy/week
50%
Workload
K head
K body
Dose Length Product mGy-cm mGy-cm
Head
Body
Building Previously Shielded?
Multi-Story?
Occupancy Above?
Yes
Occupancy Factors NCRP 147, Table 4.1
Yes
Multi Story, Floor 2
Yes
Occupancy Below?
No. of Head CT's per Week
No. of Body CT's per Week
Percentage Using Contrast
Maximum kVp
NCRP 147, Table 5.2
9.00E-05
3.00E-04 cm -1 cm -1
Radiation Shielding Design July 2023
Computed Tomography
The existing 1/32" of Lead is sufficient for this barrier. No additional shielding is required.
Southwest Wall (Barrier B)
Room Door (Barrier C) The existing 1/32" of Lead is sufficient for this barrier. No additional shielding is required.
West Wall (Barrier C) The existing 1/32" of Lead is sufficient for this barrier. No additional shielding is required.
North Wall (Barrier D)
Northeast Wall (Barrier E) The existing 4.5" of Concrete is sufficient for this barrier. No additional shielding is required.
Control Wall (Barrier A)
All walls requiring shielding must have the shielding extend from the floor to a height of at least 7. (See exception for Wall D).
Barrier Descriptions
The assumptions used in this report were supplied by the facility. If the actual CT usage is different than that provided by the facility or if there are increases to the workload or modifcations made to the barriers,, additional shielding may be required. In such cases, there should be consultation with a medical physicist. A copy of this report should be maintained by the facility for the life of this room.
Shielding is an integral part of rooms utilizing ionizing radiation and is required to protect staff, patients, and members of the public in adjacent spaces. The contents of this report should be reviewed carefully to ensure adjacent spaces are adequately protected.
Barrier penetrations, such as those for outlets, switches, light boxes, etc, should be wrapped or backed with equivalent shielding as specified for the prescribed wall. Special attention should be given to penetrations and joints as this is often a point of failure for shielded spaces.
Design & Building Requirements
Walls requiring lead will only need shielding installed on one side of the wall. For example, lead-lined drywall may be installed on one side of the studs while regular GWB may be installed on the other side.
1/32" Lead should be added to the existing 1/16" for a total barrier thickness of 3/32" Lead. Lead should extend from the floor to the concrete decking above. For the part of the wall extending from 7 feet to the concrete decking above, a total barrier thickness of 3/32" is required.
Control Door (Barrier A) The existing 1/32" of Lead is sufficient for this barrier. No additional shielding is required.
The existing 1/32" of Lead is sufficient for this barrier. No additional shielding is required.
Radiation Shielding Design July 2023
The existing 4.5" of Concrete is sufficient for this barrier. No additional shielding is required.
Floor (Barrier G)
Southeast Wall (Barrier F) The existing 1/16" of Lead is sufficient for this barrier. No additional shielding is required.
1/16" Lead should be added to the existing 4.5" of Concrete to protect occupied spaces above. The lead should extend from Wall D out approximately 15'8" to adjoin the pillars. Any penetrations for electical, HVAC, etc should be wrapped and backed with equivalent lead. The lead may be installed above or below the concrete decking but should be installed in such a way as to prevent gaps, voids, or penetrations in the
Ceiling (Barrier H)
Radiation Shielding Design July 2023
Shielding Calculations
None
1/32" Lead
None
None
None 1/16" Lead
Minimum Shielding To Be Installed
None
A Control Door Control 5.56 1.0 0.1 0.66 mm Lead 1/32" Lead
A Control Wall Control 5.6 1.0 0.1 0.65 mm Lead2.152
Room Type Computed Tomography
Design Goal
(mGy/wk)
Minimum Barrier Thickness
Existing Shielding
Barrier Description Adjacent
Occupied Space Distance
(m) Occupancy
Factor
Total Weekly Air Kerma (mGy/wk)
50%
No. of Head CT's per Week
No. of Body CT's per Week
Percentage Using Contrast
Maximum kVp
Room Number A256
K 1 sec (Head) 1.62E-01
None
None
1/32" Lead None
1/32" Lead
C Room Door Hallway 4.44 0.125 0.02 0.65 mm Lead 1/32" Lead
B Southwest Wall Chute 5.57 0.025 0.02 0.15 mm Lead0.054
0.428
114 mm Conc.H Ceiling Office 3.35 1.0 0.02
1/32" Lead
G Floor Patient Rooms 3.35 0.2
0.1
0.02 114 mm Conc.
C West Wall Hallway 2.51 0.2
0.02
0.02 1.20 mm Lead
1/16" Lead
F Southeast Wall CT 4.54 1.0 3.275 0.78 mm Lead 1/16" Lead
E Northeast Wall Exterior (2nd Fl.) 4.16 0.025 0.098 33.73 mm Conc. 114 mm Conc.
D North Wall Office 2.96
K 1 sec (Body) 2.97E-01
Total Weekly Dose at 1m 67.5 mGy/wk
1.203 95.43 mm Conc.
6.015 136.82 mm Conc.
1.0 0.02 7.704 1.70 mm Lead
2.143
2.184
Radiation Shielding Design July 2023
Floor Map
Wall A
Wall F
Wall C Wall E
Wall D
Door A No Additional
Shielding Required
Wall B
No Additional
Shielding Required No Additional
Shielding Required
Door C
1/32" Lead should be added to the existing 1/16" for a total barrier thickness of 3/32" Lead. Lead should extend from the floor to the concrete decking above.
No Additional
Shielding Required
No Additional
Shielding Required
No Additional
Shielding Required
No Additional
Shielding Required
Ceiling 1/16" Lead should be added to the existing 4.5" of Concrete to protect occupied spaces above.
(See Details on Next Page)
Radiation Shielding Design July 2023
Side View
P ill ar
Wall D 1/32" Lead should be added to the existing 1/16" for a total barrier thickness of 3/32" Lead. Lead should extend from the floor to the concrete decking above.
Ceiling 1/16" Lead should be added to the existing 4.5" of Concrete to protect occupied spaces above. The lead should extend from Wall D out approximately
15'8" to adjoin the pillars. Any penetrations for electical, HVAC, etc should be wrapped and backed with equivalent lead. The lead may be installed above or below the concrete decking but should be installed in such a way as to prevent gaps, voids, or penetrations in the protective barrier.
Radiation Shielding Design July 2023
Medical Physicist Credentials Eric Hooper, MS, CHP, DABSNM Current physics credentials including initial qualifications, continuing education, and continuing experience can be found on the Olympic Health Physics website at www.olympichp.com. A clickable link and/or the QR code below may also be used to access physics credentials directly.
Additional Services Stereotactic Biopsy Physics Evaluations
Gamma Camera Physics Evaluations
QR Code to Physics Credentials https://www.olympichp.com/current-credentials/
Equipment Calibration Certificates
Current calibration certificates for equipment used during this evaluation can be found on the Olympic Health Physics website at www.olympichp.com. A clickable link and/or the QR code below may also be used to access equipment calibration certificates directly.
QR Code to Equipment Calibration Certificates https://www.olympichp.com/calibration-certificates/
Mammography Physics Evaluations
Radiographic Physics Evaluations
Fluoroscopic Physics Evaluations
PET Physics Evaluations
MRI Physics Evaluations
CT Physics Evaluations
Radiation Shielding
Health Physics Audits
Radioactive Materials Licensing
Ultrasound Physics Evaluations https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/current-credentials/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/calibration-certificates/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/medical-physics-2/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/mammography/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/radiographic-fluoroscopic/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/ultrasound/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/mri/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/computed-tomography/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/nuclear-medicine/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/ https://www.olympichp.com/medical-physics/radiation-shielding-design/…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .