This document provides an amendment to a solicitation for renovations to space for domiciliary providers at a Veterans Affairs building. Key details include extending the proposal due date to February 16, 2022 at 2:00 PM Central time due to questions and answers, a site visit roster, and revised specifications and drawings being attached. The renovation work includes upgrades to electrical, mechanical, and architectural systems across two floors. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 11
657-19-127JB
36C255
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
36C255
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
To all Offerors/Bidders
36C25522R0033
12-21-2021
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 16 FEB 2022 @ 14:00 CST
The above cited solicitation is hereby amended as shown below:
Qustions & answers, the Site Visit roster, and revised specs and drawings are attached.
The due date for proposals is extended as stated above.
Electronic submission of proposals is required. No physical copies will be accepted.
Proposals must be submitted electronically by emailing to all of the following addresses:
kevin.knight2@va.gov; david.holden@va.gov; james.petrik@va.gov Each email with attachments must be less than 10 megabytes. Copies of Bid Bonds shall be included.
Original physical copies of Bid Bonds must still be received at the contracting office before the closing time.
Except as stated herein, any and all terms of the Original Solicitation are still in effect and not changed.
Kevin D. Knight
Issue Date: January 20, 2022
Reference: Addendum #001
TITLE: Revisions and Updates
The following instructions herein and the listed documents below are hereby modified to be incorporated as part of the contract documents.
This Addendum consists of the summary of changes and the pertinent drawing and specification changes as noted below. This change consists of REVISIONS as follows:
SUMMARY OF CHANGES TO DRAWINGS:
Architectural
1. Sheet 02‐AI‐112 Equipment Floor Plan – Floor 01 reissued
2. Sheet 02‐AI‐122 Equipment Floor Plan – Floor 02 reissued.
3. Additional Sheet Additional sheet has been added showing sites signage standards.
Civil
4. No changes to drawings issued.
Structural
5. No Changes to drawings issued.
Mechanical
6. No Changes to drawings issued.
Electrical
7. Sheet 02‐ED‐111 Lighting Demolition Plan – Floor 01 reissued.
8. Sheet 02‐ED‐112 Lighting Demolition Plan – Floor 02 reissued.
9. Sheet 02‐ED‐122 Power Demolition Plan – Floor 02 reissued.
10. Sheet 02‐EJ‐504 Panel Schedules reissued.
11. Sheet 02‐EP‐111 Power Plan – Floor 01 reissued.
12. Sheet 02‐EP‐121 Power Plan – Floor 02 reissued.
13. Sheet 02‐ET‐101 Systems Plan – Floor 00 reissued.
14. Sheet 02‐ET‐111 Systems Plan – Floor 01 reissued.
15. Sheet 02‐ET‐121 Systems Plan – Floor 02 reissued.
SUMMARY OF CHANGES TO SPECIFICATIONS:
16. Specification Section 12 24 00 Window Shades
a. Specification Section issued with this addendum.
17. Specification Section 26 24 16 Panels
a. Specification Section reissued with this addendum.
18. Hazardous Material Survey
a. Issued with this addendum.
REQUESTS FOR SUBSTITUTION:
19. No Requests for Substitutions issued with this Addendum.
QUESTIONS FROM BIDDERS:
20. Please advise if the designated SSHO and Competent Person role can be fulfilled by the site superintendent?
a. This can be the same person as long as qualifications are appropriate.
21. Will the SSHO be full time separate person?
a. See answer to Question #1.
22. Is the project taxable?
A Missouri Form 5060 Project Exemption Certificate will be provided at the Pre‐Construction
Kick‐off Meeting.
23. Specification 101113, what are the locations of chalkboards, marker boards and presentation boards?
a. See updated sheets 02‐AI‐112, 02‐AI‐122.
24. Please provide a specification for the window shades.
a. See attached Specification Section 12 24 00 Window Shades
25. Sheet 02‐AS‐101, how many bollards?
a. Provide (4) 6” bollards
26. Please verify that the offices on the 2nd floor (201‐205) will not be occupied during the construction of the 2nd floor.
a. No offices on the 2nd floor will be occupied during construction of the second floor.
27. Will there be abatement drawings forth coming or do we just bid the quantities in the specifications?
a. See attached Hazardous Material Report
28. Specification section 028333.13 1.1 lead locations. Can we get the square footage of walls that have lead on them?
29. On Drawing 02‐MG‐501 Detail 1 Terminal Unit Water Coil Piping Connections; on the (33) terminal boxes being removed and relocated, does the owner want all new coil piping per this detail or is the intent to reuse the existing coil piping assembly?
a. Existing coil piping assembly can be reused.
30. From question #10, If new coil piping, will pre‐packaged coil kits and hoses be acceptable in lieu of individual components as shown?
a. For new Fan Coil units, pre‐packaged coil kits and hoses are acceptable with the exception of the control valve which must be provided separately.
31. The electric panel board spec references Section 25 10 10 (Advanced Utility Metering). This was not included in the bid package. Can you provide this section?
a. Section 25 10 10 is not needed for this project. Refer to attached revised specification section 26 24 16 with this reference deleted.
32. For fixtures A1 and B1 that get removed and reinstalled, do these existing light fixtures have a 6’ MC whip pre‐attached to them for reuse in the new installation?
a. Provide with new.
33. Electrical Demolition Note B on the various Demolition Drawings states that the Electrical
Contractor is responsible for maintaining the continuity of existing circuits that contain devices or equipment that are to remain in place after the demolition. As no existing schedules were included for the Demo’d Panel boards L1‐1, L1‐2, L1‐3 and L1‐4, it is impossible to quantify the extent of this work, if any. As such, we’d request that we do one of the following?
1. Remove the note in it’s entirety. If, during the demolition, it’s discovered that there are existing loads originating out of one of the four demo’d panels, then that could be addressed under the change order process.
2. Identify for the Electrical Bidders those loads which are to remain and where they are actually located.
a. Panelboard directories (located on‐site at facility panelboards) should be used as much as possible during the bid process for this item, but the contractor should include some testing in his bid to be able to determine extents for existing circuits during construction
(prior to demolition work on these circuits.
34. Where is the location of the existing main distribution panel (MDP) located?
a. Basement level 00, room “G09”.
35. Drawing 02‐EJ‐600 shows refeeding existing panel L21‐A from a 100A CB in new panel L2‐1.
When looking at the panel board schedule for L2‐1 on drawing 02‐EJ‐504, I do not see a 100A breaker listed. Please advise?
a. Refer to attached revised panelboard schedules on drawing 02‐EJ‐504.
36. Please advise on the location for the existing panel board L21‐A?
a. Panelboard “L21‐A” is located in room 201A. Refer to attached revised drawings 02‐ED‐
122 and 02‐EP‐121.
37. Drawing 02‐EJ‐600 shows feeding the new SPD’s from a 60A CB in new panels L1‐1 and L2‐1.
When looking at the panel board schedule for L1‐1 and L2‐1 on drawing 02‐EJ‐504, we do not see a 60A breaker listed. Please advise.
38. In the solicitation and specifications Section 1.3 Statement of Bid Items, the general scope of work reflects renovation scopes of work which cover numerous divisions including concrete, masonry, metals, woods and plastics, thermal and moisture protection, finishes etc. In the solicitation, Factor 1: Prime Contractor Construction Experience states: For the purposes of this evaluation, a relevant project is further defined as “replacement of boilers, completed within a functioning hospital or VA hospital setting". Question: Please confirm the
Contractor can submit projects for Factor 1 and Factor 5 which cover renovation scopes of work in lieu of boiler replacements
a. Yes. Contractor can submit projects for Factor 1 and Factor 5.
39. On drawing 02‐EP‐111, in Multi‐purpose Room 131, there is an HVAC unit that is not shown being electrically connected. Should it be or is it existing?
a. Refer to attached revised drawing 02‐EP‐111.
40. Who’s to supply the disconnect switch for WH‐3 on Dwg 02‐EP‐121?
a. Reference tagged note P012 on same sheet.
41. On drawing 02‐EP‐121 there are two HVAC units in the corridor that don’t show any electrical connection to them. Should there be electrical connections?
a. Refer to attached revised drawing 02‐EP‐121.
42. Are there any requirements for temporary power and/or temporary lighting? Please advise.
a. Not unless needed to temporarily power circuits due to a project phasing issue.
43. For the purpose of locking in material/equipment pricing, when is the targeted NTP date for this project?
a. The estimated date for the Pre-construction meeting and NTP is around April 1st.
This is just an estimate and could vary depending on availability of funds and time for the awardee to obtain the bonds.
44. On the Lighting Demolition for Floor 1 (Dwg 02‐ED‐111) we are removing a few light fixtures from stairwell S103. However, we don’t see any replacements on Dwg 02‐EL‐111. Please advise
a. Refer to attached revised drawing 02‐ED‐111.
45. Can we get a clarification to Bid Item #2 (Deduct Alternate #001)? According to item 1.3.B on sheet 01 00 00 ‐2, it appears that the VA wants a deduct for all receptacles and data outlets.
However, in looking at drawings 02‐EP‐111 and 02‐EP‐121, it appears that the VA only wants a deduct for certain receptacles identified by tagged note P05. Similarly with the data outlets, some of them are tagged S3. So, are we only supposed to provide a deduct for those certain receptacles and data outlets identified with tagged notes P05 and S3?
a. Correct. Deduct alternate is only to include those items identified (P05 and S3).
46. Please verify that there is no work that will need to be performed on shift work or weekend hours?
a. There is no work that is required to be performed on shift work or weekends.
47. Are there any additional ceilings above the existing acoustical ceilings?
a. In the past there has been a additional acoustical tile applied directly to structure above.
The nature of the previous projects is has been removed in parts and pieces over time and is in no way continuous. Site visit prior to bid is recommended to understand full scope of what is currently in place after recently completed HVAC project.
48. Can the Site Construction Superintendent also act as the SSHO and/or QCM if they have the requirements necessary to fulfill these specific on‐site job manpower? Can 1 person fill all 3 rolls?
a. See response to question #1.
49. Confirm if this project is taxable or tax exempt?
A Missouri Form 5060 Project Exemption Certificate will be provided at the Pre‐Construction
Kick‐off Meeting.
50. Sheet 02‐AE‐601: Glazing legend calls out 4 types of glazing, however only door 200A / Stair
1 calls out GL‐1. Provide glazing for door type D2 for multiple locations
a. Provide GL‐1 aw well.
51. Sheet 02‐AI‐001: Provide locations of WC‐1 / Window Film and WC‐2 / Roller Shade
a. All exterior windows within the project boundary get both, except in Vestibule 101 and
Stair 102 provide film only.
52. Steel Bollards specific size cannot be located. Provide information as well as installation detail. Sheet 02‐AS‐101: provide bollard quantity
a. Provide (4) 6” bollards
53. Provide drawing 02 AE 701 with wall section and details. Is the note referring to 02 AE 801?
a. Yes the Note should refer to Sheet 02‐AE‐801
54. Structural Steel 05 50 00 & Toilet Compartment 10 21 13:05 50 00 / 2.5 Supports / B. For
Ceiling Hung Toilet Stall:
a. Structural Engineer to provide sizes of both structural channels, angles and trapeze cross support.
i. Provide 3 ½” x 3 ½” x 3/8”
b. Structural Engineer to provide locations of proposed stall supports above acoustical ceiling.
i. Coordinate locations with manufacturer’s final submittal.
55. Specification 10 11 13 Chalkboard & Markerboard: Provide markerboard, presentation board specific manufacturer (basis of design), specific sizes of units and locations on Reflected Ceiling Plans
56. Specification 10 11 23 Tackboard: Provide tackboard specific manufacturer (basis of design), specific sizes of units and locations on Drawings.
57. Specification 10 13 00 Directories: Provide directory specific manufacturer (basis of design), specific sizes of units and locations on Drawings.
a. See attached Site specific signage requirements.
b. See Sheets 02‐AW‐111, 02‐AW‐112
c. Place on Directory sign per Client standards in Lobby 101 final location to be verified in field with COR.
58. Clarify make and model for kitchen Equipment called out in the spec section 11 26 00.
Details do not match with drawings provided.
a. All kitchen equipment is shown on plans and elevations and to be considered
Government Furnished Contractor Rough In.
Fire Protection
59. Specification 21 13 13 is missing Verify if fire pump is required Sheet 02‐FP‐001: Coded note B calls out existing sprinkler system. Provide existing / as‐built sprinkler drawings.
Mechanical Piping Legend calls out specific sprinkler head types but does not show locations etc., provide specific information.
a. Per latest flow test 6/30/2018 there is no fire pump required. Contractor should preform another flow test to confirm since the data is greater than a year old. There is no existing sprinklers/sprinkler systems in the building. Fire Protection contractor shall submit shop drawings with locations for engineer review.
60. Site plan sheet 02‐AS‐101: Provide location of Fireline to be tied into and approx. depth.
Provide location of closest Fireline shut off on site. Engineer to provide sprinkler line / head anticipated locations
a. To be coordinated on site with COR during pre‐bid walk thru.
b. Fire Protection contractor shall submit shop drawings with locations for engineer review.
Mechanical
61. Sheet 02‐MG‐602:
a. Fan Coil Schedule: coded notes 1 & 2 as provided are not shown on schedule for units
i. The remarks indicate which fan coil units they apply to.
Electrical
62. Is channeling on the exterior walls, which are solid, required or can a surface mounted raceway such as "Wiremold" be used in the few instances where this occurs?
a. This is acceptable to CMTA if “Wiremold” ran to room corners, kept at a minimum, painted to match adjacent surfaces and if acceptable to the project COR. Each specific location to be reviewed in field prior to final acceptance and the use of units in the outside has been specifically designed to be at a minimum.
63. Please confirm conduit is required for the telecom cabling when going from the outlet to the cable tray, and that J‐Hooks may not be used.
a. Confirmed. Refer also to added details on attached revised drawing 02‐EJ‐504.
64. Please confirm the paging, security, intercom, and panic systems are a conduit system in their entirety.
a. Confirmed. Refer also to added details on attached revised drawing 02‐EJ‐504.
65. Is the security system being furnish by the owner or by the contractor? If by the contractor, please provide contact information for that vendor.
a. Contractor furnished and provided. Match the existing campus facility PIV card access system.
66. Is the security system entirely new, or are we extending the renovated area to an existing system? If existing, where is the existing panel. If new, where does it get located?
a. New. Locate within OIT closets. Refer to attached revised drawings 02‐ET‐111 and 02‐
ET‐121.
67. Electrical panels L1‐2 and L2‐2, coded note PO14 calls for removal of line to source. Provide location of source power.
a. Reference power riser on drawing 02‐EJ‐600.
68. The panel schedule for L1‐1 doesn't show the 3 pole 60 amp breaker needed for the SPD.
Please confirm this is required
69. The panel schedule for L2‐1 doesn't show the 3 pole 60 amp breaker for the SPD or the 3 pole 100 amp breaker for feeding L21‐A. Please confirm these are required.
70. Where is Panel L21‐A located. It isn't shown on the drawings.
a. Panelboard “L21‐A” is located in room 201A. Refer to attached revised drawings 02‐ED‐
122 and 02‐EP‐121.
71. Sheet 02‐ET‐101:
Provide panel clarification for panel shown in Transformer Rm. G09
a. Disregard. Refer to attached revised drawing 02‐ET‐101.
Provide existing (2) FACP information in OIT G04
Siemens.
Can existing (2) FACP be expanded / modified. Who is current contractor servicing systems?
Yes. Verify local contact with project COR.
72. Drawing 02‐AD‐111, General Demolition General Note J states: WHERE EXISTING FLOOR
FINISH IS REMOVED, FLOORING AND ADHESIVE SHALL BE REMOVED TO PROVIDE A CLEAN
FLOOR SLAB. FLOOR SLAB SHALL BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW
FLOORING MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16
Question: Please provide average thickness of self-leveling required throughout the entire area of renovation so we can quantify this note in our proposal. Also, what are the tolerances for the finish floor after leveling? If an average thickness cannot be provided, we will only be able to quantify the concrete fill at floor voids only and will not be able to include floor leveling throughout the entire area of renovation.
a. Per Specification Section 09 05 16 – Subsurface Preparation For Floor Finishes Part 3 3.2.L
Tolerances: Subsurface shall meet the flatness and levelness tolerance specified on drawings or recommended by the floor finish manufacturer. Tolerance shall also not to exceed 1/4” deviation in 10’. As required, install underlayment to achieve required tolerance.
73. Does this project have ASBESTOS & LEAD? No actual report can be located.
‐ END OF ADDENDUM #1 ‐
A.1 List of Attachments
See attached document: 12 24 00 - Window Shades.
See attached document: 262416 - Panels.
See attached document: 1801901 Asbestos Mold Survey - Jefferson Building 2 (final).
See attached document: ELECTRICAL DRWINGS.
See attached document: ST A3 VA STL v2.
See attached document: ST. LOUIS DOMICILIARY EQUIPMENT PLANS.
See attached document: 657-19-127JB Sign in Sheet pre bid 20220104.