Pre-Proposal Conference 589-22-410 Elevators Bldg 1 _ 15 KC VAMC.doc

DOC document 36 KB Posted

Attached to
Z1DA--589-22-410, Replace Elevators in Buildings 1 and 15 11/22- Reviewing package, specs, SOW, etc.
Solicitation number
36C25522R0030
Issued by

About this file

This pre-proposal conference document outlines requirements for a federal construction contract to replace elevators in two buildings at the Kansas City Veterans Affairs Medical Center. The solicitation seeks offers for a base bid and three alternates to remove and replace four elevators. Proposals are due February 15, 2022 and must remain open for 120 days. The project value ranges from $2-5 million and has a 550-day period of performance. The procurement is reserved for service-disabled veteran-owned small businesses, which must self-perform at least 25% of construction labor. The selection will be based on lowest price among technically acceptable offers. The document specifies insurance, bonding, wage rate, tax and progress payment requirements. It also requires daily logs and use of an online file sharing and submittal platform during the project.

View the file

Other files

File Type Posted
36C25522R0030 0004.docx DOCX document
36C25522R0030 0003.docx DOCX document
589-22-410 Replace Elevators Pre-Bid Sign In.pdf PDF
36C25522R0030 0002_1.docx DOCX document
36C25522R0030 0001.docx DOCX document
General Decision Number MO20220045 01072022.docx DOCX document
Wage Determination No. 1986-0497 12272021.docx DOCX document
KCVA Project 589-22-410 Specifications (379 Pages).pdf PDF
Combined Drawings 589-22-410 (9 Pages).pdf PDF
36C25522R0030_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL CONF 589-22-410 Replace Elevators Buildings 1 & 15, KC VAMC

Introduction

(a) Good morning, thank you for taking the time to attend this pre-bid conference.

(b) Today we will discuss contractual issues, discuss technical issues, entertain questions, and finally conduct a walk through of the areas. Please sign the attendance roster; this will be published along with any applicable amendments to the solicitation on the Sam.gov website.

(c) Before we cover the issues, let me first introduce myself and the Government team.

CO – Matt Finley COR – Cameron Buse. Alternate- Marcus Stevension. The COR is responsible for day-to-day technical oversight of this project. They are not here to be Quality Control. This is the prime contractor’s responsibility.

Other VA staff -

I. Contractual Items

1. General:

(a) Project No./Project Title: 589-22-410 Replace Elevators Buildings 1 & 15 KC VAMC (b) Cost Range: Between $2,000,000 and $5,000,000 (VAAR 836.204), NAICS Code 238290, Other Building Equipment Contractors.

(c) Completion Time: 550 Calander days after receipt of notice to proceed for base bid.

(d) Proposals are due Tuesday February 15, 2022 - 2:00 PM CT to Matthew.Finley@va.gov . All proposals are required to have a 120-day acceptance period. Questions are due February 3, 2022. Be promt with your responses. Please ensure that you provide name, company name, phone # where you can be reached, and email address in the event a clarification is necessary. Questions must be sent via email to the contracting officer at matthew.finley@va.gov and must be from the prime contractor. Please do not post VA employees contact information to public forums as a direct POC.

(d) The project is 100% set aside for Service Disabled Veteran Owned Small Business. The successful prime contractor will be required to perform no less than 25 percent of the construction labor. (See worksheet in solicitation).

(e) The selection process for this procurement is based on the Lowest Priced Technically Accepted Offer. Note that offers that are not technically acceptable cannot be selected, regardless of price.

(f) Please review and comply with Project Specific Information Instructions outlined in the solicitation. You may be considered nonresponsive if required items are not submitted with your initial proposal. The Government plans to award without discussions. However, we reserve the right to open discussions if necessary.

(g) There is a base bid amount and 3 additional CLIN items/deductive alternates. Enter bid amounts for base bid and all alternates on the worksheet page 3 of the solicitation. Amounts must be entered for all items.

(h) Please keep side-bar conversations to a minimum. Pictures may only be taken while being escorted, cannot be taken with people in them and no photos of anything that could be considered VA “sensitive information”.

2. Disclaimer Statements:

(a) Remarks and explanations at the conference shall not qualify the terms of the solicitation

(b) Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing

3. Bonds:

(a) A bid Bond in the amount of 20% must accompany your BID.

(b) After award of the contract a Payment Bond and a Performance Bond in the amount of 100% of the contract value are due prior to a Notice to Proceed Letter being issued.

4. Buy American Act: The solicitation is subject to the Buy American Act, and it generally requires the use of American made products. Please keep this in mind when you are providing product submittal data.

5. Davis-Bacon Act: All labor performed under this contract is subject to the Davis-Bacon Act and related labor laws, to include the payment of at least the amounts shown in the wage determination in the solicitation. If the wage rate changes prior to the proposal due date, an amendment including the current rates will be issued.

6. Other Contracting Topics:

(a) The purchase of material for this project is exempt from state sales tax. A Missouri Tax exempt certificate will be issued after contract award.

(b) The contractor is expected to maintain insurance coverage during the contract period as directed in the specifications.

(c) Progress payments will be made no later than 30 days after receipt of an acceptable invoice.

(e) There are 2 important submittals that we need at contract start-up. They are the Schedule of Values, and a Construction Schedule.

(f) Weekly meetings will be held with the contractor and VA staff via MS Teams. A FTP site such as Procore, Submittal Exchange or approved equal must be established and maintained by the contractor throughout project and close out phase. A qualified and approved superintendent must be present on site at all times. This individual will be responsible for submitting daily logs describing work preformed to the COR each day.

(g) All contractor staff must complete the badging process prior to commencing work at the medical center.

II. Technical Issues – I will now turn the conference over to the COR. Please ensure that you stay together as a group during the walk thru so that information can be presented only once.

File details come from the government source that posted it. Updated .