36C25522Q0026 0003.docx

DOCX document 21 KB Posted

Attached to
H191-- Aboveground Fuel Tank Inspection and Fuel Oil SDVOSB Set-Aside
Solicitation number
36C25522Q0026
Issued by

About this file

This document includes an amendment to a solicitation and related questions and answers. The amendment provides additional context for a solicitation seeking a contractor to provide annual inspections, maintenance, repair, and certification of all Aboveground Storage Tanks at the Kansas City Department of Veterans Affairs Medical Center in Kansas City, Missouri. The opportunity is set aside for SDVOSBs and has a North American Industry Classification System code of 541330 for Engineering Services. The estimated value is between $16.5 million based on the small business size standard. Interested offerors should request a copy of the solicitation by emailing the points of contact by November 8, 2021. Relevant attachments include past inspection reports and fuel analysis to help inform offerors' responses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 589-22-1-1829-0003 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25522Q0026 10-18-2021

X X X

See CONTINUATION Page X The purpose of this Amendment is to update the solicitation as follows:

1. To provide questions and answers on pages 2 and 3 about the solicitation and requirement.

2. To provide attachments #1, 2, and 3 to help answer questions.

Jennifer Sotomayor Contracting Officer Questions and Answers

1. Have the tanks been inspected before? If so, please provide a copy of the most recent tank inspections.

1. Yes, see Attachment 1

1. Are there any known outstanding repairs that need to be made on the tanks?

1. No known repairs, however, we expect there may be. The extent of the repairs will be determined by the inspections and testing.

1. Please provide a copy of the last lab analysis performed for each tank.

1. See Attachment 2

1. Please clarify repair/component pricing for SOW. My understanding is that any repairs / component replacement recommended from the inspection will be quoted, and if approved, those costs will be added (in a modification) to the contract.

1. Repairs and component replacements will be determined by the inspections and testing. Contractor will provide the costs for repairs having materials and labor separated for each AST.

1. What fuel treatment has been used in the past?

A. See Attachments 1,2 & 3

1. When was the fuel last filtered?

B. See Attachments 1,2 & 3

1. Can all of these tanks be inspected over one visit or are there limitations on availability? As inspections must be completed +/- 30 days of previous inspection date, would this further support or conflict with all inspections occurring over one visit?

A. The schedule of service will be Monday through Friday during normal working hours. All inspections shall be completed during the same servicing cycle, without gaps (excluding weekends and holidays). The inspections need to be scheduled with the Boiler Plant Supervisor, so that there will be no issues that will impede access to the tanks for servicing. The date that the final tank inspection has been completed, is the date that will be considered as “the previous year’s testing date”. The next years testing will be completed within 30 days, before or after the date of the previous year’s test date.

1. Are there any requirements which would be required to complete more than once per year per tank?

1. There are no known requirements for additional testing more than once per year. If any Standards or Regulations change during the contract period, the impact of the changes will be addressed at that time.

If any repairs require additional testing, then those costs will be identified and included in the repair cost proposal.

1. Can there be a dollar amount threshold of components per tank?

1. The components that need to be replaced will be identified on the proposal. The material prices and labor costs will be identified separately for each tank. The VA will review the proposal and may request unit pricing if the repair costs are significant. The repairs will not be completed until authorized by the Contracting Officer.

· As it’s written a tank could need multiple components replaced at once and add up to a significant amount.

1. Correct.

· How would it be determined what is “beyond economic repair” if contractor is responsible for a great deal of the repairs?

1. After the deficiencies have been identified, the VA will communicate the needed repairs with the Contractor, and we will factor in the existing condition of the equipment and any associated components.

See attached document: Attachment 1 - VA Fuel Maintenance Report 082620.

See attached document: Attachment 2- Fuel Sample Analysis - 2020.

See attached document: Attachment 3 - VA Medical Center Fuel Oil Recirculation Filter Screen Disposal Report 08-27-20.