36C25521Q0097 - D.1 - QASP Revised.pdf

PDF 276 KB Posted

Attached to
36C25521Q0097_1 STLHCS IONM Services Federal contract opportunity
Solicitation number
36C25521Q0097_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

View the file

Other files for this federal contract opportunity

Other files attached to 36C25521Q0097_1 STLHCS IONM Services, newest first.
File Type Posted
36C25521Q0097 - D.7 - WAGE DETERMINATIONS.pdf PDF
36C25521Q0097_1 Final.pdf PDF
36C25521Q0097 - D.3 - Past Performance.pdf PDF
36C25521Q0097 - D.4 - Contractor Rules of Behavior.pdf PDF
36C25521Q0097 - D.5 - Immigration Certification.pdf PDF
36C25521Q0097 - D.2 - Conflict of Interest.docx DOCX document
36C25521Q0097 - D.6 - Subcontractor Questionaire Revised.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 7 Version 0003 Dated 3/1/2018

Attachment D.1 - Quality Assurance Surveillance Plan Solicitation Number 36C25521Q0097

The contractor will be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How monitoring will take place.

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.

The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Paula Galvin Organization or Agency: Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 South 4th Street Leavenworth, KS 66048-5055 913-946-1120 Paula.Galvin@va.gov

Brandi Holland, Contract Specialist Organization or Agency: Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 South 4th Street Leavenworth, KS 66048-5055 913-946-1113 Jason.Condiff@va.gov

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Jonathan Gibbs Organization or Agency: St. Louis VA Healthcare System 915 N Grand Ave St. Louis, MO 63125 314-532-9264 Jonathan.Gibbs@va.gov mailto:Paula.Galvin@va.gov mailto:Jason.Condiff@va.gov mailto:Jonathan.Gibbs@va.gov

Page 2 of 7 Version 0003 Dated 3/1/2018

Attachment D.1 - Quality Assurance Surveillance Plan Solicitation Number 36C25521Q0097

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.

PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

4. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. 100% surveillance: (if this method is used, define how surveillance will be accomplished.)

b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. (Define what and how often it will be inspected. For example, ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)

c. VALIDATED USER/CUSTOMER COMPLAINTS. If this method is used, explain how data will be collected and reported.

d. RANDOM SAMPLING. If this method is used, define what and how often it will be sampled. (For example, ten (10) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)

e. Verification and/or documentation provided by Contractor. Review PWS and if this method of surveillance is selected, define how documentation will be verified and how assessment will be conducted. (For example, off-site contracts may require the contractor to provide information on services provided to patients).

Quality Assurance Surveillance Plan (QASP)

Page 3 of 7 Version 0003 Dated 3/1/2018

5. QASP PERFORMANCE REPORT DATE:

Measures

PWS

Reference

Performance Requirement

Standard Acceptable Quality Level

Surveillance Method Met AQL/DID NOT MEET

AQL-

CPAR RATING/ADD

COMMENTS

Technical Proficiency

1.1.4 Contractor shall submit a

quarterly Quality Assurance report.

Mandatory to performance of duties

90% Periodic Inspection

Technical Proficiency

1.1.4 Contractor shall submit a

quarterly Quality Assurance report.

Mandatory to performance of duties

90% Periodic Inspection

Qualifications 2 Updated Licensing, registration and certification shall be provided as they are renewed. Licensing and registration information kept current.

Contractor shall maintain a current license to practice medicine in the state of Missouri.

Neurologists shall be Board Certified/Board Eligible by the American Board of Neurological Surgery.

On-site providers shall be certified in Basic Life Support (BLS). See comment on PWS at 2.1.2 & 2.1.2.2 Electro Neurophysiologic Technologists shall be accredited through the American Board of Registered Electro Neurophysiologic Technologist.

100% Direct Observation

Timeliness 3.1.1.1 Contractor shall be present prior to surgery.

During normal business hours of operation, the contracted staff shall be onsite and ready to perform services 45 minutes prior to the start of surgery. Equipment and technicians shall be cleared through biomed and SPS 45 minutes prior to surgical procedure.

Outside of normal business hours, contracted staff shall report to the operating room within 60 minutes of notification by VA. PWS 3.1.2.1

90% Direct Observation

Page 4 of 7 Version 0003 Dated 3/1/2018

Patient Safety 3.1.2.1 Contractor shall submit an equipment service report within 24 hours of the completion of the surgical case.

Mandatory to performance of

90% Direct Observation

Patient Access 7.3.1.1 The contractor shall provide contractor’s Neurologists in accordance with the operating hours and VA clinical schedule outlined in this PWS

Mandatory of performance of duties

Patient Safety 7.3.1.2 Patient safety incidents shall be reported using Patient Safety Report. All incidents reported immediately (within 24 hours.)

Mandatory to performance of

Page 5 of 7 Version 0003 Dated 3/1/2018

6. CPAR RATINGS ASSIGNED TO QASP ITEMS:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/pdfs/CPARS-Guidance.pdf p. A2-1):

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the

Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

VERY GOOD:

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY:

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.

MARGINAL:

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTO

RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

https://www.cpars.gov/pdfs/CPARS-Guidance.pdf

Page 6 of 7 Version 0003 Dated 3/1/2018

7. DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR

PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

See Sample CR below.

8. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

COR NAME/TITLE DATE

SIGNED:

CONTRACTOR NAME/TITLE DATE

Page 7 of 7 Version 0003 Dated 3/1/2018

CONTRACT REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS ISSUE

3. TO: (Contracting Officer) 4. FROM: (Name of COR)

5. DATES

a. CR PREPARED b. RETURNED BY

CONTRACTOR:

c. ACTION COMPLETE

6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR Date:

8. SIGNATURE OF CONTRACTING OFFICER Date:

9a. TO (Contracting Officer) 9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE.

(Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:

12. GOVERNMENT EVALUATION.

13. GOVERNMENT ACTIONS

14. CLOSE OUT

NAME TITLE SIGNATURE DATE

CONTRACTOR

NOTIFIED

COR

CONTRACTING

OFFICER

The contractor will be evaluated in accordance with the following:
2. GOVERNMENT ROLES AND RESPONSIBILITIES
3. CONTRACTOR REPRESENTATIVES
4. METHODS OF QA SURVEILLANCE
5. QASP PERFORMANCE REPORT DATE:
7. DOCUMENTING PERFORMANCE
8. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

File details come from the government source that posted it. Updated .