589-CA3-369, Renovate Emergency Room Phase 2 B
Solicitation number
36C25520R0007
Issued by

About this file

This solicitation package describes requirements for renovating an emergency department phase at the Kansas City VA Medical Center. Work includes general construction and renovations to existing space totaling approximately 1,250 square feet. The renovated space will include three new treatment rooms, a nourishment room, bio-med closet, shower/toilet facility, and electrical room. Headwalls and medical equipment will be provided. Electrical, mechanical, plumbing, and fire protection work is also included. The project completion period is estimated at 180 calendar days. The estimated cost range is $500,000 to $1,000,000. The solicitation will be issued on or about December 3, 2019 as a total small business set-aside for SDVOSBs under NAICS 236220. Proposals are due on or about January 17, 2020.

36C25520R0007 589-369 ER PH2 Drawings_Part3_Part1 (8 Sheets).pdf

View the file

Other files

File Type Posted
36C25520R0007-0003000.docx DOCX document
36C25520R0007-0002000.docx DOCX document
36C25520R0007-0002001.pdf PDF
36C25520R0007-0001001.pdf PDF
36C25520R0007-0001000.docx DOCX document
36C25520R0007-004.pdf PDF
36C25520R0007-007.pdf PDF
36C25520R0007-003.pdf PDF
36C25520R0007-002.pdf PDF
36C25520R0007-005.pdf PDF
36C25520R0007-001.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

C1-63A

VESTIBULE

C1-63A

CORRIDOR

C1-62C

CORRIDOR

V1-673

OFFICE

SUPERVISOR

V1-671

STAFF LOCKER/

LOUNGE

V1-671A

BIOMED

NETWORK

CLOSET

V1-675

OFFICE

V1-675B

ARMORY &

EVIDENCE

ROOM

OFFICE

V1-675A

VA POLICE

V1-683

ADMISSIONS

V1-654

TRIAGE

STATION 2

V1-650

ED 11

V1-652

ED 12

V1-687

ADMISSIONS

V1-642B

TOILET

V1-642C

TOILET

C1-62A

CORRIDOR

EXISTING

SHAFT

TO

REMAIN

G'

G1'

H'

J'

F'

E'

E F

E C

PARTIAL FIRST FLOOR PLAN-MED GAS DEMOLITION

SCALE: 1/4"= 1' 0"

1. REMOVE ALL EXISTING ABANDONED MEDICAL AIR, VACUUM, AND OXYGEN PIPING BACK

TO POINT OF CONNECTION. CAP REMAINING PIPING AS REQUIRED.

2. EXISTING ZONE VALVE CONTROL BOX TO BE REMOVED AND RETAINED FOR

RE-INSTALLATION. PREPARE REMAINING PIPING FOR RECONNECTION, RE: NEW WORK.

FLOOR PLAN NOTES

##P

N

M

A

M

V

O

MA

MV

O

MA

MV

O

MA

MV

O

01P

(TYP)

01P

(TYP)

02P

ZVC

AAP-1C

1" M

V

1/2" O

ZVC

AAP-1A

AAP-1B

1/ 2"

O 1/

2" M

A

M

V 1/

2" O

1/ 2"

M A

3/4" MV

1/2" O

1/2" MA

3/4" MV

1/2" O

1/2" MA

1" M

V 1/

2" O

3/ 4"

M A

3/ 4"

M V

1/ 2"

O 1/

2" M

A

1" M

V 1/

2" O

3/ 4"

M A

1" M

V 1/

2" O

1/ 2"

M A

3/4" MV

1/2" O

1/2" MA

3/4" MV

1/2" O

1/2" MA

1" MV

1/2" O

3/4" MA

1" M

V 1/

2" O

1/ 2"

M A

1" MV

1/2" O

1/2" MA

1 1/4" MV

1/2" O

3/4" MA

1" MV

1/2" MA

1" MV

1/2" O

3/4" MA

6A 72' 3' 4'3.9' 4.2'

E'

F'

G'

G1'

H'

J'

Lankford Fendler a s s o c i a t e s

BLDG 26

BLDG 1

BLDG

PHASE II

N

Revisions

Drawing Name: P:\18.5800\18.5833.00_KCVAMC-Emergency Dept-Remodel Phase II\Drawings\PHASE 2 DRAWINGS\18.5833.00PD201.dwg Jul 25,2019 - 5:01pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

PD201JMSLDR

FIRST FLOOR PLAN-MED GAS DEMO

PHASE IIB - PART 1

33 48

C1-63A

VESTIBULE

C1-63A

CORRIDOR

C1-62C

CORRIDOR

V1-673

OFFICE

SUPERVISOR

V1-671

STAFF LOCKER/

LOUNGE

V1-671A

BIOMED

NETWORK

CLOSET

V1-675

OFFICE

V1-675B

ARMORY &

EVIDENCE

ROOM

OFFICE

V1-675A

VA POLICE

V1-683

ADMISSIONS

V1-654

TRIAGE

STATION 2

V1-650

ED 11

V1-652

ED 12

V1-687

ADMISSIONS

V1-642B

TOILET

V1-642C

TOILET

C1-62A

CORRIDOR

EXISTING

SHAFT

TO

REMAIN

G'

G1'

H'

J'

F'

E'

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

E F

E C

PARTIAL FIRST FLOOR PLAN-PLUMBING NEW WORK

SCALE: 1/8"= 1' 0"

1. CONNECT TO EXISTING WATER PIPING AS INDICATED.

2. 1/2" HOT AND COLD WATER DOWN TO SINK. 2" WASTE DOWN, 1 1/2" VENT UP.

3. 1/2' HOT AND COLD WATER DOWN TO LAVATORY, AND 1/2" COLD WATER TO TRAP

PRIMER. 1 1/2" WASTE DOWN, 1 1/2" VENT UP. CONNECT OUTLET OF TRAP PRIMER TO

INLET ON FLOOR DRAIN PER MANUFACTURER'S RECOMMENDATIONS.

4. 1" COLD WATER DOWN TO WATER CLOSET.

5. 1/2" HOT AND COLD WATER DOWN TO SHOWER VALVE.

6. 3/4" HOT AND COLD WATER DOWN IN WALL. ROUTE 1/2" HOT AND COLD WATER TO EACH

SINK. 2" WASTE DOWN, 1 1/2" VENT UP.

7. VALVE AND CAP PIPING FOR FUTURE CONNECTION IN PHASE III. PROVIDE TEMPORARY

VALVED, BRAIDED, STAINLESS STEEL HOSE CONNECTION BETWEEN HOT WATER AND

RECIRCULATION PIPING. MINIMIZE LENGTH OF DEAD LEGS IN CAPPED PIPING.

8. CONNECT TO EXISTING VENT PIPING AS INDICATED.

9. CONNECT TO EXISTING WASTE PIPING BELOW FLOOR AS INDICATED.

10. PROVIDE 1/2" TEE, SHUTOFF VALVE, AND HOSE CONNECTION.

11. ROUTE 1/2" COLD WATER TO TRAP PRIMER VALVE. CONNECT OUTLET OF TRAP PRIMER

TO INLET ON FLOOR DRAIN(S) PER MANUFACTURER'S RECOMMENDATIONS.

12. 3/4" COLD WATER DOWN TO ICE MACHINE WITH DOUBLE CHECK BFP AND FILTER (BY

OTHERS) IN ACCESSIBLE LOCATION. ROUTE DRAIN FROM ICE MACHINE TO DRAIN BOX IN

WALL AND INDIRECT WASTE. 2" WASTE DOWN, 1 1/2" VENT UP.

13. 1/2" HOT AND COLD WATER DOWN TO RECESSED MIXING VALVE. ROUTE 1/2" TEMPERED

WATER TO INLET OF EYE/FACE WASH PER MANUFACTURER'S RECOMMENDATIONS.

FLOOR PLAN NOTES

##P

P102

P528

P528

P418

1 1/2" HW

2" CW

3/4" HWR

(TYP 2)

01P

N

6A 72' 3' 4'3.9' 4.2'

E'

F'

G'

G1'

H'

J'

NOT IN SCOPE

W

2" V

3/4" HWR

3/4" HW

3'

FD-C

02P

WCO

1/2" CW

1/2" HW

1 1/2" CW

3/4" HW

1/2" HWR

3/4" HW

1 1/2" CW

3/4" HWR

1 1/4" HW

2" CW

3/4" HW

3/4" CW

WCO

03P

2" W

04P

05P

06P

07P

W

V

2" W

1 1/2" V 2" V

07P

07P

1 1/2" CW

1" HW

1/2" HWR

C

W

H

W

H

W R

1 1/4" HW

2" CW

1 1/4" HW

2" CW

3/4" HWR

1/2" CW

1/2" HW

3/4" HW

3/4" CW

08P

09P

WCO

10P

P701

TP-1

02P

P528

P701

FD-C

TP-1

WCO

13P

09P

3/4" CW

3/4" HW

11P

3/4" CW

12P

V

P808

2" V

2" V

V1-844

TREATMENT

ROOM-3

V1-840

SHOWER

TOILET

TREATMENT

ROOM-2

TREATMENT

ROOM-1

V1-837

BIOMED

CLOSET

V1-842

V1-838

C1-62C

CORRIDOR

V1-668

NOURISHMENT

V1-834

ELECT

ROOM

Lankford Fendler a s s o c i a t e s

BLDG 26

BLDG 1

BLDG

PHASE II

N

Revisions

Drawing Name: P:\18.5800\18.5833.00_KCVAMC-Emergency Dept-Remodel Phase II\Drawings\PHASE 2 DRAWINGS\18.5833.00PL101.dwg Jul 25,2019 - 5:01pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

PL101JMSLDR

FIRST FLOOR PLAN-PLUMBING NEW WORK

34 48

M

A

M

V

O

ZVC

AAP-1C

1" M

V

1/2" O

ZVC

AAP-1A

AAP-1B

1/ 2"

O 1/

2" M

A

M

V 1/

2" O

1/ 2"

M A

3/4" MV

1/2" O

1/2" MA

3/4" MV

1/2" O

1/2" MA

1" M

V 1/

2" O

3/ 4"

M A

3/ 4"

M V

1/ 2"

O 1/

2" M

A

1" M

V 1/

2" O

3/ 4"

M A

1" M

V 1/

2" O

1/ 2"

M A

3/4" MV

1/2" O

1/2" MA

3/4" MV

1/2" O

1/2" MA

1" MV

1/2" O

3/4" MA

1" M

V 1/

2" O

1/ 2"

M A

1" MV

1/2" O

1/2" MA

1 1/4" MV

1/2" O

3/4" MA

1" MV

1/2" MA

1" MV

1/2" O

3/4" MA

6A 72' 3' 4'3.9' 4.2'

E'

F'

G'

G1'

H'

J'

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

C1-63A

VESTIBULE

C1-63A

CORRIDOR

C1-62C

CORRIDOR

V1-673

OFFICE

SUPERVISOR

V1-671

STAFF LOCKER/

LOUNGE

V1-671A

BIOMED

NETWORK

CLOSET

V1-675

OFFICE

V1-675B

ARMORY &

EVIDENCE

ROOM

OFFICE

V1-675A

VA POLICE

V1-683

ADMISSIONS

V1-654

TRIAGE

STATION 2

V1-650

ED 11

V1-652

ED 12

V1-687

ADMISSIONS

V1-642B

TOILET

V1-642C

TOILET

C1-62A

CORRIDOR

EXISTING

SHAFT

TO

REMAIN

G'

G1'

H'

J'

F'

E'

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

E F

E C

PARTIAL FIRST FLOOR PLAN-MED GAS NEW WORK

SCALE: 1/4"= 1' 0"

1. CONNECT TO EXISTING OXYGEN, VACUUM, AND MEDICAL AIR PIPING.

2. 1/2" O, 3/4" MV, 1/2" MA PIPED DOWN TO 2-O, 3-MV, 2-MA OUTLETS IN TREATMENT ROOM

HEADWALL UNIT.

3. VALVE AND CAP OXYGEN, VACUUM, AND MEDICAL AIR PIPING FOR FUTURE CONNECTION

TO PHASE IIB - PART 2, RE: PL202.

4. PRESSURE AND VACUUM SWITCHES INTERCONNECTED TO EXISTING AAP-1B.

FLOOR PLAN NOTES

##P

N

01P

02P

02P

02P

O

M

V

M

A

04P

1/2" MA

1/2" O

3/4" MV

1/2" MA

1/2" O

1" MV

6A 72' 3' 4'3.9' 4.2'

E'

F'

G'

G1'

H'

J'

3'

V1-844

TREATMENT

ROOM-3

V1-840

SHOWER

TOILET

TREATMENT

ROOM-2

TREATMENT

ROOM-1

V1-837

BIOMED

CLOSET

V1-842

V1-838

C1-62C

CORRIDOR

V1-668

NOURISHMENT

V1-834

ELECT

ROOM

Lankford Fendler a s s o c i a t e s

BLDG 26

BLDG 1

BLDG

PHASE II

N

Revisions

Drawing Name: P:\18.5800\18.5833.00_KCVAMC-Emergency Dept-Remodel Phase II\Drawings\PHASE 2 DRAWINGS\18.5833.00PL201.dwg Jul 25,2019 - 5:01pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

PL201JMSLDR

FIRST FLOOR PLAN-MED GAS NEW WORK

35 48

WASTE AND VENT RISER DIAGRAM

NO SCALE

SECOND FLOOR

CEILING

FLOOR

W

P-701

W

FD-C

W

P-102

V

W

W

WCOWCO

V

V

2" V

P-418P-528 P-528P-528

2" W4" W4" W

4" W

V

V

V

2" V

4" W

1 1/2" V

2" V

1 1/2" V

V1-840

SHOWER

TOILET

V1-840

SHOWER

TOILET

V1-840

SHOWER

TOILET

V1-840

SHOWER

TOILET

TREATMENT

ROOM-2

V1-842V1-844

TREATMENT

ROOM-3

TREATMENT

ROOM-1

V1-838

FIRE STOPPING DETAIL

GYPSUM/STUD WALL

NO SCALE INSULATED METALLIC PIPES

System No. W-L-5029 C

CL

ASS IF IED

Classified by Underwriters Laboratories, Inc.

to UL 1479 and CAN/ULC-S115

US

ANSI/UL1479 (ASTM E814) CAN/ULC S115

F Ratings — 1, 2 and 3 Hr (See Items 1, 3 and 4) F Ratings — 1, 2 and 3 Hr (See Items 1, 3 and 4)

T Ratings — 0, 1/2, 1 and 1-1/4 Hr (See Item 3) FT Ratings — 0, 1/2, 1 and 1-1/4 Hr (See Item 3)

L Rating At Ambient — 4 CFM/Sq Ft FH Ratings — 1, 2 and 3 Hr (See Items 1, 2 and 4)

SECTION A-A

A

A

4 3

L Rating At 400 F — Less Than 1 CFM/Sq Ft FTH Ratings — 0, 1/2, 1 and 1-1/4 Hr (See Item 3)

L Rating At Ambient — 4 CFM/Sq Ft

L Rating At 400 F — Less Than 1 CFM/Sq Ft

1. Wall Assembly — The 1, 2 or 3 hr fire-rated gypsum board/stud wall assembly shall be constructed of the materials and in the manner specified in the individual U300, U400, V400 or W400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following construction features:

A. Studs — Wall framing may consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. (51 by 102 mm) lumber spaced 16 in. (406 mm) OC. Steel studs to be min 2-1/2 in. (64 mm) wide for 1 and 2 hr F and FH rating and 3-1/2 in. (89 mm) wide for 3 hr F and FH rating and spaced max 24 in. (610 mm) OC.

B. Gypsum Board* — Min 5/8 in. (16 mm) thick with square or tapered edges. The gypsum board type, thickness, number of layers, fastener type and sheet orientation shall be as specified in the individual Wall and Partition Design. Max diam of opening is 18-5/8 in. (473 mm).

The hourly F and FH Ratings of the firestop system are equal to the hourly fire rating of the wall assembly in which it is installed.

2. Through Penetrants — One metallic pipe or tubing to be installed within the firestop system. Pipe or tubing to be rigidly supported on both sides of wall assembly. The following types and sizes of metallic pipes or tubing may be used:

A. Steel Pipe — Nom 12 in. (305 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe.

B. Iron Pipe — Nom 12 in. (305 mm) diam (or smaller) cast or ductile iron pipe.

C. Copper Tubing — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tubing. When the hourly F or FH Rating of the firestop system is 3 hr, the nom diam of copper tube shall not exceed 4 in. (102 mm).

D. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) Regular (or heavier) copper pipe. When the hourly F or FH Rating of the firestop system is 3 hr, the nom diam of copper pipe shall not exceed 4 in. (102 mm).

3.Pipe Covering* — Nom 1, 1-1/2 or 2 in. (25, 38 or 51 mm) thick hollow cylindrical heavy density (min 3.5 pcf or 56 kg/m3) glass fiber units jacketed on the outside with an all service jacket. Longitudinal joints sealed with metal fasteners or factory-applied self-sealing lap tape. Transverse joints secured with metal fasteners or with butt tape supplied with the product. For 1 and 2 hr F and FH Ratings, the annular space between insulated penetrant and periphery of opening shall be min 0 in. (point contact) to max 1-7/8 in. (48 mm). For 3 hr F and FH Ratings, the annular space shall be min 0 in. (point contact) to max 1-1/4 in. (32 mm).

See Pipe and Equipment Covering — Materials (BRGU) category in the Building Material Directory for the names of manufacturers. Any pipe covering material meeting the above specifications and bearing the UL Classification Marking with a Flame Spread Index of 25 or less and a Smoke Developed Index of 50 or less may be used.

The hourly T, FT, FTH Ratings of the firestop system are 1/2 hr for 1 hr rated walls and 1 hr for 2 hr rated walls. For 3 hr rated walls, the hourly T, FT and FTH Ratings when steel and iron pipes are used are 1 hr. For 3 hr rated walls, the hourly T, FT and FTH Ratings when copper penetrants are used are 1-1/4 hr for 2 in. (51 mm) thick pipe covering and 0 hr for pipe covering thickness less than 2 in. (51 mm).

3A. Pipe Covering* — (Not Shown) — As an alternate to Item 3, max 2 in. (51 mm) thick cylindrical calcium silicate (min 14 pcf) units sized to the outside diam of the pipe or tube may be used. Pipe insulation secured with stainless steel bands or min 18 AWG stainless steel wire spaced max 12 in. (305

mm) OC. When the alternate pipe covering is used, the T and FT Rating shall be as specified in item 3 above.

See Pipe and Equipment Covering — Materials (BRGU) category in the Building Materials Directory for names of manufacturers. Any pipe covering material meeting the above specifications and bearing the UL Classification Marking with a Flame Spread Index of 25 or less and a Smoke Developed Index of 50 or less may be used.

4.Fill, Void or Cavity Material* — Sealant — For 1 and 2 hr F and FH Rating, min 5/8 in. (16 mm) thickness of fill material applied within the annulus, flush with both surfaces of wall. For 3 hr F and FH Rating, min 1 in. (25 mm) thickness of fill material applied within the annulus, flush with both surfaces of wall. At the point contact location between pipe covering and gypsum board, a min 1/2 in. (13 mm) diam bead of fill material shall be applied at the pipe covering/gypsum board interface on both surfaces of wall.

HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-One Sealant or FS-ONE MAX Intumescent Sealant

* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.

March 30, 2015

FIRE STOPPING DETAIL

CONCRETE WALL/FLOOR

NO SCALE INSULATED METALLIC PIPES

System No. C-AJ-5091

SECTION A-A

1. Floor or Wall Assembly — Min 4-1/2 in. (114 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m³) concrete. Wall may also be constructed of any UL Classified Concrete Blocks*. Max diam of opening is 29 in. (737 mm).

See Concrete Blocks (CAZT) category in the Fire Resistance directory for names of manufacturers.

2. Metallic Sleeve — (Optional) — Nom 30 in. (762 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe sleeve cast or grouted into floor or wall assembly, flush with floor or wall surfaces or extending a max of 3 in. (76 mm) above floor or beyond both surfaces of wall. If the steel sleeve extends beyond the top surface of the floor or both surfaces of the wall, the T Rating of the firestop system is 0 hr.

2A. Sheet Metal Sleeve — (Optional) - Max 6 in. (152 mm) diam, min 26 ga galv steel provided with a 26 ga galv steel square flange spot welded to the sleeve at approximately mid- height, or flush with bottom of sleeve in floors, and sized to be a min of 2 in. (51 mm) larger than the sleeve diam. The sleeve is to be cast in place flush with bottom surface of floor and may extend a max of 1 in. (25 mm) above the top surface of the floor.

2B. Sheet Metal Sleeve — (Optional) - Max 12 in. (305 mm) diam, min 24 ga galv steel provided with a 24 ga galv steel square flange spot welded to the sleeve at approximately mid- height, or flush with bottom of sleeve in floors, and sized to be a min of 2 in. (51 mm) larger than the sleeve diam. The sleeve is to be cast in place flush with bottom surface of floor and may extend a max of 1 in. (25 mm) above the top surface of the floor.

3.Through Penetrants — One metallic pipe or tubing to be installed either concentrically or eccentrically within the firestop system. Pipe or tubing to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of metallic pipes or tubing may be used:

A. Steel Pipe — Nom 12 in. (305 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe.

B.Iron Pipe — Nom 12 in. (305 mm) diam (or smaller) cast or ductile iron pipe.

C. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) Regular (or heavier) copper pipe.

D. Copper Tubing — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tubing.

4.Pipe Covering — Min 1/2 in. (13 mm) to max 2 in. (51 mm) thick hollow cylindrical heavy density (min 3.5 pcf or 56 kg/m³) glass fiber units jacketed on the outside with an all-service jacket. Longitudinal joints sealed with metal fasteners or factory-applied, self-sealing lap tape. Transverse joints secured with metal fasteners or with butt tape supplied with the product. The annular space between the insulated pipe and the edge of the periphery of the opening shall be min 1/2 in. (13 mm) to max 12 in. (305 mm). When thickness of pipe covering is less than 2 in. (51 mm), the T Rating for the firestop system is 0 hr.

See Pipe Equipment Covering — Materials — (BRGU) category in the Building Materials Directory for names of manufacturers. Any pipe covering material meeting the above specifications and bearing the UL Classification Marking with a Flame Spread Index of 25 or less and a Smoke Developed Index of 50 or less may be used.

4A. Pipe Covering — (Not Shown) — As an alternate to Item 4, max 2 in. (51 mm) thick cylindrical calcium silicate (min 14 pcf or 224 kg/m³) units sized to the outside diam of the pipe or tube may be used. Pipe insulation secured with stainless steel bands or min 18 AWG stainless steel wire spaced max 12 in. (305

mm) OC. The annular space shall be min 1/2 in. (13 mm) to max 12 in. (305 mm).

5.Firestop System — The firestop system shall consist of the following:

A. Packing Material — Min 4 in. (102 mm) thickness of min 4 pcf (64 kg/m³) mineral wool batt insulation firmly packed into opening as a permanent form. Packing material to be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of fill material.

B.Fill, Void or Cavity Material* — Sealant — Min 1/2 in. (13 mm) thickness of fill material applied within the annulus, flush with top surface of floor or with both surfaces of wall.

HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-One Sealant or FS-ONE MAX Intumescent Sealant

* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.

A

A

5B

5A

C

CL

ASS IF IED

Classified by Underwriters Laboratories, Inc.

to UL 1479 and CAN/ULC-S115

US

ANSI/UL1479 (ASTM E814) CAN/ULC S115

F Rating — 2 Hr F Rating — 2 Hr

T Ratings — 0 and 1 Hr (See Items 2 and 4) FT Ratings — 0 and 1 Hr (See Items 2 and 4)

L Rating At Ambient — 4 CFM/sq ft FH Rating — 2 Hr

L Rating At 400 F — Less Than 1 CFM/sq ft FTH Ratings — 0 and 1 Hr (See Items 2 and 4)

L Rating At Ambient —4 CFM/sq ft

L Rating At 400 F —Less Than 1 CFM/sq ft

January 13, 2015

Lankford Fendler a s s o c i a t e s

Revisions

Drawing Name: P:\18.5800\18.5833.00_KCVAMC-Emergency Dept-Remodel Phase II\Drawings\PHASE 2 DRAWINGS\18.5833.00PG701.dwg Jul 25,2019 - 5:45pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

P701JMSLDR

PLUMBING RISERS

36 48

PARTIAL FIRST FLOOR PLAN-FIRE PROTECTION

SCALE: 1/8"= 1' 0"

FLOOR PLAN NOTES

##F

N

1. PROTECT AREA PER NFPA 13 FOR LIGHT HAZARD OCCUPANCY (0.10/1500 + 100 GPM

HOSE).

2. PROTECT AREA PER NFPA 13 FOR ORDINARY HAZARD GROUP 2 OCCUPANCY (0.20/1500 +

250 HOSE).

3. PROVIDE SPRINKLER PROTECTION AT LOCATION OF TEMPORARY WALLS SEPARATING

DIFFERENT PHASES OF CONSTRUCTION AS REQUIRED TO PROVIDE COMPLETE

CONTINUOUS SPRINKLER COVERAGE DURING CONSTRUCTION IN ACCORDANCE WITH

NFPA 13.

01F

02F

01F 01F 01F

01F

K-4450-C STRATTON C_TOILETS VITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

6A 72' 3' 4'3.9' 4.2'

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

EXISTING

SHAFT

TO

REMAIN

G'

G1'

H'

J'

F'

E'

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

E F

E C

A. EXISTING WET PIPE SPRINKLER SYSTEM SHALL BE EXTENDED / MODIFIED FOR NEW

WORK. (PROVIDE NEW CONTROL VAVLE TO ISOLATE THE NEW CONSTRUCTION.) ENTIRE

SYSTEM SHALL BE DESIGNED FOR STRICT COMPLIANCE WITH THE RULES AND

REGULATIONS OF APPLICABLE FEDERAL, STATE AND LOCAL LAWS, CODES AND

ORDINANCES, THE OWNER'S INSURANCE COMPANY AND NFPA-13, AND THE VA FIRE

PROTECTION DESIGN MANUAL. SYSTEM SHALL BE COMPLETE AND FULLY CODE

COMPLIANT.

B. CONTRACTOR SHALL COORDINATE WITH NEW REFLECTED CEILING PLAN, NEW

DUCTWORK LAYOUT AND LIGHTING LAYOUTS. FURNISH ALL MATERIALS, LABOR, TOOLS,

TRANSPORTATION, INCIDENTALS AND APPURTENANCES TO COMPLETE IN EVERY DETAIL

AND LEAVE IN WORKING ORDER ALL ITEMS OF WORK REQUIRED FOR SYSTEM OPERATION.

a. NPS 2 (DN 50) AND SMALLER: THREADED-END, BLACK STANDARD-WEIGHT STEEL PIPE; CAST-

OR MALLEABLE-IRON THREADED FITTINGS; AND THREADED JOINTS.

b. NPS 1-1/2 (DN 40) AND LARGER: GROOVED-END, SCHEDULE 10 STEEL PIPE; STEEL-WELDING

FITTINGS, GROOVED-END FITTINGS; GROOVED-END-PIPE COUPLINGS; AND GROOVED JOINTS.

C. FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED AND COORDINATED SHOP

DRAWINGS SO AS TO AVOID CONFLICTS IN THE FIELD. ALL SPRINKLER LINES SHALL BE

CONCEALED, AVOIDING INTERFERENCES WITH LIGHTS, DUCTS, PIPES, ETC. ALL

COORDINATION SHALL TAKE PLACE PRIOR TO INSTALLATION.

D. CONTRACTOR SHALL FILE ALL DRAWINGS, PAY ALL FEES AND OBTAIN PERMITS AND

CERTIFICATES OF INSPECTIONS RELATIVE TO THIS WORK. CONTRACTOR SHALL BE

RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING SPRINKLERS, PIPING, ETC.

E. FIRE PROTECTION CONTRACTOR TO REPLACE EXISTING SPRINKLERS TO ACCOMMODATE

AREAS WHERE CEILING WORK IS TO TAKE PLACE PER NFPA 13 SPRINKLERS CANNOT BE

RELOCATED AND REUSED. RE: ARCHITECTURAL REFLECTED CEILING PLANS.

F. SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH NFPA 25 SECTION 5.2.2.2 AND

PIPING SHALL NOT BE SUBJECTED TO EXTERNAL LOADS BY MATERIALS EITHER RESTING

ON THE PIPE OR HUNG FROM THE PIPE.

G. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

GENERAL NOTES

TREATMENT

ROOM-1

V1-838

V1-837

BIOMED

CLOSET

V1-840

SHOWER

TOILET

TREATMENT

ROOM-2

V1-842

V1-844

TREATMENT

ROOM-3

C1-62C

CORRIDOR

03F

03F

FP101

Lankford Fendler a s s o c i a t e s

BLDG 26

BLDG 1

BLDG

PHASE II

N

Revisions

Drawing Name: P:\18.5800\18.5833.00_KCVAMC-Emergency Dept-Remodel Phase II\Drawings\PHASE 2 DRAWINGS\18.5833.00FP101.dwg Jul 25,2019 - 5:19pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

FIRST FLOOR PLAN-FIRE PROTECTION

PHASE IIB - PART 1

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

· REFER TO ARCHITECTS REFLECTED CEILING PLANS FOR EXACT PLACEMENT OF LIGHT

FIXTURES, SPEAKER AND F.A. DEVICES IN THE CEILING SYSTEM.

· REFER TO ARCHITECTURAL DETAILS AND ELEVATIONS FOR COORDINATION OF LOCATION

OF ALL WIRING DEVICES BEFORE ROUGH-IN OF J-BOXES.

· WIRING TO BE REMOVED BACK TO THE NEAREST DEVICE TO REMAIN.

· ANY MATERIAL REMOVED THAT OWNER DOES NOT WISH TO RETAIN SHALL BE REMOVED

FROM PROJECT SITE AND DISPOSED OF BY THE CONTRACTOR DAILY.

· PROVIDE UPDATED, TYPEWRITTEN PANELBOARD DIRECTORY FOR EACH PANELBOARD

WHICH CIRCUITS HAVE BEEN ADDED TO OR MODIFIED.

· CONTRACTOR TO REFERENCE BRANCH CIRCUIT COPPER CONDUCTOR AND CONDUIT

SIZING CHART FOR SIZING OF BRANCH CIRCUITS AND OR FEEDERS AT OR BELOW

100AMPS.

· SUPPORT ALL LIGHT FIXTURES WITH A MINIMUM OF (4) 12 GA. HANGER WIRES TO

STRUCTURE ABOVE.

· CONNECT EXIT AND EMERGENCY LIGHTS TO HOT LEG, NOT SWITCH LEG.

· REPAIR AND/OR REPLACE ANY DAMAGED CEILING TILE OR GRID DUE TO INSTALLATION OF

CONDUITS, ETC. ABOVE EXISTING CEILING. WALK BUILDING WITH ARCHITECT PRIOR TO

COMMENCING WORK TO NOTE ANY EXISTING DAMAGED CEILING TILE OR GRID.

· LOCATE ALL IN SLAB REBAR PRIOR TO CORE DRILLING AND SHALL ADJUST CORE

LOCATIONS AS TO AVOID REBAR. PROVIDE MINIMUM SPACING BETWEEN CORE DRILL

LOCATIONS AS REQUIRED BY POKE THROUGH DEVICE UL LISTING. ALL CORE DRILLING

AND WORK DONE BELOW FLOOR SHALL BE DONE AFTER HOURS.

· DISCONNECTS FOR MECHANICAL EQUIPMENT ARE PROVIDED BY OTHERS. UNLESS

NOTED OTHERWISE.

· CONTRACTOR SHALL FOLLOW THE FOLLOWING GUIDE LINES;

a. MAXIMUM OF 6 RECEPTACLE PER 120V CIRCUIT.

b. MAXIMUM OF 16A PER 20A/1P CIRCUIT BREAKER.

c. WHERE ACCEPTABLE INSTALL SWITCHES UNDER COMMON FACE PLATE.

d. PROVIDE DEDICATED CIRCUIT FOR EVERY COPY MACHINE AND ABOVE COUNTER

GFI'S.

e. CONTRACTOR SHALL INSTALL FIRE ALARM DEVICES THAT COMPLIES WITH

APPLICABLE CODES. INCLUDING BUT NOT LIMITED TO THE NFPA, UL, ADA.

f. CONTRACTOR SHALL COMPLY WITH THE NEC OR ANY OTHER CODES HAVING

JURISDICTION.

· THE ELECTRICAL CONTRACTOR SHALL INCLUDE IN BID ALL COSTS ASSOCIATED WITH FIRE

ALARM MODIFICATIONS. THIS WORK SHALL INCLUDE POWER EXTENDER PANEL, SMOKE

DETECTORS, HORN/STROBES, PULL STATIONS, REMOTE INDICATING LIGHTS AND ANY

OTHER FIRE ALARM WORK SHOWN ON PLANS. ALL WIRING, PLENUM RATED CABLING,

BETWEEN DEVICES SHALL BE INCLUDED IN WORK TO PROVIDE AN OPERATIONAL

EXTENSION OF THE EXISTING FIRE ALARM SYSTEM.

· ALIGN ALL WIRING DEVICES IN VERTICAL ALIGNMENT. IF ANY DEVICE(S) ARE FOUND NOT

TO BE INSTALLED PER DETAIL CONTRACTOR SHALL RELOCATE AND PAY ALL ASSOCIATED

COSTS ASSOCIATED WITH THE RELOCATION(S).

· LIGHTING INDICATED ABOVE EXIT DISCHARGE DOOR IS FOR MEANS OF EGRESS

ILLUMINATION PER IBC 1006.1.

· MEANS OF EGRESS TO BE ILLUMINATED AT NOT LESS THAN 1 FOOTCANDLE AT THE

FLOOR. CONTRACTOR SHALL PROVIDE AND INSTALL IF NECESSARY ADDITIONAL

EMERGENCY FIXTURES IF NECESSARY TO MEET THE REQUIRED READINGS.

· PROVIDE FIRE STOP ON ALL PIPING AT FLOOR PENETRATIONS PER LOCAL CODE

REQUIREMENTS. METHOD OF FIRE STOP SHALL MEET WALL RATING. RE:

ARCHITECTURAL DRAWINGS FOR LOCATION OF FIRE RATED WALLS. PROVIDE FIRE CAP

HOUSING FOR ALL FIXTURES THAT PENETRATE FIRE RATED CEILINGS.

· INSTALL FIRE ALARM DEVICES THAT COMPLY WITH APPLICABLE CODES. INCLUDING BUT

NOT LIMITED TO THE FAIR HOUSING ACT, NFPA, UL, ADA, IBC OR ANY OTHER AUTHORITIES

HAVING JURISDICTION.

· WHERE MORE THAN ONE SWITCH IS INDICATED ON DRAWINGS SIDE BY SIDE,

CONTRACTOR SHALL INSTALL SWITCHES UNDER ONE COMMON FACE PLATE.

· FIRE ALARM CONTRACTOR IS RESPONSIBLE OF TESTING AND VERIFYING THAT THE

AUDIBILITY OF THE FIRE ALARM SYSTEM MEETS A MINIMUM OF 15 DBA ABOVE AMBIENT

NOISE LEVELS. AFTER INSTALLATION AND BEFORE CERTIFICATE OF OCCUPANCY. ADD

HORNS WHERE REQUIRED TO MAINTAIN MINIMUM LEVELS.

· UPON REQUEST FOR ELECTRONIC FILES, CONTRACTOR SHALL FILL OUT, SIGN AND

RETURN ELECTRONIC MEDIA RELEASE FORM FROM ENGINEER AND PROVIDE PAYMENT

FOR FEES STIPULATED ON ELECTRONIC MEDIA RELEASE FORM. UPON RECEIPT OF

COMPLETED RELEASE FORM AND PAYMENT, ELECTRONIC FILES WILL BE RELEASED.

· CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECONNECTION OF ALL EXISTING

ELECTRICAL LOADS, WHICH ARE TO REMAIN, TO NEW ELECTRICAL DISTRIBUTION SYSTEM.

· WHERE THE DRAWINGS INDICATE DEDICATED CIRCUITRY WITH NO SHARED NEUTRALS,

THE CONTRACTOR SHALL NOT INSTALL MULTI-WIRE BRANCH CIRCUITS WITH A COMMON

NEUTRAL.

· ALL PATIENT CARE AREAS SHALL MEET GROUNDING REQUIREMENTS OF NEC ARTICLE

517.13. WHERE TYPE MC CABLE IS USED, THE METAL SHEATHING SHALL BE LISTED AS AN

ACCEPTABLE GROUNDING PATH - TYPE 'HCFMC'.

· CONTRACTOR SHALL PROVIDE DEVICE BOX EXTENSION RINGS AS REQUIRED WHERE

ADDITIONAL DRYWALL IS BEING ADDED TO WALLS TO COMPENSATE FOR ADDITIONAL

WALL THICKNESS.

· ALL THROUGH WALL PENETRATIONS FOR LOW-VOLTAGE CABLING RACEWAYS SHALL BE

FIRE-STOPPED USING HILTI 'CP 653 BA' (OR PRE-BID APPROVED EQUAL) MANUFACTURED

FIRE-STOPPING DEVICES.

· SECURITY CABLING AND DEVICES ARE BY OTHERS - COORDINATE WITH VA COR.

SECURITY SCOPE OF PLANS COVERS RACEWAY AND INFRASTRUCTURE ONLY.

· NURSE CALL CABLING AND DEVICES ARE BY OTHERS - COORDINATE WITH VA COR.

NURSE CALL SCOPE OF PLANS COVERS RACEWAY AND INFRASTRUCTURE ONLY.

· LOW-VOLTAGE COMMUNICATIONS CABLING AND DEVICES ARE BY OTHERS - COORDINATE

WITH VA COR. LOW-VOLTAGE COMMUNICATIONS SCOPE OF PLANS COVERS RACEWAY

AND INFRASTRUCTURE ONLY.

GENERAL NOTES

(TYPICAL ALL SHEETS)

AFF ABOVE FINISH FLOOR

EXISTING TO REMAINETR

EMERGENCY POWER DOUBLE DUPLEX RECEPTACLE

DOUBLE DUPLEX RECEPTACLE. +1'-6" AFF OR AS NOTED

DOUBLE DUPLEX RECEPTACLE INSTALLED ABOVE COUNTERTOP.

DUPLEX RECEPTACLE W/GROUND FAULT PROTECTION.

+1'-6" AFF OR AS NOTED

EMERGENCY POWERED DUPLEX RECEPTACLE

PUSH BUTTON +4'-0" AFF.

DUPLEX RECEPTACLE. +1'-6" AFF OR AS NOTED

DUPLEX RECEPTACLE INSTALLED ABOVE COUNTERTOP

INDICATES WIRING DEVICE ABOVE RE: DRAWING

MECHANICAL EQUIPMENT CALL OUT BUBBLE

THERMOSTAT OUTLET BOX WITH 3/4"C, STUBBED UP OUT OF BOX TO ABOVE

ACCESSIBLE CEILING. THERMOSTAT AND WIRING BY OTHERS. +4'-0" AFF OR

AS NOTED.

CARD READER. PROVIDE DOUBLE GANG J-BOX WITH SINGLE GANG PLASTER

RING WITH 3/4"C STUBBED UP INSIDE WALL AND OUT TO ACCESSIBLE CEILING

WITH BUSHING ON THE END. +3'-10" AFF OR AS NOTED.

WALL MOUNTED OR CEILING MOUNTED JUNCTION BOX.

WALL MOUNTED JUNCTION BOX WITH BLANK COVERPLATE.

FIRE ALARM MANUAL PULL STATION. +4'-0" AFF

FIRE AND SMOKE DAMPER 120V, 1Ø

CEILING MOUNTED REMOTE INDICATED LIGHT FOR DUCT MOUNTED

SMOKE DETECTOR.

CEILING MOUNTED PHOTO-ELECTRIC SMOKE DETECTOR

LOW VOLTAGE COMMUNICATIONS OUTLET, DOUBLE GANG BOX WITH SINGLE

GANG PLASTER RING. INSTALL 1" CONDUIT STUBBED UP OUT OF TOP OF BOX

TO ABOVE AN ACCESSIBLE CEILING. INSTALL ABOVE COUNTER.

LOW VOLTAGE COMMUNICATIONS OUTLET, DOUBLE GANG BOX WITH SINGLE

GANG PLASTER RING. INSTALL 1" CONDUIT STUBBED UP OUT OF TOP OF BOX

TO ABOVE AN ACCESSIBLE CEILING. +1'-6" AFF OR AS NOTED.

DOOR HOLDER 120V, 1Ø, CONNECT TO FIRE ALARM CONTROL PANEL

OR

FSD

OR

W

GFI

INDICATES X/X= 2-POLE C.B., X/X/X = 3-POLE C.B.

ELECTRICAL SYMBOLS

GROUND CONDUCTOR

NEUTRAL CONDUCTOR

PHASE CONDUCTORS

HOMERUN INDICATED LIKE THIS INDICATED THREE SEPARATE CIRCUITS

BRANCH CIRCUIT CONCEALED IN CEILING OR WALL. ARROWS INDICATE

HOMERUNS TO PANEL. ALL CONDUCTORS ARE MINIMUM NO.12 UNLESS

NOTED OTHERWISE.

GROUNDING CONDUCTOR NO.12 WIRE EXCEPT AS NOTED

CONDUIT RUN UNDERGROUND OR CONCEALED IN FLOOR SLAB.

CONDUIT CONCEALED IN CEILING OR WALL WITH THREE CONDUCTORS:

1-PHASE; 1-NEUTRAL; 1-GROUND WIRE, MINIMUM NO.12 WIRE UNLESS

OTHERWISE SPECIFIED ON DRAWINGS.

EXIT SIGN - SINGLE FACED - ARROWS AS SHOWN ON DRAWING. SHADED

SIDE(S) INDICATES FACE SIDE(S) OF EXIT.

EXIT SIGN - DOUBLE FACED - ARROWS AS SHOWN ON DRAWING. SHADED

SIDE(S) INDICATES FACE SIDE(S) OF EXIT.

2x4 / 2x2 LIGHT FIXTURE ON EMERGENCY POWER - CRITICAL BRANCH -

LETTER DENOTES FIXTURES TYPE, REFER TO FIXTURE SCHEDULE FOR TYPE

SINGLE POLE SWITCH. +4'-0" AFF TO CENTERLINE OF DEVICE BOX

DISCONNECT SWITCH, SIZE AND TYPE AS NOTED

TOP MOUNTED 5'-0" AFF

480/277V PANELBOARD (SURFACE) TOP MOUNTED 6'-0" AFF

CONDUIT STUBBED THRU WALL WITH BUSHINGS ON BOTH ENDS. SIZE

AS NOTED ON PLANS.

EMPTY CONDUIT STUB-UP INSIDE WALL TO ABOVE ACCESSIBLE CEILING WITH

BUSHING ON THE END. SIZE AS NOTED ON DRAWINGS.

208Y/120V PANELBOARD (SURFACE) TOP MOUNTED 6'-0" AFF

POWER CONNECTION POINT

SURFACE MOUNTED EQUIPMENT, TYPE AS INDICATED ON DRAWINGS

FLUSH MOUNTED EQUIPMENT, TYPE AS INDICATED ON DRAWINGS

WALL WASH OR RECESSED CEILING LIGHT FIXTURE

STRIP FIXTURE, LETTER DENOTES FIXTURE TYPE, REFER TO SCHEDULE

GROUND

CONDUIT DOWN

CONDUIT UP

OR

AA

OR

OR

OR

1/3, 1/3/5

CATV JUNCTION BOX WITH 3/4" CONDUIT STUBBED UP OUT OF BOX TO ABOVE

ACCESSIBLE CEILING. +1'-6" AFF OR AS NOTED.

VOICE OUTLET WITH 3/4" CONDUIT STUBBED UP OUT OF BOX TO ABOVE

ACCESSIBLE CEILING. INSTALLED ABOVE COUNTERTOP. (W DENOTES WALL

MOUNTED +48" AFF)

DUCT MOUNTED PHOTO-ELECTRIC SMOKE DETECTOR

FA COMBINATION HORN/STROBE WALL MOUNTED, +6'-8" AFF.

FA COMBINATION HORN/STROBE CEILING MOUNTED (FLUSH)

REQUEST TO EXIT MOTION SENSOR

ELECTRIC STRIKE

MAG-LOCK

FIXED CAMERA

PENDANT MOUNTED LIGHT FIXTURE, SIZE AND TYPE AS NOTED

CEILING MOUNTED HEAT DETECTOR

ML

ES

CR

RX

F

DH

RL

DH

T

X

DUPLEX RECEPTACLE MOUNTED IN CEILING TILE OR CEILING.

WALL MOUNTED MOTION SENSOR, +4'-0" AFF TO CENTERLINE OF DEVICE BOX,

TYPE AS INDICATED

MS

KEYPAD.KP

MS

CEILING MOUNTED MOTION DETECTOR TYPE AS INDICATED

JJ

B

TV

SWITCH-LEG AND OR TRAVELER

2x4 / 2x2 LIGHT FIXTURE, LETTER DENOTES FIXTURE TYPE, REFER TO

SCHEDULE

PREFABRICATED BEDSIDE PATIENT UNITPBPU

OR

2x4 / 2x2 LIGHT FIXTURE ON EMERGENCY POWER - LIFE SAFETY BRANCH -

LETTER DENOTES FIXTURES TYPE, REFER TO FIXTURE SCHEDULE FOR TYPE

480/277V E-POWER PANELBOARD (SURFACE) TOP MOUNTED 6'-0" AFF

208Y/120V E-POWER PANELBOARD (SURFACE) TOP MOUNTED 6'-0" AFF

WALL MOUNTED OR CEILING MOUNTED JUNCTION BOX, E-POWER.OR

JJ

LIGHTING GENERATOR TRANSFER DEVICE. WATTSTOPPER "ELCU-200",

OR EQUALS BY IOTA, BODINE.

GT

MS

CEILING MOUNTED MOTION DETECTOR TYPE AS INDICATED

UNLESS OTHERWISE NOTED ON THE DRAWINGS.=*

100 1 AWG

2 AWG

1-1/4"

8 AWG

8 AWG

1"

1-1/2"

1-1/4"

1-1/2"

1-1/4"

1-1/2"

1-1/4"

CONDUCTOR SIZE

BRANCH CIRCUIT COPPER CONDUCTOR

4 AWG

6 AWG

4 AWG

3 AWG

8 AWG

6 AWG

8 AWG

OVERCURRENT

PROTECTION DEVICE

RATING (AMPS)

12 AWG

12 AWG

10 AWG

10 AWG

SIZE

CONDUCTOR

REQUIRED

3/4"

3/4"

3/4"

3/4"

8 AWG

8 AWG

10 AWG

10 AWG

1"

1"

1"

10 AWG

10 AWG

10 AWG

1-1/4"

1"

3/4"

1"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

WIRE + GND.

SINGLE PHASE 2

CONDUIT SIZE

AND CONDUIT SIZING CHART

10 AWG

10 AWG

12 AWG

12 AWG

EQUIPMENT

GROUNDING

3/4"

3/4"

3/4"

3/4"

CONDUIT SIZE

SINGLE PHASE 3

WIRE + GND.

3/4"

1-1/4"

1"

1"

3/4"

3/4"

3/4"

1-1/4"

1-1/4"

1-1/4"

1"

3/4"

1"

3/4"

THREE PHASE 4

3/4"

3/4"

3/4"

3/4"

THREE PHASE 3

CONDUIT SIZE

WIRE + GND.

3/4"

3/4"

3/4"

3/4"

WIRE + GND.

CONDUIT SIZE

=* ALL CONDUCTORS SIZED ON THE POWER RISER DIAGRAM OR IN BRANCH CIRCUIT CONDUCTOR TABLE ARE BASED ON 3 CURRENT

CARRYING CONDUCTORS IN A RACEWAY OR CABLE. CONDUCTORS SHALL BE DERATED IN ACCORDANCE WITH THE NEC IF 4 OR MORE

CONDUCTORS ARE PLACED IN A RACEWAY OR CABLE.

UNLESS OTHERWISE NOTED ON THE DRAWINGS, ALL BRANCH CIRCUITS AND FEEDERS TO BE PROVIDED WITH A NEUTRAL WIRE.=*

S

VOICE SPEAKER, CEILING MOUNTED

WIRELESS ACCESS POINT.

WA

Lankford Fendler a s s o c i a t e s

BLDG 26

BLDG 1

BLDG

PHASE II

N

Revisions

Drawing Name: C:\Lankford CAD\Temp\AcPublish_9968\18.5833.00EG000.dwg Jul 25,2019 - 5:00pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

EG000SMPJOB

ELECTRICAL GENERAL NOTES & SYMBOLS

38 48

1'0'

0'

0.1'

0.1'

0.9'

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

C1-63A

VESTIBULE

C1-63A

CORRIDOR

C1-62C

CORRIDOR

V1-673

OFFICE

SUPERVISOR

V1-671

STAFF LOCKER/

LOUNGE

V1-671A

BIOMED

NETWORK

CLOSET

V1-675

OFFICE

V1-675B

ARMORY &

EVIDENCE

ROOM

OFFICE

V1-675A

VA POLICE

V1-683

ADMISSIONS

V1-654

TRIAGE

STATION 2

V1-650

ED 11

V1-652

ED 12

V1-687

ADMISSIONS

V1-642B

TOILET

V1-642C

TOILET

C1-62A

CORRIDOR

EXISTING

SHAFT

TO

REMAIN

F'

E F

E C

PA

PARTIAL FIRST FLOOR PLAN-ELECTRICAL DEMOLITION

SCALE: 1/4"= 1' 0"

1. TOILET SHOWER AREA CROSS-HATCHED AREAS, INCLUDING WALLS, FLOORS, CEILING,

ELECTRICAL WIRING DEVICES, LIGHTING, SYSTEMS, NURSE CALL SYSTEMS AND ALL

ASSOCIATED POWER AND COMMUNICATIONS WIRING SHALL REMAIN INTACT AND FOR

USE BY VA PATIENTS UNTIL NEW TOILET/ SHOWER FACILITIES CAN BE PROVIDED BY THE

MEANS OF THIS PART 1 NEW CONSTRUCTION PROCESS. ACCESS TO THIS ROOM MUST

BE MAINTAINED UNOBSTRUCTED DURING PART 1.

2. EXISTING PANELBOARD TO BE DISCONNECTED AND REMOVED. RETAIN EXISTING

PANELBOARD, FEEDER AND ALL EXISTING TO REMAIN CIRCUITS FOR EXTENSION AND

RECONNECTION AT NEW LOCATION. RE: NEW WORK PLANS.

3. EXISTING LIGHTING FIXTURES TO BE TEMPORARILY DISCONNECTED AND RELOCATED TO

NEW LOCATION. RE: NEW WORK PLANS.

4. EXISTING FLOOR CONDUIT STUBS SHALL BE ABATED OF EXISTING CONDUCTORS, CUT

FLUSH WITH FLOOR AND GROUTED SHUT.

5. EXISTING LIGHTING FIXTURE TO BE TEMPORARILY DISCONNECTED AND REMOVED TO

FACILITATE INSTALLATION OF TEMPORARY WALL. RETAIN FIXTURE FOR

REINSTALLATION. RE: NEW WORK PLANS.

6. EXISTING ELECTRICAL ROOM - PANELS SHOWN FOR REFERENCE AND LOCATION.

B

B

J

B

B

B

B

B

B B B JJ

J

J

J

MS

MS

WA

S S

S

S

WA

J

B d

J d

J d

J d

J d

J d

S

RX

S

WA

S

S

B

S S

WA

S

WA

N

N

N

N

S

N

B

TV

TV

N

N

B

B

FLOOR PLAN NOTES

##E

B

TV

S

F

RX

CR

KP

S

MS

CR

KP

WA

S

J

B

N

B

WA

S

WA

N

N N

N

N

S

MS

WA

CR

J

WA

N

BB

MS

N

AP

CR

B

N

S

S

S

S

S

01E

DEMOLITION GENERAL NOTES

A. "DASHED" BOLD, EXISTING CEILING MOUNTED DEVICES WITHIN AREA OF WORK ARE TO

BE DISCONNECTED AND REMOVED - UNLESS SPECIFICALLY NOTED OTHERWISE VIA PLAN

NOTE OR WITH “ETR” INDICATION, INCLUDING BUT NOT LIMITED TO: EXISTING LIGHT

FIXTURES, JUNCTION BOXES, AUDIO/VISUAL DEVICES, SECURITY EQUIPMENT, NURSE

CALL AND FIRE ALARM DEVICES. REMOVE ALL ASSOCIATED CONDUIT AND CONDUCTORS

BACK TO SOURCE OR TO NEAREST DEVICE FOUND TO REMAIN. WHERE CIRCUITS

CONTINUE OUTSIDE OF THE RENOVATION AREA, MAINTAIN CIRCUIT

CONTINUITY. RETAIN & TEMPORARILY LABEL ANY UN-USED BREAKERS AS “SPARE”.

B. "DASHED" BOLD, EXISTING WALL MOUNTED (RECESSED AND/OR SURFACE

MOUNTED) POWER & COMMUNICATIONS DEVICES WITHIN AREA OF WORK ARE TO BE

DISCONNECTED AND REMOVED - UNLESS SPECIFICALLY NOTED OTHERWISE VIA PLAN

NOTE OR WITH “ETR” INDICATION, INCLUDING BUT NOT LIMITED TO: RECEPTACLES, LIGHT

SWITCHES, JUNCTION BOXES, VOICE/DATA OUTLETS, AUDIO VISUAL DEVICES, NURSE

CALL, EMERGENCY LIGHTS AND FIRE ALARM DEVICES. REMOVE ALL ASSOCIATED

CONDUIT AND CONDUCTORS BACK TO SOURCE OR TO NEAREST DEVICE FOUND TO

REMAIN. WHERE CIRCUITS CONTINUE OUTSIDE OF THE RENOVATION AREA, MAINTAIN

CIRCUIT CONTINUITY. RETAIN & TEMPORARILY LABEL ANY UN-USED BREAKERS

AS “SPARE”.

C. COORDINATE WITH THE VA FOR DISCONNECTION AND REMOVAL OF ANY LOW-VOLTAGE

COMMUNICATIONS CABLES PRIOR TO ANY DISCONNECTION.

D. VA SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL DEMOLISHED ITEMS.

04E

(TYP)

04E

(TYP)

02E

05E

(R2)

06E

03E

V1-845B

NURSE

STATION

V1-624

TREATMENT

ROOM-7

V1-626

TREATMENT

ROOM-8

V1-628

DOCTORS

WORK

V1-627

ELECTRICAL

V1-632A

PATIENT

TOILET

V1-632

TREATMENT

ROOM-9

V1-630

PATIENT

TOILET

V1-625

ANTE

ROOM

V1-845A

NURSE

STATION

V1-845

MEDS

C1-76

CORRIDOR

C1-62A

CORRIDOR

C1-62B

CORRIDOR

C1-77

CORRIDOR

V1-800

ED WAITING ROOM

S18

STAIRWELL

NO.18

V1-660

PANTRY

V1-659

STORAGE

N1-655

OPEN BAYS

V1-655

OPEN BAYS

V1-657

SOILED LINEN

V1-656

TOILET

V1-658

BED 10

V1-647

STORAGE

C1-62D

CORRIDOR

V1-609

STORAGE

Lankford Fendler a s s o c i a t e s

BLDG 26

BLDG 1

BLDG

PHASE II

N

Revisions

Drawing Name: P:\18.5800\18.5833.00_KCVAMC-Emergency Dept-Remodel Phase II\Drawings\PHASE 2 DRAWINGS\18.5833.00ED101.dwg Jul 25,2019 - 5:22pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

ED101SMPJOB

FIRST FLOOR PLAN-ELECTRICAL DEMO

39 48

1'0'

0'

0.1'

0.1'

0.9'

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

EXISTING

SHAFT

TO

REMAIN

F'

REFRG

MICRO

K-4450-CSTRATTONC_TOILETSVITREOUS CHINA

E F

E C

PARTIAL FIRST FLOOR PLAN-POWER

SCALE: 1/8"= 1' 0"

1. PROVIDE 3/4', PRIMED AND PAINTED, FLAME RETARDANT, PLYWOOD BACK BOARD.

COORDINATE WITH COR.

2. TWO (2) 4" CONDUITS, WITH LONG RADIUS ELBOWS, RAN TIGHT TO STRUCTURE ABOVE.

COORDINATE ROUTING WITH ALL OTHER EXISTING UTILITIES. PROVIDE CONDUITS WITH

PULL STRING AND END BUSHINGS. GROUND EACH CONDUIT WITH A #6-AWG (cu)

GROUND WIRE. GROUND PER VA IT STANDARDS. CONDUITS SHALL HAVE LONG

SWEEPING ELBOWS.

3. COMMUNICATIONS GROUND BAR - RE: GROUND BAR DETAIL. GROUND TO NEAREST

BUILDING STEEL.

4. 4" CONDUIT SLEEVE THROUGH BIO-MED WALL. LOCATE ABOVE ACCESSIBLE CEILING

HEIGHT. PROVIDE WITH END BUSHINGS. TEMPORARILY SEAL CONDUIT SLEEVE DURING

ALL CONSTRUCTION UNTIL READY FOR UTILIZATION.

5. TOILET SHOWER AREA AND BIOMED STORAGE CLOSET CROSS-HATCHED AREAS,

INCLUDING WALLS, FLOORS, CEILING, ELECTRICAL WIRING DEVICES, LIGHTING,

SYSTEMS, NURSE CALL SYSTEMS AND ALL ASSOCIATED POWER AND COMMUNICATIONS

WIRING SHALL REMAIN INTACT AND FOR USE BY VA PATIENTS UNTIL NEW TOILET/

SHOWER FACILITIES CAN BE PROVIDED BY THE MEANS OF THIS PART 1 NEW

CONSTRUCTION PROCESS. ACCESS TO THIS ROOM MUST BE MAINTAINED

UNOBSTRUCTED DURING PART 1.

6. NORMAL POWER BRANCH CIRCUIT CONNECTION TO PRE-MANUFACTURED 'PBPU'

HEADWALL. MAKE REQUIRED CONNECTIONS TO THE HEADWALL UNIT AS REQUIRED.

COORDINATE WITH ARCHITECT FOR ROUGH-IN LOCATION AND CONNECTION

REQUIREMENTS. HEADWALL IS FURNISHED BY OTHERS AND CONNECTIONS BY

ELECTRICAL. REFER TO ARCHITECTURAL HEADWALL ELEVATIONS FOR DETAILS OF

HEADWALL CONFIGURATIONS.

7. E-POWER (CRITICAL BRANCH) BRANCH CIRCUIT CONNECTIONS TO PRE-MANUFACTURED

'PBPU' HEADWALL. MAKE REQUIRED CONNECTIONS TO THE HEADWALL UNIT AS

REQUIRED - SPLIT THE RECEPTACLES EVENLY AMONG THE 2 CIRCUITS. COORDINATE

WITH ARCHITECT FOR ROUGH-IN LOCATION AND CONNECTION REQUIREMENTS.

HEADWALL IS FURNISHED BY OTHERS AND CONNECTIONS BY ELECTRICAL. REFER TO

ARCHITECTURAL HEADWALL ELEVATIONS FOR DETAILS OF HEADWALL

CONFIGURATIONS.

8. POWER CONNECTION TO OVER-HEAD LIFT CONVEYANCE SYSTEM. COORDINATE WITH

ARCHITECT FOR ROUGH-IN LOCATION AND CONNECTION REQUIREMENTS.

9. COORDINATE ROUGH-IN HEIGHTS AT CHARTING STATION WITH ARCHITECT.

10. COORDINATE MOUNTING HEIGHT OF MONITOR DUPLEX RECEPTACLE WITH ARCHITECT

PRIOR TO ROUGH-IN.

11. TWELVE (12) 1-1/4" CONDUITS RAN ABOVE ACCESSIBLE CEILING FOR PART 2B CIRCUITS.

COORDINATE ROUTING WITH ALL EXISTING ABOVE CEILING UTILITIES. CONFIRM

ROUTING WITH VA COR. PROVIDE WITH PULL STRINGS.

12. TWO (2) 2" CONDUITS RAN ABOVE ACCESSIBLE CEILING FOR PART 2B CIRCUITS.

COORDINATE ROUTING WITH ALL EXISTING ABOVE CEILING UTILITIES. CONFIRM

ROUTING WITH VA COR. PROVIDE WITH PULL STRINGS.

FLOOR PLAN NOTES

##E

B

B

B

B

B

B

B

B

J

B

B

J

BB

B

V1-845B

NURSE

STATION

V1-624

TREATMENT

ROOM-7

V1-626

TREATMENT

ROOM-8

V1-628

DOCTORS

WORK

V1-627

ELECTRICAL

V1-632A

PATIENT

TOILET

V1-632

TREATMENT

ROOM-9

V1-630

PATIENT

TOILET

V1-625

ANTE

ROOM

V1-845A

NURSE

STATION

V1-845

MEDS

C1-76

CORRIDOR

C1-62A

CORRIDOR

C1-62B

CORRIDOR

C1-77

CORRIDOR

V1-800

ED WAITING ROOM

S18

STAIRWELL

NO.18

RN1B

RC1A

RC1A

01E

03E

02E

04E

J

J

J

J J

J

JJ

J

05E

06E07E

08E

09E

(TYP)

RN1A

(TYP)

(TYP)

(TYP)

RC1B

RN1A

RN1A

RN1A

RN1A

RN1A

RC1B

18 20

RC1B

RC1B

RN1A

RN1A

10E

RE1A

12E

11E

(TYP 12)

03E

RN1A

RN1A

RN1A

RN1A

RN1A

V1-845B

NURSE

STATION

V1-624

TREATMENT

ROOM-7

V1-626

TREATMENT

ROOM-8

V1-628

DOCTORS

WORK

V1-627

ELECTRICAL

V1-632A

PATIENT

TOILET

V1-632

TREATMENT

ROOM-9

V1-630

PATIENT

TOILET

V1-625

ANTE

ROOM

V1-845A

NURSE

STATION

V1-845

MEDS

C1-76

CORRIDOR

C1-62A

CORRIDOR

C1-62B

CORRIDOR

C1-77

CORRIDOR

V1-844

TREATMENT

ROOM-3

V1-840

SHOWER

TOILET

TREATMENT

ROOM-2

TREATMENT

ROOM-1

V1-837

BIOMED

CLOSET

V1-800

ED WAITING ROOM

V1-842 V1-838

S18

STAIRWELL

NO.18

C1-62C

CORRIDOR

V1-668

NOURISHMENT

V1-834

ELECT

ROOM

Lankford Fendler a s s o c i a t e s

BLDG 26

BLDG 1

BLDG

PHASE II

N

Revisions

Drawing Name: P:\18.5800\18.5833.00_KCVAMC-Emergency Dept-Remodel Phase II\Drawings\PHASE 2 DRAWINGS\18.5833.00EP101.dwg Jul 25,2019 - 5:23pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

Phone: 816.221.1411 | Fax: 816.221.1429

1730 Walnut Street Kansas City, Missouri 64108 1915 Frederick Avenue, St. Joseph, Missouri 64501

COA No.

Lankford Fendler a s s o c i a t e s

COPYRIGHT C 2018

LANKFORD | FENDLER + ASSOCIATES, CONSULTING ENGINEERS, INC.

Project No.

2006001168

18.5833.00

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/19/2019

EP101SMPJOB

FIRST FLOOR PLAN-POWER

40 48

2019.07.25 ED Phase IIB Revisions
33_PD201
18.5833.00PD201-33_PD201
34_PL101
18.5833.00PL101-34_PL101
35_PL201
18.5833.00PL201-35_PL201
37_FP101
37_FP101
38_EG000
18.5833.00EG000-38_EG000
39_ED101
39_ED101
40_EP101
40_EP101