This is a solicitation for renovation services at the Kansas City VA Medical Center. The Department of Veterans Affairs requires general construction, alterations, finishes and removal/replacement of existing structures and construction to renovate approximately 1,250 square feet currently occupied by the Emergency Department. The scope includes three new treatment rooms, a nourishment room, bio-med closet, shower/toilet facility and electrical room. The contractor must provide in-wall, in-ceiling or other supports for furniture, medical equipment and miscellaneous items. Electrical, mechanical, plumbing, fire protection demolition and new work is included. Asbestos abatement will be conducted with air monitoring by an industrial hygienist. The estimated cost range is $500,000 to $1,000,000. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS is 236220 and size standard is $39.5M. The contract type is firm fixed price for 180 days. The pre-proposal site visit will be in December 2019 and proposals are due in mid-January 2020.

36C25520R0007 589-369 ER PH2 Drawings_Part1 (16 Sheets).pdf

View the file

Other files

File Type Posted
36C25520R0007-0003000.docx DOCX document
36C25520R0007-0002000.docx DOCX document
36C25520R0007-0002001.pdf PDF
36C25520R0007-0001001.pdf PDF
36C25520R0007-0001000.docx DOCX document
36C25520R0007-006.pdf PDF
36C25520R0007-007.pdf PDF
36C25520R0007-003.pdf PDF
36C25520R0007-002.pdf PDF
36C25520R0007-005.pdf PDF
36C25520R0007-001.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4801 LINWOOD BLVD, KANSAS CITY MO 64128

PROJECT NO. 589-396

EMERGENCY ROOM EXPANSION PHASE IIB OF BUILDING 26

KANSAS CITY VA MEDICAL CENTER

G000

COVER SHEET

N.A.

Revisions

Drawing Name: K:\Projects\01804 VAMC ED Project Phase II\Central Office Files\00 Drawings\Sheets\Phase II\G000 07152019.dwg Jul 25,2019 - 3:01pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

S

T

A

T

E

O

F M

I

S

S

O

U

R

I

WM. KEVIN

R

E

G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

TA-3600

COWAN

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

Lankford Fendler a s s o c i a t e s

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/18/2019

GH

BC

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

1. G000 COVER SHEET G000 COVER SHEET COVER SHEET 2. G001 GENERAL NOTES AND ARCHITECTURAL LEGEND G001 GENERAL NOTES AND ARCHITECTURAL LEGEND GENERAL NOTES AND ARCHITECTURAL LEGEND 3. G002 ARCHITECTURAL ABBREVIATIONS G002 ARCHITECTURAL ABBREVIATIONS ARCHITECTURAL ABBREVIATIONS 4. G003 ARCHITECTURAL ABBREVIATIONS AND ACCESSIBILITY DIAGRAMS G003 ARCHITECTURAL ABBREVIATIONS AND ACCESSIBILITY DIAGRAMS ARCHITECTURAL ABBREVIATIONS AND ACCESSIBILITY DIAGRAMS 5. G004 MOUNTING HEIGHT & ACCESSIBILITY DIAGRAMS G004 MOUNTING HEIGHT & ACCESSIBILITY DIAGRAMS MOUNTING HEIGHT & ACCESSIBILITY DIAGRAMS 6. G010 FIRST FLOOR CODE INFORMATION G010 FIRST FLOOR CODE INFORMATION FIRST FLOOR CODE INFORMATION 7. G020 PARTITION TYPES & OTHER FIRE-RATED ASSEMBLIES G020 PARTITION TYPES & OTHER FIRE-RATED ASSEMBLIES PARTITION TYPES & OTHER FIRE-RATED ASSEMBLIES 8. G101 FIRST OVERALL FLOOR PLAN G101 FIRST OVERALL FLOOR PLAN FIRST OVERALL FLOOR PLAN 9. G103 FIRST FLOOR CONSTRUCTION ACTIVITY PLAN G103 FIRST FLOOR CONSTRUCTION ACTIVITY PLAN FIRST FLOOR CONSTRUCTION ACTIVITY PLAN 10. AD101 FIRST FLOOR DEMO PLAN - PHASE IIB AD101 FIRST FLOOR DEMO PLAN - PHASE IIB FIRST FLOOR DEMO PLAN - PHASE IIB 11. AD151 FIRST FLOOR DEMO REFLECTED CEILING PLAN - PHASE IIB AD151 FIRST FLOOR DEMO REFLECTED CEILING PLAN - PHASE IIB FIRST FLOOR DEMO REFLECTED CEILING PLAN - PHASE IIB 12. AS101 FIRST FLOOR PLAN - PHASE IIB AS101 FIRST FLOOR PLAN - PHASE IIB FIRST FLOOR PLAN - PHASE IIB 13. AS110 ENLARGED PLANS - TREATMENT ROOM 3 AS110 ENLARGED PLANS - TREATMENT ROOM 3 ENLARGED PLANS - TREATMENT ROOM 3 14. AS111 ENLARGED PLANS - TREATMENT ROOM 2 AS111 ENLARGED PLANS - TREATMENT ROOM 2 ENLARGED PLANS - TREATMENT ROOM 2 15. AS112 ENLARGED PLANS - TREATMENT ROOM 1 AS112 ENLARGED PLANS - TREATMENT ROOM 1 ENLARGED PLANS - TREATMENT ROOM 1 16. AS114 ENLARGED PLANS - SHOWER TOILET AS114 ENLARGED PLANS - SHOWER TOILET ENLARGED PLANS - SHOWER TOILET 17. AS117 EQUIPMENT SCHEDULE, LEGEND, AND HEADWALL DETAILS AS117 EQUIPMENT SCHEDULE, LEGEND, AND HEADWALL DETAILS EQUIPMENT SCHEDULE, LEGEND, AND HEADWALL DETAILS 18. AS151 FIRST FLOOR REFLECTED CEILING PLAN - PHASE IIB AS151 FIRST FLOOR REFLECTED CEILING PLAN - PHASE IIB FIRST FLOOR REFLECTED CEILING PLAN - PHASE IIB 19. AS301 WALL SECTIONS AS301 WALL SECTIONS WALL SECTIONS 20. AS500 DOOR SCHEDULE AS500 DOOR SCHEDULE DOOR SCHEDULE 21. AS600 FINISH SCHEDULE AND DETAILS AS600 FINISH SCHEDULE AND DETAILS FINISH SCHEDULE AND DETAILS 22. AS601 INTERIOR DETAILS AS601 INTERIOR DETAILS INTERIOR DETAILS 23. AS602 FIRST FLOOR FINISH PLAN - PHASE IIB AS602 FIRST FLOOR FINISH PLAN - PHASE IIB FIRST FLOOR FINISH PLAN - PHASE IIB 24. AS701 INTERIOR ELEVATIONS AS701 INTERIOR ELEVATIONS INTERIOR ELEVATIONS 25. M000 MECHANICAL GENERAL NOTES & SYMBOLS M000 MECHANICAL GENERAL NOTES & SYMBOLS MECHANICAL GENERAL NOTES & SYMBOLS 26. MD101 FIRST FLOOR PLAN - MECHANICAL DEMO PHASE IIB - PART 1 MD101 FIRST FLOOR PLAN - MECHANICAL DEMO PHASE IIB - PART 1 FIRST FLOOR PLAN - MECHANICAL DEMO PHASE IIB - PART 1 27. MH101 FIRST FLOOR PLAN - MECHANICAL NEW WORK PHASE IIB - PART 1 MH101 FIRST FLOOR PLAN - MECHANICAL NEW WORK PHASE IIB - PART 1 FIRST FLOOR PLAN - MECHANICAL NEW WORK PHASE IIB - PART 1 28. MP101 FIRST FLOOR PLAN - MECHANICAL PIPING NEW WORK PHASE IIB - PART 1 MP101 FIRST FLOOR PLAN - MECHANICAL PIPING NEW WORK PHASE IIB - PART 1 FIRST FLOOR PLAN - MECHANICAL PIPING NEW WORK PHASE IIB - PART 1 29. MG500 MECHANICAL DETAILS MG500 MECHANICAL DETAILS MECHANICAL DETAILS 30. MG601 MECHANICAL SCHEDULES MG601 MECHANICAL SCHEDULES MECHANICAL SCHEDULES 31. P000 PLUMBING GENERAL NOTES & SYMBOLS P000 PLUMBING GENERAL NOTES & SYMBOLS PLUMBING GENERAL NOTES & SYMBOLS 32. PD101 FIRST FLOOR PLAN - PLUMBING DEMO PHASE IIB - PART 1 PD101 FIRST FLOOR PLAN - PLUMBING DEMO PHASE IIB - PART 1 FIRST FLOOR PLAN - PLUMBING DEMO PHASE IIB - PART 1 33. PD201 FIRST FLOOR PLAN - MED GAS DEMO PHASE IIB - PART 1 PD201 FIRST FLOOR PLAN - MED GAS DEMO PHASE IIB - PART 1 FIRST FLOOR PLAN - MED GAS DEMO PHASE IIB - PART 1 34. PL101 FIRST FLOOR PLAN - PLUMBING NEW WORK PHASE IIB - PART 1 PL101 FIRST FLOOR PLAN - PLUMBING NEW WORK PHASE IIB - PART 1 FIRST FLOOR PLAN - PLUMBING NEW WORK PHASE IIB - PART 1 35. PL201 FIRST FLOOR PLAN - MED GAS NEW WORK PHASE IIB - PART 1 PL201 FIRST FLOOR PLAN - MED GAS NEW WORK PHASE IIB - PART 1 FIRST FLOOR PLAN - MED GAS NEW WORK PHASE IIB - PART 1 36. P701 PLUMBING RISERS P701 PLUMBING RISERS PLUMBING RISERS 37. FP101 FIRST FLOOR PLAN - FIRE PROTECTION PHASE IIB - PART 1 FP101 FIRST FLOOR PLAN - FIRE PROTECTION PHASE IIB - PART 1 FIRST FLOOR PLAN - FIRE PROTECTION PHASE IIB - PART 1 38. EG000 ELECTRICAL GENERAL NOTES & SYMBOLS EG000 ELECTRICAL GENERAL NOTES & SYMBOLS ELECTRICAL GENERAL NOTES & SYMBOLS 39. ED101 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION PHASE IIB - PART 1 ED101 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION PHASE IIB - PART 1 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION PHASE IIB - PART 1 40. EP101 FIRST FLOOR PLAN - POWER PHASE IIB - PART 1 EP101 FIRST FLOOR PLAN - POWER PHASE IIB - PART 1 FIRST FLOOR PLAN - POWER PHASE IIB - PART 1 41. EL101 FIRST FLOOR PLAN - LIGHTING PHASE IIB - PART 1 EL101 FIRST FLOOR PLAN - LIGHTING PHASE IIB - PART 1 FIRST FLOOR PLAN - LIGHTING PHASE IIB - PART 1 42. EY101 FIRST FLOOR PLAN - SYSTEMS PHASE IIB - PART 1 EY101 FIRST FLOOR PLAN - SYSTEMS PHASE IIB - PART 1 FIRST FLOOR PLAN - SYSTEMS PHASE IIB - PART 1 43. ET101 FIRST FLOOR PLAN - TELECOM PHASE IIB - PART 1 ET101 FIRST FLOOR PLAN - TELECOM PHASE IIB - PART 1 FIRST FLOOR PLAN - TELECOM PHASE IIB - PART 1 44. EG500 ELECTRICAL DETAILS PHASE IIB - PART 1 & 2 EG500 ELECTRICAL DETAILS PHASE IIB - PART 1 & 2 ELECTRICAL DETAILS PHASE IIB - PART 1 & 2 45. EG601A ELECTRICAL SCHEDULES EG601A ELECTRICAL SCHEDULES ELECTRICAL SCHEDULES 46. EG601B ELECTRICAL SCHEDULES EG601B ELECTRICAL SCHEDULES ELECTRICAL SCHEDULES 47. HA101 ASBESTOS CONTAINING MATERIAL LOCATIONS PHASE IIB & PHASE III HA101 ASBESTOS CONTAINING MATERIAL LOCATIONS PHASE IIB & PHASE III ASBESTOS CONTAINING MATERIAL LOCATIONS PHASE IIB & PHASE III 48. HA102 LEAD CONTAINING MATERIAL LOCATIONS PHASE IIB & PHASE III HA102 LEAD CONTAINING MATERIAL LOCATIONS PHASE IIB & PHASE III LEAD CONTAINING MATERIAL LOCATIONS PHASE IIB & PHASE III

AutoCAD SHX Text

SHEET INDEX

AutoCAD SHX Text B4

AutoCAD SHX Text Aerial Key Plan

AutoCAD SHX Text Scale: N.T.S.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

100% DOCUMENTS FOR BID & CONSTRUCTION

G001

GENERAL NOTES AND

ARCHITECTURAL LEGEND

AS NOTED

CG

Revisions

Drawing Name: K:\Projects\01804 VAMC ED Project Phase II\Central Office Files\00 Drawings\Sheets\Phase II\G001 07152019.dwg Jul 25,2019 - 3:06pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

S

T

A

M

I

S

S

O

U

R

I

WM. KEVIN

R

E

G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

TA-3600

COWAN

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

Lankford Fendler a s s o c i a t e s

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/18/2019

GH

BC

EG

AutoCAD SHX Text

ARCHITECTURAL LEGEND

AutoCAD SHX Text

1. REFERENCE MEP DRAWINGS AND REFERENCE MEP DRAWINGS AND SPECIFICATIONS FOR OTHER MECHANICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM, ELECTRICAL, OR ACCESSORIES TO BE PART OF THE DEMOLITION SCOPE OF WORK. 2. ALL CONTRACTORS ARE HIGHLY ENCOURAGED ALL CONTRACTORS ARE HIGHLY ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO EXAMINE AND VERIFY EXISTING CONDITIONS AND SCOPE OF WORK. NO COMPENSATION WILL BE AWARDED BASED ON LACK OF KNOWLEDGE OF DEMOLITION REQUIREMENTS OR ITEMS/ISSUES FOUND AFTER SUBMISSION OF BIDS. 3. CONTRACTORS SHALL COORDINATE AND CONTRACTORS SHALL COORDINATE AND PROVIDE ALL REQUIREMENTS FOR A COMPLETE FULLY OPERATIONAL SYSTEM W/ THE NEW SCOPE OF WORK AS INDICATED ON THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, FIRE ALARM AND PLUMBING DRAWINGS. 4. ALL "DEMOLITION" CONTRACTORS ARE TO ALL "DEMOLITION" CONTRACTORS ARE TO COORDINATE WITH "NEW WORK" CONTRACTOR REQUIREMENTS. OVER DEMOLITION SHALL BE REPLACED TO MATCH EXISTING AT THE CONTRACTORS EXPENSE. 5. ALL ITEMS ARE TO BE REMOVED AND ALL ITEMS ARE TO BE REMOVED AND DISPOSED OF LEGALLY EXCEPT WHERE NOTED TO BE SALVAGED. 6. CONTRACTOR SHALL PROTECT ALL SURFACES, CONTRACTOR SHALL PROTECT ALL SURFACES, SYSTEMS, EQUIPMENT, AND COMPONENTS WHICH ARE SCHEDULED OR SHOWN TO REMAIN FROM DAMAGE DURING DEMO AND CONSTRUCTION ACTIVITIES. ANY DAMAGE RESULTING FROM LACK OF CARE OR PROTECTION WILL BE REQUIRED TO BE REPLACED W/ NEW MATERIALS TO MATCH EXISTING. WHERE MATERIALS OR COLORS CANNOT BE MATCHED, CONTRACTOR WILL BE REQUIRED TO REPLACE THE SURFACE SYSTEM, EQUIPMENT OR COMPONENT COMPLETELY W/ NEW MATERIALS OF MATCHING QUALITY AS SELECTED BY COR/ARCHITECT. 7. EXISTING CONDITIONS ARE SHOWN BASED ON EXISTING CONDITIONS ARE SHOWN BASED ON ORIGINAL BUILDING CONSTRUCTION DOCUMENTS AND A VISUAL REVIEW OF EXISTING CONDITIONS. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCING WORK - ANY VARIATIONS SHALL BE NOTED IN WRITING TO THE ARCHITECT/ENGINEER FOR FINAL DETERMINATION OF INTENT FOR DEMO PRIOR TO BID OR AS DEMOLITION OCCURS. 8. CONTRACTORS ARE RESPONSIBLE FOR CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ALL DRAWINGS WITHIN THIS SET INCLUDING SPECIFICATIONS FOR ADDITIONAL DEMOLITION SCOPE OF WORK. 9. CONTRACTOR SHALL PROTECT DEMOLITION CONTRACTOR SHALL PROTECT DEMOLITION CONDITIONS AND OCCUPIED AND UNOCCUPIED SPACES OF THE HOSPITAL FROM ALL WEATHER EVENTS, DUST & DEBRIS. PROVIDE & INSTALL TEMPORARY SOLUTIONS FOR ALL ROOF & BUILDING PERIMETER EDGE OPENINGS & MAINTAIN THEM IN A WEATHER TIGHT MANNER UNTIL FINAL INSTALLATION/CLOSURE. CONTRACTOR IS RESPONSIBLE TO REPLACE ALL DAMAGE THAT OCCURS DUE TO NEGLECT OF TEMPORARY ENCLOSURES.

AutoCAD SHX Text

GENERAL PROJECT DEMOLITION NOTES

AutoCAD SHX Text CONTRACTOR RESPONSIBILITIES: 1. THE CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR SECURING ALL VA PERMITS, BONDS AND THE CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR SECURING ALL VA PERMITS, BONDS AND INSURANCE AS REQUIRED BY THE CONTRACT DOCUMENTS, AND ALL OTHER GOVERNING AGENCY PERMITS (INCLUDING LOCAL, COUNTY, STATE AND FEDERAL AUTHORITIES) HAVING JURISDICTION OVER THE WORK PROPOSED BY THESE CONSTRUCTION DOCUMENTS. THE COST FOR ALL PERMITS, BONDS AND INSURANCE SHALL BE THE CONTRACTORS RESPONSIBILITY AND SHALL BE INCLUDED IN THE BID FOR THE WORK. 2. ALL WORK PERFORMED BY THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL BE IN ACCORDANCE ALL WORK PERFORMED BY THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL BE IN ACCORDANCE AND COMPLY WITH ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION. REFER TO SHEET G010 FOR LIST OF CODES, CONDITIONS AND REQUIREMENTS. ADDRESS ALL APPLICABLE PUBLICATIONS, REFERENCE STANDARDS ORGANIZATIONS & FEDERAL & STATE REQUIREMENTS IN SPECIFICATIONS 028211, 028213.13, 028213.19 AND 028213.31 FOR ASBESTOS & TRANSITE ABATEMENT & 028333.13 FOR LEAD BASED PAINT ABATEMENT. 3. CONTRACTOR TO ENSURE FEDERALLY MANDATED ACCESSIBILITY CLEARANCES FOR ALL NEW CONSTRUCTION CONTRACTOR TO ENSURE FEDERALLY MANDATED ACCESSIBILITY CLEARANCES FOR ALL NEW CONSTRUCTION (INCLUDING BUT NOT LIMITED BY SIGNAGE, DOORS, WALLS, FIXTURES AND CASEWORK). ALL CONSTRUCTION SHALL COMPLY WITH 2010 ADA ACCESSIBILITY REQUIREMENTS. THESE DOCUMENTS REFLECT THE CURRENT REQUIREMENTS OF TITLE III OF THE AMERICAN WITH DISABILITIES ACT (ADA), FOR THE SCOPE OF WORK INDICATED ONLY. METOVA FEDERAL, LLC SHALL ASSUME NO RESPONSIBILITY FOR DEVIATIONS AND/OR DELETIONS FROM THESE DRAWINGS BY THE COR, CONTRACTORS, ETC. METOVA FEDERAL, LLC SHALL ASSUME NO RESPONSIBILITY FOR REQUIREMENTS OF THE ADA EXCEPT WORK WHICH IS SPECIFICALLY INDICATED ON THESE DRAWINGS. 4. BY USE OF THESE CONSTRUCTION DOCUMENTS THE CONTRACTOR HEREBY AGREES THAT HE SHALL BE BY USE OF THESE CONSTRUCTION DOCUMENTS THE CONTRACTOR HEREBY AGREES THAT HE SHALL BE SOLELY RESPONSIBLE FOR SAFETY OF THE CONSTRUCTION WORKERS AND THE PUBLIC. THE CONTRACTOR AGREES TO HOLD THE ARCHITECT AND KC-VAMC HARMLESS FOR ANY AND ALL INJURIES, CLAIMS, LOSSES OR DAMAGES RELATED TO THE PROJECT. 5. CONTRACTORS ARE HIGHLY ENCOURAGED TO VISIT THE SITE OF THE PROPOSED WORK AND FULLY CONTRACTORS ARE HIGHLY ENCOURAGED TO VISIT THE SITE OF THE PROPOSED WORK AND FULLY ACQUAINT THEMSELVES WITH CONDITIONS THAT CURRENTLY EXIST SO THAT THEY MAY FULLY UNDERSTAND THE FACILITIES, DIFFICULTIES AND RESTRICTIONS RELATED TO THE EXECUTION OF THE WORK. NO COMPENSATION WILL BE AWARDED BASED ON LACK OF KNOWLEDGE OR ITEMS FOUND AFTER SUBMISSION OF BIDS. 6. GENERAL CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL CONSTRUCTION DOCUMENTS, FIELD GENERAL CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL CONSTRUCTION DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS. GENERAL CONTRACTOR TO COMMUNICATE ANY DEVIATIONS TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR RESOLUTION. GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) BEFORE PROCEEDING WITH WORK ON ANY WORK IN QUESTION. 7. PRIOR TO COMMENCEMENT OF WORK THE CONTRACTOR AND THE CONTRACTING OFFICER'S PRIOR TO COMMENCEMENT OF WORK THE CONTRACTOR AND THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) SHALL TAKE INVENTORY OF THE EXISTING CONDITIONS OF THE BUILDING NOTING ANY DEFECTS BY PHOTOGRAPH OR VIDEO. THESE DOCUMENTS ARE TO BE PLACED ON FILE WITH THE COR & GENERAL CONTRACTOR. ADDITIONALLY, INVENTORY ALL ITEMS TO BE REMOVED AND SALVAGED/ STORED AT LOCATION AS DIRECTED BY CONTRACTING OFFICER'S REPRESENTATIVE (COR) CONTRACTOR TO INSTALL SALVAGED AND/OR OWNER PROVIDED EQUIPMENT IN AREAS OF THE WORK UPON COMPLETION OF THE PROJECT AT THE DIRECTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). AND/OR THE CONTRACT DOCUMENTS. ANY ROOMS USED FOR STORAGE BY THE CONTRACTOR SHALL HAVE ANY DAMAGE REPAIRED & BE CLEANED PRIOR TO SUBSTANTIAL COMPLETION. 8. THE GENERAL CONTRACTOR SHALL NOTIFY THE COR OF ANY INDICATED CONSTRUCTION MATERIAL OR THE GENERAL CONTRACTOR SHALL NOTIFY THE COR OF ANY INDICATED CONSTRUCTION MATERIAL OR ASSEMBLY, INCLUDING FINISHES, WHICH MAY DELAY SPECIFIED COMPLETION DATE DUE TO LONG LEAD OR DELIVERY TIME OR UNAVAILABILITY. PROVIDE SAID NOTIFICATION IN A TIMELY MANNER (NO LATER THAN 30 DAYS FROM NOTICE TO PROCEED WITH CONSTRUCTION) ALLOWING SUFFICIENT TIME FOR RE-SELECTION BY THE ARCHITECT AND RE-ORDER BY THE GENERAL CONTRACTOR OF ANY REQUIRED MATERIAL. 9. GENERAL CONTRACTOR SHALL SUBMIT, TO THE COR, CONFIRMATIONS WITH ANTICIPATED DELIVERY DATES GENERAL CONTRACTOR SHALL SUBMIT, TO THE COR, CONFIRMATIONS WITH ANTICIPATED DELIVERY DATES ON ORDERS OF MATERIALS AND EQUIPMENT WITH LONG LEAD TIMES. COR MAY REQUEST THIS INFORMATION TO BE PROVIDED AT ANY POINT IN THE PROJECT SCHEDULE. 10. GENERAL CONTRACTOR SHALL PROVIDE THEIR PUNCH LIST OF THE PROJECT & PROVIDE THOROUGH CLEANING OF COMPLETED SPACES PRIOR TO THE BEGINNING OF THE A/E PUNCH LIST. GENERAL PROJECT NOTES (USE OF SITE AND BUILDINGS/PROTECTION): 11. GENERAL CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY ACCESS GENERAL CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY ACCESS REQUIRED FOR PERFORMANCE OF THE WORK WHICH WOULD IMPACT CAMPUS TRAFFIC AT LEAST 2 WEEKS PRIOR TO NEED OF REQUIRED ACCESS. COR WILL IDENTIFY ACCEPTABLE ACCESS TIMEFRAME. 12. ALL GENERAL CONTRACTOR AND SUBCONTRACTOR DELIVERIES OF MATERIAL SHALL ENTER AT POINTS ALL GENERAL CONTRACTOR AND SUBCONTRACTOR DELIVERIES OF MATERIAL SHALL ENTER AT POINTS DESIGNATED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND BE TRANSPORTED BY A PRE-DETERMINED ROUTE THROUGH THE PROJECT SITE AND BUILDINGS. GENERAL CONTRACTOR SHALL PROTECT FINISHES ON ROUTES TO THE PROJECT SITE OR THROUGH THE BUILDINGS AND REPAIR AND REPLACE ANY FINISHES DAMAGED BY HIS EMPLOYEES OR SUBCONTRACTORS. THE PROJECT SITE AND ADJACENT OCCUPIED AREAS MUST BE KEPT CLEAN. THIS IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 13. THE PROJECT CONTRACTORS SHALL BE RESPONSIBLE FOR KEEPING ALL STREETS, PARKING LOTS, THE PROJECT CONTRACTORS SHALL BE RESPONSIBLE FOR KEEPING ALL STREETS, PARKING LOTS, SIDEWALKS AND SURROUNDINGS OF THE PROJECT FREE OF MUD AND OTHER DEBRIS. CLEAN DAILY. 14. DAMAGE CAUSED BY THE CONTRACTOR DURING CONSTRUCTION ACTIVITIES TO EXISTING UTILITIES, DAMAGE CAUSED BY THE CONTRACTOR DURING CONSTRUCTION ACTIVITIES TO EXISTING UTILITIES, PAVEMENT, CURBS, FENCES, STRUCTURES, STREETS, PARKING LOTS, SIDEWALKS AND OTHER FEATURES NOT DESIGNATED FOR REMOVAL/REPLACEMENT WILL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO REPAIR ALL DAMAGE OCCURRENCES AT HIS EXPENSE. 15. THE CONTRACTOR SHALL PROVIDE ANY TRAFFIC HANDLING AND MATERIAL DELIVERY MEASURES FOR BOTH THE CONTRACTOR SHALL PROVIDE ANY TRAFFIC HANDLING AND MATERIAL DELIVERY MEASURES FOR BOTH VEHICULAR & PEDESTRIAN TRAFFIC AS NECESSARY TO INSURE THAT THE GENERAL PUBLIC IS PROTECTED AT ALL TIMES. 16. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ALL SIGNAGE, BARRICADES, TEMPORARY THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ALL SIGNAGE, BARRICADES, TEMPORARY LIGHTING, ETC. AS REQUIRED TO KEEP THE CAMPUS CONSTRUCTION ZONES SAFE AND FACILITATE TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION OF THIS PROJECT IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. MAINTENANCE OF THE TEMPORARY MEASURES TAKEN INCLUDING TEMPORARY TRAFFIC CONTROL DEVICES WILL BE THE CONTRACTOR'S RESPONSIBILITY. 17. THE STAGING AREA LOCATIONS SHALL BE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE THE STAGING AREA LOCATIONS SHALL BE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). PHOTOGRAPH EXISTING CONDITIONS OF THE AREA TO BE USED AND PROVIDE THOSE DIGITAL PHOTOS AS A RECORD OF EXISTING CONDITIONS TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). THE CONTRACTOR SHALL PROVIDE A DETAILED DRAWING SHOWING THE EXACT LIMITS OF PROPOSED STAGING/ STORAGE FENCE LOCATIONS. STAGING AREAS SHALL INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: EQUIPMENT STORAGE, CONTRACTOR'S TRAILER, TRAILER STORAGE, MATERIAL STORAGE, PORTABLE TOILETS & EMPLOYEE PARKING. 18. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING FENCES IN GOOD CONDITION DURING THE THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING FENCES IN GOOD CONDITION DURING THE CONSTRUCTION PHASE. 19. THE CONTRACTOR IS RESPONSIBLE FOR LOCKING UP AND SECURING ALL MATERIALS, TOOLS, EQUIPMENT, THE CONTRACTOR IS RESPONSIBLE FOR LOCKING UP AND SECURING ALL MATERIALS, TOOLS, EQUIPMENT, ETC. AND MAINTAINING SAID AREA IN A GENERAL NEAT AND SIGHTLY MANNER. TAKE CORRECTIVE ACTION IN MAINTAINING AREA AS REQUESTED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). 20. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ANY AND ALL EROSION CONTROL DEVICES REQUIRED BY THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ANY AND ALL EROSION CONTROL DEVICES REQUIRED BY THE GOVERNING JURISDICTIONS, VAMC OR CONTRACTING OFFICER'S REPRESENTATIVE (COR). 21. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RETURNED TO THEIR ORIGINAL CONDITIONS WITH ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RETURNED TO THEIR ORIGINAL CONDITIONS WITH FULL REMEDIES TO HARD AND SOFT SURFACES DETERIORATED BY USE. REGRADE TO PROVIDE PROPER DRAINAGE & INSTALL GRASS SOD TO LIMITS OF DAMAGE. MAINTAIN AREAS UNTIL SOD IS FULLY ESTABLISHED. 22. ANY EXISTING VEGETATION DAMAGED WITHIN THE LIMITS OF THE STAGING AREA OR DAMAGED DURING THE ANY EXISTING VEGETATION DAMAGED WITHIN THE LIMITS OF THE STAGING AREA OR DAMAGED DURING THE COURSE OF CONSTRUCTION EVENTS SHALL BE REPLACED BY THE CONTRACTOR. 23. ALL TRAVEL THROUGHOUT THE BUILDING BY CONTRACTORS WILL BE LIMITED TO ROUTES APPROVED BY ALL TRAVEL THROUGHOUT THE BUILDING BY CONTRACTORS WILL BE LIMITED TO ROUTES APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). 24. GENERAL CONTRACTOR SHALL PROTECT ANY ADJACENT SPACES FROM DAMAGES, CAUSED BY OR AS A GENERAL CONTRACTOR SHALL PROTECT ANY ADJACENT SPACES FROM DAMAGES, CAUSED BY OR AS A RESULT OF THE WORK IN THIS CONTRACT, INCLUDING WEATHER EVENTS, DUST, DIRT AND CONSTRUCTION DEBRIS. GENERAL CONTRACTOR TO PROVIDE FOR SEPARATE TRASH REMOVAL SERVICE DURING CONSTRUCTION. PROVIDE THOROUGH CLEANING OF ANY SOILED SPACES BEFORE LEAVING PREMISES EACH DAY. 25. GENERAL CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY GENERAL CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY CONSTRUCTION ACTIVITIES WHERE EXCESSIVE NOISE OR PUNGENT SMELLS WILL BE GENERATED, THERE BY CAUSING DISTURBANCES IN ADJACENT SPACES, AT LEAST 72 HOURS PRIOR TO THE OCCURRENCE OF SAID ACTIVITY. CONTRACTING OFFICER'S REPRESENTATIVE (COR) WILL IDENTIFY ACCEPTABLE TIMEFRAME FOR ACTIVITIES TO OCCUR. 26. ALL OPERATIONS GENERATING DUST, SMOKE AND/OR ODORS/FUMES MUST BE COORDINATED PRIOR TO ALL OPERATIONS GENERATING DUST, SMOKE AND/OR ODORS/FUMES MUST BE COORDINATED PRIOR TO COMMENCEMENT OF THE WORK WITH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). MAINTAIN THE CONTINUED OPERATION OF ALL BUILDING FIRE LIFE SAFETY SYSTEMS. 27. ALL FIRE PROOFING AND FIRE STOPS MUST BE MAINTAINED. PATCHING MUST BE COMPLETED TO MAINTAIN ALL FIRE PROOFING AND FIRE STOPS MUST BE MAINTAINED. PATCHING MUST BE COMPLETED TO MAINTAIN INTEGRITY OF THE FIRE PROOFING SYSTEM OR FIRE STOPS. 28. TEMPORARY CONSTRUCTION BARRIERS AND PARTITIONS SHALL BE INSTALLED AND MAINTAINED THROUGH TEMPORARY CONSTRUCTION BARRIERS AND PARTITIONS SHALL BE INSTALLED AND MAINTAINED THROUGH OUT CONSTRUCTION UNTIL READY TO TURN IMMEDIATE AREA OVER TO THE COR/GOVERNMENT, UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). MAKE ALL NECESSARY REPAIRS TO BUILDING OR SITE DAMAGE THAT OCCURRED WITH TEMPORARY WALL/BARRIER INSTALLATION. 29. HOISTING OVER BUILDINGS OR SITE STRUCTURES: DO NOT PERFORM ANY HOISTING OVER OCCUPIED HOISTING OVER BUILDINGS OR SITE STRUCTURES: DO NOT PERFORM ANY HOISTING OVER OCCUPIED : DO NOT PERFORM ANY HOISTING OVER OCCUPIED SPACES. PRIOR TO HOISTING, THE CONTRACTOR SHALL PHYSICALLY CONFIRM THAT AREAS OF HOISTING ACTIVITIES OR BUILDINGS HOISTED OVER ARE VACANT. THE CONTRACTOR SHALL ALSO PROVIDE PERSONNEL INSIDE THE BUILDING OR AROUND HOISTING AREA TO PREVENT PEOPLE FROM ENTERING INTO THESE AREAS WHILE HOISTING IS IN PROGRESS. COORDINATE HOISTING TIMES WITH VAMC ADMINISTRATION AND CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO PREVENT DISRUPTION OF HOSPITAL/CAMPUS ACTIVITIES. THE VACANT AREAS SHALL BE THE ENTIRE STRUCTURAL BAYS THAT THE MATERIAL OR EQUIPMENT WILL BE HOISTED OVER. 30. CONTRACTOR DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL PROTECT ALL SURFACES, SYSTEMS, CONTRACTOR DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL PROTECT ALL SURFACES, SYSTEMS, EQUIP, AND COMPONENTS WHICH ARE SCHEDULED OR SHOWN TO REMAIN FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ANY DAMAGE RESULTING FROM LACK OF CARE OR PROTECTION WILL BE REQUIRED TO BE REPLACED W/ NEW MATERIALS TO MATCH EXIST'G. CONTRACTORS SHALL PATCH AND REPAIR ALL EXISTING CONSTRUCTION AND FINISHES TO REMAIN, WHICH MAY HAVE BEEN DAMAGED OR ALTERED BY NEW CONSTRUCTION OR DEMOLITION. USE MATERIALS MATCHING EXISTING ADJACENT MATERIALS AND PROVIDE A UNIFORM TRANSITION BETWEEN EXISTING AND NEW CONSTRUCTION, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR), WHERE MATERIALS OR COLORS CANNOT BE MATCHED, CONTRACTOR WILL BE REQUIRED TO REPLACE THE SURFACE SYSTEM, EQUIP OR COMPONENT COMPLETELY W/ NEW MATERIALS OF MATCHING QUALITY AS SELECTED BY CONTRACTING OFFICER'S REPRESENTATIVE (COR)/ARCHITECT. 31. THE CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS CREATED BY THE CONTRACTORS ON A DAILY THE CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS CREATED BY THE CONTRACTORS ON A DAILY BASIS, FROM THE CONSTRUCTION ZONES, AND LAWFULLY DISPOSE OF FROM THE SITE/CAMPUS OR TO A COLLECTION CONTAINER SCHEDULED FOR REGULAR REMOVAL FROM SITE AND STORED WITHIN THE APPROVED STAGING AREA. REFER TO CONSTRUCTION WASTE MANAGEMENT SPECIFICATION REQUIREMENTS. 32. NO EXPOSED CONDUIT OR WIRE MOLD WILL BE ALLOWED, IN FINISHED SPACES UNLESS SPECIFICALLY NO EXPOSED CONDUIT OR WIRE MOLD WILL BE ALLOWED, IN FINISHED SPACES UNLESS SPECIFICALLY DETAILED ON THIS SET OF DRAWINGS OR AS APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)/ARCHITECT (SEE NOTE 33). WHERE DEMOLITION OF EXISTING CONSTRUCTION IS NECESSARY FOR THE CONCEALED ROUTING OF NEW CONDUIT/WIRING, ANY AND ALL SUCH DEMOLITION SHALL BE REPAIRED TO PRE-DEMOLITION CONDITION WITH LIKE MATERIALS AND FINISHES, FLUSH WITH ADJACENT EXISTING SURFACES AND MATCHING IN APPEARANCE FROM A MINIMUM VIEWING DISTANCE OF 5 FEET. AS REQUIRED BY CODE, PROVIDE ACCESS PANELS (SIZE APPROPRIATE FOR CONDITION) FOR CONCEALED J-BOXES, EMERGENCY BATTERY PACKS, ETC. 33. WHERE EXPOSED WIRE MOLD/CONDUITS/BOXES/ETC. ARE ALLOWED BY THE CONTRACTING OFFICER'S WHERE EXPOSED WIRE MOLD/CONDUITS/BOXES/ETC. ARE ALLOWED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)/ARCHITECT AT ISOLATED CONDITIONS, THE CONTRACTOR SHALL REVIEW ROUTING WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR)/ARCHITECT AND COORDINATE MATCHING COLORS TO ADJACENT FINISHES FOR WIRE MOLD AND PAINT CONDUITS/BOXES/ETC. EXPOSED TO VIEW. PAINT COLORS SHALL COORDINATE WITH MATCHING ADJACENT BUILDING FINISHES AS SELECTED BY THE ARCHITECT/CONTRACTING OFFICER'S REPRESENTATIVE (COR). 34. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ALL INTERIOR AND EXTERIOR GLASS SURFACES THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ALL INTERIOR AND EXTERIOR GLASS SURFACES AND FLOOR SURFACES PRIOR TO OCCUPANCY OF THE SPACE BY THE VA. ALL TRASH, CONSTRUCTION DEBRIS, TOOLS, ETC. SHALL BE REMOVED BY THE CONTRACTOR PRIOR TO OCCUPANCY. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR CLEANING UP ALL PUBLIC AREAS. GENERAL NOTES: CONSTRUCTION DOCUMENTS 35. INFORMATION CONTAINED IN THESE DRAWINGS ARE BASED ON EXISTING DOCUMENTS AND LISTED FIELD INFORMATION CONTAINED IN THESE DRAWINGS ARE BASED ON EXISTING DOCUMENTS AND LISTED FIELD MEASUREMENTS. THE INFORMATION CONTAINED MAY REQUIRE ADJUSTMENTS OR MODIFICATIONS TO CONFORM WITH EXISTING CONDITIONS. IN CASES WHERE CHANGES IN DETAILING ARE NECESSARY, THESE DRAWINGS SHALL BE USED FOR THE DESIGN INTENT AND FINAL CONSTRUCTION RESULT TO OBTAIN. CLARIFY WITH DESIGN TEAM ALL EXCEPTIONS FOUND BETWEEN THE FIELD CONDITIONS AND DRAWINGS. NOTE ALL CHANGES TO THE DRAWINGS IN RED ON FIELD SET/AS BUILT SET OF CONSTRUCTION DOCUMENTS. 36. ALL EXISTING UTILITIES INDICATED ON THE DRAWINGS ARE ACCORDING TO THE BEST INFORMATION ALL EXISTING UTILITIES INDICATED ON THE DRAWINGS ARE ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE DESIGN TEAM; HOWEVER, ALL UTILITIES ACTUALLY EXISTING MAY NOT BE SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE VA FACILITIES STAFF FOR EXACT FIELD LOCATION OF EACH UTILITY PRIOR TO ANY CONSTRUCTION. ALL UTILITIES, SHOWN & UNSHOWN, DAMAGED THROUGH THE NEGLIGENCE OF THE CONTRACTOR, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE. IF THE CONTRACTOR ENCOUNTERS ANY UTILITIES NOT SHOWN OR SHOWN OR SHOWN SHOWN AND NOT ENCOUNTERED OR ENCOUNTERED BUT LOCATED IN A DIFFERENT POSITION, MAKE A RECORD OF OR ENCOUNTERED BUT LOCATED IN A DIFFERENT POSITION, MAKE A RECORD OF ENCOUNTERED BUT LOCATED IN A DIFFERENT POSITION, MAKE A RECORD OF THE UTILITY LOCATIONS ON THE AS-BUILT PLANS IN REGARDS TO LOCATION, DEPTH, ETC. AND PROVIDE THIS DOCUMENTATION TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR THE OWNER'S RECORDS. 37. PLANS INDICATE THE GENERAL SIZE, LOCATION, AND ARRANGEMENT OF CONSTRUCTION TO THE SCALE PLANS INDICATE THE GENERAL SIZE, LOCATION, AND ARRANGEMENT OF CONSTRUCTION TO THE SCALE SHOWN. DIMENSIONS ARE PROVIDED FOR ALL LAYOUT AND CONSTRUCTION. IF NOT PROVIDED CONTACT THE ARCHITECT FOR CLARIFICATION. 38. ALL DIMENSIONS ARE TO NEW AND/OR EXISTING FINISH WALL FACE, FINISH FLOOR, FINISHED CEILING OR ALL DIMENSIONS ARE TO NEW AND/OR EXISTING FINISH WALL FACE, FINISH FLOOR, FINISHED CEILING OR FACE OF MASONRY UNLESS OTHERWISE INDICATED. 39. ALL DIMENSIONS OF WALL THICKNESSES ARE FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD. ALL DIMENSIONS OF WALL THICKNESSES ARE FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD. 40. THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE PROJECT. THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND ARCHITECT OF ANY VARIATIONS FROM THE DIMENSIONS AND DETAILS SHOWN ON THESE DRAWINGS. 41. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO FABRICATION AND INSTALLATION OF ALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO FABRICATION AND INSTALLATION OF ALL EQUIPMENT AND COMPONENTS. 42. THE CONTRACTOR REMAINS RESPONSIBLE FOR DETAILS AND ACCURACY, FOR CONFIRMING AND THE CONTRACTOR REMAINS RESPONSIBLE FOR DETAILS AND ACCURACY, FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS, FOR SELECTING THE FABRICATION PROCESS AND FOR TECHNIQUES OF ASSEMBLY. 43. UNDER NO CIRCUMSTANCES SHALL ANY DIMENSION BE SCALED FROM THE DRAWINGS. ANY DIMENSION UNDER NO CIRCUMSTANCES SHALL ANY DIMENSION BE SCALED FROM THE DRAWINGS. ANY DIMENSION NOT GIVEN IN ACTUAL NUMBER DIMENSION SHOULD BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR CLARIFICATION BEFORE PROCEEDING. 44. "TYPICAL" OR "TYP" MEANS TYPICAL FOR ALL SIMILAR CONDITIONS UNLESS OTHERWISE NOTED. "TYPICAL" OR "TYP" MEANS TYPICAL FOR ALL SIMILAR CONDITIONS UNLESS OTHERWISE NOTED. 45. "ALIGN" MEANS SIMILAR COMPONENTS OF CONSTRUCTION SHALL BE IN LINE ACROSS VOIDS AND "ALIGN" MEANS SIMILAR COMPONENTS OF CONSTRUCTION SHALL BE IN LINE ACROSS VOIDS AND PARALLEL/PERPENDICULAR TO BUILDING AND SITE FEATURES. IF UNCLEAR OF REQUIRED LAYOUT, COORDINATE WITH ARCHITECT FOR DESIGN INTENT. 46. "PROVIDE" MEANS SUPPLY AND INSTALL. "PROVIDE" MEANS SUPPLY AND INSTALL. 47. NEW CONSTRUCTION ITEMS TO "MATCH EXISTING" REFERS TO LIKE ITEMS CURRENTLY INSTALLED IN NEW CONSTRUCTION ITEMS TO "MATCH EXISTING" REFERS TO LIKE ITEMS CURRENTLY INSTALLED IN EXISTING CONSTRUCTION/FINISHES. 48. THE CONTRACTOR SHALL FURNISH ALL ITEMS SHOWN ON THE DRAWINGS UNLESS SPECIFICALLY NOTED THE CONTRACTOR SHALL FURNISH ALL ITEMS SHOWN ON THE DRAWINGS UNLESS SPECIFICALLY NOTED OTHERWISE, EITHER ON THE DRAWINGS OR IN THE SPECIFICATIONS. 49. ALL WORK SHOWN "BY OTHERS" OR "NIC" OR "N.I.C." IS TO BE PERFORMED BY A CONTRACTOR UNDER ALL WORK SHOWN "BY OTHERS" OR "NIC" OR "N.I.C." IS TO BE PERFORMED BY A CONTRACTOR UNDER CONTRACT TO THE VAMC OTHER THAN THIS PROJECT'S GENERAL CONTRACTOR OR HIS SUBCONTRACTORS AND IS NOT PART OF THE CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER VAMC CONTRACTORS AS REQUIRED TO FACILITATE THIS CONTRACT WHILE ALLOWING FOR CONCESSIONS AS NEEDED TO FACILITATE OTHER CONTRACTORS' WORK. 50. THE CONTRACTOR SHALL COORDINATE THE WORK WITH THE INSTALLATION OF ALL EQUIPMENT INCLUDED THE CONTRACTOR SHALL COORDINATE THE WORK WITH THE INSTALLATION OF ALL EQUIPMENT INCLUDED IN THIS CONTRACT, AS SHOWN ON THE PLANS OR DESCRIBED IN THE PROJECT MANUAL/SPECIFICATIONS. CONTRACTOR SHALL PROVIDE ALL REQUIREMENTS FOR A COMPLETE FULLY OPERATIONAL SYSTEM WITH THE NEW SCOPE OF WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. 51. NO SUBSTITUTIONS ALLOWED OF FINISHES OR PAINT COLORS WITHOUT PRIOR WRITTEN APPROVAL BY THE NO SUBSTITUTIONS ALLOWED OF FINISHES OR PAINT COLORS WITHOUT PRIOR WRITTEN APPROVAL BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)/ARCHITECT.

AutoCAD SHX Text

GENERAL PROJECT NOTES

AutoCAD SHX Text

DETAIL INDICATOR

AutoCAD SHX Text

DETAIL INDICATOR

AutoCAD SHX Text

NEW DOOR OPENING/BORROWED LIGHT IDENTIFIER

AutoCAD SHX Text

ELEVATION INDICATOR, EXTERIOR

AutoCAD SHX Text

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

AutoCAD SHX Text

ROOM NAME AND NUMBER

AutoCAD SHX Text

KEYNOTE

AutoCAD SHX Text

WALL OR PARTITION TYPE

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text X1

AutoCAD SHX Text

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

AutoCAD SHX Text

FEC

AutoCAD SHX Text

EXXXX

AutoCAD SHX Text

BUILDING SECTION INDICATOR

AutoCAD SHX Text

XX

AutoCAD SHX Text

ASXXX

AutoCAD SHX Text

DIMENSION

AutoCAD SHX Text

NO.

AutoCAD SHX Text

NAME

AutoCAD SHX Text

EXISTING DOOR OPENING/BORROWED LIGHT IDENTIFIER

AutoCAD SHX Text

EXXX

AutoCAD SHX Text

KEYNOTE APPLIES TO ENTIRE AREA

AutoCAD SHX Text

XXX

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

NO.

AutoCAD SHX Text

NAME

AutoCAD SHX Text

XXX

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

KEYNOTE APPLIES TO ENTIRE ROOM

AutoCAD SHX Text

EXISTING DOOR TO REMAIN

AutoCAD SHX Text

EXISTING DOOR TO BE REMOVED

AutoCAD SHX Text

NEW DOOR - RE: DOOR SCHEDULE

AutoCAD SHX Text

DEMOLITION LINE

AutoCAD SHX Text

ELEVATION INDICATOR

AutoCAD SHX Text

CENTER LINE INDICATOR

AutoCAD SHX Text

EXISTING TO REMAIN LINE UNLESS NOTED OTHERWISE

AutoCAD SHX Text

FEATURES ABOVE LINE INDICATOR

AutoCAD SHX Text

HIDDEN FEATURES LINE

AutoCAD SHX Text

NEW CONSTRUCTION LINE

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

BREAK, ROUND

AutoCAD SHX Text

BREAK, STRAIGHT

AutoCAD SHX Text

DETAIL INDICATOR FOR SMALL CONDITIONS

AutoCAD SHX Text

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

AutoCAD SHX Text

CENTER LINE

AutoCAD SHX Text A2

AutoCAD SHX Text A-202

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A-512

AutoCAD SHX Text D2

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

COLUMN GRID

AutoCAD SHX Text

CORNER GUARD (CG) OR ENDGUARD (EG)

AutoCAD SHX Text

NORTH ARROW

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

MATERIALS LEGEND

AutoCAD SHX Text

EXISTING CONSTRUCTION TO REMAIN UNLESS NOTED OTHERWISE

AutoCAD SHX Text

EXISTING CONSTRUCTION TO BE REMOVED

AutoCAD SHX Text

NEW CONSTRUCTION WALLS

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

EARTH

AutoCAD SHX Text

BASE COURSE

AutoCAD SHX Text

RIGID INSULATION

AutoCAD SHX Text

BATT INSULATION

AutoCAD SHX Text

LINE TYPES

AutoCAD SHX Text

1. THE CONTRACTOR SHALL BE SOLELY THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR, AND HAVE CONTROL OVER, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT, UNLESS THE CONTRACT DOCUMENTS GIVE OTHER SPECIFIC INSTRUCTIONS CONCERNING THESE MATTERS. ENGINEERING SERVICES REQUIRED TO PERFORM THE WORK INVOLVING THE CONTRACTORS CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. SPECIFIC ENGINEERING SERVICES ARE REQUIRED FOR PORTIONS OF THE WORK, WHICH THE CONTRACTOR IS RESPONSIBLE FOR UNDER MEANS, METHODS, TECHNIQUES, SERVICE AND PROCEDURES. 2. ENGINEERING SERVICES REQUIRED FOR ENGINEERING SERVICES REQUIRED FOR PROJECT SHORING CONDITIONS IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 3. WHERE OTHER SPECIFIC ENGINEERING WHERE OTHER SPECIFIC ENGINEERING SERVICES, AND MATERIAL/INSTALLATIONS ARE INDICATED BY DRAWINGS AND SPECIFICATIONS, TO BE REQUIRED FOR THE PROJECT AND PROVIDED BY THE GENERAL CONTRACTOR AS A REQUIREMENT OF MEANS AND METHODS OF CONSTRUCTION, PROVIDE SIGNED AND SEALED ENGINEERED DOCUMENTS AND SHOP DRAWINGS FOR THE CONDITIONS. 4. ENGINEERING SERVICES REQUIRED FOR ENGINEERING SERVICES REQUIRED FOR HOISTING ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

AutoCAD SHX Text

MEANS AND METHODS OF CONSTRUCTION

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

³

G002

ARCHITECTURAL

ABBREVIATIONS

AS NOTED

Revisions

Drawing Name: K:\Projects\01804 VAMC ED Project Phase II\Central Office Files\00 Drawings\Sheets\Phase II\G002 07152019.dwg Jul 25,2019 - 3:07pm

Date

Drawing Title:

Scale:

Approved:

Sheet of

Building Number:

Location:

Project Title:

Checked By:

DRAWING NO.

Project No.

Drawn By:

Date:

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

589-396

CONSULTANTS:ARCHITECT:

8/10/2018

EMERGENCY ROOM EXPANSION, PHASE IIB

KANSAS CITY VA MEDICAL CENTER

4801 Linwood Blvd

Kansas City , MO 64128

Kansas City VA Medical Center

4801 Linwood Blvd, Kansas City, MO 64128

S

T

A

M

I

S

S

O

U

R

I

WM. KEVIN

R

E

G

I

S

T

E

R

E

D A

R

C

H

I

T

E

C

TA-3600

COWAN

95% DESIGN REVIEW 05/31/2018

STRUCTURAL ENGINEER

BOB D. CAMPBELL AND COMPANY

4338 BELLEVIEW AVENUE

KANSAS CITY, MO 64111

(816) 531-4144

INDUSTRIAL HYGIENIST

TITAN ENVIRONMENTAL SERVICES

2418 MERRIAM LANE

KANSAS CITY, KS. 66106

(913) 432-5500

MEP & FP ENGINEER

LANKFORD | FENDER & ASSOCIATES

1730 WALNUT

KANSAS CITY, MO. 64108

(816) 221-1429

Lankford Fendler a s s o c i a t e s

100% CONSTRUCTION DOCS REVIEW SUBMITTAL 8/10/2018

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION DOCS REVISIONS TO BUDGET 7/18/2019

GH

BC

AutoCAD SHX Text A LABEL CLASS A DOOR CLASS A DOOR A/C AIR CONDITION AIR CONDITION A/C UNIT AIR CONDITIONING UNIT AIR CONDITIONING UNIT A/E ARCHITECT/ENGINEER ARCHITECT/ENGINEER AAMA AMERICAN ARCHITECTURAL AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION AB ANCHOR BOLT ANCHOR BOLT ABC AGGREGATE BASE COURSE AGGREGATE BASE COURSE AC ASBESTOS CEMENT OR ASPHALTIC ASBESTOS CEMENT OR ASPHALTIC CONCRETE ACI AMERICAN CONCRETE INSTITUTE AMERICAN CONCRETE INSTITUTE ACS DR ACCESS DOOR ACCESS DOOR ACS FLR ACCESS FLOOR ACCESS FLOOR ACS PNL ACCESS PANEL ACCESS PANEL ACST ACOUSTIC ACOUSTIC ACT ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE AD AREA DRAIN AREA DRAIN ADA AMERICANS WITH DISABILITIES ACT AMERICANS WITH DISABILITIES ACT ADC AUTOMATIC DOOR CLOSER AUTOMATIC DOOR CLOSER ADDL ADDITIONAL ADDITIONAL ADDN ADDITION ADDITION ADH ADHESIVE ADHESIVE ADJ ADJACENT, ADJOINING, OR ADJACENT, ADJOINING, OR ADJUSTABLE ADMIN ADMINISTRATION ADMINISTRATION ADB AUTOMATIC DOOR BOTTOM AUTOMATIC DOOR BOTTOM AFC ABOVE FINISHED COUNTER ABOVE FINISHED COUNTER AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE ABOVE FINISHED GRADE AFS ABOVE FINISHED SLAB ABOVE FINISHED SLAB AGA AMERICAN GAS ASSOCIATION AMERICAN GAS ASSOCIATION AGC ASSOCIATED GENERAL CONTRACTORS ASSOCIATED GENERAL CONTRACTORS AGGR AGGREGATE AGGREGATE AHJ AUTHORITY HAVING JURISDICTION AUTHORITY HAVING JURISDICTION AHR ANCHOR ANCHOR AHU AIR HANDLING UNIT AIR HANDLING UNIT AIA AMERICAN INSTITUTE OF ARCHITECTS AMERICAN INSTITUTE OF ARCHITECTS AISC AMERICAN INSTITUTE OF STEEL AMERICAN INSTITUTE OF STEEL CONSTRUCTION ALT ALTERNATE ALTERNATE ALT NO ALTERNATE NUMBER ALTERNATE NUMBER ALUM ALUMINUM ALUMINUM AMP AMPERE AMPERE AMT AMOUNT AMOUNT ANOD ANODIZE ANODIZE ANSI AMERICAN NATIONAL STANDARDS AMERICAN NATIONAL STANDARDS INSTITUTE ANT ANTENNA ANTENNA APA AMERICAN PLYWOOD ASSOCIATION AMERICAN PLYWOOD ASSOCIATION APPD APPROVED APPROVED APPROX APPROXIMATE APPROXIMATE APT APARTMENT APARTMENT AR AS REQUIRED AS REQUIRED ARCH ARCHITECT ARCHITECT ASB ASBESTOS ASBESTOS ASI ARCHITECT'S SUPPLEMENTAL ARCHITECT'S SUPPLEMENTAL INSTRUCTION ASKLR AUTOMATIC SPRINKLER AUTOMATIC SPRINKLER ASPH ASPHALT ASPHALT ASSN ASSOCIATION ASSOCIATION ASTM AMERICAN SOCIETY FOR TESTING AND AMERICAN SOCIETY FOR TESTING AND MATERIALS ATCH ATTACHMENT ATTACHMENT ATM AUTOMATIC TELLER MACHINE AUTOMATIC TELLER MACHINE ATS AUTOMATIC TRANSFER SWITCH AUTOMATIC TRANSFER SWITCH AUTO AUTOMATIC AUTOMATIC AUX AUXILIARY AUXILIARY AV AUDIO VISUAL AUDIO VISUAL AVE AVENUE AVENUE AVG AVERAGE AVERAGE AW ACID WASTE ACID WASTE AWI ARCHITECTURAL WOODWORKING ARCHITECTURAL WOODWORKING INSTITUTE AWPA AMERICAN WOOD PRESERVERS' AMERICAN WOOD PRESERVERS' ASSOCIATION AWS AMERICAN WELDING SOCIETY AMERICAN WELDING SOCIETY AWT ACOUSTICAL WALL TREATMENT ACOUSTICAL WALL TREATMENT B LABEL CLASS B DOOR CLASS B DOOR B PL BASE PLATE BASE PLATE BALC BALCONY BALCONY BAT BATTEN BATTEN BB BULLETIN BOARD BULLETIN BOARD BD BOARD BOARD BD FT BOARD FEET (FOOT) BOARD FEET (FOOT) BEV BEVEL BEVEL BHMA BUILDER'S HARDWARE BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION BI FLD DR BIFOLDING DOORS BIFOLDING DOORS BITUM BITUMINOUS BITUMINOUS BKG BACKING BACKING BLD BUILD BUILD BLDG BUILDING BUILDING BLKT BLANKET BLANKET BLVD BOULEVARD BOULEVARD BM BEAM OR BENCHMARK BEAM OR BENCHMARK BOT BOTTOM BOTTOM BR BEDROOM BEDROOM BRCG BRACING BRACING BRDG BRIDGING BRIDGING BRDG JST BRIDGING JOIST BRIDGING JOIST BRG BEARING BEARING BRG PL BEARING PLATE BEARING PLATE BRKT BRACKET BRACKET BRZ BRONZE BRONZE BSMT BASEMENT BASEMENT BTWN BETWEEN BETWEEN BU BUSHEL BUSHEL BUR BUILT-UP ROOFING BUILT-UP ROOFING C CELSIUS CHANNEL CELSIUS CHANNEL C CHANNEL CELSIUS CHANNEL CELSIUS C CONC CAST CONCRETE CAST CONCRETE C LABEL CLASS C DOOR CLASS C DOOR C TO C CENTER TO CENTER CENTER TO CENTER CAB CABINET CABINET CAC CEILING ATTENUATION CLASSCEILING ATTENUATION CLASS

AutoCAD SHX Text CB CATCH BASIN OR CORNER BEAD CATCH BASIN OR CORNER BEAD CBB CEMENTITIOUS (BACKER) BOARD CEMENTITIOUS (BACKER) BOARD CC CUBIC CENTIMETER CUBIC CENTIMETER CCTV CLOSED CIRCUIT TELEVISION CLOSED CIRCUIT TELEVISION CCW COUNTERCLOCKWISE COUNTERCLOCKWISE CD CONSTRUCTION DOCUMENTS OR CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS CEM CEMENT CEMENT CEM PLAS CEMENT PLASTER CEMENT PLASTER CER CERAMIC CERAMIC CF CONTRACTOR FURNISHED CONTRACTOR FURNISHED CF/CI CONTRACTOR FURNISHED/CONTRACTOR CONTRACTOR FURNISHED/CONTRACTOR INSTALLED CF/OI CONTRACTOR FURNISHED/OWNER CONTRACTOR FURNISHED/OWNER INSTALLED CFLG COUNTERFLASHING COUNTERFLASHING CFM CUBIC FEET PER MINUTE CUBIC FEET PER MINUTE CFMF COLD-FORMED METAL FRAMING COLD-FORMED METAL FRAMING CFS CUBIC FEET PER SECOND CUBIC FEET PER SECOND CG CENTER OF GRAVITY OR CORNER CENTER OF GRAVITY OR CORNER GUARD CGSFU CERAMIC GLAZED STRUCTURAL FACING CERAMIC GLAZED STRUCTURAL FACING UNITS CH BD CHALKBOARD CHALKBOARD CHEM CHEMICAL CHEMICAL CHFR CHAMFER CHAMFER CHK CHECK CHECK CI CAST IRON CAST IRON CIP CAST-IN-PLACE CAST-IN-PLACE CIR CIRCLE CIRCLE CIRC CIRCULAR CIRCULAR CJ CONSTRUCTION JOINT OR CONTROL CONSTRUCTION JOINT OR CONTROL JOINT CL CENTER LINE CENTER LINE CLDG CLADDING CLADDING CLG CEILING CEILING CLG HT CEILING HEIGHT CEILING HEIGHT CLR CLEAR CLEAR cm² SQUARE CENTIMETER SQUARE CENTIMETER cm³ CUBIC CENTIMETER CUBIC CENTIMETER CM CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CNR CORNER CORNER CNTR COUNTER COUNTER CO CARBON MONOXIDE, CERTIFICATE OF CARBON MONOXIDE, CERTIFICATE OF OCCUPANCY, CLEANOUT, OR COMPANY CO CARBON DIOXIDE CARBON DIOXIDE COL COLUMN COLUMN COM COMMON COMMON COMB COMBINATION, COMBINED COMBINATION, COMBINED COMM COMMUNICATION COMMUNICATION COMP COMPONENT COMPONENT CONC CONCRETE CONCRETE CONC FLR CONCRETE FLOOR CONCRETE FLOOR COND CONDENSER OR CONDITION CONDENSER OR CONDITION CONF CONFERENCE CONFERENCE CONN CONNECT CONNECT CONST CONSTRUCTION CONSTRUCTION CONT CONTINUE CONTINUE CONTR CONTRACTOR CONTRACTOR COORD COORDINATE COORDINATE COR CONTRACTING OFFICER'S CONTRACTING OFFICER'S REPRESENTATIVE CORR CORRIDOR CORRIDOR CPM CRITICAL PATH METHOD CRITICAL PATH METHOD CPRS COMPRESSIBLE COMPRESSIBLE CPT CARPET CARPET CRS COLD ROLLED STEEL COLD ROLLED STEEL CRSI CONCRETE REINFORCING STEEL CONCRETE REINFORCING STEEL INSTITUTE CSB CONCRETE SPLASH BLOCK CONCRETE SPLASH BLOCK CSG CASING CASING CSI CONSTRUCTION SPECIFICATIONS CONSTRUCTION SPECIFICATIONS INSTITUTE CSK COUNTER SUNK COUNTER SUNK CSMT CASEMENT CASEMENT CSWK CASEWORK CASEWORK CT CERAMIC TILE CERAMIC TILE CTB CERAMIC TILE BASE CERAMIC TILE BASE CTF CERAMIC TILE FLOOR CERAMIC TILE FLOOR CTG COATING COATING CTR CENTER CONTOUR CENTER CONTOUR CTRL CONTROL CONTROL CTV CABLE TELEVISION CABLE TELEVISION CU COPPER C COPPER C CU FT CUBIC FEET CUBIC FEET CU IN CUBIC INCH CUBIC INCH CU YD CUBIC YARD CUBIC YARD CURT CURTAIN CURTAIN CYL CYLINDER CYLINDER CYL L CYLINDER LOCK CYLINDER LOCK D DEPTH OR PENNY (NAIL) DEPTH OR PENNY (NAIL) D LABEL CLASS D DOOR CLASS D DOOR DAT DATUM DATUM DB DECIBEL DECIBEL DBL DOUBLE DOUBLE DBL GLZ DOUBLE GLAZE DOUBLE GLAZE DC DIRECT CURRENT DIRECT CURRENT DEG DEGREE DEGREE DEL DELETE DELETE DEMO DEMOLITION DEMOLITION DEPT DEPARTMENT DEPARTMENT DET DETAIL DETAIL DF DRINKING FOUNTAIN DRINKING FOUNTAIN DIA DIAMETER DIAMETER DIAG DIAGONAL DIAGRAM DIAGONAL DIAGRAM DIAG DIAGRAM DIAGONAL DIAGRAM DIAGONAL DIFF DIFFERENCE OR DIFFUSER DIFFERENCE OR DIFFUSER DIM DIMENSION DIMENSION DIR DIRECTION DIRECTION DISP DISPENSER DISPENSER DIST DISTANCE DISTANCE DIV DIVIDE OR DIVISION DIVIDE OR DIVISION DL DEAD LOAD DEAD LOAD DOC DOCUMENT DOCUMENT DOUG FIR DOUGLAS FIR DOUGLAS FIR DOZ DOZEN DOZEN

AutoCAD SHX Text DR DOOR, DRAIN, DRESSING ROOM, OR DOOR, DRAIN, DRESSING ROOM, OR DRIVE DR CL DOOR CLOSER DOOR CLOSER DR FR DOOR FRAME DOOR FRAME DR OPNG DOOR OPENING DOOR OPENING DS DOWNSPOUT DOWNSPOUT DSGN DESIGN DESIGN DW DISHWASHER DISHWASHER DRWG DRAWING DRAWING DWTR DUMBWAITER DUMBWAITER E EAST EAST E LABEL CLASS E DOOR CLASS E DOOR EA EACH EACH EFF EFFICIENCY EFFICIENCY EG END GUARD END GUARD EFS EXTERIOR FINISH SYSTEM EXTERIOR FINISH SYSTEM EIFS EXTERIOR INSULATION AND FINISH EXTERIOR INSULATION AND FINISH SYSTEM EJ EXPANSION JOINT EXPANSION JOINT EL ELEVATION ELEVATION ELAST ELASTOMERIC ELASTOMERIC ELECT ELECTRIC ELECTRIC ELEC DR OP ELECTRIC DOOR OPENER ELECTRIC DOOR OPENER ELEV ELEVATOR ELEVATOR EMER EMERGENCY EMERGENCY EMER SHR EMERGENCY SHOWER EMERGENCY SHOWER ENCL ENCLOSURE ENCLOSURE ENGR ENGINEER ENGINEER ENVIR ENVIRONMENT ENVIRONMENT EPA ENVIRONMENTAL PROTECTION AGENCY ENVIRONMENTAL PROTECTION AGENCY EPDM ETHYLENE PROPYLENE DIENE ETHYLENE PROPYLENE DIENE MONOMER EPO EMERGENCY POWER OFF EMERGENCY POWER OFF EPS EXPANDED POLYSTYRENE BOARD EXPANDED POLYSTYRENE BOARD (INSULATION) EQ EQUAL EQUAL EQL SP EQUALLY SPACED EQUALLY SPACED EQUIP EQUIPMENT EQUIPMENT EQUIV EQUIVALENT EQUIVALENT ERD EXISTING ROOF DRAIN EXISTING ROOF DRAIN ESC ESCAPE OR ESCUTCHEON ESCAPE OR ESCUTCHEON ESCAL ESCALATOR ESCALATOR ESMT EASEMENT EASEMENT ESP ESPECIALLY ESPECIALLY EST ESTIMATE ESTIMATE ETC AND SO FORTH OR ET CETERA AND SO FORTH OR ET CETERA EW EACH WAY EACH WAY EWC ELECTRIC WATER COOLER ELECTRIC WATER COOLER EWS EYE WASH STATION EYE WASH STATION EXH EXHAUST EXHAUST EXIST EXISTING EXISTING EXP EXPANSION OR EXPOSED EXPANSION OR EXPOSED EXP BT EXPANSION BOLT EXPANSION BOLT EXST GR EXISTING GRADE EXISTING GRADE EXT EXTERIOR, EXTERNAL, OR EXTERIOR, EXTERNAL, OR EXTINGUISHER EXT GR EXTERIOR GRADE EXTERIOR GRADE EXTR EXISTING TO REMAIN EXISTING TO REMAIN F FAHRENHEIT OR FEMALE FAHRENHEIT OR FEMALE FA FIRE ALARM FIRE ALARM FAB FABRIC FABRIC FAC FACTOR FACTOR FACIL FACILITY FACILITY FAS FASCIA FASCIA FAS BD FASCIA BOARD FASCIA BOARD FCO FLOOR CLEANOUT FLOOR CLEANOUT FCTY FACTORY FACTORY FD FLOOR DRAIN FLOOR DRAIN FDC FIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION FDTN FOUNDATION FOUNDATION FE FIRE EXTINGUISHER FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER CABINET FF FINISH FACE FINISH FACE FF EL FINISH FLOOR ELEVATION FINISH FLOOR ELEVATION FF&E FURNITURE, FIXTURE, AND EQUIPMENT FURNITURE, FIXTURE, AND EQUIPMENT FH FLAT HEAD OR FLAT HEAD SCREWS FLAT HEAD OR FLAT HEAD SCREWS FHC FIRE HOSE CABINET FIRE HOSE CABINET FHMS FLAT HEAD MACHINE SCREW FLAT HEAD MACHINE SCREW FHP FULL HEIGHT PARTITION FULL HEIGHT PARTITION FHWS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .