36C25519R0075-006.docx
DOCX document 16 KB Posted
- Attached to
- Poplar Bluff JOC Federal contract opportunity
- Solicitation number
- 36C25519R0075
About this file
36C25519R0075 36C25519R0075_2.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25519R0075-007.docx | DOCX document | |
| 36C25519R0075-008.pdf | ||
| 36C25519R0075-008.pdf | ||
| 36C25519R0075-007.docx | DOCX document | |
| 36C25519R0075-006.docx | DOCX document | |
| 36C25519R0075-003.docx | DOCX document | |
| 36C25519R0075-002.docx | DOCX document | |
| 36C25519R0075-005.pdf | ||
| 36C25519R0075-001.docx | DOCX document | |
| 36C25519R0075-004.docx | DOCX document | |
| 36C25519R0075-004.docx | DOCX document | |
| 36C25519R0075-001.docx | DOCX document | |
| 36C25519R0075-002.docx | DOCX document | |
| 36C25519R0075-003.docx | DOCX document | |
| 36C25519R0075-005.pdf | ||
| 36C25519R0075-000.docx | DOCX document | |
| 36C25519R0075-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Amendment to a Previous Combined Solicitation
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 Z Poplar Bluff JOC 66048 36C25519R0075 07-25-2019 N 236220 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048
AMENDMENT TO SOLICITATION FOR THE JOC IDIQ CONTRACT 36C25519R0075
Page 14 to read as follows.
a. VOLUME I - TECHNICAL PROPOSAL (NON-PRICE FACTORS) The Technical Proposal will be submitted as a separately bound volume and will be evaluated separately from the Price Proposal. The technical (non-priced) evaluation factors, listed below in descending order of importance, will be used to determine the acceptability standards for non-price factors. The sub-factors within each evaluation factor are equal in importance.
| Rating |
| Evaluation Criteria |
| Outstanding |
| Proposal meets solicitation requirements, demonstrates an excellent understanding of the requirements and has salient features that offer significant advantage to the Government. Excellent in all respects. Advantages/strengths not offset by disadvantages/weaknesses. Very good probability of success with overall very low degree of risk in meeting Government requirements. |
| Good |
| Proposal meets most solicitation requirements and demonstrates an adequate understanding of the requirements but does not offer significant advantages to the Government over basic RFP requirements. Disadvantages/weaknesses are not significant, unless significant advantages are proposed that outweigh significant disadvantages. Where there were areas of concern, clarifications, given by contractor, were acceptable. Good probability of success with overall low degree of risk in meeting the Government requirements. |
Acceptable
Proposal meets some but not all the RFP requirements, but offers other advantages (strengths). Outweigh their disadvantages (weaknesses). Examples may include little or no experience cited; mimics RFP language rather than expressing offeror’s approach or understanding of the RFP. Probability of success considered less than full confidence (moderate risk).
Marginal
Proposal meets some but not all the RFP requirements. Examples: Proposal does not address all required RFP criteria; weak proposal, little or no experience to the extent that Overall quality cannot be determined because of errors, omissions or deficiencies that may be capable of being corrected without a major rewrite or revision of proposal. Probability of success is questionable without further explanation by offeror. (Unacceptable risk) Unawardable without discussion and proposal revision.
Unacceptable
Proposal demonstrates little to no understanding of the requirements; or approach fails to adequately meet acceptable performance expectations. Proposal contains major errors; omissions or deficiencies and these conditions cannot be corrected without a major rewrite or resubmission. There is an unacceptably high degree of risk in meeting the Government's requirements. Unawardable as proposed
The Government will rate an offeror's Technical proposal, at the factor level, by use of descriptive adjectives that combines technical merit and proposal risk that most accurately defines the offeror's performance risk considering all sub-factors identified in this section.
Page 23 to Read as follows for this amendment.
Offerors should follow-up and encourage references to get the past performance questionnaires to the Contracting Officer in a timely manner. Do not include copies of the letters or questionnaires in the proposal.
Past Performance Evaluation Ratings
| Rating |
| Description |
Very Low Risk Performance met contract requirements and exceeded many to the Government's benefit. Problems, if any, were negligible and were resolved in a timely and highly effective manner. Performance was generally current and very relevant to relevant. Excellent probability of success with overall very low degree of risk in meeting Government's requirements.
Low Risk Performance met contract requirements. Good quality. Minor problems may have been identified however; contractor took satisfactory corrective action to resolve where appropriate. Performance was current and generally very relevant to relevant. Good probability of success with overall low degree of risk in meeting the government's requirements.
Average Risk Performance met most contract requirements. Adequate quality. Problems may have been identified however; contractor usually took adequate corrective action. Performance was current and generally very relevant to semi-relevant. OR Although performance exceeds expectations and was rated excellent to very good the projects submitted were generally semi-relevant to the efforts required by this solicitation. Fair probability of success with an average degree of risk in meeting the government's requirements.
Above Average Risk Performance met some contract requirements. Fair quality. Problems may have been identified however; contractor sometimes took corrective action, but not always to the owner’s satisfaction. Performance was current and generally very relevant to semi-relevant. Fair probability of success with an overall above average risk in meeting the government’s requirements.
| High Risk |
| Performance did not meet some contractual requirements. There were problems, some of a somewhat serious to serious nature. Contractor's corrective action was sometimes marginally effective to ineffective. Performance was current and very relevant to semi-relevant. Probability of success is questionable with an unacceptably high degree of risk in meeting the government’s requirements. |
| Neutral |
| No current and/or relevant performance record is identifiable upon which to base a meaningful performance risk prediction. Government personnel were unable to identify any relevant Past Performance information for the offeror or key team members/subcontractors or their key personnel. This is neither a negative or positive assessment. Unknown |
Special Note: Offerors that May Lack Past Performance Information: In accordance with FAR Part 15.305(a)(2), An offeror with no Past Performance may receive a rating based on the evaluation of its predecessor companies, key personnel, and/or subcontractors. If such information is not applicable (i.e., the offeror does not have a predecessor company, key personnel or subcontractors with relevant experience), the offeror shall be evaluated as "Neutral”. However, the proposal of an offeror with no relevant Past Performance history, while rated “Neutral” in Past Performance, may not represent the most advantageous proposal to the Government and thus, may be an unsuccessful proposal when compared to the proposal of other offerors.
File details come from the government source that posted it.